This is a bid set of construction plans and specifications for the City of Temple, Texas, prepared by Kasberg, Patrick & Associates, LP for the Avenue A Phase I Improvements project. The project encompasses improvements on Avenue A from South 6th Street to the alley east of South 2nd Street and improvements on 4th Street from Central Avenue to Avenue A. Construction work includes water utilities, drainage infrastructure, enhanced pedestrian and vehicular mobility, landscaping, and signage. The engineer's estimate of probable cost is $1,751,425, and the selected contractor must complete all work within 182 consecutive calendar days from Notice to Proceed. A non-mandatory pre-bid conference is scheduled prior to bid opening. The bid set includes comprehensive plan sheets, detail sheets, and specifications covering roadway improvements, curb and gutter installation, concrete sidewalks, ADA-compliant ramps, wastewater systems, water lines, storm drainage systems, utility coordination, erosion control measures, and landscape design with plant schedules and material specifications.
The project requires full compliance with Texas Department of Transportation standards, Texas Manual on Uniform Traffic Control Devices, and City of Temple regulations. Contractors must obtain required permits and provide comprehensive barricading, signing, and traffic control plans prepared by a licensed Texas professional engineer. All utility work must follow current Texas Commission on Environmental Quality regulations. The contractor is responsible for locating and protecting existing utilities, coordinating with utility companies, and resolving any conflicts at contractor expense unless determined otherwise by the city on a case-by-case basis. The contractor must provide proof of insurance naming the State of Texas, City of Temple, and Temple Reinvestment Zone 1 as additional insureds and develop a Stormwater Pollution Prevention Plan. Record drawings (as-builts) must be submitted prior to final payment release. All concrete shall be Class A with 3,000 PSI minimum compressive strength, and water services shall be HDPE with all meters and apparatus supplied by the contractor per city requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Adams Avenue
ELLEN COURT
th
S T
R E
E T
CITY
HALL
Central Avenue
M ain
S tre et
3r d
St re et
4t h
St re et
Avenue A
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501
KASBERG, PATRICK & ASSOCIATES, LP
CITY OF TEMPLE, TEXAS
KPA Firm Registration Number F-510
N O R T H
HORIZONTAL SCALE IN FEET
2000 4000
P:\Temple Reinvestment\2018\18-116 Downtown City Center\CAD\Base\DTCC 4th to Ave A\STANDARD DETAIL SHEETS.dwg
DOWNTOWN CITY CENTER
AVENUE A PHASE I IMPROVEMENTS
TDLR # - TABS2026010999
02/23/2026
AutoCAD SHX Text
ADAMS AVENUE
AutoCAD SHX Text
%%USHEET INDEX
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
SEE G-01 FOR INDEX OF SHEETS
AutoCAD SHX Text
%%UCITY ENGINEER
AutoCAD SHX Text
%%UVICINITY MAP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
JAMES BILLECK, P.E. CITY ENGINEER DATE
AutoCAD SHX Text
REVIEWED FOR CONSTRUCTION:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
UTILITY CONTACTS
AutoCAD SHX Text
RELEASE OF THIS APPLICATION DOES NOT CONSTITUTE A VERIFICATION
AutoCAD SHX Text
OF ALL DATA, INFORMATION, AND CALCULATIONS SUPPLIED BY THE
AutoCAD SHX Text
APPLICANT. THE ENGINEER OF RECORD IS SOLELY RESPONSIBLE FOR
AutoCAD SHX Text
THE COMPLETENESS, ACCURACY, AND ADEQUACY OF HIS/HER
AutoCAD SHX Text
SUBMITAL, WHETHER OR NOT THE APPLICATION IS REVIEWED FOR CODE
AutoCAD SHX Text
COMPLIANCE BY CITY ENGINEERS.
AutoCAD SHX Text
LETTING DATE:
AutoCAD SHX Text
ORIGINAL BID:
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
COMPLETION DATE:
AutoCAD SHX Text
JAMES BILLECK, P.E.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
DESIGN SPEED - 30 MPH
AutoCAD SHX Text
R. DAVID PATRICK, P.E, C.F.M.
AutoCAD SHX Text TEXAS ONE CALL 1-800-545-6005 TEXAS ONE CALL 1-800-545-6005 1-800-545-6005 TEXAS EXCAVATION SAFETY SYSTEM 1-800-344-8377 1-800-344-8377 TXU ELECTRIC DELIVERY 1-512-244-5691 1-512-244-5691 ATMOS ENERGY 1-866-332-8667 1-866-332-8667 CITY OF TEMPLE, TEXAS 1-254-298-5611 1-254-298-5611 CABLEVISION 1-254-778-9441 1-254-778-9441 CENTROVISION 1-254-773-1163 1-254-773-1163 SBC 1-254-954-4102 OR 1-254-954-4102 OR 1-800-669-8344 AT&T 1-800-252-11331-800-252-1133
AutoCAD SHX Text
DATE
AutoCAD SHX Text
R. DAVID PATRICK, P.E, C.F.M.
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text
%%UCITY MANAGER
AutoCAD SHX Text
BRYNN MYERS
AutoCAD SHX Text
%%UMAYOR
AutoCAD SHX Text
TIM DAVIS
AutoCAD SHX Text
%%UCOUNCIL MEMBERS
AutoCAD SHX Text
DISTRICT 1: JESSICA WALKER
AutoCAD SHX Text
DISTRICT 2: ZOE GRANT
AutoCAD SHX Text
DISTRICT 3: KARL KUYKENDALL
AutoCAD SHX Text
DISTRICT 4: MICHAEL PILKINGTON
AutoCAD SHX Text
%%UMAYOR PRO TEM
AutoCAD SHX Text
JESSICA WALKER
AutoCAD SHX Text 01-27-2026
SHEET NO.
G-01 OF
08 SHEETSTABLE OF CONTENTS
FI
LE
: P :\T em pl e R ei nv es tm en t\2
8\
-1
D ow nt ow n
C ity
C en te r\C
AD
\B as e\
D
TC
C th to
A ve
A \S
TA
N
D
AR
D D
ET
AI
L
SH
EE
TS
.d w g L
A
ST
S A
VE
D
: 1 /1
6/
0:
:1
AM
L
A
YO
U T:
G -0
TA
BL
E
O F
C O
N
TE
N
TS
APPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
This document is released for the purpose of interim review under the authority of R. David Patrick, P.E. 82638 on January 27, 2026 It is not to be used for construction, bidding or permit purposes. 01-27-2026
Plot Date:
1/27/2026 11:47:39 AM
Plotted By:
FGOMEZ
INDEX OF SHEETS
Sheet Number Sheet Title
GENERAL SHEETS
G-00 COVER
G-01 TABLE OF CONTENTS
G-02 GENERAL NOTES 1
G-03 GENERAL NOTES 2
G-04 PROPOSED OVERALL LAYOUT
G-05 PAVEMENT SECTIONS
G-06 PROPOSED DEMOLITION LAYOUT
G-07 STRIPING & SIGNAGE LAYOUT
G-08 PREFORATED PIPE LAYOUT
CONSTRUCTION SEQUENCE
CS-01 CONSTRUCTION SEQUENCE LAYOUT
ROADWAY SHEETS
R-01 PLAN AND PROFILE - 4TH ST
R-02 PLAN AND PROFILE - AVE A
R-03 PLAN VIEW 4TH TO AVE A
R-04 PLAN VIEW 4TH TO AVE A DIM
R-05 PLAN VIEW AVE A
R-06 PLAN VIEW AVE A DIM
WASTEWATER
WW-01 PROPOSED WW-A
STORMSEWER
ST-01 PROPOSED DRAINAGE
WATERLINE
WL-01 PROPOSED WL-A
WL-02 PROPOSED WL-B & WL-C
DETAILS
D-01 CONCRETE NOTES
D-02 CURB AND GUTTER DETAILS
D-03 CURB AND GUTTER DETAILS (SHEET 2 OF 2)
D-04 CONCRETE SIDEWALK
D-05 DRIVEWAY APPROACH DETAIL
D-06 ADA HANDICAP RAMP (SHEET 4 OF 4)
D-07 ADA HANDICAP RAMP (SHEET 3 OF 4)
D-08 ADA HANDICAP RAMP (SHEET 2 OF 4)
D-09 ADA HANDICAP RAMP (SHEET 1 OF 4)
D-10 PM (2)-12
D-11 PM (3)-12
D-12 PM (4)-12
D-13 PM (1)-12
D-14 SMD (GEN)-08
D-15 SMD (FRP)-08
D-16 SMD (TWT)-08
D-17 SMD (SLIP-3)-08
D-18 SMD (SLIP-2)-08
D-19 SMD (SLIP-1)-08
D-20 PCO (SHEET 1 OF 2)
D-21 PCO (SHEET 2 OF 2)
D-22 PB
D-23 PDD
D-24 CGT-PCO
D-25 PJB
D-26 PBGC
D-27 PAZD
D-28 HIL-AD-AAD
D-29 SCP-MD
D-30 WASTEWATER GENERAL NOTES
D-31 PVC EMBEDMENT AND BACKFILL DETAILS
D-32 FLUSH BLOCKING DETAIL
D-33 THRU CASING & AIR RELEASE VALVE
D-34 MANHOLE CONE & BASE DETAIL
D-35 MANHOLE BOTTOM & DROP CONNECTION
D-36 PRE-CAST & SHALLOW MANHOLE
D-37 MANHOLE FRAME COVER & COLLAR
D-38 MANHOLE FRAME COVER & SEWER CLEANOUT
D-39 SINGLE SERVICE & CLEANOUT CONNECTION
D-40 SHORT & LONG DUAL WASTEWATER SERVICE
D-41 GENERAL WATER NOTES DETAILS
D-42 RESIDENTIAL WATER SERVICE (SHEET 2 OF 2)
D-43 REINFORCED CONCRETE PIPE DETAILS
D-44 GATE VALVE DETAILS
D-45 FIRE HYDRANT ASSEMBLY DETAILS
D-46 FRENCH DRAIN DETAIL
LANDSCAPE
LS 1.0 OVERALL LANDSCAPE REFERENCE PLAN
LS 1.1 MATERIAL SCHEDULE AND NOTES
LS 1.2 LANDSCAPE PLAN
LS 1.3 LANDSCAPE PLAN
LS 1.4 LANDSCAPE PLAN
LS 1.5 LANDSCAPE PLAN
LS 1.6 LANDSCAPE PLAN
LS 1.7 LANDSCAPE PLAN
LS 1.8 LANDSCAPE PLAN
LS 1.9 LANDSCAPE PLAN
LS 1.10 LANDSCAPE PLAN
LS 1.11 LANDSCAPE PLAN
LS 1.12 LANDSCAPE PLAN
LS 1.13 LANDSCAPE DETAILS
LS 1.14 LANDSCAPE DETAILS
LS 1.15 LANDSCAPE DETAILS
LS 1.16 SITE FURNISHING DETAILS
LS 1.17 LANDSCAPE MAINTENANCE PLAN
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
D
G-02 OF
08 SHEETS
FI
LE
: P :\T em pl e R ei nv es tm en t\2
8\
-1
D ow nt ow n
C ity
C en te r\C
AD
\B as e\
D
TC
C th to
A ve
A \S
TA
N
D
AR
D D
ET
AI
L
SH
EE
TS
.d w g L
A
ST
S A
VE
D
: 1 /1
6/
0:
:1
AM
L
A
YO
U T:
G -0
G
EN
ER
AL
N
O
TE
S
A. BIDDER/CONTRACTOR ELIGIBILITY
1. A NON-MANDATORY PRE-BID CONFERENCE WILL BE HELD PRIOR TO BID
OPENING FOR THE PROJECT.
