This is a Statement of Work (SOW) for a construction project to upgrade the sanitary riser system at the James A. Haley VA Hospital in Tampa, Florida. The project (No. 673-21-154) involves replacing the existing sanitary sewer main and vertical riser in Building One, which dates back to the 1970s and is reaching the end of its useful life. The scope includes replacing an 8-inch sewer trunk line, upgrading plumbing fixtures, and making associated architectural and electrical modifications across seven floors, with work to be completed within 365 days after notice to proceed.

The federal contract opportunity is a pre-solicitation notice set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220. The project is valued between $1-2 million, with the Request for Proposal (RFP) expected to be published at the end of June 2025. Interested SDVOSB contractors must be registered in SAM.gov and will be verified through the Small Business Administration's Dynamic Small Business Search. The contracting team includes Stacy Figlinski as the Contracting Officer and David Hernandez as the Contracting Specialist, with the project located at 13000 Bruce B. Downs Blvd, Tampa, FL 33612.

View the file

Other files

File Type Posted
7 Drawings.pdf PDF
7b Vol2 Specifications.pdf PDF
36C24825R0116.docx DOCX document
7a Vol1 Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Construction Services: Upgrade Building One Sanitary Riser

PROJECT # 673-21-154

Completion by 365 days after notice to proceed

The James A. Haley VA Hospital in Tampa, Florida has initiated a project to replace and upgrade the existing Sanitary Riser #5 in Building #1. This project comes as a result of the current sanitary system, which dates back to the 1970s, reaching the end of its useful life and beginning to fail. The hospital administration has recognized the urgency of this matter and is taking proactive measures to mitigate any potential risks associated with the outdated system.

This renovation project is the first of a series of projects aimed at replacing and upgrading all the sanitary systems in the hospital. The hospital administration believes that these renovations will significantly improve the overall health and safety of the patients and staff, while also reducing the maintenance and repair costs associated with the current system. The project is expected to be completed within a reasonable timeline and with minimal disruption to the hospital's operations.

I. Executive Summary Goals and Needs by Disciplines:

Civil A. General Scope:

1. Replace the sewer main from Building 1 Wing A Basement to the existing sewer manhole SM#11 through existing site conditions.

B. Existing Conditions:

1. An existing sewer manhole labeled SM#11 is located south of Building 1 Wing A.

2. An existing 8” gravity main exists in the building, then bends southeast, and terminates at the existing sewer manhole (to be replaced).

3. Many miscellaneous utilities and improvements surround the manhole C. Scope of Demolition:

1. Sawcut and replace all pavement and concrete that needs to be removed or is damaged during the pipe replacement.

D. Scope of Work:

1. Sewer main removal and replacement with reconnection to a new manhole.

2. Protect other infrastructure within the vicinity of the work.

3. Repair asphalt, concrete, and other disturbed site features.

E. Codes and Standards:

1. Great Lakes - Upper Mississippi River Board (GLUMRB) 10 States Standards for Utility Design and Construction

2. AASTO Standards

3. FDOT Standard Plans for Road and Bridge Construction

4. FDOT Standard Specifications for Road and Bridge Construction

5. FDOT Design Manual (FDM)

6. FDOT Drainage Manual

7. FDOT Drainage Design Guide

8. FDOT & FDEP Erosion and Sediment Control

Architectural

A. Goals and Needs:

The goal of this project is to provide an upgraded Building One Sanitary Riser #5 at the James A. Haley VAMC, Tampa, Florida. There are not any historical structures that are affected by this project. Coordination with SHPO will not be a concern.

B. Existing Conditions:

The existing roof and floor structure will not be affected by this project per current planning. The existing doors and frames and door access will remain as is. Some finishes, electrical, plumbing fixtures, and fire protection heads may need to be demolished.

C. Scope of Demolition:

This is being developed at this time. See the plumbing narrative.

D. Scope of New Work:

Cut and patch existing materials as necessary for the project.

· Basement: no architectural impact

· Ground Floor: See drawing

· First floor: See drawing

· Second Floor: See drawing

· Third Floor: See drawing

· Fourth Floor: See drawing

· Fifth Floor: See drawing

· Sixth Floor: See drawing

· Seventh Floor: See drawing

E. Owner Furnished or Installed Items:

These will be further defined as the project develops. Currently, none are expected except where bathroom accessories are being replaced.

F. Project Phasing:

The project will be built in multiple phases, to coordinate with work in the Clinic. This will be refined with input from the VA.

