7-Change Order Form.pdf.pdf

PDF 201 KB Posted

Attached to
Tree Trimming and Removal Services
Solicitation number
RFP-2026-01-0-2027/AB
Issued by
Brevard County, Florida

About this file

This is a Change Order Form document used by Hillsborough County, Florida for modifying existing contracts. The form provides a standardized template for authorizing changes, modifications, and adjustments to contracts previously awarded to contractors. The Change Order Form allows for adjustments to the original contract sum, time extensions or reductions to final completion milestones, and documentation of reasons for changes. The form requires identification of the contract, bid number, contractor name, project number, and CPA number, with sections to indicate whether changes involve time modifications, extra work, credits, or other adjustments. The document tracks the original contract sum, net changes from previous change orders, the contract sum prior to the current change order, and the new total contract sum resulting from the modification.

The Change Order Form requires approval from multiple Hillsborough County officials, including the Clerk of Circuit Court, Chair of the Board of County Commissioners, and departmental representatives from Fiscal, Procurement, and the County Attorney's office. The contractor must provide authorized signatures and, if applicable, corporate acknowledgment through notarization. The form includes a Consent of Surety section requiring the performance and payment bond surety to acknowledge and consent to changes in contract amount and completion dates. All parties waive claims to additional time extensions or monetary compensation beyond those explicitly addressed in the change order, and the form reaffirms that all previous contract terms remain in effect except where modified by the change order provisions.

View the file

Other files

File Type Posted
1-Drug Free Workplace Form.doc.doc DOC document
25-Attachment A - Insurance Requirements.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
26-1. IFB-26-00265 Terms and Conditions.pdf PDF
3-Application for Payment.pdf.pdf PDF
18-Attachment C - Technical Specifications.pdf PDF
23-IFB-26-00265 Payment Bond.pdf PDF
17-Attachment B - Measurement and Payment.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
21-IFB-26-00265 Agreement.docx DOCX document
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
16-Additional Insured Policy Sample.pdf PDF
15-Subcontractor Letter of Intent .pdf PDF
14-SBE-2 Goal Participation Tutorial.mp4 MP4 file
9-Substitute W9 Form.pdf.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
20-Blanket Additional Insured Policy Sample.pdf PDF
19-Attachment D - Drawings.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
24-IFB-26-00265 Performance Bond.pdf PDF
8-Insurance Certificate.doc.doc DOC document
2-Allowance Authorization Release Form.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
22-IFB-26-00265 Bid Bond.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 01.29.2025

HILLSBOROUGH COUNTY

CHANGE ORDER FORM

CONTRACT: CHANGE ORDER NO.:

BID NO:

CONTRACTOR: PROJECT NO:

CPA NO:

TIME CHANGE EXTRA WORK CREDIT OTHER

The Contractor is hereby authorized and directed to make the following changes and modifications to the aforesaid Contract in accordance with all requirements applicable thereto.

DESCRIPTION OF CHANGE:

COST

IMPACT

FINAL

COMPLETION

DAYS

REASON FOR CHANGE:

The original Contract Sum (TOTAL GMP) was . . . . . . . . . . . . $____________ Net change by previous Change Orders . . . . . . . . . . . . . . . . $____________ The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $____________ The Contract Sum will be by this Change Order. . . . . . $ ____________ (increased, decreased or unchanged) The new Contract Sum including this Change Order will be . . . . . . . . . . $ ____________

The Final Completion Milestone prior to this Change Order was .

The time for Final Completion Milestone will be ______________ by __________( )days.

(extended, reduced or unchanged) The Final Milestone for this change order therefore is therefore

The Contractor waives any and all claims to additional time extension and/or additional monetary compensation resulting from these changes and all cost associated with the change order as herein addressed.

Excepting those terms and provisions conflicting with this Change Order which are hereby changed to conform hereto, the aforesaid Contract as amended by all previous change orders hereto is otherwise reaffirmed in its entirety.

IN WITNESS WHEREOF, this Change Order No. _______ to __________________________________ has been executed by the parties hereto or their duly authorized representatives.

ATTEST: VICTOR D. CRIST COUNTY: HILLSBOROUGH COUNTY FLORIDA

Clerk of Circuit Court

BY: BY:

Deputy Clerk Chair, Board of County Commissioners

BOCC Document Number Date of BOCC approval

ATTEST: CONTRACTOR:

BY:

Witness Authorized Signature (SEAL)

TITLE:

DATE:

BOCC Staff Approval Date

Department Fiscal Department Director Procurement County Attorney:

Approved as to Form and Legal Sufficiency

(ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ______________________ (Name of person) as____________________________ for ___________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

(ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP OR INDIVIDUAL)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by .

(Name of person acknowledging)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount (increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person) ________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public) (Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________