Technical Specifications for Grodahl Wetland Development
This document is a technical specification manual prepared by ISG Inc. for the Iowa Department of Agriculture and Land Stewardship (IDALS), Division of Soil Conservation and Water Quality, detailing construction requirements for the Cal883432B Grodahl Wetland Development project in Calhoun County, Iowa. The project encompasses wetland restoration and development activities including site preparation, excavation and grading, tile drain investigation and installation, earthfill and drainfill placement, topsoiling, concrete structures, plastic pipe installation, riprap placement, and seeding operations. The specifications reference 13 construction plan sheets (C0-10 through C4-30) and fourteen line-item bid quantities including site stripping and preparation, pollution control measures, seeding and mulching, mobilization/demobilization, drain tile investigation and connections, removal of water, excavation (approximately 13,800 cubic yards), earthfill placement, drainfill (approximately 100-150 tons), topsoil placement, concrete installation (tied concrete block matting of 2,750 square feet), plastic pipe conduits, tile drains (769 linear feet), and corrugated metal pipe conduits. Construction must commence within 7 days of the preconstruction meeting with a target completion date of November 30, 2026, and seeding deadlines of December 15, 2026, with most line-item delivery dates of June 15, 2027.
The specifications are based on Natural Resources Conservation Service (NRCS) standard construction practices and detail material requirements, installation procedures, compaction methods, quality control standards, and payment methodologies for each work item. Payment structures include both lump-sum items (for site stripping, mobilization/demobilization, and pollution control) and unit-price items (for excavation, earthfill, drainfill, topsoil, and seeding based on measured quantities or plan quantities verified by weight tickets). The document establishes rigorous standards for concrete mix design (minimum 3,500 psi at 28 days with 4-8 percent air content), reinforcing steel placement, curing procedures, and hot/cold weather concreting protocols. Contractor responsibilities include furnishing performance and payment bonds, obtaining utility locates through Iowa One Call a minimum of 2 days prior to excavation, providing portable sanitary facilities, and maintaining erosion and sediment control measures throughout construction including silt fencing, straw wattles, and staged earthwork activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
217 East 2nd Street + Suite 110 + Des Moines, IA 50309
515.243.9143 + ISGInc.com
Architecture + Engineering + Environmental + Planning
Owner: FROM:
IDALS CALEB RASMUSSEN, PE
Water Resources Division ISG
502 E 9th St 1725 NORTH LAKE AVE.
DES MOINES, IOWA 50319 STORM LAKE, IOWA 50588
712-732-7745
GRODAHL WETLAND
TECHNICAL SPECIFICATIONS FOR IDALS CAL883432B WETLAND DEVELOPMENT
CALHOUN COUNTY
FEBRUARY 2025
PROJECT NO. 23-30402
217 East 2nd Street + Suite 110 + Des Moines, IA 50309
515.243.9143 + ISGInc.com
Architecture + Engineering + Environmental + Planning
PROJECT MANUAL FOR
IDALS CAL883432B; GRODAHL WETLAND
WETLAND DEVELOPMENT
CALHOUN COUNTY, IOWA
PROJECT NO. 23-30402
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
Caleb Rasmussen, P.E. Date
License No.: 25713
My License Renewal Date is December 31, 2026
Sections covered by this seal:
All sections Listed in Table of Contents
2/21/2025
Project No. 23-30402 Page 1 of 1
Grodahl Wetland
PROJECT MANUAL FOR
IDALS CAL883432B; GRODAHL WETLAND
WETLAND DEVELOPMENT
CALHOUN COUNTY, IOWA
PROJECT NO. 23-30402
TABLE OF CONTENTS
CERTIFICATION
TECHNICAL SPECIFICATIONS
A. IA-1 Site Preparation.................................................................................................................1 to 2
B. IA-5 Pollution Control ................................................................................................................1 to 3
C. IA-6 Seeding and Mulching for Protective Cover ......................................................................1 to 4
D. IA-8 Mobilization and Demobilization........................................................................................1 to 2
E. IA-9 Subsurface Drain Investigation, Removal, and Repair......................................................1 to 5
F. IA-11 Removal of Water............................................................................................................1 to 2
G. IA-21 Excavation.......................................................................................................................1 to 3
H. IA-23 Earthfill ............................................................................................................................1 to 4
I. IA-24 Drainfill ............................................................................................................................1 to 2
J. IA-26 Topsoiling ........................................................................................................................1 to 2
K. IA-31 Concrete..........................................................................................................................1 to 6
L. IA-45 Plastic (PVC, PE) Pipe ....................................................................................................1 to 4
M. IA-46 Tile Drains for Land Drainage .........................................................................................1 to 5
N. IA-51 Corrugated Metal Pipe Conduits .....................................................................................1 to 4
O. IA-61 Loose Rock Riprap..........................................................................................................1 to 2
PLANS
SHEET C0-10 TO C4-30 (13 SHEETS)
Natural Resources Conservation Service
Construction Specification 000 IA CS-00-1 Site Preparation
NRCS, IA SPECIFICATION IA CS-001, Page 1 of 2 May 2001
1. SCOPE
Site preparation work shall consist of clearing, grubbing, stripping, refuse removal, bank sloping and structure removal on the site as necessary to rid the site of all undesirable materials on or near the surface and prepare the site for the structure. All woody growth within the construction area shall be cleared and all stumps and roots one inch in diameter or larger shall be grubbed from the site. In addition, all areas within 25 feet of the footprint of the structure shall be cleared and grubbed except as directed by NRCS. The work shall also consist of the removal and disposal of structures (including fences) that must be removed to perform other items of work.
