7-2-CR26071-26362900 Approved Plans.pdf

PDF 22 MB Posted

Attached to
DFCM Construction - Prequalified Site Civil Stage II - Department of Transportation- UDOT Kanarraville Lagoon - Project #26362900
Solicitation number
CR26071
Issued by
Grand County, Utah

About this file

This file contains approved construction drawings for the Kanarraville Rest Stop Lagoons project, prepared by Sunrise Engineering for the State of Utah Division of Facilities Construction and Management (DFCM) in coordination with the Utah Department of Transportation (UDOT). The project involves the design and construction of a sewage lagoon system for the Kanarraville rest stop located at 11 North 300 West in Washington, Utah 84780. The construction drawings include comprehensive site plans, grading plans with elevation tables, piping and structural details, junction structures, metering flume assemblies, chain link fencing specifications, and influent pipe configurations. The approved plans were dated April 22, 2026, with code compliance review completed by Jason Van Ausdal on May 18, 2026. The drawing set encompasses 18 sheets including general notes, design criteria, survey control data, and detailed sections covering north, center, and south lagoon grading configurations, a gravel pit grading section, and all necessary mechanical and structural components.

The construction cost estimate for this Stage II prequalified bidding project is $2,642,782.00. Only contractors previously prequalified under the Stage I Prequalification process and currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The approved plans serve as the technical basis for the construction bidding process and include all elevation data, structural specifications, and site configuration details necessary for contractors to prepare accurate cost proposals and execute the project according to design standards and code compliance requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11 NORTH 300 WEST

WASHINGTON, UT 84780

TEL 435.652.8450 | sunrise-eng.com

KANARRAVILLE

KANARRAVILLE REST STOP LAGOONS

CONSTRUCTION DRAWINGS

P:\_Marketing Materials\Logos\FULL COLOR\RGB\Full Color- Horizontal-RGB.png

APPROVALS

RYAN ELLSWORTH DATE

VERN MALOY DATE

4/22/206

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

REVIEWED FOR CODE

COMPLIANCE

SHEET INDEX

GENERAL SHEETS DWG. NO

SHEET

NO.

PLAN SHEETS

DETAIL SHEETS

ORTHN

PROJECT

SITE

G2

ABBREVIATIONS LOCATION MAP

I-15

PROJECT

LOCATION

VEYO

ENTERPRISE

ST. GEORGE

SANTA CLARA

PINTURA

WASHINGTON

HURRICANE

IVINS

WASHINGTON COUNTY

Co.

Davis

WYOMING

C O

LO

R

AD

O

ARIZONA

N

EV

AD

A

IDAHO

I-80

I-80

6-50

I-1 5 I-70

Rich Co.

Morgan Co.

Weber Co.

Salt Lake Co.

San Juan Co.

Utah Co.

Wasatch Co.

Summit Co. Dagget Co.

Uintah Co.Duchesne Co.

Grand Co.

Carbon Co.

Sanpete Co.

Emery Co.

Sevier Co.

Wayne Co.Piute Co.

Garfield Co.

Kane Co.

Cache Co.

Box Elder Co.

Tooele Co.

Juab Co.

Millard Co.

Beaver Co.

Iron Co.

I-1

I-84

I-84

I-15

Washington Co.

ORTHN

AREA MAP

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

G3

SYMBOL LEGEND

EXISTING PROPOSED

S

C

SD

W

C

GM

IR

GM

POC

MH

POC

GVGV

IR

SD

W

S

MH

TT

E E

LINETYPE LEGEND

EXISTING PROPOSED

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

G4 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

G5 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

ORTHN

G6 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

594'

386'

350'

764'

N

ORTH

GP5

E

GP4

D

G P4 C

G P3 B G

P3 A www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

S1

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

N

ORTH

GP4

G P4

B G

P3

A G

P3

C

D www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

S2

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

GP1

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

Elevations Table

Number

Minimum Elevation

-25.000

-20.000

-15.000

-10.000

-5.000

0.000

5.000

10.000

15.000

20.000

25.000

Maximum Elevation

-20.000

-15.000

-10.000

-5.000

0.000

5.000

10.000

15.000

20.000

25.000

32.000

Color

594'

386' 350'

764'

N

ORTH

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

GP2

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

A S1

NORTH LAGOON GRADING SECTION

B S2

CENTER LAGOON GRADING SECTION

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

GP3

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

C

SOUTH LAGOON GRADING SECTION

D S1

LAGOON GRADING SECTION

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

GP4

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

E

GRAVEL PIT GRADING SECTION

www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

GP5

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

PP1

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

PLAN- JUNCTION STRUCTURE 1

NTS

A

SECTION- JUNCTION STRUCTURE 1

NTS

D

PLAN- JUNCTION STRUCTURE 2

NTS

B

-- PLAN- JUNCTION STRUCTURE 3

NTS

C

SECTION- JUNCTION STRUCTURE 2

NTS

E

-- SECTION- JUNCTION STRUCTURE 3

NTS

F

D1 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

UDOT CHAIN LINK FENCE - FG 6

G

D2 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

SECTION- FRAME AND BAR GRATING

K

DETAIL- OUTLET

NTS

L

PLAN- HEADWORKS AND FLUME ASSEMBLY

NTS

H

SECTION HEADWORKS AND FLUME ASSEMBLY

NTS

J

SECTION HEADWORKS AND FLUME ASSEMBLY

NTS

I

D3 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

NOT TO SCALE

PLAN - INFLUENT PIPE AND SPLASH PAD M

NOT TO SCALE

PLAN - SPLASH PAD END SECTIONP

NOT TO SCALE

SECTION - SPLASH PAD END SECTIONQ

TYP

NOT TO SCALE

SECTION - SPLASH PADN

TYP

NOT TO SCALE

DETAIL - LAGOON BOTTOM TRENCHO

D4 www.sunrise-eng.com

WASHINGTON, UT 84780

11 NORTH 300 WEST

TEL 435.652.8450 Z FAX 435.652.8416

C O

N

ST

R U

C

TI

O N

D R

AW

IN

G S

ENGINEERING

4/22/2026

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

05/18/2026

Kanarraville Rest Stop Lagoons Construction Drawings
1 G1- Cover Sheet
2 G2- Index, Project Map, Abbreviations
3 G3- Legend
4 G4- General Notes
5 G5- Project Notes & Design Criteria
6 G6- Survey Control
7 S1- Site Plan
8 S2- Lagoon Site Plan
9 GP1- Grading Plan
10 GP2- Cut and Fill
11 GP3- Grading Sections
12 GP4- Grading Sections
13 GP5- Grading Sections
14 PP1- Plan & Profile
15 D1- Junction Structure Details
16 D2- Fence Details
17 D3- Metering Flume Details
18 D4- Influent Pipe Details

File details come from the government source that posted it. Updated .