7-2-CS27003-26185370-Approved Plans.pdf
PDF 41 MB Posted
- Solicitation number
- CS27003
- Issued by
- Utah
About this file
Summary of Approved Plans for Utah State Fairpark Park Entrance Updates
This document comprises approved construction plans prepared by SPE Architects for the Division of Facilities Construction and Management (DFCM) for the Park Entrance Updates project at Utah State Fairpark, located at 155 North 1000 West, Salt Lake City, Utah 84116 (Project #26185370). The project scope involves parking lot rehabilitation and parking entrance improvements to enhance the grand entrance and improve parking and traffic flow at the facility. The approved permit set plans, dated June 17, 2026, include comprehensive design drawings across multiple disciplines: architectural, civil, structural, and electrical. The construction cost estimate is $600,000.00, and bidding is limited to contractors who have been prequalified under DFCM's Stage I Prequalification for Contractors and appear on the current DFCM Prequalified Contractors list at the time of solicitation. The plans include detailed specifications for site demolition, new concrete drives and sidewalks, curb and gutter work, parking area restriping, new entry signage and gates, and fencing modifications.
The plans incorporate comprehensive general notes and requirements addressing contractor responsibilities for field dimension verification, protection of existing finishes, dust control, safety compliance per IBC Chapter 33 and OSHA standards, blue staking before any digging activities, and coordination with owner regarding staging areas and equipment placement. Specific work requirements include daily cleaning of construction-related dust and debris in operational areas, protection of existing building and site elements with responsibility for repairs to any adversely affected areas, coordination of staging and dumpster locations with the owner, and provision of a 6-foot temporary chain-link fence with lockable gates around the staging area. The contractor is responsible for all permits, compliance with applicable codes and standards, proper handling of hazardous materials, hot work requirements per DFCM standards, and adherence to Salt Lake City and state utility requirements. Final acceptance requires submission of as-built record drawings, code inspection reports, compaction test reports, and various certifications before issuance of a certificate of occupancy.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COPYRIGHT:
© 2026 SPE ARCHITECTS
DESIGNED BY:
CHECKED BY:
SPE PROJECT #:
OWNER PROJECT #:
SPE ARCHITECTS
P.O. Box 517 Kaysville, Utah 84037
t. 801.298.1368 info@spe-architect.com www.spe-architect.com
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DRAWN BY:A
B
C
E
25-40
GTE
SPE
SPE
SHEET NUMBER:
SHEET TITLE:
ISSUED:
NO. DATE DESCRIPTION
PROFESSIONAL STAMP:
ARCHITECT'S INFORMATION:
PROJECT NAME:
REVISIONS:
NO. DATE DESCRIPTION
L a s t P lo tt e d
26185370
D
E
CODE OFFICIAL STAMP:
DRAWINGS ARE INTENDED TO BE PRINTED AND VIEWED IN COLOR
01 6/17/26 PERMIT SET
/1
/2
:4
:3
A
M
P A
R K
E N
T R
A N
C E
U P
D A
T E
S U
T A
H S
T A
T E
F A
IR
P
A R
K
N
O R
T H
W
E S
T S
A L T
L A
K E
C
IT
Y
U T
A H
TITLE SHEET
GI-001
PARK ENTRANCE UPDATES
UTAH STATE FAIRPARK
155 NORTH 1000 WEST
SALT LAKE CITY, UTAH 84116
JUNE 17, 2026
PERMIT SET
STATE OF UTAH
DEPARTMENT OF ADMINISTRATIVE SERVICES
DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT
4315 South 2700 West, Floor 3 | Taylorsville, UT 84129 / www.dfcm.utah.gov
DFCM PROJECT NO. 26185370
BHB CONSULTING ENGINEERS
2766 SOUTH MAIN STREET / SALT LAKE CITY, UTAH
84115 801.355.5656 / www.bhbengineers.com
STRUCTURAL ENGINEER
ROCKY MOUNTAIN
CONSULTING ENGINEERS
2332 W.12600 S. / RIVERTON, UTAH 84065
801.566.0503 / www.rmceut.com
ELECTRICAL ENGINEERCIVIL ENGINEER
1470 SOUTH 600 WEST / WOODS CROSS, UTAH 84087
801.298.2236 / www.entellus.com
ENTELLUS
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
07/08/2026
AE-101
A1
SIM
Room name
150 SF
DETAIL CALLOUT
BUILDING SECTION
WALL SECTION
DETAIL SECTION
ROOM NAME
ROOM NUMBER
ROOM SQ. FT.
(WHERE OCCURS)
DRAWING REVISION
REVISION NUMBER
NORTH ARROW
A GRID REFERENCE
CENTER LINE
CEILING HEIGHT
LEVEL
ELEVATION
VERTICAL ELEVATION
SPOT ELEVATION
DOOR NUMBER
WALL TYPE
WINDOW TYPE
KEYED NOTE
KEYED NOTE
GLASS TYPE
GRAPHIC SYMBOLS
N
A1
AE-101
SIM
A1
AE-101
SIM
A1
AE-101
SIM
CMU MASONRY
EARTH
CONCRETE
GRAVEL
STEEL
ALUMINUM
RIGID INSULATION
BATT INSULATION
STRUCTURAL FILL
BRICK MASONRY
PLYWOOD
PARTICLEBOARD
GYPSUM BOARD
ASPHALT PAVING
MATERIALS
WOOD (STUDS / NAILERS)
WOOD (BLOCKING)
WOOD
For the purpose of this section, deferred submittals are defined as per section 107.3.4.1 of the IBC. Submittal documents for deferred submittal items shall be submitted to the engineer/architect for their review for general conformance with the design of the building. After submittals are reviewed for general conformance by the architect and engineer of record, deferred submittals must be submitted to the building official for approval and that deferred items are not to be installed until approved by the building official (see IBC 107.3.4.1). Deferred submittals for this project are:
ITEM #1 NONE
1. THE CONTRACTOR IS TO THOROUGHLY FAMILIARIZE HIMSELF WITH THE
EXTENT OF WORK AND COORDINATE ALL TRADES.
2. ALL DIMENSIONS ARE TO BE FIELD VERIFIED - ANY VARIATIONS IN
DIMENSIONS ARE TO BE REVIEWED WITH THE ARCHITECT.
3. WHERE EXISTING WALLS ARE REMOVED PATCH REMAINING WALLS AS
REQUIRED FOR FLUSH FINISHED APPEARANCE.
4. THIS CONTRACTOR IS RESPONSIBLE FOR PATCHING/ REPAIRING ALL
IMPERFECTIONS IN ALL NEW AND EXISTING WALLS AFFECTED BY THIS
CONTRACT, INCLUDING HOLES, DENTS, BUMPS WAVES ETC. IT IS THE
CONTRACTORS RESPONSIBILITY TO VISIT THE JOB SITE PRIOR TO BIDDING
AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL SUCH WORK, THAT WILL
BE REQUIRED.
5. CORRIDORS SHALL NOT BE USED FOR STORAGE OF MATERIALS OR
STAGING OF THE WORK.
6. PATCH AND REPAIR WALLS AT OUTLETS AND AT OTHER OPENINGS
REQUIRED BY THIS REMODELING.
7. GRID LINES ARE ORIGINAL BUILDING GRID LINES.
8. PROTECT EXTG. FINISHES FROM DAMAGE.
9. DO NOT SCALE DRAWINGS. STATED & WRITTEN DIMENSIONS GOVERN. THE
GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND
SHALL BE RESPONSIBLE FOR THEIR ACCURACY. NO EXTRA CHARGE OR
COMPENSATION SHALL BE ALLOWED BECAUSE OF DIFFERENCE BETWEEN
ACTUAL DIMENSIONS AND THOSE INDICATED ON THE DRAWINGS, UNLESS
THEY CONTRIBUTE TO A CHANGE IN THE SCOPE OF THE WORK. ANY
DIFFERENCE WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE
ARCHITECT FOR DECISION PRIOR TO ORDERING, MANUFACTURING, OR
PROCEEDING WITH THE WORK. HORIZONTAL DIMENSIONS INDICATED ARE
TO/FROM FACE OF FINISH, UNLESS NOTED OTHERWISE. VERTICAL
DIMENSIONS ARE FROM TOP OF FLOOR SLAB EXCEPT WHERE NOTED TO BE
ABOVE FINISHED FLOOR (AFF). DIMENSIONS ARE NOT ADJUSTABLE
WITHOUT A APPROVAL OF ARCHITECT UNLESS NOTED +/-.
10. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL WORK REGARDLESS
OF THE LOCATION OF THE INFORMATION IN THE DOCUMENTS. THE
GENERAL CONTRACTOR SHALL UTILIZE THE CONSTRUCTION DRAWINGS
AND WRITTEN SPECIFICATIONS FOR ALL REQUIRED INFORMATION TO
PROVIDE COMPLETE CONSTRUCTION OF THIS PROJECT. ITEMS LISTED IN
DRAWINGS MAY NOT BE INCLUDED IN SPECIFICATIONS. ITEMS LISTED IN
SPECIFICATIONS MAY NOT BE INCLUDED IN DRAWINGS.
11. DISCREPANCIES BETWEEN PORTIONS OF THE CONTRACT DOCUMENTS ARE
NOT INTENDED. THE GENERAL CONTRACTOR IS TO CLARIFY WITH THE
ARCHITECT ANY SUCH DISCREPANCIES PRIOR TO COMMENCING WORK.
12. THE CONTRACTOR IS TO PROVIDE DUST WALL AS REQUIRED TO PERFORM
NEW WORK - COORDINATE LOCATION OF DUST WALLS WITH OWNER.
