6-08. Project Plans (1 Sheet).pdf
PDF 757 KB Posted
- Attached to
- Manatawny Green Surface Replacement
- Solicitation number
- US.202742
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a site plan document for the Manatawny Green Surface Replacement project, prepared by Remington & Vernick Engineers for the Borough of Pottstown in Montgomery County, Pennsylvania. The project involves replacing the existing outdoor surface of a mini-golf course located at 71 West High Street in Pottstown. The site plan details the complete reconstruction of the mini-golf course, including removal of the existing surface, preparation of the subsurface, and installation of new outdoor carpet surfaces in various colors (short green, long green, and white/tan) for each mini-golf hole and the practice green.
The document provides comprehensive construction notes, including erosion and sediment control requirements, demolition procedures, ADA accessibility guidelines, and specific PennDOT construction standards. The contractor will be responsible for providing all equipment, labor, and materials, with strict requirements for site safety, cleanliness, and restoration. The project involves careful surface preparation, surface removal, and installation of new surfacing materials, with specific attention to maintaining pedestrian access, protecting existing infrastructure, and ensuring proper environmental controls during the construction process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SI
TE
P
LA
N( IN FEET )
GRAPHIC SCALE
1 inch = ft.
12 12
EXISTING CONDITIONS & SURVEY NOTES
1. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS IN THE FIELD. ANY ERRORS OR DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY.
EROSION & SEDIMENT CONTROL (E&S) NOTES
1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL TEMPORARY E&S BEST MANAGEMENT
PRACTICES (BMPS) DURING THE CONSTRUCTION. TEMPORARY E&S BMPS SHALL INCLUDE
ANY DEPICTED ON THE PLANS AND THE FOLLOWING:
a. STORM INLET PROTECTION. INLET FILTER BAGS SHALL BE INSTALLED IN EACH EXISTING
AND PROPOSED STORM INLET RECEIVING RUNOFF FROM THE PROJECT AREA.
b. SEDIMENT BARRIERS. COMPOST FILTER SOCK, SILT FENCE OR OTHER SUITABLE
BARRIERS SHALL BE INSTALLED ON LEVEL GRADE DOWNSTREAM FROM DISTURBED
AREAS AND STOCKPILES.
c. CONCRETE WASHOUT. FOR ANY PROJECT WHERE CONCRETE WILL BE POURED ON SITE, A SUITABLE WASHOUT FACILITY MUST BE PROVIDED.
d. PUMPED WATER FILTER BAG. A PUMPED WATER FILTER BAG SHALL BE USED TO FILTER
WATER PUMPED FROM EXCAVATED AREAS (DEWATERING), SEDIMENT STORAGE AREAS
OF SEDIMENT BASINS AND SEDIMENT TRAPS.
2. E&S BMPS SHALL BE INSPECTED AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR,
REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE
PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED,
REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
3. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT
STABILIZATION OF ALL DISTURBED AREAS, THE CONTRACTOR SHALL REMOVE ALL
TEMPORARY E&S BMPS. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM,
PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH
A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION.
DEMOLITION NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, TRANSPORTATION, AND PROPER
DISPOSAL OF ALL DEMOLISHED MATERIALS. DEMOLISHED MATERIALS MUST BE MOVED
OFFSITE TO AN APPROVED FACILITY.
2. THE CONTRACTOR SHALL PERFORM DEMOLITION WORK AS NECESSARY TO FACILITATE THE
PROPOSED WORK, INCLUDING ANY DEMOLITION WORK NOT SPECIFICALLY INDICATED ON
THE PLANS.
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR AND MATERIALS.
2. AS THE AREAS ARE FOR THE EXACT SHAPE THE CONTRACTOR WILL BE REQUIRED TO USE AS
MANY ROLLS OF OUTDOOR SURFACING REQUIRED TO COMPLETE THE JOB.
3. ALL PEDESTRIAN ACCESS TO SIDEWALKS AND STREETS, INCLUDING CROSSWALKS, CURB
RAMPS, PARKING AND OTHER COMPONENTS OF PEDESTRIAN ACCESS ARE TO BE IN
ACCORDANCE WITH AMERICANS WITH DISABILITIES ACT (ADA) & ARCHITECTURAL BARRIERS
ACT (ABA) ACCESSIBILITY GUIDELINES AND THE CURRENT PUBLIC RIGHTS-OF-WAY
GUIDELINES PROPOSED BY THE ARCHITECTURAL AND TRANSPORTATION BARRIERS
COMPLIANCE BOARD (ACCESS BOARD).