For wetland restoration, enhancement, or creation projects, the wetland area shall be disturbed as little as possible and existing naturally vegetated spillway areas shall not be disturbed.
2. FOUNDATION PREPARATION
The construction areas shall be stripped a minimum of 6 inches to remove all unsuitable materials such as organic matter, grasses, weeds, sod, debris, and stones larger than 6 inches in diameter.
In an earth embankment foundation area, all channel banks and sharp breaks shall be sloped to no steeper than 1.5 horizontal to 1 vertical.
The foundation area shall be thoroughly scarified before placement of fill material. The surface shall have moisture added or shall be compacted if necessary, so that the first layer of fill material can be compacted and bonded to the foundation.
3. STRIPPED MATERIAL DISPOSAL
Suitable soil material shall be stockpiled for use as topsoil. The other stripped materials shall be buried, removed from the site, or disposed of as directed by the owner or NRCS. Whenever possible, material shall not be disposed of in the pool area created by the structure.
Stockpiled materials around a construction site should be placed so as not to hinder subsequent construction operations.
4. DISPOSAL OF REFUSE MATERIALS
Waste materials from clearing and structure removal shall be burned or buried at locations approved by the owner. Buried materials shall be covered with a minimum of 2 feet of earthfill. Whenever possible, material shall not be disposed of in any pool area created by the structure.
All refuse shall be disposed of in a manner which complies with all local and state regulations.
5. SALVAGE
Items to be salvaged shall be as shown on the drawings. Structures and fencing materials that are designated to be salvaged shall be carefully removed and neatly placed in the specified storage areas.
NRCS, IA SPECIFICATION IA CS-001, Page 2 of 2 May 2001
6. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and bid items to which they are made subsidiary are identified in Items of Work and Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
“Site Stripping and Preparation”:
1. Bid Item No. 1, 2
This item will consist of work to remove and dispose of existing material to remove vegetation on areas to be excavated or filled. Total depth of vegetative stripping and topsoil stripping shall equal a combined depth of 12" in the embankment footprint and 9” in all other areas unless otherwise noted in the plans, with the estimated cubic yards of topsoil removal as shown in the plans. The topsoil replacement quantity shall be paid separately.
This item will also include any tree and brush removal along with any fences. These shall be considered incidental to site stripping.
This item will be paid out as a lump sum. Partial payment, if requested, will be to the nearest quartile (25%, 50%, 75%, 100%)
“Crop damage”
2. Bid item No. 3
This bid item is not anticipated. Contractor shall bid $0/Acre. Final cost to be negotiated by owner and landowner and will be a pass-through cost via awarded contractor.
000 IA CS-005 Pollution Control 2011
NRCS, IA SPECIFICATION IA CS-005, Page 1 of 3 February 2011
1. SCOPE
The work shall consist of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air during construction operations.
2. MATERIALS
All materials furnished shall meet the requirements shown on the drawings or in the specifications.
3. EROSION AND SEDIMENT CONTROL MEASURES AND WORKS
The measures and works shall include, but are not limited to, the following:
Staging of Earthwork Activities: The excavation and moving of soil materials shall be scheduled so that areas unprotected from erosion will be minimized. These areas will be unprotected for the shortest time feasible.
Seeding: Structures and disturbed areas shall be seeded as soon as possible after construction is completed.
Temporary seedings may be used as an alternative to other stabilization measures as approved by
NRCS.
Mulching: Construction areas that have been disturbed but have no construction activity scheduled for 21 days or more shall have erosion protection measures applied by the 14th day. This erosion protection may be mulching or other approved temporary measures. Construction areas shall not be left open during a winter shutdown period and shall be protected by mulching.
All seeding and mulching shall be completed in accordance with the seeding plan and Iowa Construction Specification IA-6, Seeding and Mulching for Protective Cover.
The following works may be temporary. If they are installed as a temporary measure, they shall be removed and the area restored to its original state when they are no longer needed or when permanent measures are installed.
