7-CommCulturalCntr-CLAR.NO.1.pdf
PDF 225 KB Posted
- Solicitation number
- Not on record
- Issued by
- Northampton County, Pennsylvania
About this file
This is a Clarification No. One addendum issued by Carroll Engineering for the Freemansburg Municipal Community & Cultural Center Building project in Freemansburg Borough, Northampton County, Pennsylvania. The clarification modifies the Contract Site Plan (Sheet 1 of 3) to specify that the community building shall be a single-story, single-span rigid-frame pre-engineered metal building with plan dimensions of 90' x 125' from out-to-out of steel. The structure includes a steel-framed mezzanine along the south edge not exceeding 3,300 square feet, with eave heights of 20'-0" along the north edge and 26'-8" along the south edge. The secondary framing shall consist of cold-form bypass purlins for the roof and cold-form bypass girts for the walls. Wall insulation is specified as R-30 MBI Safety Liner System or approved equal, while roof insulation shall be R-38 MBI Safety Liner System or approved equal. Roof panels shall be 24-gauge, 24" coverage width standing seam; exposed wall panels shall be 26-gauge with 36" coverage width; and concealed wall panels shall be 24-gauge with 36" coverage width with galvalume finish. The rake and eave shall project 36" from the walls, snow guards shall extend the entire length of the low eave, and the building shall include all gutters, downspouts, rake trim, corner trim, and base trim. The clarification was issued on February 25, 2026, with bids due online via PennBid by 11:00 AM prevailing time on Tuesday, March 24, 2026. A non-mandatory pre-bid meeting is scheduled for 10:00 AM on Tuesday, March 10, 2026, at the Freemansburg Borough Building.
Each bid must be accompanied by either a certified check or Bid Bond in the amount of 5% of the total bid price, drawn to or in favor of Freemansburg Borough. The work constitutes public works by a public body under the Pennsylvania Prevailing Wage Act, requiring that all workers employed on the project be paid prevailing minimum wage rates as promulgated by the Pennsylvania Secretary of Labor. No bid may be withdrawn within sixty days of the opening date. Freemansburg Borough reserves the right to reject all bids and waive any bidding informalities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-CommCulturalCntr-PLANS.pdf | ||
| 3-CommCulturalCntr-NCA.pdf | ||
| 2-CommCulturalCntr-EVAF.pdf | ||
| 6-CommCulturalCntr-PROJ MAN.pdf | ||
| 4-CommCulturalCntr-BB.pdf | ||
| 1-CommCulturalCntr-CQS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Today’s Commitment to Tomorrow’s Challenges
Corporate Office: 630 Freedom Business Center 433 Lancaster Avenue 101 Larry Holmes Drive 105 Raider Boulevard 949 Easton Road Third Floor Suite 200 Suite 201 Suite 206
Warrington, PA 18976 King of Prussia, PA 19406 Malvern, PA 19355 Easton, PA 18042 Hillsborough, NJ 08844
215.343.5700 610.572.7093 610.489.5100 610.989.4940 908.874.7500
16-1124.060 (Comm&CulturalCntr-CLAR.NO.1.docx) www.carrollengineering.com
FREEMANSBURG MUNICIPAL COMMUNITY & CULTURAL BUILDING
FREEMANSBURG BOROUGH, NORTHAMPTON COUNTY
FEBRUARY 25, 2026
CLARIFICATION NO. ONE
The following items are issued to add, modify, and clarify the Contract Documents and Contract Plans.
These items shall have full force and effect as the Contract Documents and Contract Plans.
Contract Site Plan – Sheet 1 of 3:
REPLACE existing Site Plan Note 1 with the following CLARIFIED Note 1:
1. THE COMMUNITY BUILDING SHALL BE A SINGLE-STORY, SINGLE-SPAN RIGID-FRAME PRE-
ENGINEERED METAL BUILDING. THE PLAN DIMENSIONS ARE 90’ X 125’ FROM OUT-TO-OUT
OF STEEL. THE BUILDING SHALL INCLUDE A STEEL-FRAMED MEZZANINE ALONG THE
SOUTH EDGE OF THE BUILDING. THE AREA OF THE MEZZANINE SHALL NOT EXCEED 3,300
SQUARE FEET. THE TOP OF SLAB ELEVATION SHALL BE AS NOTED ON THE SITE PLAN. THE
EAVE HEIGHT SHALL BE 20’-0” ALONG THE NORTH EDGE OF THE BUILDING. THE EAVE
HEIGHT ALONG THE SOUTH EDGE OF THE BUILDING SHALL BE 26’-8”. THE SECONDARY
FRAMING FOR THE ROOF SHALL CONSIST OF COLD-FORM BYPASS PURLINS. THE
SECONDARY FRAMING FOR THE WALLS SHALL CONSIST OF COLD-FORM BYPASS GIRTS.
THE WALL INSULATION SHALL BE R-30 MBI SAFETY LINER SYSTEM OR APPROVED EQUAL,
AND THE ROOF INSULATION SHALL BE R-38 MBI SAFETY LINER SYSTEM OR APPROVED
EQUAL. THE ROOF PANELS SHALL BE 24 GA. 24” COVERAGE WIDTH STANDING SEAM. THE
EXPOSED WALL PANELS SHALL BE 26 GA. WITH 36” COVERAGE WIDTH, AND THE
CONCEALED WALL PANELS SHALL BE 24 GA. WITH 36” COVERAGE WIDTH. THE COLOR AND
PROFILE OF THE EXPOSED WALL PANELS SHALL BE SELECTED BY THE OWNER. THE
CONCEALED PANELS SHALL HAVE A GALVALUME FINISH. THE RAKE AND EAVE SHALL
PROJECT 36” FROM THE WALLS. THERE SHALL BE SNOW GUARDS FOR THE ENTIRE
LENGTH OF THE LOW EAVE. THE BUILDING SHALL INCLUDE ALL GUTTERS, DOWNSPOUTS,
RAKE TRIM, CORNER TRIM, AND BASE TRIM.
END OF CLARIFICATION NO. ONE
By responding to this Bid, you agree to perform all Terms, Conditions, and Requirements of the entire bid package, including all issued Clarifications/Addenda.