2. ALL CONSTRUCTION SPECIFICATIONS AND DETAILS NOT SHOWN SHALL BE IN ACCORDANCE
WITH PENNDOT STANDARDS AS DETAILED IN THE LATEST REVISIONS OF THE FOLLOWING:
a. PUBLICATION 35 (BULLETIN 15) “QUALIFIED PRODUCTS LIST FOR CONSTRUCTION”;
b. PUBLICATION 408/2020 ”SPECIFICATIONS”;
c. PUBLICATION 72M/2010 “STANDARDS FOR ROADWAY CONSTRUCTION”;
d. PUBLICATION 111 “TRAFFIC CONTROL - PAVEMENT MARKINGS AND SIGNING
STANDARDS”;
e. PUBLICATION 213 “TEMPORARY TRAFFIC CONTROL GUIDELINES”.
INCLUDING ALL APPLICABLE BASELINE DOCUMENT CHANGES AND APPENDICES. THESE
CONSTRUCTION SPECIFICATIONS AND DETAILS MAY BE PURCHASED THROUGH THE
PENNDOT SALES STORE AT:
P.O BOX 2028
HARRISBURG, PA 17105-2028
(TELEPHONE: 1-717-787-6746)
CONSTRUCTION SEQUENCE
THE CONSTRUCTION SEQUENCE FOR THE PROJECT WILL BE AS FOLLOWS:
1. REMOVE THE EXISTING OUTDOOR SURFACE FROM ALL LOCATIONS WITHIN THE PROJECT AS
WELL AS ANY ADHESIVES USED TO SECURE THE EXISTING SURFACES.
2. PREPARE THE NEWLY EXPOSED SUBSURFACE (CONCRETE) FOR THE INSTALLATION OF THE
NEW OUTDOOR SURFACES.
3. INSTALL THE NEW; SHORT GREEN, LONG GREEN AND WHITE/TAN OUTDOOR CARPET
SURFACES FOR EACH MINI-GOLF HOLE, AND PRACTICE GREEN.
CONTRACT NOTES
3. THE CONTRACTOR SHALL MAKE A PRE-CONSTRUCTION VIDEO OF THE PROJECT AREA BEFORE
BEGINNING ANY CONSTRUCTION ACTIVITIES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING CONCRETE CURB AND
SIDEWALK AREAS NOT SHOWN TO BE REMOVED OR REPLACED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR COMPLETE REMOVAL AND REPLACEMENT OF ANY DAMAGED CURB OR
SIDEWALK NOT DOCUMENTED PRIOR TO THE START OF CONSTRUCTION AT NO ADDITIONAL
COST TO THE OWNER.
5. THE CONTRACTOR SHALL COORDINATE THEIR WORK WITH OTHER PRIME CONTRACTORS FOR
THIS PROJECT, IF APPLICABLE. IN ADDITION, THE CONTRACTOR SHALL COORDINATE THEIR
WORK WITH PRIME CONTRACTORS ON OTHER PROJECTS UNDER CONSTRUCTION NEAR THE
PROJECT AREA. ANY COORDINATION ISSUES SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER IMMEDIATELY. THERE WILL NOT BE ANY SEPARATE PAYMENT FOR THIS
COORDINATION, BUT THE COST SHOULD BE INCLUDED IN THE VARIOUS ITEMS OF THE
PROPOSAL.
6. SEPARATE PAYMENT WILL NOT BE MADE FOR SAWCUTTING OF ANY KIND, BUT THE COST
SHALL BE INCLUDED IN THE VARIOUS ITEMS OF THE PROPOSAL.
7. SEPARATE PAYMENT WILL NOT BE MADE FOR THE REMOVAL, TEMPORARY STORAGE AND
REINSTALLATION OF EXISTING SIGNAGE ALONG THE PROJECT AREA, BUT THE COST SHALL BE
INCLUDED IN THE VARIOUS ITEMS OF THE PROPOSAL.
8. CONTRACTOR SHALL RESTORE ALL EXISTING FEATURES DISTURBED DURING CONSTRUCTION
(I.E. MAILBOXES, IRRIGATION SYSTEMS, LANDSCAPING, ETC.). ALL COSTS SHALL BE INCLUDED
IN THE PRICE BID FOR SITE CLEARING.