13. CONTRACTOR'S STAGING AREA IS TO BE PROVIDED WITH A SECURE,
LOCKED, 6'-0" (PER IBC 3306) TALL TEMPORARY CHAIN LINK FENCE. STAGING
AREA SHALL NOT BLOCK DOORS, DOCKS, SIDEWALKS ETC. ALL GAPS IN
FENCE TO BE MAINTAINED LESS THAN 4". REMOVE AND SECURE ALL
LADDERS AT THE END OF EACH DAY. DUMPSTER MUST BE KEPT IN LOCKED
FENCED AREA. COORDINATE LOCATION OF STAGING WITH OWNER.
SAFETY COMPLIANCE AND REQUIREMENTS:
THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE COMPLIANCE WITH THE INTERNATIONAL BUILDING CODE (IBC) 2021, CHAPTER 33, "SAFEGUARDS DURING CONSTRUCTION," AS WELL AS TO OTHER APPLICABLE REGULATIONS, SUCH AS OSHA STANDARDS. THIS INCLUDES BUT IS NOT LIMITED TO, IMPLEMENTING VARIOUS SAFETY MEASURES, SUCH AS TEMPORARY BARRIERS, FALL PROTECTION SYSTEMS, AND DESIGNATED SAFE ACCESS AND EGRESS ROUTES. ADDITIONALLY, PROPER HANDLING PROCEDURES FOR HAZARDOUS MATERIALS, A COMPREHENSIVE SAFETY PLAN, ADEQUATE LIGHTING AND VENTILATION, REGULAR INSPECTIONS, THOROUGH TRAINING, AND STRICT ADHERENCE TO ALL RELEVANT SAFETY REGULATIONS MUST ALSO BE DONE AS REQUIRED BY THE SCOPE OF THIS PROJECT. THE CONTRACTOR MUST DEMONSTRATE A PROACTIVE APPROACH TO SAFETY, ENSURING THAT ALL NECESSARY MEASURES ARE IN PLACE TO PROTECT WORKERS, VISITORS, AND THE GENERAL PUBLIC THROUGHOUT THE CONSTRUCTION PROCESS. THE CONTRACTOR IS RESPONSIBLE FOR FULLY UNDERSTANDING AND COORDINATING ALL APPLICABLE REQUIREMENTS AS WELL AS ALL SAFETY MEANS & METHODS AS THEY PERTAIN TO THIS PROJECT. FAILURE TO COMPLY WITH THESE REQUIREMENTS MAY RESULT IN INJURIES OR DAMAGES, FOR WHICH THE CONTRACTOR WILL BE HELD LIABLE. ALL COSTS AND TIME ASSOCIATED WITH THESE REQUIREMENTS MUST BE REFLECTED IN THE CONTRACTOR'S BID AND SHALL NOT
INCUR ADDITIONAL COST TO THE OWNER.
SITE WORK DIGGING REQUIREMENTS:
WHEN CONDUCTING EXTERIOR OR SITE WORK, AS TO MINIMIZE POTENTIAL DAMAGE TO EXISTING UNDERGROUND UTILITIES AND BURIED INFRASTRUCTURE, THE CONTRACTOR HOLDS THE RESPONSIBILITY OF ENSURING THE SITE IS BLUE STAKED BEFORE ENGAGING IN ANY DIGGING, TRENCHING, OR EXCAVATING ACTIVITIES, IRRESPECTIVE OF WHETHER THESE ACTIONS ARE EXPLICITLY SPECIFIED IN THE PROJECT PLANS. ADDITIONALLY, THE CONTRACTOR IS ACCOUNTABLE FOR EXERCISING DUE DILIGENCE BY INVESTIGATING AREAS THAT REQUIRE DIGGING BUT WERE NOT MARKED DURING THE BLUE STAKES PROCESS. THIS CAN BE ACHIEVED THROUGH METHODS LIKE POTHOLING
AND/OR HYDROVAC EXCAVATION OR SIMILAR METHODS.
WORK REQUIREMENTS
AND LIMITATIONS
A. CLEANING OF CONSTRUCTION RELATED DUST / DEBRIS IN AREAS MEANT TO BE
OPERATIONAL DURING CONSTRUCTION, MUST BE DONE DAILY.
B. TO MINIMIZE FACILITY DISRUPTION, WORK IS NOT TO BEGIN UNTIL ALL NEW BUILDING
PRODUCTS / ACCESSORIES ARE ON-SITE AND/OR VERIFIED TO BE IN THE CONTRACTORS
STORAGE FACILITIES.
C. CONTRACTOR IS TO TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING BUILDING /
SITE ELEMENTS AND FINISHES - ANY EXISTING ELEMENTS AND FINISHES THAT ARE
ADVERSELY AFFECTED BY THE WORK OF THIS PROJECT WILL BE THE CONTRACTORS
RESPONSIBILITY TO PATCH / REPAIR / REPLACE / REFINISH AS REQUIRED TO BRING THE
AFFECTED ELEMENTS BACK TO ITS ORIGINAL OR BETTER THAN ORIGINAL CONDITION, AS
DEEMED ACCEPTABLE BY THE OWNER AND ARCHITECT.
D. CONTRACTOR IS TO COORDINATE STAGING AREAS, DUMPSTER LOCATIONS, CONTRACTOR
PARKING ETC. WITH THE OWNER - STAGING AREA IS TO HAVE A 6' TALL, TEMPORARY CHAIN
LINK FENCE (WITH LOCKABLE GATES AS REQ'D.) - FENCE / GATES SHALL HAVE NO GAPS
LARGER THAN 4"
North: ______ South: ______ East: ______ West: ______
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly
ListingListing Element
Assembly Hours
Smoke Partitions
Fire Partitions
Exterior Bearing Walls
Interior Bearing Walls
Exterior Non-Bearing Walls
Structural Frame
Partitions - Permanent
Fire Barriers
Floors - Ceiling Floors
Roofs - Ceiling Roofs
Exterior Doors and Windows
Shaft Enclosures
Fire Walls
BAHTBABABA
Design Wind Speed: ______ mphB. Seismic Design Category: ______
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): ___________________Actual AreaH:
Number of Stories: ______ Building Height: ____________G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
Guidelines
ADA Accessibility Building Conservation
Uniform Code for
National Electrical Code
Conservation Code
International Energy
International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
YearYear
APPLICABLE CODES
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
N.A.
2021 2009 ANSI 117.1
PARKING LOT REHABILITATION AND PARKING ENTRANCE
PROJECT FOR AN OVERALL LARGER COMPLEX OF BUILDINGS -
CODE ANALYSIS IS NOT APPLICABLE TO THIS PROJECT
COPYRIGHT:
© 2026 SPE ARCHITECTS
DESIGNED BY:
CHECKED BY:
SPE PROJECT #:
OWNER PROJECT #:
SPE ARCHITECTS
P.O. Box 517 Kaysville, Utah 84037
t. 801.298.1368 info@spe-architect.com www.spe-architect.com
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DRAWN BY:A
B
C
E
25-40
GTE
SPE
SPE
SHEET NUMBER:
SHEET TITLE:
ISSUED:
NO. DATE DESCRIPTION
PROFESSIONAL STAMP:
ARCHITECT'S INFORMATION:
PROJECT NAME:
REVISIONS:
NO. DATE DESCRIPTION
L a s t P lo tt e d
26185370
D
E
CODE OFFICIAL STAMP:
DRAWINGS ARE INTENDED TO BE PRINTED AND VIEWED IN COLOR
01 6/17/26 PERMIT SET
/1
/2
:4
:3
A
M
P A
R K
E N
T R
A N
C E
U P
D A
T E
S U
T A
H S
T A
T E
F A
IR
P
A R
K
N
O R
T H
W
E S
T S
A L T
L A
K E
C
IT
Y
U T
A H
GENERAL
INFORMATION
GI-002
@ at
ABV above
ACOUS acoustical
ACT acoustical ceiling tile
AD area drain
ADJ adjustable
AFF above finished floor
ALT alternate
ALUM aluminum
APPROX approximate
ARCH architect
B.O. bottom of
BALC balcony
BD board
BET between
BLDG building
BLKG blocking
BLW below
BM beam
BOT bottom
BRKT bracket
BULKHD bulkhead
BUR built up roof
C.G. corner guard
CAB cabinet
CALK caulking
CEM cement
CER ceramic
CJ control joint
CLG ceiling
CLOS closet
CLR clear
CO cased opening
COL column
CONC concrete
CONT continuous
CPT carpet
CT ceramic tile
CTR center
DBL double
DET detail
DIA diameter
DIM dimension
DN down
DR door
DS down spout
DW dishwasher
DWG drawing
Ø diameter
(E) existing
E east
ABBREVIATIONS DRAWING INDEX
DRAWING TITLESHT. #
GENERAL:
GI-001 TITLE SHEET
GI-002 GENERAL INFORMATION
GI-003 DFCM FORMS
GI-004 ADA GENERAL REQUIREMENTS
CIVIL:
CE101 NOTES & LEGEND
CE102 CITY NOTES
CE300 DEMOLITION PLAN
CE400 SITE PLAN
CE401 SITE PLAN CONT.