Diversions: Diversions may be required to divert clean runoff water away from work areas and to collect runoff from work areas for treatment and safe disposition.
Stream Crossings: Culverts or bridges may be required where construction equipment must cross streams.
Sediment Basins: Sediment basins may be required to settle and filter out sediment from eroding areas to protect properties and streams below the construction site.
Sediment Filters: Straw bale filters, geotextile sediment fences, or other equivalent methods may be used to trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under them.
Waterways: Waterways may be required for the safe removal of runoff from fields, diversions, and other structures or measures
NRCS, IA SPECIFICATION IA CS-005, Page 2 of 3 February 2011
4. CHEMICAL POLLUTION
The Contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to be used to dispose of chemical pollutants, such as drained lubricating or transmission oils, greases, soaps, concrete mixer wash water, asphalt, etc., produced as a by-product of the construction work.
At the completion of the construction work, sumps shall be removed and the area restored without causing pollution.
Sanitary facilities such as chemical toilets or septic tanks shall not be placed adjacent to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water sources. At the completion of construction work, facilities shall be disposed of without causing pollution.
5. AIR POLLUTION
The burning of brush or trash or disposal of other materials shall adhere to local and state regulations.
Fire prevention measures shall be taken to prevent the start or the spreading of wild fires, which result from project work. Fire breaks or guards shall be constructed at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall insure safe operations at all times. If chemical dust suppressants are used, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer�s requirements and recommendations. A copy of the product data sheet and manufacturer�s recommended application procedures shall be provided to the Engineer five working days before use.
6. MAINTENANCE, REMOVAL, AND RESTORATION
All pollution control measures and works shall be adequately maintained in a functional condition as long as needed during the construction operation. All temporary measures shall be removed and the site restored to as near original conditions as practical.
7. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
�Pollution Control�
1. Bid Item No.3
NRCS, IA SPECIFICATION IA CS-005, Page 3 of 3 February 2011
This item shall consist of applying and performing all construction activities in a manner that will minimize water pollution, air pollution and soil erosion. This includes all materials, labor, transportation, maintenance, removal, and disposal of storm water controls such as silt fence and straw wattles as shown on the plans.
Payment for this item is lump sum. Partial payment will be made in increments of 25%, 50%, 75%, and 100% based on total progress of the contract, less this item and mobilization.
�Pollution Control�
1. Bid Item No.4
This item shall consist of applying and performing all construction activities in a manner that will minimize water pollution, air pollution and soil erosion. This includes all materials, labor, transportation, maintenance, removal, and disposal of storm water controls such as silt fence and straw wattles as shown on the plans.
Payment for this item is lump sum. Partial payment will be made in increments of 25%, 50%, 75%, and 100% based on total progress of the contract, less this item and mobilization.
000 IA-6 Seeding and Mulching for Protective Cover
NRCS, IA SPECIFICATION IA CS-006, Page 1 of 4 February 2011
1. SCOPE
The work shall consist of seeding, mulching, and fertilizing all disturbed areas and other areas as indicated on the drawings or otherwise designated.
2. SEEDBED PREPARATION AND APPLICATION
The entire area to be seeded shall be reasonably smooth and all washes and gullies shall be filled to conform to the desired cross-section before actual seedbed preparation is begun. At this stage of the operation, the required fertilizer and lime shall be applied uniformly and incorporated into the top 3 inches of the soil with suitable tillage equipment. The seedbed preparation operation shall be suspended when the soil is too wet or too dry. The seedbed shall be loosened to a depth of at least three inches.
On side slopes steeper than 2-1/2 horizontal to1 vertical, the 3 inch minimum depth of seedbed preparation is not required, but the soil shall be worked enough to insure sufficient loose soil to provide adequate seed cover.
Unless otherwise specified, the seeding operation shall be performed immediately after preparation of the seedbed. The seed shall be drilled or broadcast by equipment that will insure uniform distribution of the seed.
3. MATERIALS
The seeding, fertilizing, and mulching requirements are as specified on Form IA-CPA-4.
Straw from cereal grains or hay will be used as mulching material. It shall be relatively free of weeds.
4. MULCH APPLICATION
The required mulching shall be performed as soon as possible after seeding unless otherwise specified.
The mulch shall be applied uniformly over the area. The type and rate shall be as specified. When mulching is required, all areas seeded during any one day shall be mulched within 24 hours. The mulch may be spread by any means that results in a uniform cover.
The mulch shall be anchored. Anchoring of the mulch may be performed by a mulch anchoring tool or regular farm disk weighted and set nearly straight, by installation of mulch netting, or by other methods approved by NRCS.
5. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
NRCS, IA SPECIFICATION IA CS-006, Page 2 of 4 February 2011
For items of work which lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
Bid Item No. 5 Structure & Channel Seeding
This item will consist of seeding the waterways and any other disturbed areas noted on the plans or as determined by engineer. The all portions of the dike and easement areas are to be seeded with bid item no. 6.
All seed must be clean and weed free. Seeding rates are expressed in bulk pounds per acre.
Seed quality shall not drop below 70% Pure Live Seed (PLS) where PLS = (percent germination plus percent dormant seed) times percent purity.
Seeding rates are as follows:
Smooth Brome grass 25 pounds/acre
Seed shall be applied with a drill and placed at ¼ to ½ inch deep.
Fertilizer shall be applied on the entire seeding area at the following rate:
Nitrogen (N) 30 pound/acre
Phosphorus (P2O5) 30 pounds/acre
Potassium (K2O) 40 pounds/acre
Straw mulch shall be applied at a rate of 2 tons per acre on all areas receiving structure and channel seeding.
Seeding shall be completed during the following seeding periods:
Spring March 1 to May 15
Summer August 1 to September 15
Fall November 15 to Freeze-up
If construction is completed during any other time of the year, the seeding shall be performed at the next seeding period.
If seeding is completed during the spring seeding period, a companion crop of oats shall be seeded at a rate of 1-1/2 bushels per acre.
Measurement will be based on the areas successfully seeded to the nearest 0.1 acre.
NRCS, IA SPECIFICATION IA CS-006, Page 3 of 4 February 2011
Bid Item No. 6 Buffer Seeding
This item will consist of seeding the areas designated on the plans as buffer seeding and include borrow areas, disturbed areas not seeded as part of structural seeding, and other areas within the easement. Buffer seeding is not required in area below normal pool elevation established by the weir elevation.
Some areas of the site may have existing CRP vegetation or steep slopes with existing vegetation. Local NRCS personnel will determine if these areas will be included as part of the buffer seeding areas for this project or will be left as is. This may affect the bid quantity and Contractor will verify with Engineer the number of acres that will require buffer seeding.
All seed must be clean and weed free. Seeding rates are expressed in pounds of pure live seed per acre. All seed must be yellow-tagged Iowa ecotype unless approved otherwise by owner.
Seeding mixture shall include a minimum of 5 native grasses and 10 native forbs. The mixture shall provide a minimum of 30 grass seeds per square foot and 10 forbs seeds per square foot. Number of seeds will be based on Iowa Conservation Practice 327 �Native
Species for Wildlife�. Contractor�s proposed seed mix shall be submitted to Engineer and local NRCS office for approval at least 2 weeks before seed is to be applied.
Seeding shall be completed during the following seeding periods:
Spring April 1 to June 30
Fall November 15 to Freeze-up
The seed bed shall be properly prepared prior to seeding:
(a) Any weed control measures shall be completed prior to seeding. If spraying is used, then a span of two weeks shall be allowed between spraying and seeding.
(b) If the land was in soybeans, no additional tillage is required. If the land was in corn or other vegetation, areas to be seeded shall be disked to thoroughly loosen and pulverize the soil to a depth of 3 inches. This may require multiple passes of equipment. If the land was used for pasture and has a smooth surface, the preparation in non-disturbed areas to be seeded shall include mowing any vegetation taller than 12 inches and applying an appropriate herbicide at the labeled rates to emergent growth 2 to 4 weeks after mowing. After the vegetation has died, the area shall be disked thoroughly loosen and pulverize the soil depth of 3 inches. If emergent growth occurs prior to seeding, the areas shall receive a second application of herbicide. Seeding shall not occur until the existing vegetation has died (about 1 week).
(c) If deeper disking is used at the site, a lighter disk or spring harrow shall be used to remove deep furrows.
(d) After disking operations and prior to seed application, the seedbed shall be firmed with a cultipacker or similar piece of equipment.
(e) No lime or fertilizer is to be applied.
Sow seed with contour using a grassland or rangeland drill set for the specified seeding rates. The drill shall be equipped with double coulter furrow openers. The drill shall be
NRCS, IA SPECIFICATION IA CS-006, Page 4 of 4 February 2011 subject to acceptance by Engineer. Overlap each successive seeding pass to ensure complete coverage.
Plant seed not more than 1/4 inch deep; some seed may be seen on the surface after seeding.
Broadcasting by centrifugal-type or hydroseeder broadcasters, or by hand shall be allowed in areas not accessible to drills or other equipment. Once broadcast, the seed must be covered with soil to a depth no greater than 1/4 inch by means of hand rakes or other approved methods.
Upon completion of the seeding operation, cultipack the seedbed to provide a positive seed-soil contact. If the drill seeder is equipped with an approved cultipacker or press wheels, separate operations shall not be necessary. The type of cultipacker/seeder to be used shall be subject to acceptance by Engineer.