B. GENERAL NOTES
1. ALL CONSTRUCTION FOR THIS PROJECT SHALL GENERALLY CONFORM TO THE
REQUIREMENTS OF THE TEXAS DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF HIGHWAYS,
STREETS AND BRIDGES (2014 EDITION) UNLESS EXCEPTED OR NOTED ON THESE
PLANS.
2. ALL BARRICADES, SIGNS AND TRAFFIC CONTROL FOR THIS PROJECT SHALL
CONFORM TO THE LATEST EDITION OF THE TEXAS MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS.
3. THE BIDDERS FOR THIS PROJECT SHALL FAMILIARIZE THEMSELVES WITH ALL
REQUIREMENTS OF WORKING IN STATE AND CITY OF TEMPLE RIGHTS-OF-WAY
AND EASEMENTS. THE BIDDERS SHALL FAMILIARIZE THEMSELVES WITH ALL
INSURANCE REQUIREMENTS FOR SAID WORK AND SHALL INCLUDE IN THEIR BIDS,
INSURANCE COSTS AND INSURANCE PREMIUMS THAT PROVIDE FOR THE STATE
OF TEXAS, THE CITY OF TEMPLE, TEMPLE REINVESTMENT ZONE 1 AND THE
ENGINEER AS ADDITIONAL INSURED UNDER THE CONTRACTOR'S POLICIES.
4. THE CONTRACTOR SHALL IF REQUIRED PROVIDE THE CITY OF TEMPLE WITH A
BARRICADE, SIGNING AND TRAFFIC PLAN WHICH WILL INCLUDE HOW TRAFFIC
WILL BE HANDLED DURING CONSTRUCTION. THE BARRICADES, SIGNS AND
LIGHTS SHALL CONFORM TO THE LATEST EDITION OF THE TEXAS MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. THE PLAN
SHALL BE PREPARED BY A TEXAS REGISTERED PROFESSIONAL ENGINEER.
STANDARD TRAFFIC CONTROL PLANS HAVE BEEN PROVIDED. SHOULD THE
CONTRACTOR CHOOSE TO DEVIATE AND DEVELOP THEIR OWN TRAFFIC
CONTROL IT SHALL BE DESIGNED BY A LICENSED PROFESSIONAL ENGINEER IN
THE STATE OF TEXAS.
5. CONTRACTOR SHALL NOTIFY THE CITY OF TEMPLE A MINIMUM OF THREE (3)
WORKING DAYS (MONDAY-FRIDAY) IN ADVANCE OF CONSTRUCTION STARTUP,
FOLLOWED BY A LETTER OF CONFIRMATION. CONTRACTOR SHALL ALSO GIVE A
MINIMUM OF THREE (3) WORKING DAYS (MONDAY-FRIDAY) NOTICE TO ALL
AUTHORIZED INSPECTORS, SUPERINTENDENTS OR PERSONS IN CHARGE OR
PRIVATE AND PUBLIC UTILITIES AFFECTED BY HIS OPERATIONS PRIOR TO
COMMENCEMENT OF WORK. THE FOLLOWING ARE TELEPHONE NUMBERS OF THE
ENTITIES MOST LIKELY TO BE AFFECTED:
TEXAS ONE CALL 1-800-545-6005
TEXAS EXCAVATION SAFETY SYSTEM 1-800-344-8377
TXU ELECTRIC DELIVERY 1-512-244-5691
ATMOS ENERGY 1-866-332-8667
CITY OF TEMPLE, TEXAS 1-254-298-5611
CABLEVISION 1-254-778-9441
CENTROVISION 1-254-773-1163
SBC 1-254-954-4102 OR
1-800-669-8344
AT&T 1-800-252-1133
6. LOCATION OF EXISTING UTILITIES SHOWN ON THE PLANS WAS COMPILED FROM
RECORD INFORMATION. NO WARRANTY IS IMPLIED AS TO THE ACTUAL LOCATION
OF EXISTING UTILITIES. CONTRACTOR TO FIELD VERIFY LOCATIONS OF EXISTING
UTILITIES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CONTRACTOR
SHALL CALL THE CITY OF TEMPLE AT (254) 298-5611. BY POT HOLING, IF THERE
ARE ANY CONFLICTS BETWEEN PROPOSED AND EXISTING UTILITIES, OR IF THE
EXISTING UTILITIES ARE IN ANY WAY DIFFERENT FROM WHAT IS SHOWN ON THE
DRAWINGS, THEN IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY
THE CITY OR OTHER AFFECTED UTILITY BEFORE PROCEEDING WITH ANY
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESOLVING
ALL CONFLICTS AT HIS EXPENSE. THE OWNER WILL CONSIDER ANY CONFLICTS
AT SAID LOCATIONS ON A CASE BY CASE BASIS IN ORDER TO DETERMINE IF THE
CONTRACTOR SHOULD BE REIMBURSED FOR HIS EXPENSE IN SOLVING SAID
CONFLICT.
7. CONTRACTOR SHALL MAKE ALL DUE PRECAUTIONS TO PROTECT EXISTING
FACILITIES FROM DAMAGE. ANY DAMAGE TO EXISTING FACILITIES INCURRED AS
A RESULT OF THESE CONSTRUCTION OPERATIONS ARE TO BE REPAIRED
IMMEDIATELY BY THE CONTRACTOR TO AT LEAST THE PREEXISTING CONDITION
AT NO ADDITIONAL COST TO THE OWNER.
8. CONTRACTOR SHALL COORDINATE INTERRUPTIONS OF ALL UTILITIES AND
SERVICES WITH ALL APPLICABLE UTILITY COMPANY OR COMPANIES. ALL WORK
TO BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY
COMPANY OR AGENCY INVOLVED.
9. WHEN UNLOCATED OR INCORRECTLY LOCATED UNDERGROUND PIPING OR A
BREAK IN A LINE OR OTHER UTILITIES AND SERVICES ARE ENCOUNTERED
DURING SITE WORK OPERATIONS, THE CONTRACTOR SHALL NOTIFY THE
APPLICABLE UTILITY COMPANY IMMEDIATELY TO OBTAIN PROCEDURE
DIRECTIONS. CONTRACTOR TO COOPERATE WITH THE APPLICABLE UTILITY
COMPANY IN MAINTAINING ACTIVE SERVICES IN OPERATION.