CE500 GRADING PLAN
CE906 DETAIL SHEET
STRUCTURAL:
S-001 GENERAL STRUCTURAL NOTES
S-002 SPECIAL INSPECTIONS
S-010 LEGENDS AND NOTES
S-101 FOOTING AND FOUNDATION PLANS
S-501 DETAILS
S-601 SCHEDULES
S-602 SCHEDULES
ARCHITECTURAL:
AE-101 SITE PLAN - DEMOLITION
AE-102 SITE PLAN - NEW
AE-201 ELEVATIONS
AE-301 SECTIONS
AE-401 ENLARGED SITE PLAN AREAS
AE-402 ENLARGED VEHICLE ENTRY
AE-501 DETAILS
AE-502 DETAILS
AE-503 DETAILS
AE-504 DETAILS / SIGN SCHEDULE
ELECTRICAL:
E000 ELECTRICAL GENERAL SHEET
E001 ELECTRICAL SITE PLAN
E401 ENLARGED ELECTRICAL PLAN
E501 ELECTRICAL DETAILS
E601 ELECTRICAL SCHEDULES
PROJECT LOCATION
DEFERRED SUBMITTALS
GENERAL NOTES
EA each
EIFS exterior insulation & finish system
ELEC electrical
ELEV elevation
EMER emergency
ENCL enclosure
EOS edge of slab
EQ equal
EQUIP equipment
ETR existing to remain
EW each way
EWC electric water cooler
EXP. JT. expansion joint
EXTG. existing
F.O. face of
FA fire alarm
FAP fire annunciator panel
FD floor drain
FE fire extinguisher
FEC fire extinguisher cabinet
FG finish group
FH fire hydrant
FHC fire hose cabinet
FIN finish
FLR floor
FRT fire retardant treated
FT foot or feet
FUR furring
FV field verify
GAL gallon
GALV galvanized
GB grab bar
GC general contractor
GL glass
GND ground
GWB gypsum board
GYP gypsum
H.W.H. hot water heater
HC handicapped
HDWD hardwood
HDWR hardware
HM hollow metal
HORIZ horizontal
HR hour
HT height
ID inner diameter
INCAN incandescent
INSUL insulation
INT interior
JAN janitor
JST joist
JT joint
LAM laminate
LAV lavatory
LB(S) pounds
LDG landing
LT light
MAX maximum
MECH mechanical
MEMB membrane
MFR manufacturer
MIN minimum
MISC miscellaneous
MO masonry opening
MTD mounted
MTL metal
(N) new
N north
NIC not in contract
NO number
NOM nominal
NTS not to scale
O.P. overflow pipe
OA overall
OC on center
OD outside diameter
OFF office
OH opposite hand
OPG opening
OPP opposite
PART partition
PERM perimeter
PG paint grade
PLAM plastic laminate
PLAS plaster
PLYWD plywood
PR pair
PT paint
PTD painted
R riser
RAD radius
RCP reflected ceiling plan
RD roof drain
RE refer
REF refrigerator
REINF reinforced
REQD required
RESIL resilient
RM room
RO rough opening
RTU root top unit (mechanical)
S south
SAFB sound attenuation fiber batt
SC scupper
SCHED schedule
SEAL sealant
SECT section
SF square foot
SHT sheet
SIM similar
SPEC specification
SQ square
SS stainless steel
STD standard
STL steel
STOR storage
STRUCT structural
SUSP suspended
SYM symmetrical
T tread
T&G tongue & groove
TEL telephone
TER terrazzo
THK thick
THR threshold
TO top of
TOM top of masonry
TYP typical
UC undercut
UNFIN unfinished
UNO unless noted otherwise
UON unless otherwise noted
UTIL utility
VCT vinyl composition tile
VERT vertical
VIF verify in field
VTR vent termination pipe
VWC vinyl wall covering
W west
W/ with
W/O without
WC water closet
WIN window
WP waterproof
WS wet stack
WSCT wainscot
WT weight
PROJECT
LOCATION
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
N .A
T h e f o ll o w in g d o c u m e n ts a re r e q u ir e d b e fo re a c e rt if ic a te o f o c c u p a n c y i s i s s u e d
A c o d e i n s p e c ti o n r e p o rt r e c o m m e n d in g t h a t a c e rt if ic a te o f o c c u p a n c y b e i s s u e d
F in a l re p o rt f ro m t h e s p e c ia l in s p e c ti o n a g e n c y
C e rt if ic a te o f fi re c le a ra n c e f ro m t h e S ta te
F ir e M a rs h a ll.
F in a l a p p ro v a l fr o m t h e S ta te
E le v a to r in s p e c to r, i f a p p lic a b le
F in a l a p p ro v a l fr o m t h e S ta te b o ile r in s p e c to r, i f a p p lic a b le
R e p o rt o f th e d is in fe c ti o n o f th e p o ta b le w a te r s y s te m I P
C
A
C e rt if ic a te o f C o m p lia n c e f ro m t h e a p p ro v e d f a b ri c a to r, i f a p p lic a b le
IB
C
.2
.2
A s ta m p e d a n d s ig n e d f in a l re p o rt f ro m t h e s tr u c tu ra l e n g in e e r w h e n s tr u c tu ra l o b s e rv a ti o n i s r e q u ir e d b y I B
C
A n N
F R
C C e rt if ic a te f o r fe n e s tr a ti o n w it h o u t th e N
F R
C l a b e l.
F in a l re p o rt f ro m t h e s p e c ia l in s p e c to r a n d t h e m e c h a n ic a l e n g in e e r w h e n s m o k e c o n tr o l is r e q u ir e d
T h e r e p o rt s m u s t c o m p ly w it h I B
C
.1
.8
.3
N .A
N .A
N .A
N
.A
N .A
N
.A
G E
N E
R A
L D
F C
M N
O T
E S
C
O N
S T
R U
C T
IO
N
O F
N E
W S
T A
T E
B U
IL
D
IN
G
S A
N D
R E
M O
D E
L
IN
G O
F E
X
IS
T
IN
G B
U
IL
D
IN
G S
H A
L L C
O M
P L Y
W
IT
H A
L L T
H E
R E
Q U
IR
E
M E
N T
S O
F T
H E
D F
C M
S T
A N
D A
R D
S T
H E
D F
C M
T A
N D
A R
D S
C A
N B
E F
O U
N D
A T
T H
E F
O L L O
W
IN
G W
E B
S
IT
E w w .d fc m
.u ta h .g o v
A
R C
H
IT
E C
T E
N G
IN
E
E R
S H
A S
D E
S
IG
N E
D T
H
IS
P R
O J E
C T
T O
M E
E T
A L L D
F C
M S
T A
N D
A R
D S
P
R
IO
R T
O F
IN
A
L A
P P
R O
V A
L O
F T
H E
P R
O J E
C T
A F
IN
A
L I N
S P
E C
T
IO
N N
E E
D S
T O
B E
U B
M
IT
T E
D T
O T
H E
B U
IL
D
IN
G
O F
F
IC
IA
L I N
D
IC
A T
IN
G
T H
A T
T H
E P
R O
J E
C T
I S
C O
M P
L E
T E
I
A
C
O R
D A
N C
E W
IT
H
T H
E A
P P
R O
V E
D D
R A
W
IN
G S
A N
D D
O C
U M
E N
T S
T
H E
F O
L L O
W
IN
G D
O C
U M
E N
T S
A R
E R
E Q
U
IR
E D
B E
F O
R E
A C
E R
T
IF
IC
A
T E
O F
O C
C U
P A
N C
Y I
IS
U
E D
A
C O
D E
I N
S P
E C
T
IO
N R
E P
O R
T R
E C
O M
M E
N D
IN
G
T H
A T
A C
E R
T
IF
IC
A
T E
O F
C
U P
A N
C Y
B E
I S
S U
E D
F
IN
A L R
E P
O R
T F
R O
M T
H E
S P
E C
IA
L I N
S P
E C
T
IO
N A
G E
N C
Y
C
E R
T
IF
IC
A
T E
O F
F
IR
E C
L E
A R
A N
C E
F R
O M
T H
E S
T A
T E
F
IR
E M
A R
S H
A L L
R
E P
O R
T O
F T
H E
D
IS
IN
F
E C
T
IO
N O
F T
H E
P O
T A
B L E
W A
T E
R S
Y S
T E
M I P
C
A
C E
R T
IF
IC
A T
E O
F C
O M
P L
IA
N C
E F
R O
M T
H E
A P
P R
O V
E D
F A
B R
IC
A
T O
R
IF
P P
L
IC
A B
L E
IB
C
.2
.2
A
S
IG
N E
D F
IN
A
L O
B S
E R
V A
T
IO
N R
E P
O R
T F
R O
M T
H E
S T
R U
C T
U R
A L E
N G
IN
E
R
W
E
N S
T R
U C
T U
R A
L O
B S
E R
V A
T
IO
N I S
R E
Q U
IR
E
D B
Y I B
C
H O
T W
O R
K
Q
U
IR
E M
E N
T S
N O
T E
T H
A T
T H
E S
T A
T E
O F
U T
A H
D
F C
M R
E Q
U
IR
A
IN
IN
G T
E S
T
IN
G A
N D
P E
R M
IT
S
F O
R E
V E
R Y
O N
E T
H
IL
L P
E R
F O
R M
H O
T W
O R
K S
O N
S T
A T
E P
R O
J E
C T
S
V
IS
IT
E U
R L I N
D
IC
A T
E D
B E
L O
W F
O R
M O
R E
I N
F O
R M
A T
IO
N h tt p s /d fc m
.u ta h .g o v /c o n s tr u c ti o n -m a n a g e m e n t/ b u ild in g -o ff ic ia l/ h o t-w o rk s
COPYRIGHT:
© 2026 SPE ARCHITECTS
DESIGNED BY:
CHECKED BY:
SPE PROJECT #:
OWNER PROJECT #:
SPE ARCHITECTS
P.O. Box 517 Kaysville, Utah 84037
t. 801.298.1368 info@spe-architect.com www.spe-architect.com
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DRAWN BY:A
B
C
E
25-40
GTE
SPE
SPE
SHEET NUMBER:
SHEET TITLE:
ISSUED:
NO. DATE DESCRIPTION
PROFESSIONAL STAMP:
ARCHITECT'S INFORMATION:
PROJECT NAME:
REVISIONS:
NO. DATE DESCRIPTION
L a s t P lo tt e d
26185370
D
E
CODE OFFICIAL STAMP:
DRAWINGS ARE INTENDED TO BE PRINTED AND VIEWED IN COLOR
01 6/17/26 PERMIT SET
/1
/2
:4
:3
A
M
P A
R K
E N
T R
A N
C E
U P
D A
T E
S U
T A
H S
T A
T E
F A
IR
P
A R
K
N
O R
T H
W
E S
T S
A L T
L A
K E
C
IT
Y
U T
A H
DFCM FORMS
GI-003
X
X
X X
X
X
X X
X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
(A) CIRCULAR (B) T-SHAPED
A
X
VERTICAL CHANGES IN LEVEL BEVELED CHANGES IN LEVEL
60" MIN. 60" MIN.
