7-07. Technical Specifications.pdf

PDF 313 KB Posted

Attached to
Manatawny Green Surface Replacement
Solicitation number
US.202742
Issued by
Montgomery County, Pennsylvania

About this file

This document is a technical specification and scope of work for the Borough of Pottstown's Manatawny Green Miniature Golf Course Surface Replacement project. The project involves removing and replacing the existing outdoor carpet surfaces on all golf holes and the practice green at the Manatawny Green Mini Golf Course located at 71 W. High Street in Pottstown, Pennsylvania. The contractor will be responsible for mobilization, removing existing putting surfaces and adhesives, preparing the subfloor, and installing new outdoor carpet surfaces in three different styles: a short green grass carpet, a long green grass carpet, and a beige "sand" carpet. The project has a contract time limit of 30 calendar days from the Notice to Proceed.

The specified carpet materials include UV-stabilized outdoor grasslike carpets manufactured by Value Carpets, with specific product types like "Competitor - Green" and "Supergrass - Green" for the green surfaces, and "Ship N Shore - Beige" for the sand areas. The adhesive to be used is Ultrabond ECO 420, a high-performance, moisture-resistant indoor/outdoor carpet adhesive. Payment for the work will be made per square foot of carpet and adhesive installed, with a maximum mobilization cost of $3,500. The project requires compliance with Pennsylvania Department of Transportation specifications and will involve careful traffic management, dust control, and restoration of any disturbed areas.

View the file

Other files

File Type Posted
4-02. Notice to Bidders.pdf PDF
2-04. Information for Bidders.pdf PDF
8-01. Signed Cover Sheet.pdf PDF
6-08. Project Plans (1 Sheet).pdf PDF
1-03. Proposal Section.pdf PDF
5-06. General Conditions.pdf PDF
3-05. Wage Rate Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS

00000 - Scope of Work (3 pages) 01000 - General Requirements (7 pages) 96816 - Carpeting (3 pages)

OTHER DOCUMENTS

1. Project Plans titled “Manatawny Green Surface Replacement” (1 Sheets) dated 2/28/2025 as prepared by Remington & Vernick Engineers of King of Prussia, PA.

Scope of Work 00000-1

SECTION 00000

SCOPE OF WORK

PART 1 - GENERAL

1.01 Project Location

A. The project site is the Manatawny Green Mini Golf Course located at 71 W. High Street, Pottstown, PA 19464.

1.02 Project Description

A. The Borough of Pottstown (Borough) is replacing the outdoor carpet surfaces at the

Manatawny Green Miniature Golf course, a municipal miniature golf course. The current outdoor carpet surfaces are worn down and in need of replacement. In general, the project consists of, but is not limited to: removing the existing outdoor carpet surfaces and existing adhesives, substrate preparation and installation of the new outdoor carpet surfaces.

1.03 Contract Description

A. The major items of work described herein are intended to be inclusive of all work necessary for completion. The contractor shall provide all equipment, labor and materials necessary to complete the entire project, including any items or tasks which are not specifically mentioned, but which are necessary to complete the work in accordance with applicable codes (e.g. Pennsylvania Uniform Construction Code, National Electrical Code, etc.) and the standard practice of the profession.

1.04 Work Included

A. Base Bid:

1. Mobilization. The contractor shall supply required insurance, performance and payment bonds. The contractor shall mobilize the project site and commence construction.

2. Removal of the existing mini golf putting surfaces for all golf holes as well as the practice green.

3. Removal of any adhesives used to hold the existing surface in place, as well as the cleaning and preparation of the subfloor for the installation of the proposed new putting surface.

4. Installation of the new outdoor putting surface, on all golf holes and practice green as shown on the plan.

5. The contractor is to restore any disturbed areas within the limits of the project, at their own expense after the project is completed.

Scope of Work 00000-2

6. Contractor is responsible for measuring the quantity of carpet per mini-golf hole and providing adequate carpet quantity to ensure the resurfacing of various shapes without leaving edges or seams.

1.05 General Requirements

A. Construction layout of all proposed elements of construction to the specified lines. All limits of work shall be marked out and approved by the Engineer prior to excavation.

B. Setup and maintenance of temporary erosion and sediment controls. The Contractor may be required to install additional erosion controls at the direction of the Engineer. No additional payment will be made for erosion controls. The Contractor will be required to clean and remove any material that erodes from excavations associated with the project.

No additional payment will be made for clean up and disposal of eroded material.

C. Removal of existing features as incidental to the contract work items, including but not limited to the following: existing putting surface and any foreign materials encountered during removal for contract items.

1.06 Additional Requirements

A. Contract time limits and requirements for the project are as follows:

All work by the Contractor must be substantially complete within the contract time limit of 30 calendar days. The contract time limit shall begin once the written Notice to Proceed order has been issued to the Contractor.

B. The cost of all related incidental work, dust control, erosion control, cleaning and restorations shall be included in the various unit prices bid. These activities are not separate pay items.

C. All materials, construction procedures, type and use of equipment, measurement and payment shall be in accordance with the Commonwealth of Pennsylvania Department of Transportation Specifications, Publication 408, unless otherwise noted and/or modified by these specifications.

D. The Contractor is responsible for the construction layout of this project. The Contractor shall forward all construction layout survey information to the Engineer for reference including benchmarks, stationing and elevations.

E. All contractors and other persons utilizing this specification and the information contained herein are cautioned to comply with the requirements of Pennsylvania Act 172, entitles “Excavation and Demolition Work Protection of Underground Utilities.” Each individual Contractor using the project plans must verify the location and depth of all underground utilities and facilities before starting work. The Contractor shall notify “PA One Call” (1- 800-242-1776) at least 72 hours prior to the start of any excavation.

F. The Contractor shall establish contact with an individual from each local utility prior to commencement of excavation. The Contractor shall notify the Engineer, and the utility owner immediately should a conflict occur in the limits of construction. The Contractor shall be responsible for coordination of all work to be performed by the utility owner with

Scope of Work 00000-3 regards to the work included in this contract. Additional payment will not be made for any delays incurred or any additional work carried out due to conflicts with existing utility mains or service lines.

G. At least 48 hours prior to construction, the contractor shall post “No Parking” signs every 50 feet along each side of the project area on posts or stakes (4’ to 5’ above the ground).

Signs shall be removed immediately after completion. The contractor shall notify the police department prior to the posting of signs.

H. All paved asphalt or concrete areas disturbed during construction shall be restored to at least equal to that which existed prior to the start of construction.

I. All grass areas disturbed during construction shall be topsoiled, fertilized and seeded. No additional payment will be made for restoration of grass areas, but the cost shall be included in the various items of the proposal.

J. The Contractor shall be responsible for the location and preservation of underground and surface utilities and structures at / or adjacent to the site of construction. It shall be at the Contractor’s own expense to repair or replace anything that is damaged by the Contractor.

K. Payment will not be made for the relocation of signs but shall be included in the various items of the proposal.

L. The Contractor shall refer to the project plans for additional requirements.

M. The project plans, entitled “Manatawny Green Surface Replacement” are appended and hereby included with the project specifications.

PART 2 – PRODUCTS

Not used.

PART 3 – EXECUTION

Not used.

PART 4 – QUANTITY AND PAYMENT

Not used.

END OF SECTION

General Requirements 01000-1

SECTION 01000

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.01 General

A. Only major items of work are given in the Bid Form, but it is the intent of the specifications to secure a completely interconnected and functionable system, and should any workmanship or materials be required which are obviously necessary to carry out the full intent and meaning of the plans and specifications or to be reasonably inferred therefrom, the cost of such workmanship or materials shall be included in the items in the bid form.

B. Where construction is being performed in traveled roadways or rights-of-way, the

Contractor is to provide all necessary traffic controls and devices in accordance with the current Pennsylvania Department of Transportation standards.

C. The Contractor shall notify all utility companies prior to Construction of utilities, curbing and paving.

D. Prior to any excavation, the Contractor shall have all utilities marked and shall excavate or otherwise determine the exact location and elevations of said utilities. The Contractor shall notify the Engineer of any conflicts. The Contractor shall arrange for any necessary utility relocations or field changes and shall reschedule his operations appropriately.

E. The Contractor, in the construction of the project, shall not stockpile materials or store equipment on any private property; except areas designated by the plans or as directed by the Engineer. If so required, the Engineer may direct the Contractor to have equipment removed from any project during weekend hours.

F. All work of refilling sunken ditches, repaving over trenches and keeping streets and sidewalks in passable condition shall be done to the satisfaction of the Owner during the construction of the project as well as during the maintenance period. If any remedial work is not done within three (3) days after written notice is given by the Engineer, the work may be done by the Owner and charged to the Contractor.

G. Special care shall be taken to prevent contamination, siltation, or interference of any kind with the stream flows or ponds along the line of work. No waste matter of any kind will be allowed to discharge into the stream flows or impounded water of any ponds or other bodies of water.

H. The Contractor is to insure that proper measures for erosion control are employed and provide for the early establishment of vegetation that will help avoid erosion problems during and after construction. It is expected that the Contractor will anticipate possible

General Requirements 01000-2 problems and provide timely and adequate control to prevent or minimize adverse effects.