10. THE CONTRACTOR SHALL CONTACT THE CITY OF TEMPLE AT (254) 298-5611 FOR
EXISTING UTILITY LOCATIONS PRIOR TO ANY EXCAVATION. IN ADVANCE OF
CONSTRUCTION, THE CONTRACTOR IS TO VERIFY THE LOCATIONS OF ALL
UTILITIES TO BE EXTENDED, TIED TO OR ALTERED, OR SUBJECT TO
DAMAGE/INCONVENIENCE BY THE CONSTRUCTION OPERATIONS. THE CITY OF
TEMPLE WATER AND WASTEWATER MAINTENANCE RESPONSIBILITY ENDS AT
RIGHT-OF-WAY/EASEMENT LINES.
11. CONTRACTOR SHALL STRIP 6 INCHES OF TOPSOIL FROM ALL AREAS SUBJECT TO
GRADE MODIFICATIONS. REMOVE ANY AREA OF WEAK SOIL.
12. WITHIN CITY OF TEMPLE RIGHT-OF-WAY, RESIDENTIAL DRIVEWAYS ARE TO HAVE
A 10% MAXIMUM GRADE. NON RESIDENTIAL DRIVEWAYS ARE TO HAVE A 3%
MAXIMUM GRADE FOR THE FIRST THIRTY (30) FEET OFF THE EDGE OF
PAVEMENT.
13. HE CONTRACTOR SHALL PROTECT ALL EXISTING FENCES. IN THE EVENT THAT A
FENCE MUST BE REMOVED. THE CONTRACTOR SHALL REPLACE SAID FENCE OR
PORTION THEREOF WITH THE SAME TYPE OF FENCING TO A QUALITY OF EQUAL
OR BETTER THAN THE ORIGINAL FENCE. THIS WILL NOT BE A SEPARATE PAY
ITEM, UNLESS SPECIFICALLY NOTED ON THE CONSTRUCTION DRAWINGS.
14. THE CONTRACTOR SHALL MAKE AN EXAMINATION OF THE PROJECT SITE AND
COMPLETELY FAMILIARIZE HIMSELF WITH THE NATURE AND EXTENT OF THE
WORK TO BE ACCOMPLISHED. NO EXTRA COMPENSATION WILL BE ALLOWED
FOR DIFFERING SITE CONDITIONS( SUFACE OR SUB-SURFACE) ANY WORK MADE
NECESSARY BY UNUSUAL CONDITIONS OR OBSTACLES ENCOUNTERED DURING
THE PROGRESS OF THE WORK, WHICH CONDITIONS OR OBSTACLES ARE
READILY APPARENT UPON A VISIT TO THE SITE. IF THERE ARE ANY QUESTIONS
OF THIS REGARD OR IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS
AND ACTUAL SITE CONDITIONS THE CONTRACTOR SHALL NOTIFY THE ENGINEER
PRIOR TO THE SUBMISSION OF BIDS.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF HIS MATERIALS
AND EQUIPMENT FROM THEFT, VANDALISM, ANIMALS, FIRE, ETC., WHILE SAID
MATERIALS AND EQUIPMENT ARE ON THE PROJECT WHETHER STORED OR
INSTALLED IN PLACE, UNTIL THE PROJECT HAS BEEN ACCEPTED BY THE CITY OF
TEMPLE.
16. UPON COMPLETION OF THE PROJECT, THE SITE(S) AS DEFINED HEREIN, SHALL
BE CLEANED OF ALL DEBRIS AND LEFT IN A NEAT AND PRESENTABLE CONDITION.
17. IN THOSE CASES WHERE FIXED FEATURES REQUIRE, THE DESIGN SLOPES
INDICATED HEREIN AND ON THE CROSS SECTIONS MAY BE MODIFIED IN THE
FIELD AS DETERMINED BY THE ENGINEER IF EXISTING CONDITIONS SO REQUIRE.
18. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT ALL ADJOINING
PAVEMENT SECTIONS SHALL BE PROTECTED DURING ALL PHASES OF
CONSTRUCTION AND ANY DAMAGES INCURRED DUE TO CONTRACTOR'S
OPERATION SHALL BE REPAIRED AND/OR REPLACED AT THE CONTRACTOR'S
EXPENSE.
19. WHERE EXISTING PAVEMENT ADJOINS NEW PAVEMENT, THE EXISTING
PAVEMENT SHALL BE SAWED TO A NEAT TRANSVERSE LINE TO PERMIT
ADEQUATE JOINING.
20. AT TIMES REQUESTED BY THE CONTRACTOR, THE CITY OF TEMPLE STREET
DEPARTMENT FORCES WILL REMOVE AND/OR RELOCATE EXISTING TRAFFIC
SIGNS. TWO DAYS NOTICE WILL BE REQUIRED.
21. ACCESS TO OFFICES, BUSINESSES AND DRIVEWAYS ALONG THE PROJECT MUST
RECEIVE PRIORITY BY THE CONTRACTOR.
22. EXISTING PAVING, BUILDINGS AND OTHER ITEMS SHOWN ON THE PLANS ARE
NOT SPECIFICALLY RELATED TO THE WORK OF THE CONTRACTOR AND IS FOR
INFORMATION ONLY, UNLESS OTHERWISE NOTED.
23. THE PROCUREMENT AND TRANSPORTATION OF WATER REQUIRED FOR
INCLUSION IN THE PROJECT IS THE RESPONSIBILITY OF THE CONTRACTOR.
24. ALL UTILITY TECHNICAL SPECIFICATIONS FOR THE CITY OF TEMPLE SHALL BE IN
ACCORDANCE WITH THE SPECIFICATIONS LISTED BELOW AND AMENDMENTS
INCLUDED HEREIN. THE TECHNICAL SPECIFICATIONS FROM "STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION" (BLUE BOOK) BY THE
NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS:
NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
REGIONAL INFORMATION CENTER
P.O. BOX 5888 ARLINGTON, TEXAS 76005-5888
WILL BE USED ON THE PROJECT. COPIES MAY BE PURCHASED FROM THE
ABOVE ADDRESS OR REVIEWED AT THE CITY ENGINEERS OFFICE.
RESPONSIBILITY FOR UPDATING THESE COPIES WILL BE THE CONTRACTORS
RESPONSIBILITY.
C. CONSTRUCTION LAYOUT/PROJECT COORDINATION
1. CONTRACTOR SHALL LOCATE, PROTECT AND MAINTAIN BENCHMARKS,
MONUMENTS AND CONTROL POINTS. RE-ESTABLISHMENT OF DISTURBED OR
DESTROYED ITEMS SHALL BE ACCOMPLISHED BY A TEXAS REGISTERED
PROFESSIONAL LAND SURVEYOR AT NO COST TO THE OWNER.
2. PRE-CONSTRUCTION CONFERENCE
PRIOR TO BEGINNING WORK ON THE PROJECT AND SOON AFTER THE AWARD
OF THE CONTRACT, A CONFERENCE WILL BE HELD AMONG THE
REPRESENTATIVES OF THE CITY OF TEMPLE, THE ENGINEER, THE CONTRACTOR
AND ANY SUBCONTRACTOR THAT WILL BE INVOLVED IN THE WORK. AT THAT
TIME THE CONTRACTOR SHALL SUBMIT CHARTS OR BRIEFS, OUTLINING THE
MANNER OF EXECUTION OF THE WORK THAT IS INTENDED IN ORDER TO
COMPLETE THE SPECIFIED WORK WITHIN THE ALLOTTED TIME. THIS
CONFERENCE WILL MORE COMPLETELY ESTABLISH THE SEQUENCE OF WORK
TO BE FOLLOWED AND ESTABLISH THE ESTIMATED PROGRESS SCHEDULE FOR
COMPLETION OF THE VARIOUS TASKS. WHEN APPLICABLE, THE
PRE-CONSTRUCTION CONFERENCE WILL BE HELD ONLY AFTER INSTALLATION OF
THE EROSION AND SEDIMENTATION CONTROLS.
A. IN ADDITION, AT THIS CONFERENCE, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR FURNISHING THE ENGINEER WITH ALL OF THE
FOLLOWING, AS SPECIFIED HEREIN OR AS DIRECTED BY THE ENGINEER:
a. SAMPLES OF ALL MATERIALS TO BE USED ON THE PROJECT WITH
IDENTIFICATION AS TO PRODUCT NAME; NAME, LOCATION, PHONE
NUMBER (INCLUDING AREA CODE) AND MAILING ADDRESS OF PRODUCT
SOURCE AND MANUFACTURER, IF DIFFERENT FROM SOURCE; CONTENT
OF PRODUCT; AMOUNT OF EACH INGREDIENT IN THE PRODUCT, AND
MANUFACTURER'S DIRECTIONS AS TO USE AND APPLICATION OF THE
PRODUCT, IF APPLICABLE.
b. MANUFACTURER'S LITERATURE OF ALL MATERIALS AND EQUIPMENT
INSTALLED ON THE PROJECT.
3. THE PLANS FOR THIS PROJECT SHOW PROPOSED ELEVATIONS, SLOPES AND
DIMENSIONS THAT ARE INTENDED FOR ACTUAL PLACEMENT. HOWEVER, THERE
MAY BE SOME INSTANCES WHERE EXISTING CONDITIONS MAKE IT IMPRACTICAL
TO ACHIEVE THE IDEAL. IN THOSE INSTANCES, THE ENGINEER WILL ASSIST THE
CONTRACTOR IN MAKING PROPER FIELD CHANGES TO BETTER ACCOUNT FOR
FIELD CONDITIONS.
