This is a Wage Rate Determination document prepared for the N. Cannon Avenue & Poplar Street Sanitary Sewer Rehabilitation project administered by the Borough of Lansdale in Pennsylvania. The document establishes prevailing wage rates that contractors and subcontractors must pay workers employed on this PENNVEST-funded infrastructure project. The wage determination applies to all laborers, mechanics, and other workers engaged in the sanitary sewer rehabilitation work, including open cut replacement, cured-in-place pipe (CIPP) lining, lateral replacement, manhole work, and related infrastructure restoration activities. These prevailing wage requirements are mandatory for all bidders and contractors performing work on this project as a condition of the public funding provided through the Pennsylvania Infrastructure Investment Authority.
The wage rates specified in this determination establish the minimum hourly compensation, including base wages and fringe benefits, that must be paid to workers in various classifications throughout the project duration. As a PENNVEST-funded project, the inclusion of prevailing wage determinations is a standard funding requirement that protects worker compensation standards on public infrastructure projects. All contractors submitting bids for this sanitary sewer rehabilitation project must comply with the established wage rates and include these labor cost requirements in their bid proposals. The prevailing wage determination remains in effect for the entire contract term and applies uniformly to all work classifications required to complete the scope of work defined in the project specifications and plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .