6AOP_Schedule of Items.docx

DOCX document 18 KB Posted

Attached to
Hoosier National Forest 6 AOP Replacement Federal contract opportunity
Solicitation number
12445523B0003
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items for a federal construction contract to replace a culvert on the Hoosier National Forest. The contract will involve clearing and grubbing, removing an existing pipe culvert, constructing embankments, placing riprap and aggregate surfacing, installing a 20-foot long precast concrete arch culvert with headwalls and wingwalls totaling 36 linear feet, constructing reinforced concrete stem wall footings, establishing turf, installing erosion control mats and temporary object markers, placing streambed simulation rock, and implementing temporary traffic control. The schedule lists the estimated quantities and unit prices for each item, and the total estimated contract price. The solicitation is being conducted by the US Department of Agriculture Forest Service for work on the Hoosier National Forest in Perry County, Indiana.

View the file

Other files for this federal contract opportunity

Other files attached to Hoosier National Forest 6 AOP Replacement, newest first.
File Type Posted
6AOP_PLANS.pdf PDF
FSSS_6AOP.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Hoosier 6 AOP Culvert Replacement Tell City Ranger District Hoosier National Forest Perry County

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15201

Construction survey and staking, method 1, tolerance C

Lump Sum

15713

Soil erosion and pollution control

Lump Sum

20101

Clearing and grubbing, disposal method F

Lump Sum

20302

Removal of pipe culvert, disposal method A

Each

20417

Embankment construction, compaction method 2

Cubic Yard

20801

Structure excavation

Cubic Yard

20803

Structural backfill

Cubic Yard

25101

Placed riprap, Method A, Class 2

Cubic Yard

30112

Aggregate surfacing, grading G, compaction method B

Cubic Yard

55203

Precast Structural Concrete, 20’ Span x 5’ Rise Concrete Arch with Headwalls and Wingwalls

Linear Feet

55299
Reinforced Concrete Stem Wall Footings
Lump Sum
1

62550

Turf establishment

Lump Sum

62901

Erosion control mat, type 3B biodegradable

Square Yard

63301

Type 3 Object Marker Sign system

Each

63501

Temporary traffic control

Lump Sum

64801

Placed Streambed simulation rock, bed class 10, method A

Cubic Yard

Total: $___________________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

File details come from the government source that posted it. Updated .