4. THE CONTRACTOR FOR THE PROJECT WILL MARK THE LIMITS OF CONSTRUCTION
AND RIGHT-OF-WAY PRIOR TO COMMENCEMENT OF THE PROJECT. PRIVATE
PROPERTY SHALL BE OFF LIMITS UNLESS WRITTEN PERMISSION IS GIVEN TO THE
CONTRACTOR BY THE OWNER. THE CITY OF TEMPLE WILL NOT BE RESPONSIBLE
FOR ANY CONTRACTOR OPERATIONS OFF OF THE PROJECT SITE.
D. SITE GRADING/CONNECTION NOTES
1. CONTRACTOR SHALL CONTROL DUST CAUSED BY THE WORK AND COMPLY WITH
POLLUTION CONTROL REGULATIONS OF GOVERNING AUTHORITIES. THIS SHALL
BE SUBSIDIARY TO THE PROJECT.
2. CONTRACTOR SHALL REMOVE BUILT UP MATERIAL ON ADJACENT PUBLIC
ROADWAYS RESULTING FROM HIS WORK. CLEANING TO BE AT LEAST ONCE A
DAY. THIS SHALL BE SUBSIDIARY TO THE PROJECT.
3. CONTRACTOR SHALL NOT STOCKPILE MATERIAL WITHIN THE 100 YEAR FLOOD
PLAIN. FOR THE LIMITS OF THIS PROJECT THERE IS NOT A 100 YEAR FLOOD
PLAIN.
4. THIS PROJECT IS A UNIT PRICE PROJECT AND PAYMENTS SHALL BE MADE AT THE
UNIT PRICE AND QUANTITY FOR ITEMS CONSTRUCTED AND/OR INSTALLED.
5. THE SUCCESSFUL CONTRACTOR SHALL DEVELOP A PROJECT SCHEDULE FOR
THE PROJECT IN PRIMAVERA, MICROSOFT OFFICE, EXCEL, OR OTHER SOFTWARE
THAT ILLUSTRATES THE TASKS TO COMPLETE THE PROJECT WITH A CRITICAL
PATH. THE SCHEDULE SHALL BE MAINTAINED THROUGHOUT THE PROJECT AND
THE CONTRACTOR SHALL BE PREPARED TO REVIEW AND DISCUSS THE
SCHEDULE AT THE CONSTRUCTION PROGRESS MEETINGS. CONSTRUCTION
PROGRESS MEETINGS WILL BE HELD AT A MINIMUM OF ONCE PER MONTH AND
THE CITY RESERVES THE RIGHT TO HAVE CONSTRUCTION PROGRESS MEETINGS
AS REGULARLY AS THEY DEEM NECESSARY. THIS SHALL BE SUBSIDIARY TO THE
PROJECT.
6. ALL HYDRO MULCH ON THIS PROJECT SHALL BE INSTALLED UTILIZING HIGH
PERFORMANCE - FLEXIBLE GROWTH MEDIUM. THE SPECIFICATION FOR HIGH
PERFORMANCE - FLEXIBLE GROWTH MEDIUM IS INCLUDED IN THE
SPECIFICATIONS AND CONTRACT DOCUMENT BOOK FOR THIS PROJECT. ALL
ELEMENTS OF THE SPECIFICATION SHALL BE PERFORMED AND INCLUDED IN THE
PROJECT. ALL BID ITEMS FOR FURNISHING AND INSTALLING HYDRO-MULCH
SHALL INCLUDE HIGH PERFORMANCE - FLEXIBLE GROWTH MEDIUM, WATER TO
ESTABLISH AND MAINTAIN GRASS AND FINAL MOWING PRIOR TO ACCEPTANCE.
THIS PHASE OF THIS PROJECT DOES NOT SPECIFICALLY REQUIRE
REVEGITATION. IF THE CONTRACTOR UTILIZES ANY LAYDOWN OR STAGING AREA
THAT REQUIRES REVEGITATION IT SHALL FOLLOW THIS NOTE AND BE AT THE
COST OF THE CONTRACTOR
7. ALL STORAGE AREAS FOR MATERIALS AND EQUIPMENT OR OTHER AREAS
DISTURBED BY THE CONTRACTOR IN THE CONSTRUCTION OF THIS PROJECT
THAT ARE OUTSIDE OF THE AREA TO REMAIN NON-VEGETATED SHALL BE
RE-VEGETATED AT NO EXPENSE TO THE CITY.
8. THE CONTRACTOR SHALL NOTIFY AFFECTED PROPERTY OWNERS A MINIMUM OF
1 WEEK PRIOR TO THE START OF CONSTRUCTION IN AND AROUND THEIR
RESPECTIVE PROPERTIES.
9. INCLUDED WITH THE DESIGN PACKAGE ARE THE DESIGN AUTOCAD FILES THAT
INCLUDES EXISTING SURFACE AND PROPOSED SURFACE. USE OF THE AUTOCAD
FILE IS AT THE RISK OF THE BIDDERS. NO WARRANTY IS ISSUED BY THE DESIGN
ENGINEER OR THE CITY FOR USE OF THIS FILE.
10. ALL WATER VALVES, WATER METERS, MANHOLES, HAND HOLES, JUNCTION
BOXES, ETC. THAT ARE IN THE AREA OF CONSTRUCTION SHALL BE ADJUSTED TO
THE FINAL GRADE OF INFRASTRUCTURE. THIS SHALL BE SUBSIDIARY TO THE
PROJECT.
11. ALL WATER SERVICES SHALL BE HDPE AS SHOWN IN THE DETAILS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ALL WATER METERS
AND INSTALLING ALL ITEMS AND APPARATUS REQUIRED BY THE CITY OF TEMPLE
AND OTHER REGULATORY AGENCIES FOR WATER SERVICE INSTALLATIONS.
12. ALL ASPHALT PAVING SHALL RECEIVE PRIME COAT AND TACK COAT AS
APPROPRIATE. THIS SHALL BE SUBSIDIARY TO THE RESPECTIVE ASPHALT BID
ITEMS.
13. THERE MAY BE INSTANCES IN WHICH FIELD ADJUSTMENTS OR CHANGES WILL BE
REQUIRED FOR CONSTRUCTION OF THIS PROJECT. IN THOSE INSTANCES, THE
CONTRACTOR SHALL WORK WITH THE ENGINEER TO MAKE FIELD ADJUSTMENTS
IN ORDER TO SUCCESSFULLY COMPLETE THE PROJECT. THESE ADJUSTMENTS
WILL BE PAID UTILIZING EXISTING BID PRICES AT THE UNIT PRICE BID AND
QUANTITY INSTALLED. IN THE EVENT THERE IS NOT A BID ITEM FOR A
CONSTRUCTION TASK, A CHANGE ORDER WILL BE ISSUED.
14. CURB INLETS THAT EXTEND INTO THE SIDEWALKS SHALL BE INCORPORATED
AND MEET ALL ADA STANDARDS. THIS SHALL BE SUBSIDIARY TO THE PROJECT.
15. ALL STORM WATER JUNCTION BOXES AND INLETS SHALL INCLUDE MANHOLES
AND SHALL BE SUBSIDIARY TO THE APPROPRIATE BID ITEM FOR JUNCTION
BOXES AND INLETS.
16. ALL DEWATERING FOR CONSTRUCTION SHALL BE SUBSIDIARY TO THE PROJECT.
17. THE SUCCESSFUL CONTRACTOR SHALL PERFORM MOWING OF THE VEGETATION
ONCE GRASS HAS REACHED A HEIGHT OF 3 INCHES AND A FINAL MOWING OF
THE PROJECT PRIOR TO ACCEPTANCE. THIS SHALL BE SUBSIDIARY TO THE
PROJECT.
GENERAL NOTES 1APPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
This document is released for the purpose of interim review under the authority of R. David Patrick, P.E. 82638 on January 27, 2026 It is not to be used for construction, bidding or permit purposes. 01-27-2026
Plot Date:
1/27/2026 11:47:40 AM
Plotted By:
FGOMEZ
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
G-03 OF
08 SHEETS
FI
LE
: P :\T em pl e R ei nv es tm en t\2
8\
-1
D ow nt ow n
C ity
C en te r\C
AD
\B as e\
D
TC
C th to
A ve
A \S
TA
N
D
AR
D D
ET
AI
L
SH
EE
TS
.d w g L
A
ST
S A
VE
D
: 1 /1
6/
0:
:1
AM
L
A
YO
U T:
G -0
G
EN
ER
AL
N
O
TE
S
G. CONCRETE FOR CONSTRUCTION (CONTINUED)
1. CONCRETE RIP RAP SHALL BE 4-INCHES IN THICKNESS, CLASS "A" CONCRETE
WITH #4 BARS 16" ON CENTER EACH WAY. FINISHED CONCRETE SHALL RECEIVE
A BROOM FINISH AND BE SPRAYED WITH TYPE 2 MEMBRANE CURING
COMPOUND. THE RIP RAP SHALL BE PLACED WITH A 24-INCH DEPTH BY 6-INCH
WIDE TOE DITCH AT THE BOTTOM OF SLOPE EDGE AND WITH AN 18-INCH DEPTH
BY 6-INCH WIDE TOE DITCH AT THE TOP OF SLOPE EDGE AND ALONG THE EDGE
OF THE SLOPE, UNLESS OTHERWISE NOTED ON THE PLANS.