G. Codes and Standards:

2020 Florida Building Code; modified from the 2018 IBC 2020 Florida Test Protocols for High-Velocity Hurricane Zones, 7th Edition 2020 Florida Building Code, Accessibility, 7th Edition 2020 Florida Building Code, Energy Conservation, 7th Edition 2020 National Electrical Code 2020 Florida Building Code, Plumbing, 7th Edition; modified from the 2018 International Plumbing Code 2020 Florida Building Code, Mechanical, 7th Edition; modified from the 2018 Uniform Mechanical Code 2020 Florida Building Code, Energy Conservation Code; modified from the 2018 IECC

CODES REFERENCE GUIDE

Area
Primary
Supplement
Occupancy Classification
NFPA 101-

IBC-2018

Building Construction Types - allowable height, allowable building areas, and the requirements for sprinkler protection related to minimum building construction types.

NFPA 101-

2018 & NFPA

220-2018

IBC-2018

Means of Egress
NFPA 101-
Standpipes
IBC-2018
IFC-2018

Interior Finish

NFPA 101-

HVAC Systems
IMC-2018
-

Vertical Openings

NFPA 101-

Sprinkler Systems - minimum construction standard

NFPA 101-

Fire Alarm Systems
NFPA 101-

NFPA 72-

CODES REFERENCE GUIDE

CODES REFERENCE GUIDE

Area
Primary
Supplement

Smoke Alarms and Smoke Detection Systems

NFPA 101-

Portable Fire Extinguishers
IFC-2018
-

Cooking Equipment

NFPA 101-

2018 & NFPA

96-2017

Stationary Pumps for Fire Protection
NFPA 20-2019
-
Occupancy Classification
NFPA 101-

IBC-2018

Building Construction Types - allowable height, allowable building areas, and the requirements for sprinkler protection related to minimum building construction types.

NFPA 101-

2018 & NFPA

220-2018

IBC-2018

Means of Egress
NFPA 101-
Standpipes
IBC-2018
IFC-2018

Interior Finish

NFPA 101-

HVAC Systems
IMC-2018
-

Vertical Openings

NFPA 101-

Sprinkler Systems - minimum construction standard

NFPA 101-

Fire Alarm Systems
NFPA 101-

NFPA 72-

Smoke Alarms and Smoke Detection Systems

NFPA 101-

Portable Fire Extinguishers
IFC-2018
-

Cooking Equipment

NFPA 101-

2018 & NFPA

96-2017

Stationary Pumps for Fire Protection
NFPA 20-2019
-

Plumbing A. General Scope:

1. The plumbing design will provide a design solution to replace the hospital sanitary riser #5.

2. The design will include demolition, new work, and phasing drawings for the sanitary riser replacement.

B. Existing Conditions

1. The vertical portion of sanitary riser #5 is located outside of stair #2. The sanitary piping runs in walls in electrical rooms, the canteen area, bathrooms, and an exam room. To replace the sanitary riser walls and ceilings in these areas will be significantly impacted. This impact includes but is not limited to:

a. Demolition and replacement of drywall

b. Demolition and replacement of tiled bathroom walls

c. Possible replacement of acoustical tiled ceilings in areas

d. For work done in electrical rooms, there may be a need for temporary supports of conduits, and other pieces of electrical equipment.

2. No fire piping or mechanical ductwork relocation is expected to be required, but some sprinkler removal and replacement will be required. As well as temporary support of fire protection devices such as strobes.

3. Areas of possible asbestos containing material have been previously mapped and riser replacement will require work in some of these areas, especially on the second floor.

C. Design Requirements:

1. Provide Plumbing system design for riser #5 of the sanitary sewer, sanitary vent system at VAMC in Tampa, Florida.

2. Provide low water consumption flush valves.

3. Design documents and other deliverables are to be provided as required by the contract. Deliverables, such as construction drawings, construction specifications, and design narrative will be prepared and provided as part of the design effort, whereas other deliverables, such as construction cost estimates, operation and maintenance manuals, and as-built drawings will be provided as part of the construction effort.

4. The scope includes:

a. Replacing vent piping in the same chase as the riser being replaced.

b. Replacement of water closet flush valves in bathrooms where riser replacement is taking place.

c. Replacement sink traps and associated ADA insulation in bathrooms where riser replacement is taking place.

d. Replacement of the horizontal sanitary main from riser #5 to the exterior of the building (all the way to the first manhole).

e. No wall mounted water closets are located on walls that will be impacted by this work, so none are set to be replaced at this time.