Includes crimped straw mulching of 0.6 acres Apply as described in bid item no. 5.
Measurement will be based on the area successfully seeded and measured to the nearest
0.1 acre.
Weed Control (Not a Bid item)
Weed control may be needed in portions of this site depending upon the start date of the contract, the initiation of grading, and the seeding dates.
Weed control will be added to the contract with a change order to be negotiated between
Contractor and Division based on conditions observed and the type of weed control used and will be paid only once. If delays require additional weed control, this will be paid for at
Contractor�s own expense.
Weed control may include placement of a cover crop such as oats or rye, spraying with appropriate chemicals, or disking. If thistles are present, only spraying is allowed for weed control and shall include appropriate chemicals designed to control thistles.
210-VI-NEH SPECIFICATION CS-008, Page 1 of 2 May 2001
NATURAL RESOURCES CONSERVATION SERVICE
CONSTRUCTION SPECIFICATION
Construction Specification 8�Mobilization and Demobilization
1. SCOPE
The work consists of the mobilization and demobilization of the contractor�s forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.
Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. EQUIPMENT AND MATERIAL
Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. PAYMENT
Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment.
Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. ITEMS OF WORK AND CONSTRUCTION DETAILS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such
210-VI-NEH SPECIFICATION CS-008, Page 2 of 2 May 2001 not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
1. Bid Item No. 7
This item shall consist of mobilizing and demobilizing personnel and equipment in preparation to perform the work within the scope of this contract.
Any work that is necessary to provide access to the site including, but not limited to, grading, temporary culverts, and clearing will be included in this item. When construction is completed access areas will be restored, as close as practical, to its original condition.
Any fence removed for access and /or to provide work area shall be replaced with same or like materials as approved by the engineer.
The Contractor shall exercise caution to minimize the amount of damage caused by the grading and clearing operations.
Portable toilets shall be provided at the construction site and used for the sanitary facilities.
This item shall not include transportation of personnel, equipment and operating supplies within the work limits areas of this contract.
Payment will constitute full compensation for related subsidiary item, Pollution Control.
Payment will be made as the work proceeds and will paid out on the percent of the project complete as the work progresses. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for the completion of the work.
Contractor is to contact �Iowa One Call� for utility locations a minimum of two (2) days prior to any excavation/construction. The ticket number must be provided to Engineer.
NRCS, IA SPECIFICATION IA CS-009, Page 1 of 5 December 2014
NATURAL RESOURCES CONSERVATION SERVICE
CONSTRUCTION SPECIFICATION
IA-9 SUBSURFACE DRAIN INVESTIGATION,
REMOVAL, AND REPAIR
1. SCOPE
The work shall consist of investigation, location, repair, and/or removal of subsurface drains (tile) near new or existing animal waste storage facilities or in wetland restoration, enhancement, or creation project areas, or other situations where subsurface drains may be present.
2. INVESTIGATION AND LOCATION
An inspection trench at least 10 inches wide shall be dug at the location shown on the drawings or as directed by the engineer or his representative. The trench shall be at least 6 feet deep measured from the original ground line, unless otherwise shown on the plans. The Engineer or his representative shall examine the trench and excavated material to identify tile lines.
Size, material, operating condition and direction of flow of each conduit shall be documented. Location and flow line elevation of each conduit shall be surveyed with horizontal and vertical control based on benchmarks shown on the plans.
The inspection trench shall be documented by surveying the natural ground and trench bottom location and elevations at the beginning, end, and every 50 feet for trenches longer than 50 feet.
Backfilling shall not be started without approval of the Engineer. See Section 5 for backfill specifications.
Trench shields, shoring and bracing, or other methods necessary to safeguard the workers and work, and to prevent damage to the existing improvements shall be furnished, placed, and subsequently removed by the contractor.
3. TILE REPAIR
Unless designated for removal, replace damaged conduit with new conduit having equal or greater capacity using material specified in Section 6 or 7. When replacing short sections of clay or concrete tile with single-wall corrugated polyethylene pipe, use the next larger nominal size.
Make connections with manufactured fittings and tight joints. Where joints have gaps that would allow soil to enter, cover the joint with a permanent type material such as coal tar pitch treated roofing paper, fiber glass sheet or mat, or plastic sheet.
If the investigation trench has been excavated below the existing drain grade, backfill the trench with gravel or well-pulverized soil in layers not over four (4) inches thick and tamp by hand or manually directed power tamper to provide a firm foundation for the conduit at the existing grade. Do not backfill with any soil containing broken tile fragments.
Using selected soil free of hard clods, rocks, or frozen soil, hand tamp the backfill material around the haunch of the pipe in layers not over four (4) inches thick to provide support. Hold the conduit in place
NRCS, IA SPECIFICATION IA CS-009, Page 2 of 5 December 2014 mechanically while placing excavated material around and over the conduit to ensure proper alignment and grade is maintained. Complete the backfill operation according to Section 5.