2. ALL EXPANSION JOINT MATERIAL FOR DRIVEWAY AND SIDEWALK INSTALLATIONS
SHALL BE GRADE 1 5. REDWOOD (1/2" x 3 1/2" DIMENSION).
3. ALL REINFORCING STEEL FOR CONCRETE SHALL MEET ASTM A 615, GRADE 60.
4. PRE-CAST INLETS, JUNCTION BOXES, MANHOLES AND BOX CULVERTS ARE
ALLOWABLE ON THIS PROJECT. HOWEVER, ALL SUPPLIER SUBMITTALS WILL BE
REQUIRED AND THE OWNER RESERVES THE RIGHT TO CHANGE ELEVATIONS
AND SLOPES OF, TO AND FROM EACH PROPOSED STRUCTURE AT ANY TIME.
G. JOB SITE SAFETY NOTES
1. ALL CONSTRUCTION OPERATIONS FOR THIS PROJECT SHALL BE ACCOMPLISHED
IN ACCORDANCE WITH APPLICABLE REGULATIONS OF THE UNITED STATES
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). COPIES OF THE
OSHA STANDARDS MAY BE PURCHASED FROM THE U.S. GOVERNMENT PRINTING
OFFICE; INFORMATION AND RELATED REFERENCE MATERIALS MAY BE OBTAINED
FROM OSHA: 903 SAN JACINTO; AUSTIN, TEXAS.
2. THESE PLANS, PREPARED BY KASBERG, PATRICK & ASSOCIATES, LP, DO NOT
EXTEND TO OR INCLUDE DESIGNS OR SYSTEMS PERTAINING TO THE SAFETY OF
THE CONTRACTOR OR HIS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE
PERFORMANCE OF THE WORK. THE SEAL OF KASBERG, PATRICK & ASSOCIATES,
LP, REGISTERED PROFESSIONAL ENGINEER(S) HEREON DOES NOT EXTEND TO
ANY SUCH SAFETY SYSTEMS THAT MAY NOW OR HEREAFTER BE
INCORPORATED IN THE WORK.
3. THE CONTRACTOR SHALL PROVIDE A TRENCH SAFETY PLAN SIGNED AND
SEALED BY LICENSED ENGINEER IN THE STATE OF TEXAS TO THE CITY OF
TEMPLE FOR RECORD PURPOSES, AS REQUIRED BY THE LAWS OF THE STATE
OF TEXAS. IMPLEMENTATION OF THE SUBMITTED TRENCH SAFETY PLAN SHALL
BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
4. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ALL JOB SITE
SAFETY, FOR MANAGEMENT OF JOB SITE PERSONNEL, FOR SUPERVISION OF THE
USE OF JOB SITE EQUIPMENT AND FOR DIRECTION OF ALL CONSTRUCTION
PROCEDURES, METHODS AND ELEMENTS REQUIRED TO COMPLETE THE
CONSTRUCTION OF THE PROPOSED IMPROVEMENTS.
5. BLASTING IS NOT PERMITTED ON THIS PROJECT.
6. IN ADDITION TO OTHER SAFETY REQUIREMENTS, ALL TRUCKS USED FOR
HAULING MATERIAL AND/OR EQUIPMENT TO AND/OR FROM THIS PROJECT SHALL
BE EQUIPPED WITH AN AUDIBLE BACKUP WARNING DEVICE THAT IS IN GOOD
OPERATING CONDITION.
7. ADVISORY SPEED LIMIT SIGNS SHALL BE PLACED AS DIRECTED BY THE CITY OF
TEMPLE AND/OR THE TEXAS DEPARTMENT OF TRANSPORTATION. THE LOCATION
AND SPEED WILL BE DETERMINED BY THOSE TWO ENTITIES IN ORDER TO FIT
PROJECT CONDITIONS.
8. PROTECTION OF VEHICULAR AND PEDESTRIAN TRAFFIC IS OF THE UTMOST
IMPORTANCE FOR THE PROJECT. THE TRAFFIC CONTROL AND SEQUENCE OF
CONSTRUCTION PLAN SHALL ADDRESS ALL ANTICIPATED SITUATIONS IN THIS
REGARD WITH SUFFICIENT DETAIL. THE CONTRACTORS PLAN WILL BE REVIEWED
BY LOCAL TxDOT OFFICIALS AND THE CITY OF TEMPLE.
H. ENVIRONMENTAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING SANITARY
FACILITIES ON THIS PROJECT FOR EMPLOYEES.
2. CONTRACTOR SHALL NOT PLACE ASPHALT PRODUCTS ON THE GROUND WITHIN
48 HOURS OF FORECASTED RAIN.
3. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND
FEDERAL REQUIREMENTS REGARDING EXCESS AND WASTE MATERIAL,
INCLUDING METHODS OF HANDLING AND DISPOSAL.
4. CONTRACTOR SHALL MAINTAIN ACCESS TO PUBLIC AND PRIVATE FACILITIES
DURING CONSTRUCTION. CONSTRUCTION ACTIVITIES TO BE COORDINATED WITH
THE CITY OF TEMPLE. THIS SHALL BE SOLE RESPONSIBLITY OF THE
CONTRACTOR.
5. CONTRACTOR SHALL LOCATE MATERIAL STORAGE AREAS AWAY FROM STORM
WATER CONVEYANCE SYSTEMS. CONTRACTOR TO PROVIDE PROTECTED
STORAGE AREAS FOR CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS AND OTHER
POTENTIALLY TOXIC MATERIALS.
6. NO OPEN BURNING IS ALLOWED WITHIN THE TEMPLE CITY LIMITS. BURNING IS
ALLOWED IN BELL COUNTY BY AIR CURTAIN DESTRUCTORS METHOD AND PRIOR
WRITTEN APPROVAL FROM APPLICABLE GOVERNMENT AGENCIES AT THE
CONTRACTOR'S EXPENSE. THE CONTRACTOR CAN HAUL CLEARED VEGETATION
TO AN ACCEPTABLE OFF-SITE LOCATION WITH WRITTEN APPROVAL BY THE
OWNER'S REPRESENTATIVE. PRIOR TO CONSTRUCTION THE CONTRACTOR
MUST DESIGNATE TO THE CITY OF TEMPLE REPRESENTATIVE WHICH METHOD
WILL BE USED FOR DISPOSAL OF CLEARED VEGETATION.
7. FUEL STORAGE IS NOT ALLOWED ON THIS PROJECT.
8. CONTRACTOR SHALL ADVISE OWNER IMMEDIATELY, VERBALLY AND IN WRITING,
OF ANY FUEL OR TOXIC MATERIAL SPILLS ONTO THE PROJECT CONSTRUCTION
AREA AND THE ACTIONS TO BE TAKEN TO REMEDY THE PROBLEM.
9. CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF HIS FUELS, MATERIALS AND
CONTAMINATED EXCAVATIONS IN A LEGALLY APPROVED MANNER.
10. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE
ENVIRONMENTAL LAWS.
11. IN THE EVENT THAT SITE GRADING AND/OR EXCAVATION REVEALS WHAT MIGHT
BE HAZARDOUS MATERIALS, ALL CONSTRUCTION OPERATIONS SHALL CEASE.
THE CITY OF TEMPLE FIRE DEPARTMENT, FIRE CHIEF AND CITY ENGINEER SHALL
BE CALLED TO THE SITE TO EVALUATE THE SITUATION. IF REQUIRED, THE CITY
OF TEMPLE WILL AUTHORIZE THE HAZARDOUS MATERIALS RESPONSE
COMPANY WHICH IS UNDER CONTRACT WITH THE CITY OF TEMPLE TO BEGIN
REMEDIATION OF THE SITUATION. AT THAT SAME TIME, THE CITY OF TEMPLE
WILL DETERMINE WHAT CONSTRUCTION ACTIVITIES MAY CONTINUE THAT
WOULD NOT ENDANGER CONSTRUCTION WORKERS OR CITIZENS.
12. CONTRACTOR SHALL COPY THE CITY OF TEMPLE AND THE ENGINEER ON SWPPP,
NOI, AND NOT.
13. TEMPLE TRACTS ARE TO BE FENCED OFF DURING CONSTRUCTION AND
AVAILABLE TO CONSTRUCTION CREWS FOR STAGING.
I. PROJECT DOCUMENTATION
1. ALL BOUNDARY AND TOPOGRAPHIC SURVEY SERVICES FOR THIS PROJECT
WERE PROVIDED BY ALL COUNTY SURVEYING, INC. OF TEMPLE, TEXAS.
