4-Consent of Surety-Change Order.pdf.pdf

PDF 648 KB Posted

Attached to
Tree Trimming and Removal Services
Solicitation number
RFP-2026-01-0-2027/AB
Issued by
Brevard County, Florida

About this file

This is a Consent of Surety to Change Order form used by Hillsborough County, Florida for construction contracts. The document serves as formal acknowledgment by a surety company that it consents to modifications of an existing contract with the county. The form requires the contractor (principal) to identify the relevant change order number, the surety company name, and the surety's authorized agent. The document specifies the contract adjustment, including whether the change order increases or decreases the total contract amount by a stated dollar figure and whether it extends the completion date by a specified number of calendar days. Upon execution, the surety acknowledges that both the performance bond and payment bond associated with the original contract are adjusted accordingly to reflect the modifications outlined in the change order.

The form must be executed by an authorized representative of the surety company and includes space for a corporate seal. The document requires notarization before a Florida notary public, with the notarization occurring either through physical presence or online notarization. The notary must record the date of notarization, the name of the person executing the document, their title or capacity (such as officer or attorney in fact), and identify whether the notary personally knows the signer or obtained identification. If the signatory executes the document as an attorney in fact, a power of attorney document must be attached. The form was revised on March 9, 2020.

View the file

Other files

File Type Posted
1-Drug Free Workplace Form.doc.doc DOC document
25-Attachment A - Insurance Requirements.pdf PDF
11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
26-1. IFB-26-00265 Terms and Conditions.pdf PDF
3-Application for Payment.pdf.pdf PDF
18-Attachment C - Technical Specifications.pdf PDF
23-IFB-26-00265 Payment Bond.pdf PDF
17-Attachment B - Measurement and Payment.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
21-IFB-26-00265 Agreement.docx DOCX document
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
16-Additional Insured Policy Sample.pdf PDF
15-Subcontractor Letter of Intent .pdf PDF
14-SBE-2 Goal Participation Tutorial.mp4 MP4 file
9-Substitute W9 Form.pdf.pdf PDF
7-Change Order Form.pdf.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
20-Blanket Additional Insured Policy Sample.pdf PDF
19-Attachment D - Drawings.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
24-IFB-26-00265 Performance Bond.pdf PDF
8-Insurance Certificate.doc.doc DOC document
2-Allowance Authorization Release Form.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
22-IFB-26-00265 Bid Bond.doc DOC document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount

(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)

________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

Revised 03.09.2020