4. TILE REMOVAL
Remove conduits as shown on the plans or directed by the Engineer or his representative, including envelope filter material or other flow enhancing material when present.
Cap or plug the open ends of the disconnected conduit to prevent soil entry when the conduit will continue to function downstream, or otherwise shown on the plans. For a minimum distance of two feet around each sealed conduit end, backfill in layers not over four (4) inches thick and tamp by hand or manually directed power tamper to a density equal to or greater than the surrounding undisturbed soil. Do not backfill with any soil containing broken tile fragments, large stones, frozen material, or large dry clods.
Where tile are located beneath an existing animal waste facility or earthen embankment, remove the tile or fill the entire length of tile with concrete or Portland cement grout as shown on the plans. When tile removal is specified, the owner shall contact the Iowa Department of Natural Resources (IDNR) for permission to remove the drainage tile under the waste facility structure. The structure shall be emptied of waste or lowered to a point below the tile prior to its removal. The structure must be retested for percolation and the results submitted to IDNR and approval received prior to reusing the structure.
If shown on the plans or directed by the engineer, reroute upstream drain lines so the capacity of the upstream drainage system is maintained. Install conduit in accordance with Iowa Construction Specification IA-46, Tile Drains for Land Drainage.
5. BACKFILL
Compact soil around disturbed tile as specified in Section 3 (Tile Repair) and Section 4 (Tile Removal).
Keep the backfill within 5 feet of the conduit free from large stones, frozen material, and large dry clods.
Unless otherwise shown on the plans, backfill the remainder of the trench as follows:
For trenches located under or near structures, backfill in 12-inch layers and compact each layer to a density equal to or greater than the surrounding undisturbed soil.
For other locations, backfill the remainder of each trench with the excavated soil material which shall extend above the ground surface and be well rounded over the trench.
6. MATERIALS
Unless otherwise shown on the plans, conduit and fittings used for repair shall conform to the specifications listed in Table 1. Perforated pipe shall have a water inlet area of at least 1 square inch per foot, provided by perforations spaced uniformly along the long axis of the pipe. The perforations shall be circular or slots. Circular perforations shall not exceed 3/16 inch in diameter. Slots shall not be more than 1/8 inch wide.
NRCS, IA SPECIFICATION IA CS-009, Page 3 of 5 December 2014
Table 1. Acceptable pipe for subsurface drain repair
Kind of Pipe# Specification
Corrugated Polyethylene (PE) Pipe and Fittings, 3 to 6 inch ASTM F 405
Corrugated Polyethylene (PE) Pipe and Fittings, 3 to 24 inch ASTM F 667
Corrugated Profile Wall (Dual Wall) Polyethylene (PE) pipe, 2 to 60 inch ASTM F 2648$
Corrugated Profile Wall (Dual Wall) Polyethylene (PE) pipe, 12 to 60 inch ASTM F 2306$
Polyvinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80 and 120 ASTM D 1785
PVC Pressure-Rated Pipe (SDR Series) ASTM D 2241
Clay drain tile ASTM C 4
Concrete drain tile ASTM C 412
#Pipe sizes are nominal and the ranges are inclusive $Pipe conforming to AASHTO M 252 (3 to 10 inch), or AASHTO M 294 (12 to 60 inch) is acceptable.
7. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and bid items to which they are made subsidiary are identified in Items of Work and Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
�Drain Tile Investigation�
1. Bid Item No. 8
This item will consist of the excavation necessary to locate and determine the tie-in locations for the tile locations shown on the plans. This item shall also include backfilling of the trenches.
The extent of the tile investigation shall be as shown on the drawings. If extra work is required to locate additional tile not shown on the drawings, the Contractor can request additional compensation, but it must be first approved by the Division.
NRCS, IA SPECIFICATION IA CS-009, Page 4 of 5 December 2014
�Connect to Existing Tile�
2. Bid Item No. 9
This item includes all labor, tools, equipment, and materials to make the specified connections between the existing field tile line and the new tile main including: excavation, trench bottom shaping, cutting and fitting of tile, placement of collars, placement and binding of tile compaction of soil bedding envelope, trench backfill, the keeping and delivery of a log of connections made, and miscellaneous associated work necessary to complete the item.
Does not include repairs or connections to tile intercepted during installation of new tile as a part of the wetland project.
�Cap Existing Tile�
3. Bid Item No. 10
This item consists of capping and abandoning the downstream tile after the new tile has been connected.
�Drain Tile Investigation�
4. Bid Item No. 8
This item will consist of the excavation necessary to locate and determine the tie-in locations for the tile locations shown on the plans. This item shall also include backfilling of the trenches.