2. GEOTECHNICAL INVESTIGATION AND REPORT WERE PROVIDED BY LANGERMAN
FOSTER ENGINEERING COMPANY OF WACO, TEXAS.
J. SIDEWALK/ADA
1. THE SIDEWALK SHALL COMPLY WITH SECTION 403 OF THE TEXAS ACCESSIBILITY
STANDARDS.
2. THE RUNNING SLOPE OF THE PROPOSED SIDEWALK SHALL NOT BE STEEPER
THAN 1:20 (5%)
3. THE CROSS SLOPE OF THE SIDEWALK SHALL NOT BE STEEPER THAN 1:48 (2.08%)
4. THE MAXIMUM ALLOWABLE VERTICAL CHANGE IS 1/4 - INCH.
K. PAVEMENT STRUCTURE SPECIFICATIONS / NOTES
1. THE DETAIL FOR THE PAVEMENT STRUCTURE FOR THIS PROJECT IS SHOWN ON
OTHER PLAN SHEETS.
2. SINCE SOME VARIATION WAS FOUND IN SUBSURFACE CONDITIONS AT BORING
LOCATIONS, ALL PARTIES INVOLVED SHOULD BE AWARE THAT EVEN MORE
VARIATION MAY BE ENCOUNTERED BETWEEN BORING LOCATIONS. STATEMENTS
IN THE GEOTECHNICAL REPORT FOR THE PROJECT AS TO SUBSURFACE OVER
GIVEN AREAS ARE INTENDED ONLY AS ESTIMATIONS BASED ON DATA OBTAINED
AT SPECIFIC BORING LOCATIONS.
3. SUBGRADE FOR DRIVEWAYS SHALL BE PREPARED BY PROOFROLLING EXISTING
SUBGRADE TO DETECT SOFT SPOTS. ANY SOFT SPOTS SHOULD BE REMOVED TO
A DEPTH OF 8-12 INCHES AND REPLACED WITH SELECT FILL. SELECT FILL SHALL
BE TAMPED TO 95% MODIFIED PROCTOR.
21. REQUIRED FILL EMBANKMENT OUTSIDE OF THE ROADWAY SHALL BE PLACED
AND COMPACTED PER TECHNICAL SPECIFICATIONS OR MAXIMUM 6 INCH LOOSE
LIFTS AND COMPACTED TO MINIMUM 95% STANDARD PROCTOR DENSITY AT
OPTIMUM MOISTURE TO +2%. IF NOT OTHERWISE SPECIFIED.
22. ANY EXISTING PAVEMENT, CURBS, AND/OR SIDEWALK DAMAGED OR REMOVED
BY THE CONTRACTOR THAT ARE NOT A PART OF THIS CONTRACT ARE TO BE
REPAIRED BY THE CONTRACTOR TO AT LEAST THE PREEXISTING CONDITION AT
HIS EXPENSE BEFORE ACCEPTANCE OF THE WORK.
23. MAKE CONNECTION BETWEEN NEW AND EXISTING ASPHALT STREETS BY
REMOVING EXISTING STREET FROM THE END OF EXISTING PAVEMENT UNTIL
FULL DEPTH BASE AND HMAC ARE ENCOUNTERED AND HMAC APPEARS TO BE
IN SOUND CONDITION. PROVIDE EXPANSION JOINTS AND DOWELS WHERE
CONNECTING EXISTING CURB TO NEW CONSTRUCTION.
24. AT INTERSECTIONS WHICH HAVE VALLEY DRAINAGE THE CROWN OF THE
INTERSECTING STREETS TO CULMINATE IN A DISTANCE OF 40 FEET FROM THE
INTERSECTING CURB LINE, UNLESS OTHERWISE NOTED OR DIRECTED BY THE
ENGINEER.
25. UNLESS OCCURRING AT AN EXPANSION JOINT, MAKE CONNECTION BETWEEN
NEW AND EXISTING SIDEWALK BY EXPOSING AND CLEANING A ONE FOOT
LENGTH OF WELDED WIRE REINFORCEMENT AND LAPPING NEW
REINFORCEMENT ONTO THIS LENGTH.
26. STREETS SHALL BE CUT AND/OR FILLED TO SUBGRADE PRIOR TO UTILITY
CONSTRUCTION.
E. TESTING AND SUBMITTALS
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING MATERIAL
SAMPLES AS WELL AS ANY MANUFACTURERS LITERATURE OF MATERIALS USED ON
THIS PROJECT AS REQUIRED BY THE ENGINEER. ANY COSTS ASSOCIATED WITH ANY
SAMPLING AND TESTING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
THESE COSTS SHALL BE CONSIDERED AS INCIDENTAL AND THE CONTRACTOR WILL
NOT BE ENTITLED TO ANY ADDITIONAL COMPENSATION.
2. CONTRACTOR SHALL COORDINATE ALL MATERIALS TESTING WITH THE CITY OF
TEMPLE CONSTRUCTION REPRESENTATIVE AND THE CITY TESTING COMPANY,
INCLUDING SOIL DENSITY TESTS AND RELATED SOILS ANALYSIS. TESTS TO BE
ACCOMPLISHED BY AN INDEPENDENT LABORATORY UNDER CONTRACT WITH THE
CITY OF TEMPLE, AT THE FREQUENCY, TIME AND LOCATION AS SPECIFIED IN THE
TECHNICAL SPECIFICATIONS. A COPY OF THE TEST RESULTS TO BE FORWARDED TO
THE CITY OF TEMPLE, THE OWNERS REPRESENTATIVE, AND THE CONTRACTOR.
TESTS WHICH SHOW UNSATISFACTORY RESULTS ARE TO BE REPEATED AT THE
EXPENSE OF THE CONTRACTOR SUBSEQUENT TO THE CONTRACTOR'S REMEDIAL
ACTIVITIES.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PAY FOR ALL CHARGES
OF TESTING LABORATORIES FOR SERVICES IN CONNECTION WITH INITIAL TESTS
MADE ON ALL IMPORTED MATERIALS TO THE PROJECT SITES INCLUDING BUT NOT
LIMITED TO EMBEDMENT MATERIALS, FILL MATERIAL, BACKFILL MATERIAL, SELECT
MATERIAL, CRUSHED LIMESTONE BASE, SUBBASE, CONCRETE, STEEL, WOOD FORMS,
LIQUID ASPHALT, AGGREGATE, WATER, CEMENT, CURING COMPOUND, GUARD RAIL,
HOT MIX, ETC.
4. THE TESTS FOR WHICH THE CONTRACTOR WILL TYPICALLY BE RESPONSIBLE
ARE ATTERBERG LIMITS, SIEVE ANALYSIS, PLASTICITY INDICES, MIX DESIGN,
CALIFORNIA BEARING RATIOS, TRIAXIAL TESTING, PROCTORS (MOISTURE DENSITY
CURVES) AND ALL TESTS REQUIRED BY THE SPECIFICATIONS THAT PROVE THE
MATERIAL BROUGHT TO THE PROJECT SITES MEETS OR EXCEEDS THE
SPECIFICATIONS AND CONTRACT DOCUMENTS. THE CITY OF TEMPLE WILL PAY ALL
THE CHARGES OF TESTING LABORATORIES FOR SERVICES IN CONNECTION WITH IN
PLACE FIELD DENSITIES, CONCRETE CYLINDERS TESTING, HMAC DENSITY TESTS
AND ANY IN PLACE TEST REQUIRED FOR QUALITY ASSURANCE. RETESTING AFTER
FAILURE OF INPLACE TESTS SHALL BE AT THE EXPENSE OF THE CONTRACTOR.
F. CONCRETE FOR CONSTRUCTION
1. THE CONCRETE FOR ALL VALLEY GUTTERS, RADIUS UNITS, DRIVEWAYS, BOX
CULVERTS, APRONS, 1. HEADWALLS, AND WING WALLS SHALL BE A MINIMUM 28-DAY
COMPRESSIVE STRENGTH OF 3000 P.S.I., A MINIMUM 7-DAY FLEXURAL STRENGTH OF
510 P.S.I., A MAXIMUM WATER TO CEMENT RATIO OF 6.0 GALLONS PER SACK AND BE
A MINIMUM (6) SIX SACKS PER CUBIC YARD OF CONCRETE SHALL BE REQUIRED
UNLESS OTHER WISE SPECIFIED IN PLANS. ALL OTHER CONCRETE SHALL BE AS
SPECIFIED ON THE PLANS.
2. TYPE 2 MEMBRANE CURING COMPOUND (WHITE PIGMENTED) SHALL BE USED
FOR THIS PROJECT.
3. ALL CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE REQUIREMENTS
OF TxDOT ITEM 526 "MEMBRANE CURING".
L. STORMWATER POLLUTION PREVENTION PLAN (SW3P)
1. CONTRACTOR SHALL PREPARE A STORMWATER POLLUTION PREVENTION PLAN
(SW3P) FOR THE PROJECT. THE ENGINEER HAS INCORPORATED IN THESE
CONSTRUCTION DRAWINGS SOME MINIMUM STORM WATER CONTROLS THAT
SHOULD BE INCLUDED INTO THE CONTRACTOR'S PLANS.