M
IN
M
IN
12" MIN. 36" MIN. 12" MIN.
16" to 18"
60" min.
/4
/4
/2
FLOOR LINE
PAPER TOWEL
DISPENSER &
TRASH
(UNOBSTRUCTED)
PAPER TOWEL
DISPENSER
(UNOBSTRUCTED)
TOILET SEAT
COVERS
(UNOBSTRUCTED)
SANITARY NAPKIN
VENDOR
(UNOBSTRUCTED)
SOAP DISPENSER BABY CHANGING
STATION
(UNOBSTRUCTED)
HAND DRYER
(UNOBSTRUCTED)
M A
X
N
T R
O L S
M A
X
M A
X
N
T R
O L S
M A
X
WALL LINE
M A
X
N
T R
O L S
FLOOR LINE
1' - 3" 1' - 3"
2' - 6"
CLEAR MIN.
ACCESSIBLE
URINAL (STYLE
MAY VARY)
FACE OF WALL
VENEER OR
PARTITION
FLOOR LINE
M
IN
3' - 6" MIN.
4' - 6" MIN.
1' - 0" MAX.
GRAB BAR
7" - 9"
-1
/2
M
IN
C
L E
A R
1' - 6"
WALL LINE
1' - 0" MIN.1' - 0" MIN.
WHERE SPACE
PERMITS, EXTEND
GRAB BAR ON
TRANSFER SIDE
12" MIN.
TOILET STYLE
MAY VARY
1' - 6"
60" MIN. CLEAR
3' - 6" MIN.
M
IN
C
L E
A R
CLEAR
FLOOR
SPACE
M
IN
FLOOR LINE
FRAMED MIRROR - 38"
MAX. TO REFLECTIVE
SURFACE (NOT
BOTTOM OF FRAME)
SOAP
DISPENSER
ACCESSIBLE
LAVATORY W/
ADA FAUCET W/
ADA LEVER
HANDLES
PIPE INSULATION
AT ALL EXPOSED
PIPES
CLEAR
FLOOR
SPACE
WALL LINE
M A
X
C L E
A R
1' - 5" MAX.
M
IN
8"
11"
M A
X
M
IN
2' - 6" MIN.
M A
X
M A
X
8"
11"
5" MAX.
FLOOR LINE
1' - 3" MIN.
H
IG
T
IN
4' - 0"
" CLEAR
FLOOR
SPACE
WALL LINE
WATER CLOSET LOCATION
/ CLEAR FLOOR SPACE
ELECTRIC WATER COOLER
ACCESSIBLE URINAL
ACCESSIBLE LAVATORY
ACCESSIBLE TOILET STALL
WHEELCHAIR TURNING SPACE
MISC. ACCESSORIES MOUNTING HEIGHT
ACCESSIBLE CHANGES IN LEVEL
3' - 4"
3'
4"
SANITARY
NAPKIN
DISPOSAL
TOILET PAPER
M A
X
FULL LENGTH
MIRROR
1'
6" 4'
6"
6'
0"
1' - 6"
FIRE
EXTINGUISHER
CABINET
4'
1/
" M A
X
4'
1/
" M
A X
3'
2" M
A X
" M
IN
. C
LE
A
R A
C C
E S
S
6" MIN.
BOTTOM OF
PARTITION MUST
HAVE A MIN. TOE
CLEARANCE OF
9" ABOVE FINISH
FLOOR ON THE
FRONT AND AT
LEAST ONE SIDE
(EXCLUSIVE OF
PARTITION
SUPPORT
MEMBERS)
M
IN
MIN.
2' - 6"
CLEAR
FLOOR
SPACE
WALL LINE
1'
5"
1' - 3" 1' - 3" back wall seat wall control wall
CONTROLS IN TRANSFER-TYPE SHOWER
control wall control wall
LOCATION OF SHOWER SPRAY UNIT
SPACING OF GRAB BARSRECTANGULAR SHOWER
COMPARTMENT SEAT
L-SHAPED SHOWER
COMPARTMENT SEAT
TRANSFER-TYPE SHOWER COMPARTMENT WITH GRAB BARS
m in
48" min.
36"
18" m a x
15" max.
m in
1 1/2"
2 1/2" max.
m a x
15"-16"
/2 m a x
22"-23"
15"-16"
2 1/2" max.
/2 m a x
CL
CL
SHOWER ROD AND CURTAIN
FLOOR LINE
CEILING LINE
DIVIDING SHOWER
WALLS
6'
8"
SHOWER ROD
SHOWER CURTAIN
ACCESSIBLE SHOWERS
A B
S O
L U
T E
D
IM
ABSOLUTE DIM.
1' - 0"
MIN.
SHOWERS AND ALL RELATED COMPONENTS MUST FULLY COMPLY
WITH THE REQUIREMENTS OF "TRANSFER-TYPE SHOWER
COMPARTMENTS" AS STATED IN ICC/ANSI A117.1-2003
M
IN
F
O R
W A
L L H
U N
G T
O
IL
E T
M
IN
F
O R
F L O
U
N T
E D
T O
IL
E
T
CHARACTER HEIGHT
LIBRARY
/8
9" 9"
SIGNAGE AT DOORS
WALL OR GLASS
AT SIDELITE AS
OCCURS
WALL OR GLASS
AT SIDELITE AS
OCCURS
SIGN TYPE
VARIES - SEE
DOOR SCHEDULE
SIGN TYPE
VARIES - SEE
DOOR SCHEDULE
48" MIN. TO 60" MAX.
TO BASELINE OF
BRAILE / BASELINE
HIGHEST RAISED
CHARACTER
48" MIN. TO 60" MAX.
TO BASELINE OF
BRAILE / BASELINE
HIGHEST RAISED
CHARACTER
C O
O R
D
W
F
IX
T U
R
C C
E S
S O
R
IE
S
Q 'D
C O
O R
D
W
F
IX
T U
R
C C
E S
S O
R
IE
S
Q 'D
COPYRIGHT:
© 2026 SPE ARCHITECTS
DESIGNED BY:
CHECKED BY:
SPE PROJECT #:
OWNER PROJECT #:
SPE ARCHITECTS
P.O. Box 517 Kaysville, Utah 84037
t. 801.298.1368 info@spe-architect.com www.spe-architect.com
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DRAWN BY:A
B
C
E
25-40
GTE
SPE
SPE
SHEET NUMBER:
SHEET TITLE:
ISSUED:
NO. DATE DESCRIPTION
PROFESSIONAL STAMP:
ARCHITECT'S INFORMATION:
PROJECT NAME:
REVISIONS:
NO. DATE DESCRIPTION
L a s t P lo tt e d
26185370
D
E
CODE OFFICIAL STAMP:
DRAWINGS ARE INTENDED TO BE PRINTED AND VIEWED IN COLOR
01 6/17/26 PERMIT SET
/1
/2
:4
:3
A
M
P A
R K
E N
T R
A N
C E
U P
D A
T E
S U
T A
H S
T A
T E
F A
IR
P
A R
K
N
O R
T H
W
E S
T S
A L T
L A
K E
C
IT
Y
U T
A H
ADA GENERAL
REQUIREMENTS
GI-004N
O
T E
T
H E
I N
F O
R M
A T
IO
N
O N
T H
IS
S
H E
E T
I N
D
IC
A T
E S
G E
N E
R A
L A
D A
D E
S
IG
Q U
IR
E
M E
N T
S A
N D
I S
F O
R R
E F
E R
E N
C E
O N
L Y
A
N Y
D
IS
C R
E P
A N
C
IE
B
T W
E E
N T
H
IS
S H
E E
T A
N D
T H
E R
E S
T O
F T
H E
D E
S
IG
N D
R A
W
IN
G S
A
B E
C O
N S
T R
U C
T E
D A
S I N
D
IC
A T
E D
I N
T H
E D
E S
IG
N
D R
A W
IN
G
S
IF
Y Q
U E
S T
IO
N
S A
R
IS
E D
U E
T O
D
IS
C R
E P
A N
C
IE
S O
R M
IS
S
F O
R M
A T
IO
N
C O
N T
A C
T T
H E
A R
C H
IT
E
C T
P R
IO
R
T O
P E
R F
O R
M
R K
P R
O V
ID
E
B L O
C K
IN
G
B
A C
K
IN
G A
S R
E Q
U
IR
E D
F O
R A
L L W
A L L
U N
T E
D A
C C
E S
S O
R
IE
S F
IX
T
U R
E S
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
GRADING NOTES
Know what'sbelow.
before you dig.Call www.bluestakes.org
BLUE STAKES OF UTAH
1-800-662-4111
UTILITY NOTIFICATION CENTER, INC.
H:
\1
0\
1\
D_
PR
OD
UC
TI
ON
\C iv il\
_P la n Se t\P
LA
N
SE
T
1.
dw g
6-
-1
:3 3:
HR
IS
TO
PH
ER
A
RG
YL
E
MONUMENT
PUBLIC UTILITY EASEMENT
EXISTING INDEX CONTOUR
EXISTING MINOR CONTOUR
PROPOSED CONTOUR
SECTION CORNER
PROPOSED FENCE
CENTER LINE OF ROAD
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
ADA PARKING
STREET LIGHT
1. CONSTRUCTION EXIT IS TO BE CONSTRUCTED AT TIME OF ENTRY TO SITE.
2. CLEAR AND GRUB AREAS FOR SEDIMENT MEASURES.
3. INSTALL SILT FENCES.
4. COMPLETE CLEARING OF SITE AND BEGIN ROUGH GRADING.
5. FILL AREAS SHALL BE FILLED IN 12 INCH MAXIMUM LIFTS AND COMPACTED TO AT LEAST 95%
MAXIMUM DENSITY.
