7. Drawings - Wooded Hill Repaving.pdf
PDF 3 MB Posted
- Solicitation number
- 127EAW26Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a project planning and design document for campground renovations at the Cleveland National Forest in San Diego County, California, prepared by the United States Department of Agriculture Forest Service, Pacific Southwest Region.
The project encompasses renovations at two campground locations: Laguna Campground and Wooded Hill Campground. The work includes asphalt overlay and roadway improvements, specifically targeting the Meadow Loop Road at Laguna Campground and approximately 0.7 miles of the Wooded Hill Road. The Wooded Hill Road work begins at milepost 0.00 and ends at the gate at milepost 0.70. The existing paved surface averages 0.5 to 3 inches with variable base depths of 0 to 4 inches. Construction work requires compacting the asphalt base or existing subgrade to 95% maximum density and applying a new asphalt overlay while maintaining existing configuration. The document specifies that this is a public works contract subject to Davis Bacon prevailing wages. Contractors must submit a construction schedule and traffic control plan to the Contracting Officer prior to work commencement, contact utility locating services before excavation, implement erosion prevention and control measures, comply with California water quality management best management practices, and ensure all equipment driven on state or county roads is currently licensed. All project-generated debris and waste material must be removed from forest land and disposed of legally by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
SHEET OF
United States Department of Agriculture Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE
G-01 TITLE SHEET
G-02 NOTES
G-03 LAGUNA CAMPGROUND SITE MAP
C-01 CROSS SECTION TYPICAL
DRIVING DIRECTION:
Driving south from Julian on CA-79 S, turn left onto Sunrise Hwy, continue on Sunrise Hwy for 15.8 mi., entrance is on the right.
Driving from Interstate I-8, take exit for Sunrise Hwy, stay on Sunrise Hwy for 8.2 mi., entrance is on the left.
PREPARED BY:
APPROVED:
CIVIL ENGINEER DATE
FOREST ENGINEER DATE
DISTRICT RANGER DATE
R05 PACIFIC SOUTHWEST REGION
CLEVELAND NATIONAL FOREST
SAN DIEGO COUNTY, CALIFORNIA
GAOA LAGUNA CAMPGROUND RENOVATIONS
RECOMMENDED BY:
SUBJECT
AREA
CLEVELAND NATIONAL FOREST
G-04 WOODED HILL SITE MAP
AutoCAD SHX Text
STATE OF CALIFORNIA
AutoCAD SHX Text
INDEX MAP - N.T.S.
AutoCAD SHX Text
MEXICO
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
PACIFIC
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text
EUREKA
AutoCAD SHX Text
REDDING
AutoCAD SHX Text
SACRAMENTO
AutoCAD SHX Text
SONORA
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
RENO
AutoCAD SHX Text
NEEDLES
AutoCAD SHX Text
BAKERSFIELD
AutoCAD SHX Text
FRESNO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
FRANSICO
AutoCAD SHX Text
LOS
AutoCAD SHX Text
ANGELES
AutoCAD SHX Text
LOS PADRES
AutoCAD SHX Text
NATIONAL FOREST
AutoCAD SHX Text
SITE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Hemet
AutoCAD SHX Text Julian
AutoCAD SHX Text Hot Springs
AutoCAD SHX Text Warner
AutoCAD SHX Text Alpine
AutoCAD SHX Text Corners
AutoCAD SHX Text Cameron
AutoCAD SHX Text Perris
AutoCAD SHX Text Corona
AutoCAD SHX Text Elsinore
AutoCAD SHX Text Temecula
AutoCAD SHX Text Lake
AutoCAD SHX Text Capistrano
AutoCAD SHX Text San Juan
AutoCAD SHX Text Oceanside
AutoCAD SHX Text San Diego
AutoCAD SHX Text Escondido
AutoCAD SHX Text Ramona
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Pala
AutoCAD SHX Text
PROJECT
WORK NOTES:
1. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM
COMMERCIAL SOURCES.
2. THE CONTRACTOR IS RESPONSIBLE FOR WATER.
3. ALL PROJECT GENERATED DEBRIS AND WASTE MATERIAL SHALL BE REMOVED FROM
THE FOREST LAND AND DISPOSED OF LEGALLY BY THE CONTRACTOR.