2. CONTRACTOR SHALL SUBMIT THE SW3P TO THE TEXAS COMMISSION ON
ENVIRONMENTAL QUALITY (TCEQ), THE ENGINEER AND THE CITY OF TEMPLE,
COMPLETE THE NOTICE OF INTENT (NOI) AND FORWARD THE NOTICE OF
TERMINATION (NOT) WHEN THE PROJECT IS COMPLETED AND ACCEPTED BY THE
CITY OF TEMPLE, TEXAS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING, MAINTAINING,
REPORTING AND INSPECTION OF THE WATER POLLUTION ABATEMENT PLAN AND
INSTALLED CONTROLS.
4. AFTER PERMANENT EROSION CONTROL HAS BEEN ESTABLISHED THE
CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES.
THIS SHALL BE SUBSIDIARY TO THE EROSION CONTROL PAY ITEMS.
M. BID SCHEDULE NOTES
1. THE BID SCHEDULE CONTAINS A BID ITEM FOR PAYMENT TO THE CONTRACTOR
FOR PROVIDING RECORD DRAWINGS (AS-BUILTS) FOR THIS PROJECT. FINAL
PAYMENT FOR THE PROJECT WILL NOT BE RELEASED BY THE CITY OF TEMPLE
UNTIL THE RECORD DRAWINGS ARE DELIVERED TO THE ENGINEER IN AN
ACCEPTABLE, LEGIBLE CONDITION.
WATERLINE
1. ALL TESTING SHALL BE IN COMPLIANCE WITH CURRENT TCEQ REGULATIONS,
AND TECHNICAL SPECIFICATIONS.
2. ALL WATER LINES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT
TCEQ REGULATIONS, CHAPTER 290.
3. ALL FIRE HYDRANTS TO BE CITY OF TEMPLE STANDARD FIRE HYDRANT TYPE B,
UNLESS OTHERWISE NOTED.
4. PIPE MATERIAL FOR 3" AND SMALLER WATER LINES SHALL BE DR-21 PVC, CLASS
200. PIPE MATERIAL FOR 4-INCH TO 12-INCH WATER LINES SHALL BE PVC, AWWA
C900, CLASS 150, DR-18 OR CLASS 250 DUCTILE IRON PIPE. PIPE MATERIAL FOR
14-INCH AND LARGER WATER LINES SHALL BE PVC, AWWA C905, CLASS 150,
DR-18 OR CLASS 250 DUCTILE IRON PIPE.
5. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT A PLAN FOR TIE-INS
AND FLUSHING FOR APPROVAL BY OWNER. SCHEDULE SHALL BE CONFIRMED
WITH THE CITY 48 HOURS PRIOR TO ACTIVITY.
P. RAIN/WEATHER DAYS
1. THIS PROJECT IS A CALENDAR DAY PROJECT AND WILL ALLOW SUBMITTAL OF
WEATHER DAYS. THE CITY OF TEMPLE REQUIRES THAT THE AVERAGE RAIN DAYS
IN A MONTH BE EXCEEDED BEFORE ANY WEATHER DAYS ARE ADDED TO THE
PROJECT. A WEATHER DAY SHALL BE CONSIDERED ANY DAY WITH ANY AMOUNT
OF PRECIPITATION. IN ORDER TO SUBMIT FOR ADDITIONAL DAYS FOR WEATHER,
THE CONTRACTOR SHALL TRACK THE PRECIPITATION ON THE PROJECT SITE
AND SUBMIT THE DAYS OF PRECIPIATION MONTHLY AND INCLUDE THE AVERAGE
PRECIPITATION DAYS FOR THAT MONTH AS SHOWN IN THE TABLE BELOW. ONLY
DAYS IN EXCESS OF THE AVERAGE PRECIPITATION FOR THE MONTH WILL BE
ALLOWED FOR ADDITIONAL DAYS DUE TO WEATHER. AVERAGE RAIN DAYS SHALL
BE AS FOLLOWS:
AVERAGE RAIN DAYS
JANUARY - 7 DAYS JULY - 6 DAYS
FEBRUARY - 7 DAYS AUGUST - 5 DAYS
MARCH - 7 DAYS SEPTEMBER- 7 DAYS
APRIL - 7 DAYS OCTOBER - 7 DAYS
MAY - 8 DAYS NOVEMBER - 7 DAYS
JUNE - 6 DAYS DECEMBER - 7 DAYS
GENERAL NOTES 2APPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
This document is released for the purpose of interim review under the authority of R. David Patrick, P.E. 82638 on January 27, 2026 It is not to be used for construction, bidding or permit purposes. 01-27-2026
Plot Date:
1/27/2026 11:47:40 AM
Plotted By:
FGOMEZ
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS
O E
O E
O E
O
E OEOEOE
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
FIBER FIBER FIBER FIBER
FIBER
FIBER
FIBER
FIBER
OE OE OE
OE OE OE OE OE
OE
OE
OE OE OE OE OE
OE
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
O E
O E
O E
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E O
E O
E O
E O
E O
E O
E O
E O
E O
E O
E O
E
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
FI
BE
R
FI
BE
R
FI
BE
R1267 725.774
SW
726.127
SW
726.074
SW
724.761
NG
725.853
SW1272
725.157
ASPH
725.962
SW1274
725.276
ASPH
726.274
SW1276
725.652
ASPH
726.466
SW1278
726.007
ASPH
726.588
SW
724.440
724.675
SW
724.187
SW
724.351
SW-SWALE
724.448
SW 1328
724.476
SW
724.559
SW1334
724.696
SW
724.713
SW
724.705
SW
724.583
ASPH
724.503
ASPH 1341
724.012
NG
724.055
NG
724.656
SW
724.675
SW
724.777
SW
723.963
NG
724.571
SW
724.585
SW
724.274
NG
724.283
NG
724.682
DOOR THRESHOLD
724.633
DOOR THRESHOLD
723.915
BLDG CNR-NG
721.939
SW
721.617
SW1356
721.469
SW
720.559
ASPH
720.997
ASPH
721.114
ASPH
720.804
ASPH1361
720.071
ASPH
720.610
SW
720.610
SW
720.570
SW
726.342
SW
726.506
SW
726.069
NG
725.954
NG
DOOR THRESHOLD1372
726.547
DOOR THRESHOLD726.506
DOOR THRESHOLD
726.571
R THRESHOLDDOOR THRESHOLD726.996
DOOR THRESHOLD
724.521
SW
724.493
SW724.491
BLDG CNR
8'' WW 8'' WW 8'' WW 8'' WW 8'' WW
10'' WW 10'' WW 10'' WW 10'' WW 10'' WW
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 12'' W 12'' W 12'' W 12'' W 12'' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
4th STR
EET
6t h
ST
R
EE
T
A
LL
EY
CENTRAL AVENUE
Bell County Annex
5+
6+
7+
8+
9+
9+
2n d
ST
R
EE
T
AVENUE A
O'BRIENS
6t h
ST
R
EE
TPOLICE
DEPT.
19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
BEGIN STA. 21+13.00
N 10374681.35 E 3233297.63
BEGIN STA. 7+40.73
N 10374776.36 E 3233500.25
FI
LE
: P :\T em pl e R ei nv es tm en t\2
8\
-1
D ow nt ow n
C ity
C en te r\C
AD
\B as e\
D
TC
C th to
A ve
A \T
C P
LA
YO
U
TS
.d w g L
A
ST
S A
VE
D
: 1 /2
7/
1:
:2
AM
L
A
YO
U T:
G -0
PR
O
PO
SE
D
O
VE
R
AL
L
LA
YO
U
T
HORIZONTAL SCALE IN FEET
30 60
SHEET NO.