5. Proposed Design Solution:

a. The design will involve placement of a new 8” sewer trunk line routed in the same location as the existing 8” sewer. The tie ins for branches and manhole connection will be made during evening outage tie-ins. Connections will be made by placing a basin and pump at the sewer connection locations to pump waste in a bypass downstream to allow for connections to be made.

b. Vertical riser replacement will involve placement of a sanitary riser line in the same location as the existing riser. This replacement and the tie ins for branches will be made during evening outage tie-ins.

D. Applicable Codes and Standards:

1. As a minimum, the plumbing system will be designed to meet the requirements of the following codes and standards:

a. Department of Veterans Affairs Plumbing Design Manual (PG-18-10).

b. Department of Veterans Affairs Medical/Surgical Inpatient Units and Intensive Care Nursing Unit Design Guide (PG-18-13).

c. NFPA 99, Health Care Facilities Handbook.

d. Guideline for Design and Construction of Health Care Facilities.

e. American Institute of Architects Academy of Architecture Health (AIA).

f. American Society of Plumbing Engineers (ASPE).

g. American Water Works Association (AWWA).

h. Department of Veterans Affairs Barrier Free Design Guide (PG-18-13).

i. Architectural Barriers Act Accessibility Standards (ABAAS).

j. American with Disabilities Act (ADA).

k. National Fire Protection Association (NFPA).

l. ICC, International Plumbing Code (IPC).

Upgrade Building One Sanitary Riser, Project No. 673-21-154, TMM2211 James A. Haley VAMC, Tampa, Florida

m. ICC, International Building Code (IBC).

n. Local and State Codes.

E. Plumbing system description:

3. Sanitary sewer drainage and vent system

a. Sanitary waste will maintain the current layout and will be removed from the building via a 8-inch sanitary waste line and will exit five feet outside of the building.

b. Adequate gradients will be maintained to insure a self-cleansing velocity. Cleanouts will be provided per code.

c. The sanitary drainage system will be pitched to maintain flow at a minimum velocity of 2 fps in accordance with the IPC.

1) Piping 2 inches and smaller shall be pitched at 1/4 inch per foot.

2) Piping 3 inches and larger shall be pitched at 1/8 inch per foot.

4. Plumbing fixtures

a. Flush valves provided shall be low flow type compatible with existing fixtures.

b. Fixture traps shall be cast copper alloy with ADA-compliant insulation.

F. Material:

1. Sanitary sewer, and vent piping systems below grade shall be service weight cast iron, hub & spigot with compression gaskets.

2. Sanitary sewer, and vent piping systems above grade shall be service weight cast iron, no-hub with heavy-duty CISPI couplings.

Electrical

A. General Scope:

1. The electrical design will be the removal of the existing vanity light fixtures in the bathrooms that are affected by the plumbing riser replacement.

2. A new LED light fixture will replace the demolished light fixture. The light fixture will reuse the existing circuitry and lighting controls.

3. Sanitary riser #5, to be demolished and replaced, runs within the existing electrical room. Temporary supports of the conduits may be needed for the removal.

New light fixtures will be installed in new ceilings.

B. Existing Conditions:

The existing roof and floor structure will not be affected by this project per current planning. The existing doors and frames and door access will remain as is. Some finishes, electrical, plumbing fixtures, and fire protection heads may need to be demolished.

C. Scope of Demolition:

This is being developed at this time. See the plumbing narrative.

D. Scope of New Work:

Cut and patch existing materials as necessary for the project.

1. Basement: no architectural impact

2. Ground Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

3. First floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

4. Second Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

5. Third Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

6. Fourth Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

7. Fifth Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

8. Sixth Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

9. Seventh Floor:

a. Plumbing work will be happening in electrical rooms.

b. New light fixture in the adjacent bathroom.

E. Owner Furnished or Installed Items:

These will be further defined as the project develops. Currently none are expected.

F. Project Phasing:

The project will be built in multiple phases, to coordinate with work in the Clinic. This will be refined with input from the VA.

G. Codes and Standards:

2020 National Electrical Code

II. Place of Performance James A. Haley Medical Center Building #1 – Main Hospital 13000 Bruce B. Downs Blvd.

Tampa, FL. 33612

III. Hours Of Operation and Scheduling Standard work hours for this site are 7:30 AM to 5:00 PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site’s standard working hours the Contractor must submit a written request for approval to the COR at least seven (7) working days prior to the proposed start of such work.

IV. COMPLIANCE

The contractor shall comply with all the construction documents provisions and all applicable Department of Veterans Affairs Master Specifications, and all project specifications herein.