The extent of the tile investigation shall be as shown on the drawings. If extra work is required to locate additional tile not shown on the drawings, the Contractor can request additional compensation, but it must be first approved by the Division.
�Connect to Existing Tile�
5. Bid Item No. 9
This item includes all labor, tools, equipment, and materials to make the specified connections between the existing field tile line and the new tile main including: excavation, trench bottom shaping, cutting and fitting of tile, placement of collars, placement and binding of tile compaction of soil bedding envelope, trench backfill, the keeping and delivery of a log of connections made, and miscellaneous associated work necessary to complete the item.
NRCS, IA SPECIFICATION IA CS-009, Page 5 of 5 December 2014
Does not include repairs or connections to tile intercepted during installation of new tile as a part of the wetland project.
�Cap Existing Tile�
6. Bid Item No. 10
This item consists of capping and abandoning the downstream tile after the new tile has been connected.
�Drain Tile Investigation�
1. Bid Item No. 8
This item will consist of the excavation necessary to locate and determine the tie-in locations for the tile locations shown on the plans. This item shall also include backfilling of the trenches.
The extent of the tile investigation shall be as shown on the drawings. If extra work is required to locate additional tile not shown on the drawings, the Contractor can request additional compensation, but it must be first approved by the Division.
�Connect to Existing Tile�
2. Bid Item No. 9
This item includes all labor, tools, equipment, and materials to make the specified connections between the existing field tile line and the new tile main including: excavation, trench bottom shaping, cutting and fitting of tile, placement of collars, placement and binding of tile compaction of soil bedding envelope, trench backfill, the keeping and delivery of a log of connections made, and miscellaneous associated work necessary to complete the item.
Includes temporary blocking or diverting flowing water while the connection is be made.
Does not include repairs or connections to tile intercepted during installation of new tile as a part of the wetland project.
�Cap Existing Tile�
3. Bid Item No. 10
This item consists of capping and abandoning the downstream tile after the new tile has been connected.
Includes all materials, labor and equipment necessary to successfully cap the downstream tile.
No wood products are to be used in capping of the tile. The tile cap shall be either manufactured fitting or custom fitting made of metal or hdpes grouted in place.
000 IA-11 Removal of Water
NRCS, IA SPECIFICATION IA CS-011, Page 1 of 2 February 2011
1. SCOPE
The work shall consist of the removal of surface water and ground water as needed to perform the required construction in accordance with the plans and specifications.
2. DIVERTING SURFACE WATER
The Contractor shall build, maintain and operate all cofferdams, channels, diversions, flumes, sumps, and other temporary protective works needed to divert surface water away from the construction site while construction is in progress.
3. DEWATERING THE CONSTRUCTION SITE
Foundations, cutoff trenches, borrow areas and other parts of the construction site shall be dewatered as needed for proper execution of the construction work. The Contractor shall furnish, install, operate and maintain all works and equipment needed to perform the dewatering.
4. EROSION AND POLLUTION CONTROL
Removal of water from the construction site, including the borrow areas shall be accomplished in such a manner that erosion and the transmission of sediment and other pollutants are minimized.
5. REMOVAL OF TEMPORARY WORKS
After temporary works have served their purposes and before the Contractor leaves the site, they shall be removed.
6. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
1. Subsidiary Item - Dewatering
NRCS, IA SPECIFICATION IA CS-011, Page 2 of 2 February 2011
This item shall include all costs to divert, pump, dam or other means to dewater the site as needed to complete construction activities.
No separate payment will be made for Removal of Water. Compensation for this item shall be made subsidiary to other bid items requiring removal of water in order to complete.
000 IA-21 Excavation
NRCS, IA SPECIFICATION IA CS-021, Page 1 of 3 July 2013
1. SCOPE
The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials. The cutoff trench and any other required excavations shall be dug to the lines and grades shown on the drawings or as staked in the field. Structure or trench excavations will conform to all safety requirements of OSHA.
2. USE OF EXCAVATED MATERIALS
Suitable materials from the specified excavations shall be used in the construction of required permanent earth fill. The suitability of materials for specific purposes shall be determined by the NRCS Inspector.
3. DISPOSAL OF WASTE MATERIAL
All surplus or waste material shall be disposed of in areas shown on the drawings or as approved by the NRCS Inspector. The waste material shall be smoothed and sloped to provide drainage.
4. STRUCTURE AND TRENCH EXCAVATION
Structure or trench excavations will conform to all safety requirements of OSHA.
5. BORROW EXCAVATION
When the quantities of suitable materials obtained from specified excavations are insufficient to construct the specified fills, additional materials shall be obtained from the designated borrow areas as shown on the drawings or as approved by NRCS and the landowner. On wetland projects, borrow shall not be taken from the wetland area within 10 feet of the embankment or as shown on the drawings.