G-04 OF
08 SHEETSGENERAL SHEETS
PROPOSED OVERALL LAYOUT
N O R T H
MILL AND LAYOVER
LEGEND
CONCRETE
CROSSWALKS
LANDSCAPE AREAS
PROPOSED
4TH STREET
ALIGNMENT
PROPOSED
AVENUE A
ALIGNMENT
APPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
01-27-2026
Plot Date:
1/27/2026 11:47:43 AM
Plotted By:
FGOMEZ
PROPOSED
WL - B
ALIGNMENT
PROPOSED
WL- A
ALIGNMENT
PROPOSED
WW - A
ALIGNMENT
PROPOSED
ST - A
ALIGNMENT
PROPOSED
ST - B
ALIGNMENT
PROPOSED
ST - C
ALIGNMENT
PAVEMENT SECTION
AutoCAD SHX Text Finish Floor Elev=716.89'
AutoCAD SHX Text Finish Floor Elev=716.81'
AutoCAD SHX Text Finish Floor Elev=713.55'
AutoCAD SHX Text Finish Floor Elev=709.27'
AutoCAD SHX Text Finish Floor Elev=710.39'
AutoCAD SHX Text Finish Floor Elev=716.89'
AutoCAD SHX Text Finish Floor Elev=716.81'
AutoCAD SHX Text Finish Floor Elev=713.55'
AutoCAD SHX Text Finish Floor Elev=710.39'
AutoCAD SHX Text F
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
TYPICAL SECTION - 4TH
NOT TO SCALE
2' 12'
LANE
34'
3'
2'12'
LANE
3'
CURB & GUTTER
(TYP)
1.00%
PGL
1.00%
4" HMAC TYPE "B"
9" CRUSHED LIMESTONE BASE (CLB)
6" MOISTURE CONDITIONED
SUB GRADE (MCS)
79.0±
2" HMAC TYPE "D"
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP) VARIES
VARIES
SDWK
VARIES
VARIES
SDWK
2' 12'
LANE
7.5'
TYPICAL SECTION - 4TH ST. & AVE. A
NOT TO SCALE
2'12'
LANE
INDIRECT FLOW CURB & GUTTER
(TYP)
2.00%
PGL
79.5'
1.00%
2' 2'7.5'
2' CONCRETE VALLEY GUTTER (TYP)
VARVAR
3' 3'
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
4" HMAC TYPE "B"
9" CRUSHED LIMESTONE BASE (CLB)
6" MOISTURE CONDITIONED
SUB GRADE (MCS)
2" HMAC TYPE "D"
VARIES
VARIES
SDWK
VARIES
VARIES
SDWK
VEHICULAR PAVING BAND
TYPE 2 - EXTERIOR SIDEWALK
2' 12'
LANE
7.5'
TYPICAL SECTION - W/ ANGLED PARKING LEFT
NOT TO SCALE
2'12'
LANE
INDIRECT FLOW CURB & GUTTER
(TYP)
2.00%
PGL
76.7±
2.00%
2' 2'17'
2' CONCRETE VALLEY GUTTER (TYP)
VARIESVAR
3' 3'
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
4" HMAC TYPE "B"
9" CRUSHED LIMESTONE BASE (CLB)
6" MOISTURE CONDITIONED
SUB GRADE (MCS)
2" HMAC TYPE "D"
VARIES
VARIES
SDWK
VARIES
VARIES
SDWK
LAYDOWN CURB
NOTE:
SEE SHEET D-02 FOR
CONCRETE NOTES
2' 12'
LANE
34'
3'
2'12'
LANE
3'
CURB & GUTTER
(TYP)
1.00%
PGL
4" HMAC TYPE "B"
9" CRUSHED LIMESTONE BASE (CLB)
6" MOISTURE CONDITIONED
SUB GRADE (MCS)
79.0±
2" HMAC TYPE "D"
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP) VARIES
VARIES
SDWK
VARIES
SDWK
1.00%
VARIES
TYPICAL SECTION - AVE. A
NOT TO SCALE
2' 12'
LANE
7.5'/17'
TYPICAL SECTION - AVE A W/ PARALLEL PARKING
NOT TO SCALE
CENTRAL AVENUE
2'12'
LANE
INDIRECT FLOW CURB & GUTTER
(TYP)
1.00%
PGL
79.5'
2' 2'7.5'/17'
2' CONCRETE VALLEY GUTTER (TYP)
VAR
VAR
3' 3'
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
SPOT
ELEVATION
(TYP)
4" HMAC TYPE "B"
9" CRUSHED LIMESTONE BASE (CLB)
6" MOISTURE CONDITIONED
SUB GRADE (MCS)
2" HMAC TYPE "D"
VARIES
VARIES
SDWK
VARIES
VARIES
SDWK
1.00%
SHEET NO.
G-05 OF
08 SHEETS
FI
LE
: P :\T em pl e R ei nv es tm en t\2
8\
-1
D ow nt ow n
C ity
C en te r\C
AD
\B as e\
D
TC
C th to
A ve
A \S
TA
N
D
AR
D D
ET
AI
L
SH
EE
TS
.d w g L
A
ST
S A
VE
D
: 1 /1
6/
0:
:1
AM
L
A
YO
U T:
G -0
PA
VE
M
EN
T
SE
C
TI
O
N S
(2
NOTES:
1. SUBGRADE UNDERNEATH PROPOSED CURB SHALL BE PREPARED BY
REMOVING ALL VEGETATION, ROOTS, EXISTING FILL, DEBRIS OR OTHER
DELETERIOUS MATERIALS. THE SUBGRADE SHALL BE PROOF ROLLED IN
ACCORDANCE WITH TXDOT ITEM 216 "PROOFROLLING" FOR SOFT OR WEAK
AREAS. EXPOSED SUBGRADE SHOULD BE PROTECTED FROM DRYING. THE
SUBGRADE SHALL BE SCARIFIED 6" AND RE-COMPACTED TO AT LEAST 100%
OF TEX-114 AT OR ABOVE OPTIMUM MOISTURE CONTENT.
2. CONTRACTOR SHALL TAKE EXTREME CARE WHEN FORMING AND PAVING
CURBS. SLOPES FOR THE PROPOSED CURBS ARE CRITICAL TO THE STORM
WATER DRAINAGE FOR THESE STREETS AND THE CONTRACTOR SHALL
ENSURE THE CURBS HAVE POSITIVE DRAINAGE AS SHOWN ON THE
PROPOSED ELEVATIONS.
3. ALL SAW CUTS SHALL BE AT FULL DEPTHS.
4. SEE SHEETS D-01 TO D-05 FOR CONCRETE DETAILS
PAVEMENT SECTIONSAPPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
This document is released for the purpose of interim review under the authority of R. David Patrick, P.E. 82638 on January 27, 2026 It is not to be used for construction, bidding or permit purposes. 01-27-2026
Plot Date:
1/27/2026 11:47:49 AM
Plotted By:
FGOMEZ
AutoCAD SHX Text 9"
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 6'
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
(TYPICAL)
AutoCAD SHX Text
6" SUBGRADE COMPACTED TO A
AutoCAD SHX Text
MIN 95%%% ASTM 698 NEAR
AutoCAD SHX Text
OPTIMUM MOISTURE
AutoCAD SHX Text
#5 BARS ON 12" CENTERS
AutoCAD SHX Text
CLASS "A" CONCRETE
AutoCAD SHX Text 4-1/2"
AutoCAD SHX Text
1" SAND CUSHION
AutoCAD SHX Text 3 1/2"
AutoCAD SHX Text
3 - #5 BARS ON
AutoCAD SHX Text
#5 BARS ON 12" CENTERS
AutoCAD SHX Text
PAVESTONES
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PROPOSED WHITE CONCRETE
AutoCAD SHX Text
PROPOSED WHITE CONCRETE
AutoCAD SHX Text 1'-3 1/2"
AutoCAD SHX Text
GRADE CONTROL
AutoCAD SHX Text 8 1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 3"
AutoCAD SHX Text R = 1/4"
AutoCAD SHX Text R = 1/4"
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
3,000 PSI
AutoCAD SHX Text 1/4"
AutoCAD SHX Text
CLASS "A"
AutoCAD SHX Text
#4 BARS
AutoCAD SHX Text 2' - 0"
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 12'' W 12'' W 12'' W 12'' W 12'' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
8' ' W
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6'' SS
6' ' S
S
6'' SS
6'' SS
6'' SS
6'' SS
W W
W W
W W
W W
W W
8" WW8" WW8" WW8" WW8" WW
W
W
W
W
W
W
W
W
12" W
W
W
W
W
12" W 12" W
4" W4" W4" W4" W4" W
W
3" W 3" W
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
W W
REMOVE
REPLACE
ROAD SIGN
LIGHT POLE
LIGHT POLE
LIGHT POLE LIGHT POLE
LIGHT POLE
LIGHT POLE
REMOVE
AND
REPLACE
ROAD SIGN
LIGHT POLE
REMOVE OAK
TREE
REMOVE
REPLACE
ROAD SIGN
REMOVE OAK
TREE
REMOVE OAK
TREE
POWERPOLE
TO BE
RELOCATED
APPROVED BY
DESIGNED BY
DRAWN BY
PROJECT NO.
DATE
DEVIN J PATIN, EIT
18-116
Fabian Gomez
CITY OF TEMPLE, TEXAS
AVENUE A PHASE I IMPROVEMENTSKASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS 76501© 2026 Kasberg, Patrick & Associates, LP
KPA Firm Registration Number F-510
BYREVISIONDATENO.
01-27-2026
Plot Date:
1/27/2026 11:47:52 AM
Plotted By:
FGOMEZFI
LE
: P
:\T em pl e
R ei nv es tm en t\2
8\
-1
D ow nt ow n C ity C en te r\C
AD
\B as e\ D
TC
C th to A ve A
\D
EM
O A
R
EA
.d w g L
A
ST
S A
VE
D
: 1 /2
7/
1:
:2
AM
L
A
YO
U T:
G -0
PR
O
PO
SE
D
D
EM
O
LI
TI
O
N L
AY
O
U T
SHEET NO.
G-06 OF
08 SHEETSGENERAL SHEETS
PROPOSED DEMOLITION LAYOUT
HORIZONTAL SCALE IN FEET
20 40
N O R T H
AutoCAD SHX Text
R. DAVID PATRICK
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 82738
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text NOTE: 1. CONTRACTOR TO FIELD VERIFY AND LOCATE ALL CONTRACTOR TO FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .