7. Drawings - Wooded Hill Repaving.pdf

PDF 3 MB Posted

Attached to
Forest Service - GAOA Laguna Campground Renovations
Solicitation number
127EAW26Q0008
Issued by

About this file

This is a project planning and design document for campground renovations at the Cleveland National Forest in San Diego County, California, prepared by the United States Department of Agriculture Forest Service, Pacific Southwest Region.

The project encompasses renovations at two campground locations: Laguna Campground and Wooded Hill Campground. The work includes asphalt overlay and roadway improvements, specifically targeting the Meadow Loop Road at Laguna Campground and approximately 0.7 miles of the Wooded Hill Road. The Wooded Hill Road work begins at milepost 0.00 and ends at the gate at milepost 0.70. The existing paved surface averages 0.5 to 3 inches with variable base depths of 0 to 4 inches. Construction work requires compacting the asphalt base or existing subgrade to 95% maximum density and applying a new asphalt overlay while maintaining existing configuration. The document specifies that this is a public works contract subject to Davis Bacon prevailing wages. Contractors must submit a construction schedule and traffic control plan to the Contracting Officer prior to work commencement, contact utility locating services before excavation, implement erosion prevention and control measures, comply with California water quality management best management practices, and ensure all equipment driven on state or county roads is currently licensed. All project-generated debris and waste material must be removed from forest land and disposed of legally by the contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

SHEET OF

United States Department of Agriculture Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE

G-01 TITLE SHEET

G-02 NOTES

G-03 LAGUNA CAMPGROUND SITE MAP

C-01 CROSS SECTION TYPICAL

DRIVING DIRECTION:

Driving south from Julian on CA-79 S, turn left onto Sunrise Hwy, continue on Sunrise Hwy for 15.8 mi., entrance is on the right.

Driving from Interstate I-8, take exit for Sunrise Hwy, stay on Sunrise Hwy for 8.2 mi., entrance is on the left.

PREPARED BY:

APPROVED:

CIVIL ENGINEER DATE

FOREST ENGINEER DATE

DISTRICT RANGER DATE

R05 PACIFIC SOUTHWEST REGION

CLEVELAND NATIONAL FOREST

SAN DIEGO COUNTY, CALIFORNIA

GAOA LAGUNA CAMPGROUND RENOVATIONS

RECOMMENDED BY:

SUBJECT

AREA

CLEVELAND NATIONAL FOREST

G-04 WOODED HILL SITE MAP

AutoCAD SHX Text

STATE OF CALIFORNIA

AutoCAD SHX Text

INDEX MAP - N.T.S.

AutoCAD SHX Text

MEXICO

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

EUREKA

AutoCAD SHX Text

REDDING

AutoCAD SHX Text

SACRAMENTO

AutoCAD SHX Text

SONORA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

RENO

AutoCAD SHX Text

NEEDLES

AutoCAD SHX Text

BAKERSFIELD

AutoCAD SHX Text

FRESNO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

FRANSICO

AutoCAD SHX Text

LOS

AutoCAD SHX Text

ANGELES

AutoCAD SHX Text

LOS PADRES

AutoCAD SHX Text

NATIONAL FOREST

AutoCAD SHX Text

SITE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Hemet

AutoCAD SHX Text Julian

AutoCAD SHX Text Hot Springs

AutoCAD SHX Text Warner

AutoCAD SHX Text Alpine

AutoCAD SHX Text Corners

AutoCAD SHX Text Cameron

AutoCAD SHX Text Perris

AutoCAD SHX Text Corona

AutoCAD SHX Text Elsinore

AutoCAD SHX Text Temecula

AutoCAD SHX Text Lake

AutoCAD SHX Text Capistrano

AutoCAD SHX Text San Juan

AutoCAD SHX Text Oceanside

AutoCAD SHX Text San Diego

AutoCAD SHX Text Escondido

AutoCAD SHX Text Ramona

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Pala

AutoCAD SHX Text

PROJECT

WORK NOTES:

1. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM

COMMERCIAL SOURCES.

2. THE CONTRACTOR IS RESPONSIBLE FOR WATER.

3. ALL PROJECT GENERATED DEBRIS AND WASTE MATERIAL SHALL BE REMOVED FROM

THE FOREST LAND AND DISPOSED OF LEGALLY BY THE CONTRACTOR.