6. DRAINAGE WILL BE CONTROLLED AND GROUND SLOPED SO AS TO DIRECT RUNOFF TO
SEDIMENT CONTROLLED INLETS.
7. INSTALL REMAINDER OF STORM DRAIN.
8. INSTALL UTILITY LINES, WATER, ETC.
9. INSTALL CURBS, WALKS, ETC., AND STABILIZE ALL DISTURBED AREAS.
10. INSTALL BASE COURSE.
11. REMOVE SEDIMENT CONTROL MEASURES, CLEAN OUT TEMPORARY SEDIMENTATION BASINS
AND REGRADE, CLEAN OUT SEDIMENT TRAPS AND CONVERT THEM TO STORM WATER
MANAGEMENT STRUCTURES.
12. PAVE SITE.
13. OWNER TO BE RESPONSIBLE TO CHECK CLEAN OUT INLET BOXES FOR SEDIMENT AND OIL
AND CLEAN AS NECESSARY
1. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS
AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS
REPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING
IT WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT. ALL
EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED
PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557 EXCEPT UNDER
BUILDING FOUNDATION WHERE IT SHALL BE 95% MIN. OF MAXIMUM
DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED
2% ABOVE NOR 3% BELOW OPTIMUM. CONTRACTOR SHALL SUBMIT A
COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS
ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS
WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN
COMPACTED IN ACCORDANCE WITH THESE PLANS AND SPECS AND THE
RECOMMENDATIONS SET FORTH IN THE SOILS. REPORT.
2. THE CONTRACTOR IS TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING
EROSION CONTROL FOR CONSTRUCTION OF THE PROJECT. SPECIFIC DETAILS
SHOWN SHALL BE USED IN COMBINATION WITH OTHER ACCEPTED LOCAL
PRACTICES.
3. EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN
THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION
AVAILABLE AT THE TIME OF PREPARATION OF PLANS. LOCATIONS MAY NOT
HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO
ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN ON THESE
PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY
ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR'S FAILURE TO
VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING OF
CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR
AND ASSUMED INCLUDED IN THE CONTRACT.
4. IF AT ANY TIME DURING CONSTRUCTION ANY UNFAVORABLE GEOLOGICAL
CONDITIONS ARE ENCOUNTERED, WORK IN THAT AREA WILL STOP UNTIL
APPROVED CORRECTIVE MEASURES ARE OBTAINED FROM THE ENGINEER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING HIS/HER OWN ESTIMATE
OF EARTHWORK QUANTITIES.
6. WHERE NEW CURB AND GUTTER IS BEING CONSTRUCTED ADJACENT TO
EXISTING ASPHALT OF CONCRETE PAVEMENT, THE FOLLOWING SHALL APPLY:
· PRIOR TO PLACEMENT OF ANY CONCRETE THE CONTRACTOR SHALL HAVE
A LICENSED SURVEYOR VERIFY THE GRADE AND CROSS SLOPE OF THE
CURB AND GUTTER FORMS.
· THE CONTRACTOR SHALL SUBMIT THE SLOPE AND GRADES TO THE
ENGINEER FOR APPROVAL PRIOR TO THE PLACEMENT OF CONCRETE.
· THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY
SECTION WHICH DOES NOT CONFORM TO THE DESIGN OR TYPICAL CROSS
SECTION.
· THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CURB AND GUTTER
POURS WITHOUT THE APPROVAL OF THE ENGINEER.
1. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE CONSTRUCTED
AND MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND
REGULATIONS OF THE LOCAL GOVERNING MUNICIPALITY.
2. ALL SEDIMENT CONTROL MEASURES TO BE ADJUSTED TO MEET FIELD
CONDITIONS AT THE TIME OF CONSTRUCTION AND CONSTRUCTED PRIOR TO
ANY GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON
BALANCE OF SITE.
3. DAILY INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL
STRUCTURES MUST BE PROVIDED TO INSURE INTENDED PURPOSE IS
ACCOMPLISHED. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SEDIMENT
LEAVING THE PROPERTY. SEDIMENT CONTROL MEASURES SHALL BE IN
WORKING CONDITION AT THE END OF EACH WORKING DAY.
4. ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS WILL BE PROTECTED
TO PREVENT TRACKING OF MUD ONTO PUBLIC WAYS.
5. ALL SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAINAGE
SYSTEM THROUGH THE USE OF SANDBAGS, STRAW BALES, SILT FENCES,
GRAVEL, BOARDS, AND OTHER APPLICABLE METHODS.
6. ALL DISTURBED AREAS OUTSIDE OF ROADWAYS, PARKING LOTS, SIDEWALKS
AND OR BUILDING FOOTPRINTS SHALL BE SEEDED, SODDED AND/OR
MULCHED.
7. IF SITE IS READY TO RECEIVE FINAL COVER DURING THE NON-PLANTING
SEASON, THEN IT SHALL BE PROTECTED BY MULCHING. THE MULCH WILL
REMAIN UNTIL THE NEXT PLANTING SEASON AS DEFINED BY THE LOCAL
GOVERNING MUNICIPALITY.
8. RE-VEGETATE ALL DENUDED AREAS AS PER THE STANDARDS AND
REGULATIONS OF THE LOCAL GOVERNING MUNICIPALITY.
9. THE CONTRACTOR AGREES THAT:
A. THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH
PHASE OF WORK.
B. THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH,
SCRAP AND UNUSED MATERIAL AT THEIR OWN EXPENSE IN A TIMELY
MANNER.
C. THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND
ORDERLY MANNER AT ALL TIMES.
D. THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH
OUT OF THE WAY OF OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB.
FAILURE TO DO SO WILL RESULT IN A DEDUCTION FOR THE COST OF CLEAN
UP FROM FINAL PAYMENT.
E. THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY, TRAFFIC CONTROL.
PERMITS, RETESTING AND REINSPECTION AT THEIR OWN EXPENSE.
F. UNLESS OTHERWISE NOTED ALL EXCESS SOILS AND MATERIALS SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE LAWFULLY
DISPOSED OF OFF SITE AT THE CONTRACTOR'S EXPENSE.
G. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, SIGNS,
FLAG-MEN OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
1. ALL SERVICE LATERALS SHALL BE EXTENDED 2 FEET PAST THE 10 FOOT P.U.E.
2. ALL CONSTRUCTION SHALL COMPLY WITH LOCAL GOVERNING MUNICIPALITY
DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS
3. LOCATIONS OF ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE
LOCATIONS. CONTRACTOR IS TO FIELD VERIFY CONNECTION POINTS WITH
EXISTING UTILITIES, INCLUDING LOCATIONS AND INVERT ELEVATIONS OF
ALL EXISTING STRUCTURES OR PIPES, BEFORE STAKING OR CONSTRUCTING
ANY NEW UTILITIES. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE
CAUSED TO EXISTING UTILITIES AND UTILITY STRUCTURE THAT ARE TO
REMAIN.
4. CONTRACTOR IS RESPONSIBLE TO EXPOSE ALL UTILITY SERVICES STUBBED
INTO PROJECT PROPERTY AND GIVE ENTELLUS. 48 HOURS PRIOR NOTICE SO
ENTELLUS CAN VERIFY DEPTHS AND INVERT ELEVATIONS TO DETERMINE IF
CONFLICTS EXIST. ALSO ANY EXISTING UTILITIES THAT RUN ACROSS
PROJECT PROPERTY WHICH MAY CAUSE POTENTIAL CONFLICT NEED TO BE
EXPOSED AND LOCATED BOTH HORIZONTALLY AND VERTICALLY.
CONTRACTOR PROCEEDS AT OWN RISK IF ENTELLUS IS NOT NOTIFIED TO
FIELD VERIFY THE ABOVE MENTIONED CONDITIONS.
5. CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL
DRAWINGS WHERE APPLICABLE.
6. NO GROUNDWATER OR DEBRIS TO BE ALLOWED TO ENTER THE NEW PIPE
DURING CONSTRUCTION. THE OPEN END OF ALL PIPES IS TO BE
COVERED AND EFFECTIVELY SEALED AT THE END OF EACH DAYS WORK.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF
ADEQUATE CLASSIFICATION WITH SUFFICIENT BEDDING TO MEET ALL
REQUIREMENTS AND RECOMMENDATIONS FOR H-20 LOAD REQUIREMENTS.
8. ALL NEW SANITARY SEWER CONSTRUCTION TO BE DONE IN ACCORDANCE
WITH LOCAL GOVERNING MUNICIPALITY STANDARDS & SPECIFICATIONS.
9. ALL SEWER LINES AND LATERALS ARE TO BE SDR 35 PVC PIPE.
10. SEWER LATERALS WILL BE INSTALLED AT A UNIFORM SLOPE OF NOT LESS
THAN 2% GRADE AND THEY SHALL HAVE A MINIMUM OF 4 FEET OF COVER,
UNLESS OTHERWISE NOTED.
11. ALL NEW CULINARY AND IRRIGATION WATER CONSTRUCTION TO BE DONE
IN ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS &
SPECIFICATIONS.
12. WATER LINES TO BE PVC C-900. WATER LINES SHALL BE A MINIMUM
OF 10' HORIZONTALLY FROM SEWER MAINS. CROSSINGS SHALL MEET
STATE HEALTH STANDARDS. (MECHANICAL JOINTS REQUIRED WHEN
LESS THAN 18" VERTICAL OR 10' HORIZONTAL SEPARATION FROM
SEWER LINES.)
