7-2-CR26071-26362900 Approved Plans.pdf
PDF 22 MB Posted
- Solicitation number
- CR26071
- Issued by
- Grand County, Utah
About this file
This file contains approved construction drawings for the Kanarraville Rest Stop Lagoons project, prepared by Sunrise Engineering for the State of Utah Division of Facilities Construction and Management (DFCM) in coordination with the Utah Department of Transportation (UDOT). The project involves the design and construction of a sewage lagoon system for the Kanarraville rest stop located at 11 North 300 West in Washington, Utah 84780. The construction drawings include comprehensive site plans, grading plans with elevation tables, piping and structural details, junction structures, metering flume assemblies, chain link fencing specifications, and influent pipe configurations. The approved plans were dated April 22, 2026, with code compliance review completed by Jason Van Ausdal on May 18, 2026. The drawing set encompasses 18 sheets including general notes, design criteria, survey control data, and detailed sections covering north, center, and south lagoon grading configurations, a gravel pit grading section, and all necessary mechanical and structural components.
The construction cost estimate for this Stage II prequalified bidding project is $2,642,782.00. Only contractors previously prequalified under the Stage I Prequalification process and currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The approved plans serve as the technical basis for the construction bidding process and include all elevation data, structural specifications, and site configuration details necessary for contractors to prepare accurate cost proposals and execute the project according to design standards and code compliance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11 NORTH 300 WEST
WASHINGTON, UT 84780
TEL 435.652.8450 | sunrise-eng.com
KANARRAVILLE
KANARRAVILLE REST STOP LAGOONS
CONSTRUCTION DRAWINGS
P:\_Marketing Materials\Logos\FULL COLOR\RGB\Full Color- Horizontal-RGB.png
APPROVALS
RYAN ELLSWORTH DATE
VERN MALOY DATE
4/22/206
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
REVIEWED FOR CODE
COMPLIANCE
SHEET INDEX
GENERAL SHEETS DWG. NO
SHEET
NO.
PLAN SHEETS
DETAIL SHEETS
ORTHN
PROJECT
SITE
G2
ABBREVIATIONS LOCATION MAP
I-15
PROJECT
LOCATION
VEYO
ENTERPRISE
ST. GEORGE
SANTA CLARA
PINTURA
WASHINGTON
HURRICANE
IVINS
WASHINGTON COUNTY
Co.
Davis
WYOMING
C O
LO
R
AD
O
ARIZONA
N
EV
AD
A
IDAHO
I-80
I-80
6-50
I-1 5 I-70
Rich Co.
Morgan Co.
Weber Co.
Salt Lake Co.
San Juan Co.
Utah Co.
Wasatch Co.
Summit Co. Dagget Co.
Uintah Co.Duchesne Co.
Grand Co.
Carbon Co.
Sanpete Co.
Emery Co.
Sevier Co.
Wayne Co.Piute Co.
Garfield Co.
Kane Co.
Cache Co.
Box Elder Co.
Tooele Co.
Juab Co.
Millard Co.
Beaver Co.
Iron Co.
I-1
I-84
I-84
I-15
Washington Co.
ORTHN
AREA MAP
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
G3
SYMBOL LEGEND
EXISTING PROPOSED
S
C
SD
W
C
GM
IR
GM
POC
MH
POC
GVGV
IR
SD
W
S
MH
TT
E E
LINETYPE LEGEND
EXISTING PROPOSED
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
G4 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
G5 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
ORTHN
G6 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
594'
386'
350'
764'
N
ORTH
GP5
E
GP4
D
G P4 C
G P3 B G
P3 A www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
S1
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
N
ORTH
GP4
G P4
B G
P3
A G
P3
C
D www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
S2
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
GP1
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
Elevations Table
Number
Minimum Elevation
-25.000
-20.000
-15.000
-10.000
-5.000
0.000
5.000
10.000
15.000
20.000
25.000
Maximum Elevation
-20.000
-15.000
-10.000
-5.000
0.000
5.000
10.000
15.000
20.000
25.000
32.000
Color
594'
386' 350'
764'
N
ORTH
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
GP2
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
A S1
NORTH LAGOON GRADING SECTION
B S2
CENTER LAGOON GRADING SECTION
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
GP3
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
C
SOUTH LAGOON GRADING SECTION
D S1
LAGOON GRADING SECTION
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
GP4
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
E
GRAVEL PIT GRADING SECTION
www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
GP5
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
PP1
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
PLAN- JUNCTION STRUCTURE 1
NTS
A
SECTION- JUNCTION STRUCTURE 1
NTS
D
PLAN- JUNCTION STRUCTURE 2
NTS
B
-- PLAN- JUNCTION STRUCTURE 3
NTS
C
SECTION- JUNCTION STRUCTURE 2
NTS
E
-- SECTION- JUNCTION STRUCTURE 3
NTS
F
D1 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
UDOT CHAIN LINK FENCE - FG 6
G
D2 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
SECTION- FRAME AND BAR GRATING
K
DETAIL- OUTLET
NTS
L
PLAN- HEADWORKS AND FLUME ASSEMBLY
NTS
H
SECTION HEADWORKS AND FLUME ASSEMBLY
NTS
J
SECTION HEADWORKS AND FLUME ASSEMBLY
NTS
I
D3 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
NOT TO SCALE
PLAN - INFLUENT PIPE AND SPLASH PAD M
NOT TO SCALE
PLAN - SPLASH PAD END SECTIONP
NOT TO SCALE
SECTION - SPLASH PAD END SECTIONQ
TYP
NOT TO SCALE
SECTION - SPLASH PADN
TYP
NOT TO SCALE
DETAIL - LAGOON BOTTOM TRENCHO
D4 www.sunrise-eng.com
WASHINGTON, UT 84780
11 NORTH 300 WEST
TEL 435.652.8450 Z FAX 435.652.8416
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
ENGINEERING
4/22/2026
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
05/18/2026
| Kanarraville Rest Stop Lagoons Construction Drawings |
| 1 G1- Cover Sheet |
| 2 G2- Index, Project Map, Abbreviations |
| 3 G3- Legend |
| 4 G4- General Notes |
| 5 G5- Project Notes & Design Criteria |
| 6 G6- Survey Control |
| 7 S1- Site Plan |
| 8 S2- Lagoon Site Plan |
| 9 GP1- Grading Plan |
| 10 GP2- Cut and Fill |
| 11 GP3- Grading Sections |
| 12 GP4- Grading Sections |
| 13 GP5- Grading Sections |
| 14 PP1- Plan & Profile |
| 15 D1- Junction Structure Details |
| 16 D2- Fence Details |
| 17 D3- Metering Flume Details |
| 18 D4- Influent Pipe Details |
File details come from the government source that posted it. Updated .