Borrow areas shall be excavated and grading completed in a manner to eliminate steep or unstable side slopes or hazardous or unsightly conditions.
6. OVER-EXCAVATION
Excavation beyond the specified lines and grades shall be corrected by filling the resulting voids with compacted earthfill, except that if the earth is to become the subgrade for riprap, sand or gravel bedding or drainfill, the voids shall be filled with material conforming to the specifications for the riprap, bedding or drainfill, as appropriate.
7. SPECIFIC SITE REQUIREMENTS
Compensation for any work item described in the contract documents but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such
NRCS, IA SPECIFICATION IA CS-021, Page 2 of 3 July 2013 not be measured for payment. Payment for each item will be made at the contract lump sum price and will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be made based on the approved quantity measured by the engineer or weight tickets. Payment will constitute full compensation of the work completed as defined by each work item.
The volume of excavation as provided in the bid quantities has been determined from the topographic information shown on the Drawings using a computer program. Payment will be made based on the planned quantities provided unless additional excavation is directed by the
Engineer. Excavation resulting from the contractor's improper construction operations, as determined by the Engineer, is not included for measurement and payment.
B. Items of Work and Construction Details
�Excavation (General)�:
Bid Item No. 11
This item will consist of excavation and grading of material needed for the following typical items as shown in the plans:
• Establishing pool final grade
• Core Trench (for tile identification)
• Borrow excavation for containment dike fill
• Auxiliary spillway.
Excavations required for the placement of tile exploration, new tile installation, riprap placement, tied concrete block matting, and temporary construction entrance are not included in this bid quantity and will not be measured for payment. The cost of excavation for these items are incidental and should be included as part of their corresponding bid items.
Widening of the core trench beyond plan detail is acceptable but shall not exceed 10 feet. No additional compensation is to be paid for contractor elected over excavation.
This item does not include the excavation for site stripping or topsoil, which is covered under
Specification IA-CS-001. �Site Preparation�.
This item includes the hauling of excavated material to be used as earthfill or spoil.
The material excavated with suitable quality shall be used within the dike as directed by engineer.
Suitable excess excavated material shall be disposed of along top of banks for tile outlet channels or in designated areas by Engineer or Engineer's Representative.
See Specification IA-CS-023 for compaction method.
Payment will be based on plan quantity. If unsuitable material is found at the bottom of the core trench, the over excavation shall be measured and paid in a change order.
Payment will constitute full compensation for the following related Subsidiary items: Pollution
Control; Removal of Water; and Structure Excavation.
NRCS, IA SPECIFICATION IA CS-021, Page 3 of 3 July 2013
1. Subsidiary Item � Borrow Excavation
This item will consist of excavation of the borrow area for placement of cohesive material in the embankment core and compacted clay liner, if included and as shown in the plans. The cost for excavation and transporting of borrow shall be included in corresponding bid Items listed in Specification IA-CS-023 �Earthfill�.
Borrow from any other area will not be allowed unless directed and approved by the Engineer.
The topsoil from the borrow area shall be removed to a minimum depth of 6" and stockpiled.
When the borrow operations have been completed, grades shall be returned to that indicated on the plans and the topsoil shall be uniformly spread over the entire borrow area to a depth of 6".
No separate payment will be made for strip or respread of topsoil over borrow area.
2. Subsidiary Item � Structure Excavation
This item shall consist of the excavation necessary to install the riprap, corrugated metal pipe
(CMP) conduit, CMP tile outlets and water control structure in the locations and as shown on the drawings.
No separate payment will be made for Structure Excavation. Compensation for this item will be included in payment with the corresponding bid items for CMP conduit; CMP water control structure; steel sheet pile; and riprap.
000 IA-23 Earthfill
NRCS, IA SPECIFICATION IA CS-023, Page 1 of 4 December 2015
1. SCOPE
The work shall consist of the construction of earth fills required by the drawings and specifications. The completed work shall conform to the lines, grades, and elevations shown on the drawings or as staked in the field.
2. MATERIALS
All fill materials shall be obtained from required excavations and designated borrow areas. Fill materials shall contain no sod, brush, roots or other bio-degradable materials. Rocks larger than 6 inches in diameter shall be removed prior to compaction of the fill.
3. FOUNDATION PREPARATION
Foundations for earthfill shall be stripped a minimum of 6 inches to remove vegetation and other unsuitable materials. Foundation surfaces shall be scarified to a minimum depth of 2 inches prior to placing fill material.
Foundation and abutment surfaces shall not be sloped steeper than 1.5 horizontal to 1 vertical unless otherwise shown on the drawings.
4. PLACEMENT
Fill shall not be placed until the required excavation and foundation…