I. The Contractor shall apply and pay for all permits that may be required for any of the work involved with this project.

J. The Contractor is to notify residents by door-hangers, at least forty-eight (48) hours in advance, before starting construction work that will directly affect their property frontage, driveway(s) and/or on-street parking.

K. The Contractor will be provided with one (1) set of contract specifications and full size drawings, where applicable. Electronic copies will be available by request in .pdf format. The cost for any additional copies shall be included in various items of the proposal.

L. All notes on plans shall be made a part of the specifications.

M. The Contractor shall notify the Engineer at least forty-eight (48) hours in advance of any work scheduled for Saturdays. There will be no work permitted on Sundays or holidays. This project will receive full-time inspection and the normal working hours for the Inspector are from 7:00 AM to 3:30 PM, Monday through Friday. Any overtime inspection costs which are avoidable will be reimbursed by the Contractor.

N. During the construction phase of the project, travel lanes shall remain open at the end of each day.

O. The Contractor shall take extreme care in the placement of the asphaltic tack coat so as to not make it visible on the concrete curb or inlet top units. It shall be the Contractor's responsibility to keep the concrete curb and inlet top units clean of this material.

P. Separate payment will not be made for construction layout. The costs for construction layout for all site work shall be included in the various items of the proposal.

1.02 Preconstruction Video

A. The Contractor shall, at no extra cost to the Owner, take DVD video recordings of the site prior to the commencement of construction. The video recording shall accurately depict the existing preconstruction condition of all curbs, sidewalks, driveways, fences, lawns, landscaped area, mailboxes, street furniture and all other appurtenances within, or outside a 25 foot radius of the limits of the construction of the project. One (1) copy of the video recording shall be provided to the Engineer. The date of the DVD video, as well as identification as to the location which the video depicts must be provided.

General Requirements 01000-3

1.03 Maintenance and Protection of Traffic

A. The Contractor shall erect or place and maintain in good condition, barricades, warning signs, lights, flares, approved yellow-flashing light units, rubber traffic cones, and other warning and danger signals and devices, appropriate and adequate for the specific needs and subject to the Engineer's approval, at working sites, closed roads, intersections, open excavations, locations of material storage, standing equipment and other obstructions, at points where the usable vehicular or pedestrian traffic width of the road or sidewalk is reduced, at points where traffic is deflected from its normal courses or lanes, and at other places of danger to vehicular or pedestrian traffic.

B. The Contractor shall provide sufficient watchmen and traffic directors and shall take all other precautions, including any that may be ordered by the Engineer, which are necessary for the safety of the public and protection of the work.

C. The Contractor shall obtain the approval of the Engineer and consent of all appropriate authorities having jurisdiction, for any detours which may be required. The Contractor shall make all necessary arrangements with such authorities regarding the establishment, maintenance and repair of such detours, the regulations and direction of traffic thereon, and the installation and maintenance of signs and traffic devices.

D. Before beginning work on any phase of the project, the Contractor shall furnish and install warning signals, barricades, wood traffic guides, lights, flares and other devices necessary, in the opinion of the Engineer, to protect the public during that phase of his operations.

E. If battery operated flashing warning lights are used, they shall conform to the specifications prepared by The Pennsylvania Department of Transportation, Official Traffic Control Devices. These specifications require, in part, that the flashing lights be weatherproof and reasonably tamper-proof and theft proof, be equipped with seven inch (7") minimum diameter amber plastic lens, shall operate with a flash rate of between 55 and 75 flashes per minute with a flash duration of not less than 18% of each flash cycle;

and shall be inspected and cleaned daily so as to maintain the lights in the proper working condition.

F. Road construction signs shall be placed at each end of the project along with every connecting intersection. At the start and end of each day, detour signs shall be placed if required.

G. During the work on this project, the Contractor shall provide and/or be prepared to provide traffic protection devices in accordance with the Manual on Uniform Traffic Control Devices and PennDOT Pub. 212. The minimum numbers set forth in the Schedule shall be on hand at each separate project site prior to the commencement of any work (or phase of work) and shall be maintained available on the project site throughout the period of the project (or phase). Failure to provide and maintain the minimum number of devices shall be sufficient cause for the Engineer to order cessation

General Requirements 01000-4 of work. When lack of any required safety devices presents an immediate hazard, the Engineer may order that such devices be provided by the Owner or by other Contractors, deducting the cost thereof from any monies due or becoming due the Contractor lacking the required devices.

H. Additional devices shall be provided by the Contractor as required or directed prior to the commencement of any operation or phase of an operation requiring such devices.

I. Uniform traffic directors (flagpersons) shall be provided whenever alternate two-way traffic is maintained in a single lane, whenever Contractor's operations require closing of a lane or portion of a lane on a multiple lane roadway, whenever the Contractor's equipment or vehicles are entering or leaving active roadways at other than normal street intersections, whenever a Contractor's operations will be contrary to or cause confusion regarding normal traffic control devices (traffic signals, signs, etc.) within a work area and whenever else, in the opinion of the Engineer, the Contractor's operations cause such hazards as to require the use of Traffic Directors.

J. Traffic Directors shall be responsible and thoroughly familiar with their responsibilities, and, while serving as Traffic Directors, shall not be required to perform any other duties. Traffic Directors shall be provided with an orange or red flag, an orange, orange and white, or lime green traffic safety vest and white or orange hard hat or other appropriate head gear. The Contractor may, at his option, secure the services of uniformed policemen having jurisdiction in the locality within which the project is located. Provision of such uniformed policemen will be deemed sufficient in meeting the requirements of this specification.

K. Traffic must be maintained throughout each separate work area during construction. At least one 12' lane must be maintained for traffic during all actual construction periods and at least two 10' lanes must be maintained for traffic at all other times.

L. The Contractor is advised that there may be heavy commuter traffic during the morning from 7:30 AM to 9:00 AM and the afternoon from 3:00 PM to 5:30 PM.

M. Construction shall be so staged to maintain at least one lane for traffic in each direction throughout each separate work area during the morning 7:30 AM to 9:00 AM and the afternoon 3:00 PM to 5:30 PM weekday periods of peak traffic.

N. Any restriction of traffic at any time shall be subject to the approval of the Engineer, and the Municipal Police Department. Any restriction of traffic on a Pennsylvania State Highway shall be subject to regulations and permitting prescribed by The Pennsylvania Department of Transportation. The Contractor shall submit a schedule of staged construction to the Engineer for approval prior to any restriction of traffic.

O. Should construction be in close proximity to a school or school traffic route, and be commenced during an active school period, the Contractor shall provide open traffic lanes to accommodate school bus and school related traffic.

General Requirements 01000-5

P. If detours are proposed by the Contractor, they are subject to the review and approval of the Engineer, the Municipal Police Department and/or The Pennsylvania Department of Transportation, as applicable.

Q. A detour plan and schedule shall be prepared by the Contractor for each proposed detour and submitted to each of the approving agencies previously mentioned. All detour signs shall conform to the requirements for Traffic Control Devices.

R. Temporary traffic stripes will be necessary to control and guide traffic through individual work areas. The Contractor shall submit a scheme for approval by the Engineer of all temporary traffic stripes prior to removal of any existing traffic stripes.

S. Construction of proposed utility pipes or storm pipes across existing roadways shall be so staged to maintain one lane in each direction. Trenches shall not remain open overnight.

T. The Contractor shall provide adequate means of access for fire, police and emergency vehicles throughout the length of the project. Contractor shall also provide for safe and adequate means of access to adjacent properties, both private and public.

U. The cost of all work as specified hereinbefore and all other work required to protect public safety and maintaining traffic flow shall be included in the prices bid for the various items in the Bid Form, unless specifically requested as a bid item in which case payment will be made as a lump sum.

1.04 Dust Control

A. The Contractor will be required to maintain all excavations, embankments, stockpiles, haul roads, permanent access roads, plant sites, waste areas, borrow areas, and all other work areas within or outside the project boundaries free from dust which would cause a hazard or nuisance to others. Approved temporary methods of stabilization consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Sprinkling, to be approved, must be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times, and the Contractor must have sufficient competent equipment on the job to accomplish this if sprinkling is used. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs. If any dust control is not done within twenty-four (24) hours after written notice is given by the Engineer, the work may be done by the Owner and charged to the Contractor. Costs for dust control shall be included in the prices bid for the various items in the bid form.

General Requirements 01000-6

1.05 Mobilization

A. DESCRIPTION—This work is the assembly and set-up of the general plant required to comply with the contract and with local and State laws and regulations. General plant includes Contractor's offices, shops, plants, storage areas, and sanitary or other facilities.

This work includes obtaining the required permits, insurance, bonds, and any other initial items required for the start of the work.

B. MATERIAL—These material and furnishings will not be considered a part of the other completed contract items.

(a) Mobilization shall be performed in strict compliance with Section 608 of the Commonwealth of Pennsylvania Department of Transportation Publication 408.

PART 2 – PRODUCTS

Not used

PART 3 – EXECUTION

Not used

4.01 General Requirements

A. Quantity of all other items covered in the General Requirements will not be measured for this project, but the work shall be performed as incidental to the proposed work.

