This document is a Bid Price Schedule for the Lincoln Center Waterproofing Project issued by the City of Tallahassee, Florida. The bid involves professional waterproofing services with a base bid for waterproofing and three additive/deductive line items: tuckpointing (2,000 linear feet included in base bid), epoxy injection (1,000 linear feet included in base bid), and concrete repair (5 cubic feet included in base bid). The bidding process requires unit pricing for all items, and failure to submit pricing for any item will render the entire bid non-responsive.

The pricing structure allows for flexibility in project scope through additive and deductive line items, with bidders expected to provide comprehensive unit pricing. While specific bid amounts are not populated in the provided spreadsheet, the document indicates that the total project cost will be calculated by summing the base bid and any selected additive or deductive line items. The project appears to be a municipal infrastructure maintenance initiative focused on addressing waterproofing, structural repair, and preservation needs at the Lincoln Community Center.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Lincoln Center Waterproofing Project
Item No.Item DescriptionTotal Amount
1Base Bid: Waterproofing$
A1Additive/Deductive: Tuckpointing (2,000 LF included in Base Bid)$ L.F.
A2Additive/Deductive: Epoxy Injection (1,000 LF included in Base Bid)$ L.F.
A3Additive/Deductive: Concrete Repair (5 cu.ft. included in Base Bid)$ cu.ft.
Base Bid + Additives/Deductives Total$
Bidders must provide a unit price for all items.
Therefore, failure to submit a unit price for all items shall render the entire bid non-responsive.