4. UNLESS SPECIFIED OTHERWISE, STANDARD SPECIFICATIONS FOR ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS APPLY; FP-24 IS AVAILABLE ON-LINE AT
https://flh.fhwa.dot.gov/resources/specs/fp-24/fp24.pdf AND FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (attached in contract document)
5. IF STATE OF CALIFORNIA SPECIFICATIONS OR TYPICAL ARE REFERRED TO,
DOWNLOAD IS AVAILABLE AT
http://www.dot.ca.gov/hq/esc/oe/construction_contract_standards/std_specs /2015_StdSpecs/2015_StdSpecs.pdf
AND
http://www.dot.ca.gov/hq/esc/oe/project_plans/HTM/stdplns-US-customary-units-new15.htm
6. BMPs, FIBER ROLLS SOIL AND SEDIMENT CONTROL INFORMATION:
http://www.dot.ca.gov/hq/construc/stormwater/CSBMP-May-2017-Final.pdf
7. TEMPORARY TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 2009 VERSION, ELECTRONIC COPY IS
AVAILABLE AT
http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/mutcd2009r1r2edition.pdf
8. QUALITY CONTROL AND TESTING AS REQUIRED BY SPECIFICATIONS IS THE
CONTRACTOR RESPONSIBILITY, INSPECTIONS CONDUCTED BY FOREST SERVICE
EMPLOYEES ARE FOR THE GOVERNMENT REFERENCE PURPOSES ONLY.
GENERAL NOTES:
1. THIS IS A PUBLIC WORKS CONTRACT. DAVIS BACON PREVAILING WAGES APPLY.
2. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE TO THE C.O.
PRIOR TO THE START OF WORK
3. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE C.O. FOR
APPROVAL PRIOR TO ANY WORK
4. WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED
INCIDENTAL TO OTHER PAY ITEMS
5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT
A SERVICE TO LOCATE ANY BURIED UTILITIES. USA=1-800-227-2600 , THE
NATIONAL 811 NUMBER, OR THE WEBSITE http:/www.call811.com
6. EROSION PREVENTION AND CONTROL DURING OPERATIONS- SET THE MINIMUM
CONSTRUCTION LIMITS NEEDED FOR THE PROJECT AND CONFINE DISTURBANCE
WITHIN THIS AREA. MONITOR & MAINTAIN EROSION CONTROLS (I.E. SILT FENCES,
STRAW WATTLES, ETC) AS NEEDED THROUGH CONSTRUCTION AND REMOVE
THEM ONCE SOURCES OF EROSION ARE ELIMINATED
7. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF CHAPTERS 10, 11, & 12.2
IN THEIR ENTIRETY OF "WATER QUALITY MANAGEMENT FOR NATIONAL FOREST
SYSTEM LANDS IN CALIFORNIA BEST MANAGEMENT PRACTICES" DATED
SEPTEMBER 2000
http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf
8. EQUIPMENT, FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS SHALL
BE CURRENTLY LICENSED.
NTS
SHEET 2 OF 5
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
F.K.
F.K.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
CLEVELAND N.F.
AutoCAD SHX Text
NOTES
AutoCAD SHX Text G-02
AutoCAD SHX Text
GAOA LAGUNA CAMPGROUND
RENOVATIONS
NTS
SHEET 3 OF 5
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
F.K.
F.K.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
LAGUNA C.G. SITE PLAN
AutoCAD SHX Text G-03
AutoCAD SHX Text
CLEVELAND N.F.
AutoCAD SHX Text
GAOA LAGUNA CAMPGROUND
NTS
SHEET 4 OF 5
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
F.K.
F.K.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
WOODED HILL ROAD SITE PLAN
AutoCAD SHX Text G-03
AutoCAD SHX Text
CLEVELAND N.F.
AutoCAD SHX Text
GAOA LAGUNA CAMPGROUND
WIDTH VARIES THROUGH OUT SITE
EXISTING PAVED SURFACE AVERAGE 0.5"-3"
EXISTING SLOPE VARIABLETYPICAL EXISTING SECTION (N.T.S.)
MAINTAIN EXISTING
CONFIGURATION
EXISTING SLOPE VARIES
CONSTRUCTION LIMITS TYP.
NEW ASPHALT OVERLAY
EXISTING DITCH
CROSS SLOPE VARIES
EXISTING BASE VARIES 0 - 4"
EXISTING SLOPE VARIABLE
COMPACT ASPHALT BASE OR EXISTING
SUBGRADE TO 95% MAX DENSITY
ASPHALT PROFILE (N.T.S.)
NTS
SHEET 5 OF 5
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
F.K.
F.K.
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text
CROSS SECTION TYPICAL
AutoCAD SHX Text C-01
AutoCAD SHX Text
CLEVELAND N.F.
AutoCAD SHX Text
GAOA LAGUNA CAMPGROUND
| Sheets and Views |
| Mt Laguna_Wooded Hill Repaving 2026-Model |
| Mt Laguna_Wooded Hill Repaving 2026-COVER |
| Mt Laguna_Wooded Hill Repaving 2026-Sheet 2 Notes |
| Mt Laguna_Wooded Hill Repaving 2026-Sheet 3 Laguna Campground Site |
| Mt Laguna_Wooded Hill Repaving 2026-Sheet 4 Wooded Hill Site) |
| Mt Laguna_Wooded Hill Repaving 2026-Sheet 5 Cross Section |
File details come from the government source that posted it. Updated .