B. Payment for all other items covered in the General Requirements will not be made for this project, but the cost shall be included in the various items of the proposal.

4.02 Mobilization (Max $3,500)

A. Quantity of “Mobilization (Max $3,500)” will not be measured for this project but shall be bid as a lump sum (LS) as shown on the bid form.

B. Payment for “Mobilization (Max. $3,500)” will be based on the lump sum (LS) amount bid for the base bid. Payment will be made once the contractor has provided the required insurance certificate, performance and payment bonds, and has begun physical construction.

General Requirements 01000-7

Carpeting 96816-1

SECTION 96816

CARPETING

PART 1 – GENERAL

1.01 Description

A. Replace existing mini golf carpeting where shown on the plans or as directed by the Engineer.

1.02 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For synthetic grass surfacing.

1. Include sections and details.

2. Show locations of seams and method of seaming.

3. Show layout of game lines, numbers, and letters. Indicate application method of each line and marking.

PART 2 – PRODUCTS

2.01 Materials

A. Acceptable Manufacturers:

1. The products of Carpet & Tile Mart – Flooring Supercenters, was used to establish standards of quality. Other manufacturers may be used provided they are approved as an equivalent product.

a. New Green (short): “Competitor – Green” – 12’ wide durable grass carpet with loop construction, 100% Olefin PolyPropyleneUV Stabilized outdoor grasslike carpet, manufactured by Value Carpets in Dalton Georgia, or approved equal.

b. New Green (long): “Supergrass – Green” (Rough) – 12’ wide 100% Polypropylene UV Stabilized, outdoor grasslike carpet, manufactured by Value Carpets in Dalton Georgia, or approved equal.

c. New Green (“sand”): “Ship N Shore - Beige” (Sand) – 6’, 8’ or 12’ wide beige outdoor carpet, manufactured by Value Carpets in Dalton Georgia, or approved equal.

2. Adhesive used for the installation shall be submitted to the Engineer for approval.

a. Ultrabond ECO 420 – High-Performance, Moisture-Resistant, Indoor/Outdoor

Carpet Adhesive manufactured Ultrabond, or an approved equal.

Carpeting 96816-2

PART 3 – EXECUTION

3.01 Preparation

A. General: Comply with the Carpet and Rug Institute's CRI 104 and with carpet manufacturer's written installation instructions for preparing substrates.

B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch (3 mm) wide or wider, and protrusions more than 1/32 inch (0.8 mm), unless more stringent requirements are required by manufacturer's written instructions.

C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet manufacturers.

D. Broom and vacuum clean substrates to be covered immediately before installing carpet.

3.02 Installation

A. Comply with the Carpet and Rug Institute's CRI 104 and carpet manufacturer's written installation instructions for the following:

a. Direct-glue-down installation.

b. Double-glue-down installation.

c. Carpet with attached cushion installation.

d. Pre-applied adhesive installation.

e. Hook-and-loop installation.

f. Stretch-in installation.

g. Stair installation.

B. Comply with carpet manufacturer's written instructions and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile.

4.01 Installation of New Green (short) Outdoor Surface which includes the removal of the existing surface and any subsurface padding and adhesive

A. Quantity of “Installation of New Green (short) Outdoor Surface which includes the removal of the existing surface and any subsurface padding and adhesive” will be measured in Square Feet (SF).

Carpeting 96816-3

B. Payment for “Installation of New Green (short) Outdoor Surface which includes the removal of the existing surface and any subsurface padding and adhesive” will be made per square foot (SF) of carpet and adhesive installed, including removal of existing surface, padding, and adhesive.

4.02 Installation of New Green (long) Outdoor Surface which includes the removal of the

A. Quantity of “Installation of New Green (long) Outdoor Surface which includes the

B. Payment for “Installation of New Green (long) Outdoor Surface which includes the removal of the existing surface and any subsurface padding and adhesive” will be made per square foot (SF) or carpet and adhesive installed, including removal of existing

4.03 Installation of New Green (“sand”) Outdoor Surface which includes the removal of the

A. Quantity of “Installation of New Green (“sand”) Outdoor Surface which includes the

B. Payment for “Installation of New Green (“sand”) Outdoor Surface which includes the removal of the existing surface and any subsurface padding and adhesive” will be made per square foot (SF) of carpet and adhesive installed, including removal of existing

4.04 Adhesive

A. Quantity of Adhesive will not be measured for this project, but the work shall be performed as incidental to the proposed work.

B. Payment for Adhesive will not be made for this project, but the cost shall be included in the various items of the proposal.

File details come from the government source that posted it. Updated .