7-2-CS27021-27211510-Approved Plans.pdf
PDF 16 MB Posted
- Solicitation number
- CS27021
- Issued by
- Utah
About this file
This is an Approved Plans document for a construction project managed by the State of Utah's Division of Facilities Construction and Management (DFCM) on behalf of the Department of Natural Resources/Division of State Parks. The project, titled Antelope Island Well Replacement (Project #27211510), involves the construction of infrastructure to replace an existing well system. The scope of work includes constructing a pad for a new well, drilling a new 8-inch diameter well to approximately 550 feet below ground surface, installing a well manhole, connecting 6-inch pipes with valves and fittings from the new well to the existing 6-inch diameter water main, and constructing a meter manhole with associated pipes, fittings, valves, and appurtenances. The contractor is responsible for obtaining all permits and inspections as outlined in Specification Section 1.12.
The construction cost estimate for this project is $370,000.00. The approved plans document provides the detailed engineering drawings and specifications necessary for contractors to prepare accurate bids for this standard low-bid construction opportunity. Bidders are required to review all plan documents and specifications thoroughly before submitting proposals, with particular attention to permit and inspection requirements that will be the contractor's responsibility throughout project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .