Bid Results Summary
This is a bid results document for the Nether Providence Township Houston Park – Beatty Run Streambank Restoration – Phase 3 project located in Pennsylvania. The project encompasses three primary scopes of work: Left Streambank Stabilization, Right Streambank Stabilization, and Park Trail & Driveway Restoration. The Left Streambank Stabilization scope includes pool stone wall repair (1 lump sum), streambank stabilization (115 linear feet), clearing and woody debris removal (1 lump sum), grading (1 lump sum), erosion and sediment control measures (1 lump sum), tree removal (19 each), and restoration (1 lump sum). The Right Streambank Stabilization scope includes streambank stabilization (105 linear feet), clearing and woody debris removal (1 lump sum), grading (1 lump sum), erosion and sediment control measures (1 lump sum), and restoration (1 lump sum). The Park Trail & Driveway Restoration scope includes trail restoration (1,215 square yards), park entrance driveway paving (250 square yards), and erosion and sediment control measures (1 lump sum). Sealed bids were received online via PennBid through November 5, 2026, with public bid opening scheduled for November 12, 2026, at the Commissioner's Meeting. Bid security of 10% was required.
Seven contractors submitted bids across the two bid tabs presented in the results document. The lowest responsive bids were as follows: Delaware Environmental Construction Services at $153,815.00, Buck Frank Excavation, Inc. at $274,155.00, J.D. Fedele Construction & Demolition Inc at $217,440.00, James R Kenney Excavating & Paving Inc. at $374,400.00, JMCCONTRACTORS, Inc. at $247,993.00, Stonewood Landshaping, Inc. at $268,223.35, and Land-Tech Enterprises, Inc. at $475,875.00. The successful contractor was required to pay a PennBid program fee of a percentage of the contract award value, with a minimum fee of $150.00 and maximum of $6,000.00. The contract included requirements for a performance bond and payment bond equal to 100% of the contract price and a one-year maintenance bond equal to 10% of the contract price. Pennsylvania Prevailing Wage Rates applied to the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Items
Unit of
Measure Quantity Required
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
TREAMBANK STABILIZATION
#1-1 Pool Stone Wall Repair LS 1 $27,945.00 $27,945.00 $20,000.00 $20,000.00 $35,000.00 $35,000.00 $53,058.00 $53,058.00 #1-2 Streambank Stabilization LF 115 $88.00 $10,120.00 $200.00 $23,000.00 $44.00 $5,060.00 $114.00 $13,110.00 #1-3 Clearing/Woody Debris Removal LS 1 $4,400.00 $4,400.00 $12,500.00 $12,500.00 $8,000.00 $8,000.00 $13,164.00 $13,164.00 #1-4 Grading LS 1 $18,000.00 $18,000.00 $18,000.00 $18,000.00 $17,000.00 $17,000.00 $10,280.00 $10,280.00 #1-5 Erosion & Sediment Control Measures LS 1 $3,500.00 $3,500.00 $15,000.00 $15,000.00 $3,500.00 $3,500.00 $7,450.00 $7,450.00 #1-6 Tree Removal EA 19 $500.00 $9,500.00 $1,000.00 $19,000.00 $2,222.00 $42,218.00 $755.00 $14,345.00 #1-7 Restoration LS 1 $3,700.00 $3,700.00 $20,000.00 $20,000.00 $8,000.00 $8,000.00 $10,751.00 $10,751.00
$77,165.00 $127,500.00 $118,778.00 $122,158.00
STREAMBANK STABILIZATION
#2-1 Streambank Stabilization LF 105 $88.00 $9,240.00 $200.00 $21,000.00 $44.00 $4,620.00 $126.00 $13,230.00 #2-2 Clearing/Woody Debris Removal LS 1 $4,000.00 $4,000.00 $12,500.00 $12,500.00 $7,100.00 $7,100.00 $7,009.00 $7,009.00 #2-3 Grading LS 1 $18,000.00 $18,000.00 $10,000.00 $10,000.00 $17,000.00 $17,000.00 $5,324.00 $5,324.00 #2-4 Erosion & Sediment Control Measures LS 1 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $3,500.00 $3,500.00 $8,231.00 $8,231.00 #2-5 Restoration LS 1 $3,500.00 $3,500.00 $5,000.00 $5,000.00 $8,000.00 $8,000.00 $10,727.00 $10,727.00
$37,240.00 $52,500.00 $40,220.00 $44,521.00
DRIVEWAY RESTORATION
#3-1 Trail Restoration SY 1215 $24.00 $29,160.00 $16.00 $19,440.00 $53.00 $64,395.00 $64.89 $78,841.35 #3-2 Park Entrance Driveway Paving SY 250 $35.00 $8,750.00 $60.00 $15,000.00 $88.00 $22,000.00 $81.00 $20,250.00 #3-3 Erosion & Sediment Control Measures LS 1 $1,500.00 $1,500.00 $3,000.00 $3,000.00 $2,600.00 $2,600.00 $2,453.00 $2,453.00
$39,410.00 $37,440.00 $88,995.00 $101,544.35
$268,223.35
Delaware Environmental Construction Services
J.D. Fedele Construction & Demolition Inc
JMCCONTRACTORS, Inc.