4. UNLESS SPECIFIED OTHERWISE, STANDARD SPECIFICATIONS FOR ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS APPLY; FP-24 IS AVAILABLE ON-LINE AT

https://flh.fhwa.dot.gov/resources/specs/fp-24/fp24.pdf AND FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (attached in contract document)

5. IF STATE OF CALIFORNIA SPECIFICATIONS OR TYPICAL ARE REFERRED TO,

DOWNLOAD IS AVAILABLE AT

http://www.dot.ca.gov/hq/esc/oe/construction_contract_standards/std_specs /2015_StdSpecs/2015_StdSpecs.pdf

AND

http://www.dot.ca.gov/hq/esc/oe/project_plans/HTM/stdplns-US-customary-units-new15.htm

6. BMPs, FIBER ROLLS SOIL AND SEDIMENT CONTROL INFORMATION:

http://www.dot.ca.gov/hq/construc/stormwater/CSBMP-May-2017-Final.pdf

7. TEMPORARY TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 2009 VERSION, ELECTRONIC COPY IS

AVAILABLE AT

http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/mutcd2009r1r2edition.pdf

8. QUALITY CONTROL AND TESTING AS REQUIRED BY SPECIFICATIONS IS THE

CONTRACTOR RESPONSIBILITY, INSPECTIONS CONDUCTED BY FOREST SERVICE

EMPLOYEES ARE FOR THE GOVERNMENT REFERENCE PURPOSES ONLY.

GENERAL NOTES:

1. THIS IS A PUBLIC WORKS CONTRACT. DAVIS BACON PREVAILING WAGES APPLY.

2. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE TO THE C.O.

PRIOR TO THE START OF WORK

3. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE C.O. FOR

APPROVAL PRIOR TO ANY WORK

4. WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED

INCIDENTAL TO OTHER PAY ITEMS

5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT

A SERVICE TO LOCATE ANY BURIED UTILITIES. USA=1-800-227-2600 , THE

NATIONAL 811 NUMBER, OR THE WEBSITE http:/www.call811.com

6. EROSION PREVENTION AND CONTROL DURING OPERATIONS- SET THE MINIMUM

CONSTRUCTION LIMITS NEEDED FOR THE PROJECT AND CONFINE DISTURBANCE

WITHIN THIS AREA. MONITOR & MAINTAIN EROSION CONTROLS (I.E. SILT FENCES,

STRAW WATTLES, ETC) AS NEEDED THROUGH CONSTRUCTION AND REMOVE

THEM ONCE SOURCES OF EROSION ARE ELIMINATED

7. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF CHAPTERS 10, 11, & 12.2

IN THEIR ENTIRETY OF "WATER QUALITY MANAGEMENT FOR NATIONAL FOREST

SYSTEM LANDS IN CALIFORNIA BEST MANAGEMENT PRACTICES" DATED

SEPTEMBER 2000

http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf

8. EQUIPMENT, FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS SHALL

BE CURRENTLY LICENSED.

NTS

SHEET 2 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

CLEVELAND N.F.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text G-02

AutoCAD SHX Text

GAOA LAGUNA CAMPGROUND

RENOVATIONS

NTS

SHEET 3 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

LAGUNA C.G. SITE PLAN

AutoCAD SHX Text G-03

AutoCAD SHX Text

CLEVELAND N.F.

AutoCAD SHX Text

GAOA LAGUNA CAMPGROUND

NTS

SHEET 4 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

WOODED HILL ROAD SITE PLAN

AutoCAD SHX Text G-03

AutoCAD SHX Text

CLEVELAND N.F.

AutoCAD SHX Text

GAOA LAGUNA CAMPGROUND

WIDTH VARIES THROUGH OUT SITE

EXISTING PAVED SURFACE AVERAGE 0.5"-3"

EXISTING SLOPE VARIABLETYPICAL EXISTING SECTION (N.T.S.)

MAINTAIN EXISTING

CONFIGURATION

EXISTING SLOPE VARIES

CONSTRUCTION LIMITS TYP.

NEW ASPHALT OVERLAY

EXISTING DITCH

CROSS SLOPE VARIES

EXISTING BASE VARIES 0 - 4"

EXISTING SLOPE VARIABLE

COMPACT ASPHALT BASE OR EXISTING

SUBGRADE TO 95% MAX DENSITY

ASPHALT PROFILE (N.T.S.)

NTS

SHEET 5 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

CROSS SECTION TYPICAL

AutoCAD SHX Text C-01

AutoCAD SHX Text

CLEVELAND N.F.

AutoCAD SHX Text

GAOA LAGUNA CAMPGROUND

Sheets and Views
Mt Laguna_Wooded Hill Repaving 2026-Model
Mt Laguna_Wooded Hill Repaving 2026-COVER
Mt Laguna_Wooded Hill Repaving 2026-Sheet 2 Notes
Mt Laguna_Wooded Hill Repaving 2026-Sheet 3 Laguna Campground Site
Mt Laguna_Wooded Hill Repaving 2026-Sheet 4 Wooded Hill Site)
Mt Laguna_Wooded Hill Repaving 2026-Sheet 5 Cross Section

File details come from the government source that posted it. Updated .