SITE SAFETY, CLEANLINESS & RESTORATION NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY ON THE PROJECT SITE AND FOR
FOLLOWING ALL OSHA AND LOCAL SAFETY STANDARDS.
2. THE CONTRACTOR SHALL ENSURE THAT THE SITE IS SECURE AT THE END OF EACH WORKDAY.
ALL EQUIPMENT AND MATERIALS SHOULD BE STORED NEATLY AND SECURELY. EXCAVATED
AREAS SHALL BE BACKFILLED OR SECURED TO PREVENT ANY FALL HAZARD.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING PAVED SURFACES, INCLUDING
SIDEWALKS, FREE AND CLEAR OF SEDIMENT AND IN A BROOM SWEPT CONDITION WHEN
OPEN TO PUBLIC USE. AT A MINIMUM, THE CONTRACTOR SHALL CLEAN PAVED SURFACES
AT THE END OF EACH WORKDAY AND WHEN DIRECTED BY THE ENGINEER.
4. THE ALL VEGETATED AREAS DISTRIBUTED DURING CONSTRUCTION SHALL BE TOPSOILED,
SEEDED, FERTILIZED AND COVERED WITH STRAW MULCH. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR WATERING AND/OR RE-SEEDING AS NECESSARY TO ENSURE VEGETATIVE
STABILIZATION.
5. ALL PAVED AND CONCRETE AREAS EXCAVATED OR DAMAGED DURING CONSTRUCTION
SHALL BE RESTORED TO EXISTING CONDITION AT LEAST EQUAL TO THAT WHICH EXISTED
PRIOR TO THE START OF CONSTRUCTION.
6. PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL PERFORM FINAL CLEANING. FINAL
CLEANING SHALL INCLUDE REMOVAL AND PROPER DISPOSAL OF ALL EXCESS CONSTRUCTION
MATERIALS AND DEBRIS AS WELL AS CLEANING ALL PAVED SURFACES.
SITE INFORMATION
LOCATION:
1. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS IN THE FIELD. ANY ERRORS OR DISCREPANCIES SHALL BE
71 WEST HIGH STREET
POTTSTOWN, PA 19464
OWNER:
1. BOROUGH OF POTTSTOWN
SHEET No. :
CHECKED BY :DRAWN BY : DESIGN BY :
JOB No. :
DATE :
SCALE :
DMF DMF OMH
N o.
C H
K R
EV
IS
IO
N
D
AT
E
BY
Z:
\S ha re d\ 2_
O ld
Se rv er s\
Ki ng
O fP ru ss ia \C ad d\
D ra fti ng
\D ra fti ng
\P A\
Po tts to w n\
PM
PN
T0
M an at w an y
G re en S ur fa ce R ep la ce m en t\C
AD
\S ite P la n.
dw g
/9
/2
:3 1:
A
M
ALL DOCUMENTS PREPARED BY REMINGTON & VERNICK
ENGINEERS AND AFFILIATES ARE INSTRUMENTS OF
SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT
INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE
BY OWNER OR OTHERS ON EXTENSIONS OF THE PROJECT
OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT
WRITTEN VERIFICATION OR ADAPTATION BY REMINGTON &
VERNICK ENGINEERS AND AFFILIATES FOR THE SPECIFIC
PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND
WITHOUT LIABILITY OR LEGAL EXPOSURE TO REMINGTON
& VERNICK ENGINEERS AND AFFILIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS REMINGTON &
VERNICK ENGINEERS AND AFFILIATES FROM ALL CLAIMS,
DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR
R E S U L T I N G T H E R E F R O M .
of 2/28/2025
PMPNT033
AS NOTED
BO
R
O U
G H
O F
PO
TT
ST
O
W N
BO
R
O U
G H
O F
PO
TT
ST
O
W N
M O
N
TG
O M
ER
Y
C O
U N
TY
PE
N N
SY
LV
AN
IA
M
AN
AT
AW
N Y
G R
EE
N
S U
R
FA
C E
R
EP
LA
C
EM
EN
T
PROFESSIONAL ENGINEER LIC. No. PE-080447
OWEN M. HYNE
DATE:
REMINGTON
& VERNICK
ENGINEERS
(610) 940-1050, FAX (610) 940-1161
Croton Road Corporate Center 555 Croton Road, Suite 401 King of Prussia, PA 19406
WEB ADDRESS : RVE.COM
· Excellence Innovation Service·
09/15/2025
| Sheets and Views |
| 1 Site Plan |
File details come from the government source that posted it. Updated .