$153,815.00
Stonewood Landshaping, Inc.
$217,440.00 $247,993.00
Nether Providence Beatty Run Streambank Restoration - Phase 3
83250-155-WRPP-3
Left Streambank Stabilization Totals:
Right Streambank Stabilization Totals:
Park Trail & Driveway Restoration Totals:
Project Totals:
# Items Unit of
Measure
Quantity Required
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
TREAMBANK STABILIZATION
#1-1 Pool Stone Wall Repair LS 1 $20,000.00 $20,000.00 $49,000.00 $49,000.00 $25,000.00 $25,000.00 #1-2 Streambank Stabilization LF 115 $103.00 $11,845.00 $85.00 $9,775.00 $400.00 $46,000.00 #1-3 Clearing/Woody Debris Removal LS 1 $10,000.00 $10,000.00 $11,500.00 $11,500.00 $22,000.00 $22,000.00 #1-4 Grading LS 1 $7,500.00 $7,500.00 $28,000.00 $28,000.00 $33,000.00 $33,000.00 #1-5 Erosion & Sediment Control Measures LS 1 $19,500.00 $19,500.00 $18,500.00 $18,500.00 $38,000.00 $38,000.00 #1-6 Tree Removal EA 19 $3,500.00 $66,500.00 $1,300.00 $24,700.00 $2,500.00 $47,500.00 #1-7 Restoration LS 1 $3,500.00 $3,500.00 $3,000.00 $3,000.00 $7,500.00 $7,500.00
$138,845.00 $144,475.00 $219,000.00
STREAMBANK STABILIZATION
#2-1 Streambank Stabilization LF 105 $100.00 $10,500.00 $85.00 $8,925.00 $400.00 $42,000.00 #2-2 Clearing/Woody Debris Removal LS 1 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $28,000.00 $28,000.00 #2-3 Grading LS 1 $5,000.00 $5,000.00 $40,000.00 $40,000.00 $31,000.00 $31,000.00 #2-4 Erosion & Sediment Control Measures LS 1 $15,200.00 $15,200.00 $17,500.00 $17,500.00 $20,000.00 $20,000.00 #2-5 Restoration LS 1 $2,500.00 $2,500.00 $5,500.00 $5,500.00 $7,500.00 $7,500.00
$43,200.00 $76,925.00 $128,500.00
DRIVEWAY RESTORATION
#3-1 Trail Restoration SY 1215 $54.00 $65,610.00 $90.00 $109,350.00 $75.00 $91,125.00 #3-2 Park Entrance Driveway Paving SY 250 $92.00 $23,000.00 $135.00 $33,750.00 $105.00 $26,250.00 #3-3 Erosion & Sediment Control Measures LS 1 $3,500.00 $3,500.00 $9,900.00 $9,900.00 $11,000.00 $11,000.00
$92,110.00 $153,000.00 $128,375.00
Buck Frank Excavation, Inc James R Kenney Excavating
& Paving Inc.
Land-Tech Enterprises, Inc.
Project Totals:
Left Streambank Stabilization Totals:
Right Streambank Stabilization Totals:
Park Trail & Driveway Restoration Totals:
$475,875.00$374,400.00$274,155.00