13. ALL WATER LINES SHALL BE 8" MINIMUM SIZE AND SERVICE LATERALS
SHALL BE 1-1/2" MINIMUM UNLESS OTHERWISE NOTED.
14. WATER SERVICE LATERALS TO INCLUDE ALL BRASS SADDLE; CORP.
STOP LATERAL, DOUBLE CHECK VALVE AND BACKFLOW PREVENTION
DEVICE, AND SHUTOFF VALVE IN BOX NEAR BUILDING EDGE.
15. ALL WATER LINES SHALL BE A MINIMUM 48" BELOW FINISH GROUND
TO TOP OF PIPE. ALL VALVE BOXES AND MANHOLES SHALL BE RAISED
OR LOWERED TO FINISH GRADE AND SHALL INCLUDE A CONCRETE
COLLAR IN PAVED AREAS.
16. CONTRACTOR TO NOTIFY PUBLIC UTILITIES FOR CHLORINE TEST PRIOR
TO FLUSHING LINES, CHLORINE LEFT IN PIPE 24 HOURS MINIMUM WITH
25 PPM RESIDUAL. ALL TURNING OF MAINLINE VALVES, CHLORINATION,
FLUSHING, PRESSURE TESTING, BACTERIA TESTING, ETC. TO BE
COORDINATED WITH LOCAL GOVERNING MUNICIPALITY. ALL TESTS TO BE
IN ACCORDANCE WITH AWWA STANDARDS.
17. BOTTOM FLANGE OF FIRE HYDRANTS TO BE SET TO APPROXIMATELY
4" INCHES ABOVE BACK OF CURB ELEVATION. HYDRANTS TO INCLUDE
TEE, 6" LINE VALVE, AND HYDRANT COMPLETE TO MEET CITY
STANDARDS.
18. ALL NEW STORM DRAIN/LAND DRAIN CONSTRUCTION TO BE DONE IN
ACCORDANCE WITH LOCAL GOVERNING MUNICIPALITY STANDARDS &
SPECIFICATIONS.
19. ALL STORM WATER CONVEYANCE PIPING TO BE RCP - CLASS 3 OR
EQUAL, UNLESS OTHERWISE NOTED.
20. CONTRACTOR IS TO SUBMIT SITE PLAN/SUBDIVISION PLAT TO DOMINION
ENERGY GAS FOR DESIGN OF GAS SERVICE TO BUILDINGS/LOTS.
CONTRACTOR TO COORDINATE WITH DOMINION ENERGY GAS FOR
CONTRACTOR LIMITS OF WORK VERSUS DOMINION ENERGY GAS LIMITS.
21. ALL GAS LINE TAPS TO BE HDPE WITH COPPER TRACER WIRE AND
DETECTA TAPE. TERMINATE TRACER WIRE AT APPROVED LOCATIONS.
22. ALL GAS LINE TAPS, VALVES AND CAPS TO BE FUSED USING
ELECTRO-FUSION TECHNOLOGY.
23. ALL ELECTRICAL CONDUITS/LINES TO BE PVC SCH 40 OR BETTER.
24. ALL PHONE AND TV CONDUITS TO BE PVC SCH 40 OR BETTER.
25. CONTRACTOR IS TO SUBMIT SITE PLAN/SUBDIVISION PLAT TO COMCAST FOR
DESIGN OF CABLE TV SERVICE TO BUILDINGS/LOTS. CONTRACTOR TO
COORDINATE WITH COMCAST FOR CONTRACTOR LIMITS OF WORK VERSES
COMCAST LIMITS.
26. CONTRACTOR IS TO COORDINATE LOCATIONS OF NEW TELEPHONE SERVICE
TO NEW BUILDINGS OR LOTS WITH CENTURYLINK. A PVC CONDUIT,
PLYWOOD BACKBOARD, AND GROUND WIRE IS REQUIRED FOR SERVICE
THROUGH PROPERTY. COORDINATE SIZES AND LOCATION WITH
CENTURYLINK.
27. ALL UTILITIES ARE TO BE INSTALLED IN ACCORDANCE WITH THE
CORRESPONDING AGENCY/DISTRICT STANDARDS AND SPECIFICATIONS:
WATER - WASHINGTON CITY
SEWER - WASHINGTON CITY
STORM DRAIN - WASHINGTON CITY
IRRIGATION - WASHINGTON CITY
ELECTRICAL - ROCKY MOUNTAIN POWER
TELEPHONE - CENTURYLINK
NATURAL GAS - ENBRIDGE GAS
30.82 30.82
PROPOSED MINOR CONTOUR
EXISTING FENCE
LOT OR BOUNDARY LINE
EXISTING BUILDING
PROPOSED BUILDING
EXISTING ASPHALT
PROPOSED ASPHALT
EXISTING CONCRETE
PROPOSED CONCRETE
EXISTING CURB & GUTTER
PROPOSED CURB & GUTTER
ABBREVIATIONSUTILITY NOTES
1. ALL IMPROVEMENTS SHALL COMPLY WITH THE STANDARDS AND REGULATIONS OF THE LOCAL
GOVERNING MUNICIPALITY. CONTACT THE PUBLIC WORKS OFFICE BEFORE BEGINNING.
2. CONTRACTOR TO FIELD VERIFY LOCATION, SIZE, AND AVAILABILITY OF EXISTING UTILITIES.
UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT
HIS/HER EXPENSE. SEE UTILITY NOTE 3.
3. ALL DIMENSIONS ARE IN FOOT UNITS AND ARE TO THE TOP BACK OF CURB UNLESS SHOWN
OR NOTED OTHERWISE.
4. PROVIDE HANDICAP RAMPS AT ENDS OF WALKWAYS. END 0.1' ABOVE FLOWLINE OF CURB.
5. CURB AND GUTTER SHALL BE AS PER APWA STD DWG NO 205 TYPE A.
6. UTILITY INFORMATION INDICATED ON DRAWING IS BASED UPON VISUAL OBSERVATION OR
INFORMATION FURNISHED BY MUNICIPAL AUTHORITIES WHICH MAY NOT BE VALID. LATERAL
LOCATIONS AND ELEVATIONS ARE ASSUMED. SEE UTILITY NOTE 3.
7. ALL GRADING SHALL BE DONE UNDER THE SUPERVISION OF A QUALIFIED SOILS ENGINEER
WHO SHALL VERIFY THAT ALL FILL HAS BEEN PLACED IN ACCORDANCE WITH PROVISIONS IN
CURRENT INTERNATIONAL BUILDING CODE.
8. COMPACTION TEST REPORTS SHALL BE MADE AVAILABLE TO THE ENGINEER WITHIN 24
HOURS OF A REQUEST. FINAL REPORTS AS SPECIFIED IN CURRENT INTERNATIONAL
BUILDING CODE SHALL BE SUBMITTED TO THE ENGINEER WITHIN TEN DAYS AFTER
COMPLETION OF GRADING.
9. ALL STORM DRAIN PIPE SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S
RECOMMENDATIONS AND THE LOCAL GOVERNING MUNICIPALITY'S STANDARDS AND
SPECIFICATIONS.
10. STORM DRAIN PIPE WITHIN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO THE
RIGHT-OF-WAY OWNER'S SPECIFICATIONS.
PRIVATE STORM DRAIN PIPE OPTIONS SHALL CONSIST OF THE FOLLOWING MATERIALS.
1. PVC PIPE, ASTM D3034, SDR 35, BELL & SPIGOT TYPE.
2. RCP PIPE, CLASS 3, BELL & SPIGOT TYPE.
3. HIGH DENSITY CORRUGATED POLYETHYLENE SMOOTH
INTERIOR PIPE, ASTM D3350 WITH WATERTIGHT JOINTS.
11. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CHECK CONDITIONS AT THE SITE
BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY
DISCREPANCIES.
12. TYPICAL DETAILS SHALL APPLY IN GENERAL CONSTRUCTION UNLESS SPECIFICALLY DETAILED.
WHERE NO DETAILS ARE GIVEN, CONSTRUCTION WILL BE AS FOR SIMILAR WORK. DO NOT
SCALE DRAWINGS.
13. ANY OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER BEFORE PROCEEDING WITH ANY WORK INVOLVED.
14. PIPE BEDDING SHALL BE 3/8" MAXIMUM AGGREGATE. USE 3/4" MAXIMUM SIZE ROAD BASE
FOR BACKFILL MATERIAL. COMPACT TO 95% STANDARD PROCTOR DENSITY. MAXIMUM LIFT 8
INCHES.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PUBLIC AND OSHA STANDARDS.
16. ALL WORK SHALL COMPLY WITH THE AMERICAN PUBLIC WORKS ASSOCIATION UTAH CHAPTER
(APWA) MANUAL OF STANDARD SPECIFICATIONS 2007 EDITION WITH ALL PERTINENT
SUPPLEMENTS AND AMENDMENTS AND THE MANUAL OF STANDARD PLANS 2007 EDITION.
SAID STANDARD SPECIFICATIONS AND PLANS SHALL BE THE REQUIREMENTS.
17. IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR AND
MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THE WORK TO BE
COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR
SHALL NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR
AMBIGUITIES WHICH EXIST IN THE PLANS OR SPECIFICATIONS. THE ENGINEER'S
INTERPRETATION THEREOF SHALL BE CONCLUSIVE. THE CONTRACTOR SHALL BE HELD
RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR WRITTEN AUTHORITY FROM
THE OWNER AND/OR ENGINEER.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND
TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL
CONFORM TO THE REGULATORY AGENCY'S STANDARD SPECIFICATIONS. ALL TESTING AND
INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE-TESTING AND/OR REINSPECTION
SHALL BE PAID FOR BY THE CONTRACTOR.
19. THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS-BUILT RECORD
DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; ELECTRICAL
AND INSTRUMENTATION EQUIPMENT; PIPING AND CONDUITS; STRUCTURES AND OTHER
FACILITIES. THE AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE STREET LIGHT
LAYOUT PLAN SHOWING LOCATION OF LIGHTS, CONDUITS, CONDUCTORS, POINTS OF
CONNECTIONS TO SERVICES, PULLBOXES, AND WIRE SIZES. AS-BUILT RECORD DRAWINGS
SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL
IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE
PREPARED AND SUBMITTED BY THE CONTRACTOR.
20. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO ENGINEER, ONE SET OF NEATLY MARKED AS-BUILT RECORD DRAWINGS SHOWING THE INFORMATION
REQUIRED ABOVE. AS-BUILT RECORD DRAWINGS SHALL BE REVIEWED AND THE COMPLETE
AS-BUILT RECORD DRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS
REDLINED AS A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL
ACCEPTANCE.
GENERAL NOTES
EROSION CONTROL
SEQUENCE OF CONSTRUCTION
x x x
X X X
DOWNWARD GRADE
LEGEND
PROPOSED WATER LINE
EXISTING WATER LINE
WTR WTR
VALVE
WATER METER
FIRE HYDRANT
BLOWOFF
PROPOSED SEWER LINE
EXISTING SEWER LINESS SS
SS SS
SEWER MANHOLE
WATER MANHOLE
WTR WTR
PROPOSED IRRIGATION LINE
EXISTING IRRIGATION LINEIRR IRR
IRR IRR
VALVE
IRRIGATION METER
BLOWOFF
IRRIGATION MANHOLE
PROPOSED LAND DRAIN
EXISTING LAND DRAINLD LD
LD LD
LAND DRAIN MANHOLE
POWER POLEPWR
TELEPHONE POLETEL
UTILITY POLEUTIL
PROPOSED STORM DRAIN
EXISTING STORM DRAINSD SD
SD SD
STORM DRAIN MANHOLE
CATCH BASIN / CLEANOUT
CURB INLET
PROPOSED FIBER OPTIC
EXISTING FIBER OPTICFO FO
FO FO
EXISTING NATURAL GASGAS GAS
PROPOSED NATURAL GASGAS GAS
EXISTING POWERPWR PWR
PROPOSED POWERPWR PWR
EXISTING OVERHEAD POWEROHP OHP
PROPOSED OVERHEAD POWEROHP OHP
EXISTING TELEPHONETEL TEL
PROPOSED TELEPHONETEL TEL
EXISTING UNDERGROUND POWERUGP UGP
PROPOSED UNDERGROUND POWERUGP UGP
WM
TEE
ELBOW
REDUCER
TEE
ELBOW
REDUCER
BUILDABLE AREA SETBACK
STREET SIGN
SSSS
LD LD
SDSD
THRUST BLOCK
THRUST BLOCK
UTIL
TEL
PWR
WW
IRR IRR
IRR
HPS HIGH POINT STATION
ID INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IRR IRRIGATION
IRRMH IRRIGATION MANHOLE
K RADIUS OF CURVATURE
L LENGTH
LAT LATERAL SERVICE
LD LAND DRAIN
LDMH LAND DRAIN MANHOLE
LF LINEAL FEET
LG LIP OF GUTTER
LP LOW POINT
LP LIGHT POLE
LPE LOW POINT ELEVATION
MECH MECHANICAL
MH MANHOLE
MON MONUMENT
NE NORTHEAST
NW NORTHWEST
OD OUTSIDE DIAMETER
OHP OVERHEAD POWER
OSHA OCCUPATIONAL SAFETY AND
HEALTH
ADMINISTRATION
PC POINT OF CURVATURE
PCC PORTLAND CONCRETE CEMENT
PI POINT OF INFLECTION
PL PROPERTY LINE
PPM PARTS PER MILLION
PROP PROPERTY
PT POINT OF TANGENCY
PUE PUBLIC UTILTIY EASEMENT
PUE&DE PUBLIC UTILITY EASEMENT &
DRAINAGE EASEMENT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INFLECTION
R RADIUS
RC REBAR & CAP
RCL ROADWAY CENTERLINE
RCP REINFORCED CONCRETE PIPE
ROW RIGHT OF WAY
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SDR STANDARD DIMENSION RATIO
SE SOUTHEAST
SEC SECONDARY, SECTION
SL STREET LIGHT
SLB&M SALT LAKE BASE & MERIDIAN
SPEC SPECIFICATION
SPP STEEL PIPE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
STD STANDARD
SW SECONDARY WATER
SW SOUTHWEST
SWL SECONDARY WATERLINE
SWPPP STORMWATER POLLUTION
PREVENTION PLAN
TAN TANGENT
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBW TOP BACK OF WALK
TEL TELEPHONE
TCW TOP OF CURBWALL
TOA TOP OF ASPHALT
TOC TOP OF CONCRETE
TOE TOE OF SLOPE OR WALL
TOG TOP OF GRATE
TOW TOP OF WALL
UTIL UTILITY
UD UNDERDRAIN
UGP UNDERGROUND POWER
UP UTILITY POLLE
VC VERTICAL CURVE
W WEST, WATER
W2 SECONDARY WATER
WL WATERLINE
WM WATER METER
WP WORK POINT
LEGEND
ABBREVIATIONS
DIAMETER
DELTA
° DEGREES
' MINUTES, FEET
" SECONDS, INCHES
ADA AMERICAN DISABILITIES ACT
ADS CORRUGATED BLACK PLASTIC PIPE
APWA AMERICAN PUBLIC WORKS ASSOCIATION
ARCH ARCHITECT, ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
B&C BAR & CAP
BLA BOUNDARY LINE AGREEMENT
BLDG BUILDING
BM BENCHMARK
BND BOUNDARY
BOW BACK OF WALK
BRG BEARING
BV BUTTERFLY VALVE
C&G CURB AND GUTTER
CB CATCH BASIN
CH CHORD
CHB CHORD BEARING
CI CAST IRON
CIP CAST IN PLACE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
COMM COMMUNICATIONS
CONC CONCRETE
CONST CONSTRUCTION
CUL CULINARY
CW CULINARY WATER
CWL CULINARY WATERLINE
DEMO DEMOLITION
DI DUCTILE IRON
DIAM DIAMETER
DIST DISTANCE
DWG DRAWING
E EAST, ELECTRICITY, ELECTRICAL
EASE EASEMENT
EG EXISTING GRADE
EL ELBOW
ELEC ELECTRICAL
ELEV ELEVATION
EOA EDGE OF ASPHALT
EVC END VERTICAL CURVE
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EX EXISTING
FF FIELD FENCE
FFE FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOWLINE
FND FOUNDATION
FP FIRE PROTECTION
FTG FOOTING
G GAS, NATURAL GAS
GB GRADE BREAK
GV GATE VALVE
HDPE HIGH-DENSITY POLYETHYLENE PIPE
HP HIGH POINT
HPE HIGH POINT ELEVATION
PROPOSED RETAINING WALL
EXISTING RETAINING WALL
EXISTING ROCK WALL
PROPOSED ROCK WALL
1.5%
CE101
NOTES & LEGEND
COPYRIGHT:
© 2022 SPE ARCHITECTS
DESIGNED BY:
CHECKED BY:
SPE PROJECT #:
OWNER PROJECT #:
SPE ARCHITECTS
P.O. Box 517
Kaysville, Utah 84037
t. 801.298.1368 info@spe-architect.com www.spe-architect.com
1 2 3 4 5
1 2 3 4 5
A
B
C
D
DRAWN BY:A
B
C
E
25-40
CSA
STA
CSA
SHEET NUMBER:
SHEET TITLE:
ISSUED:
NO. DATE DESCRIPTION
PROFESSIONAL STAMP:
ARCHITECT'S INFORMATION:
PROJECT NAME:
REVISIONS:
NO. DATE DESCRIPTION
26185370
D
E
CODE OFFICIAL STAMP:
U
TA
H S
TA
TE
F
AI
R P
AR
K
SI
TE
A C
C
ES
S
PA
R
KI
N
G
N O
R
TH
W
ES
T
SA
LT
L
AK
E C
IT
Y, U
TA
H
01 06/17/26 PERMIT SET
Entellus e
TM
1470 South 600 West Woods Cross, UT 84010 Phone 801.298.2236 www.Entellus.com
1061017
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
Know what'sbelow.
before you dig.Call www.bluestakes.org
BLUE STAKES OF UTAH
1-800-662-4111
UTILITY NOTIFICATION CENTER, INC.
H:
\1
0\
1\
D_
PR
OD
UC
TI
ON
\C iv il\
_P la n Se t\P
LA
N
SE
T
1.
6-
2:
IS
TO
PH
ER
A
RG
YL
E
1. COMPLIANCE:
ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS AND THE MOST RECENT EDITIONS OF THE FOLLOWING: THE INTERNATIONAL PLUMBING CODE, UTAH DRINKING WATER REGULATIONS, APWA MANUAL OF STANDARD PLANS AND SPECIFICATIONS, AND SLC PUBLIC UTILITIES MODIFICATIONS TO APWA STANDARD PLANS AND APPROVED MATERIALS AND SLC PUBLIC UTILITIES APWA SPECIFICATIONS MODIFICATIONS. THE CONTRACTOR IS REQUIRED TO ADHERE TO ALL OF THE ABOVE-MENTIONED DOCUMENTS UNLESS OTHERWISE NOTED AND APPROVED IN WRITING BY THE SALT LAKE CITY DIRECTOR OF PUBLIC UTILITIES.
2. COORDINATION:
THE CONTRACTOR IS RESPONSIBLE TO NOTIFY ALL APPROPRIATE GOVERNMENT AND PRIVATE ENTITIES ASSOCIATED WITH THE PROJECT. THE FOLLOWING MUST BE CONTACTED 48-HOURS PRIOR TO CONSTRUCTION AS APPLICABLE TO THE PROJECT:
PUBLIC UTILITIES:
BACKFLOW PREVENTION - 483-6795
DEVELOPMENT REVIEW ENGINEERING - 483-6781
INSPECTIONS, PERMITS, CONTRACTS & AGREEMENTS - 483-6727
PRETREATMENT - 799-4002
STORM WATER - 483-6721
SLC DEPARTMENTS:
ENGINEERING - PUBLIC WAY PERMITS AND ISSUES - 535-6248
ENGINEERING - SUBDIVISIONS - 535-6159
FIRE DEPARTMENT - 535-6636
PERMITS AND LICENSING (BLDG SERVICES) - 535-7752
PLANNING AND ZONING - 535-7700
TRANSPORTATION - 535-6630
- ALL OTHER POTENTIALLY IMPACTED GOVERNING AGENCIES OR ENTITIES
- ALL WATER USERS INVOLVED IN WATER MAIN SHUTDOWNS
- APPLICABLE SEWER, WATER AND DRAINAGE DISTRICTS
- BLUESTAKES LOCATING SERVICES - 532-5000
- COUNTY FIRE DEPARTMENT - 743-7231
- COUNTY FLOOD CONTROL - 468-2779
- COUNTY HEALTH DEPARTMENT - 385-468-3913
- COUNTY PUBLIC WAY PERMITS - 468-2241
- HOLLADAY CITY - 272-9450
- SALT LAKE COUNTY HIGHWAY DEPARTMENT - 468-3705 OR 468-2156
- THE UTAH TRANSIT AUTHORITY FOR RE-ROUTING SERVICE - 262-5626
- UNION PACIFIC RAILROAD CO., SUPERINTENDENTS OFFICE - 595-3405
- UTAH DEPARTMENT OF TRANSPORTATION, REGION #2 - 975-4800
- UTAH STATE ENGINEER - 538-7240
3. SCHEDULE
PRIOR TO CONSTRUCTION THE CONTRACTOR WILL PROVIDE, AND WILL UPDATE AS CHANGES OCCUR, A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE SPECIFICATIONS AND SALT LAKE CITY ENGINEERING OR SALT LAKE COUNTY REGULATIONS AS
APPLICABLE FOR WORKING WITHIN THE PUBLIC WAY.
4. PERMITS, FEES AND AGREEMENTS
CONTRACTOR MUST OBTAIN ALL THE NECESSARY PERMITS AND AGREEMENTS AND PAY ALL APPLICABLE FEES PRIOR TO ANY CONSTRUCTION ACTIVITIES. CONTACT SALT LAKE CITY ENGINEERING (535-6248) FOR PERMITS AND INSPECTIONS REQUIRED FOR ANY WORK CONDUCTED WITHIN SALT LAKE CITY'S PUBLIC RIGHT-OF-WAY. APPLICABLE UTILITY PERMITS MAY INCLUDE MAINLINE EXTENSION AGREEMENTS AND SERVICE CONNECTION PERMITS. ALL UTILITY WORK MUST BE BONDED. ALL CONTRACTORS
MUST BE LICENSED TO WORK ON CITY UTILITY MAINS.
CONSTRUCTION SITES MUST BE IN COMPLIANCE WITH THE UTAH POLLUTION DISCHARGE ELIMINATION SYSTEM (UPDES) STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES (538-6923). A COPY OF THE PERMIT'S STORM WATER POLLUTION PREVENTION PLAN MUST BE SUBMITTED TO PUBLIC UTILITIES FOR REVIEW AND APPROVAL. ADDITIONAL WATER QUALITY AND EROSION CONTROL MEASURES MAY BE REQUIRED. THE CONTRACTOR MUST ALSO COMPLY WITH SALT LAKE CITY'S CLEAN WHEEL
ORDINANCE.
5. ASPHALT AND SOIL TESTING
THE CONTRACTOR IS TO PROVIDE MARSHALL AND PROCTOR TEST DATA 24-HOURS PRIOR TO USE. CONTRACTOR IS TO PROVIDE COMPACTION AND DENSITY TESTING AS REQUIRED BY SALT LAKE CITY ENGINEERING, UDOT, SALT LAKE COUNTY OR OTHER GOVERNING ENTITY. TRENCH BACKFILL MATERIAL AND COMPACTION TESTS ARE TO BE TAKEN PER APWA STANDARD SPECIFICATIONS, SECTION 330520 - BACKFILLING TRENCHES, OR AS REQUIRED BY THE SLC PROJECT ENGINEER IF NATIVE MATERIALS ARE USED. NO NATIVE MATERIALS ARE ALLOWED WITHIN THE PIPE ZONE. THE MAXIMUM LIFTS FOR BACKFILLING EXCAVATIONS IS 8-INCHES. ALL MATERIALS AND COMPACTION TESTING IS TO BE PERFORMED BY A LAB RECOGNIZED AND ACCEPTED BY
SALT LAKE COUNTY PUBLIC WORKS AND/OR SALT LAKE CITY ENGINEERING.
6. TRAFFIC CONTROL AND HAUL ROUTES
TRAFFIC CONTROL MUST CONFORM TO THE MOST CURRENT EDITION OF SALT LAKE CITY TRAFFIC CONTROL MANUAL - PART 6 OF “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” FOR SALT LAKE COUNTY AND STATE ROADS. SLC TRANSPORTATION MUST APPROVE ALL PROJECT HAUL ROUTES (535-7129). THE CONTRACTOR MUST ALSO CONFORM TO UDOT, SALT LAKE COUNTY OR OTHER APPLICABLE GOVERNING ENTITIES REQUIREMENTS FOR TRAFFIC CONTROL.
7. SURVEY CONTROL
CONTRACTOR MUST PROVIDE A REGISTERED LAND SURVEYOR OR PERSONS UNDER SUPERVISION OF A REGISTERED LAND SURVEYOR TO SET STAKES FOR ALIGNMENT AND GRADE OF EACH MAIN AND/OR FACILITY AS APPROVED. THE STAKES SHALL BE MARKED WITH THE HORIZONTAL LOCATION (STATION) AND VERTICAL LOCATION (GRADE) WITH CUTS AND/OR FILLS TO THE GRADE OF THE MAIN AND/OR FACILITY AS APPROVED. IN ADDITION, THE CONTRACTOR AND/OR SURVEYOR SHALL PROVIDE TO SALT LAKE CITY PUBLIC UTILITIES CUT SHEETS FILLED OUT COMPLETELY AND CLEARLY SHOWING THE PERTINENT GRADES, ELEVATIONS AND CUT/FILLS ASSOCIATED WITH THE FIELD STAKING OF THE MAIN AND/OR FACILITY. THE CUT SHEET FORM IS AVAILABLE AT THE CONTRACTS AND AGREEMENTS OFFICE AT PUBLIC UTILITIES. ALL MAINS AND LATERALS NOT MEETING MINIMUM GRADE REQUIREMENTS AS SPECIFIED BY ORDINANCE OR AS REQUIRED TO MEET THE MINIMUM REQUIRED FLOWS OR AS APPROVED MUST BE REMOVED AND RECONSTRUCTED TO MEET DESIGN GRADE. THE CONTRACTOR SHALL PROTECT ALL STAKES AND MARKERS UNTIL PUBLIC UTILITY SURVEYORS COMPLETE FINAL MEASUREMENTS. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, MAINTAINING, OR RESTORING ALL MONUMENTS AND REFERENCE MARKS WITHIN THE PROJECT SITE. DEPENDING ON THE LOCATION OF THE PROJECT; CONTACT THE COUNTY SURVEYOR FOR SECTION CORNER MONUMENTS (801-468-2028) AND/OR THE SALT LAKE CITY SURVEYOR (801-535-7973) FOR SALT LAKE CITY MONUMENTS AND CONSTRUCTION REQUIREMENTS. ALL ELEVATIONS SHALL BE REFERENCED TO SALT LAKE CITY DATUM UNLESS NOTED OTHERWISE ON THE PLANS.
8. ASPHALT GUARANTEE
THE CONTRACTOR SHALL REMOVE, DISPOSE OF, FURNISH AND PLACE PERMANENT ASPHALT PER SALT LAKE CITY ENGINEERING, UDOT, COUNTY, OR OTHER GOVERNMENT STANDARDS AS APPLICABLE TO THE PROJECT. THE CONTRACTOR SHALL GUARANTEE THE ASPHALT RESTORATION FOR A PERIOD AS REQUIRED BY THE GOVERNING ENTITY.
9. TEMPORARY ASPHALT
IF THE CONTRACTOR CHOOSES TO WORK WITHIN THE PUBLIC WAY WHEN HOT MIX ASPHALT IS NOT AVAILABLE, THE CONTRACTOR MUST OBTAIN APPROVAL FROM THE APPROPRIATE GOVERNING ENTITY PRIOR TO INSTALLING TEMPORARY ASPHALT SURFACING MATERIAL. WITHIN SALT LAKE CITY, WHEN PERMANENT ASPHALT BECOMES AVAILABLE, THE CONTRACTOR SHALL REMOVE THE TEMPORARY ASPHALT, FURNISH AND INSTALL THE PERMANENT ASPHALT. THE CONTRACTOR SHALL GUARANTEE THE ASPHALT RESTORATION FOR A PERIOD AS REQUIRED BY THE GOVERNING ENTITY FROM THE DATE OF COMPLETION.
10. SAFETY
THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF SAFETY OF THE PROJECT AND SHALL MEET ALL OSHA, STATE, COUNTY AND OTHER GOVERNING…