This document package includes plans and specifications for a federal construction project to replace a culvert on the Hoosier National Forest in Indiana. Key details include replacing an existing culvert pipe with a concrete arch structure and wingwalls, installing erosion control measures, temporary traffic control during the 45-day road closure, and restoring all disturbed areas. The project also involves removing the existing structure, installing the new culvert and appurtenances, constructing approach roadways, and placing slope protection. The solicitation number is 12445523B0003 for the Hoosier National Forest 6 AOP Replacement project through the Department of Agriculture Forest Service. The plans indicate construction must be completed according to specifications, permits, and between 6:00 AM to 6:00 PM Monday through Friday.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6AOP_Schedule of Items.docx | DOCX document | |
| FSSS_6AOP.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS FROM TELL CITY, IN:
SHEET OF
United States Department of Agriculture
Forest Service
1 10
HEAD NORTHEAST ON IN-37 FOR 21.9 MILES. TURN LEFT ONTO IN-62 W FOR 4.0 MILES. TURN LEFT
ONTO S INDIAN LAKE RD FOR 1.5 MILES. CONTINUE STRAIGHT THROUGH LOCKED GATE FOR 0.9 MILES
TO PROJECT SITE.
LAT: 38.194244°
LONG: -86.663051°
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR
DATE
RO BRIDGE PROGRAM MANAGER
DATE
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVERSHEET 5/31/2023
G-02 GENERAL NOTES & QUANTITIES
C-01 EROSION CONTROL & CONTROL PLAN
C-02 ROAD PLAN & PROFILE
C-03 STREAM VIEWS
C-04 CULVERT DETAILS
C-05 ROCK WEIR DETAILS
C-06 CROSS SECTIONS
C-08 SOIL BORINGS
HOOSIER 6 AOP CULVERT REPLACEMENT
INDIANA
PERRY COUNTY
R09 EASTERN REGION
HOOSIER NATIONAL FOREST
TELL CITY RANGER DISTRICT
SN: 091204000036105
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
GENERAL NOTES &
QUANTITIES
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
G-02 2 10
1. OWNER WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES
REQUIRED OF THE CONTRACTOR TO PERFORM THEIR WORK.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY SECURING AND PROTECTING THE PROJECT SITE. THIS MAY INCLUDE , BUT IS NOT LIMITED TO, CONSTRUCTION PERIMETER FENCING, SIGNAGE, AND PROTECTION OF EXCAVATIONS.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS. THE CONTRACTOR
SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED
AND/OR SHOWN ON THE DRAWINGS. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED
UNTIL REPORTING TO CONTRACTING OFFICER FOR CLARIFICATION OR CORRECTION.
4. ALL OBSTRUCTIONS MAY NOT BE SHOWN ON PLANS. THE CONTRACTOR SHALL VISIT THE SITE AND DETERMINE THE ACTUAL CONDITIONS WITH REGARD TO
THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, SIDEWALKS, CULVERTS, UTILITIES AND OTHER MISCELLANEOUS OBSTACLES THAT MAY INTERFERE.
5. ANY INSPECTION BY THE STATE, FEDERAL, OR USFS SHALL NOT, IN ANY WAY, RELIEVE THE CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN
STRICT COMPLIANCE WITH THE APPLICABLE CODES, REGULATIONS AND PROJECT CONTRACT DOCUMENTS.
6. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS
INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE INTENT OF THE PROJECT CONTRACT DOCUMENTS BUT NOT SPECIFICALLY CALLED OUT
THEREIN, ALL APPLICABLE AGENCY REQUIREMENTS, AND ANY OTHER WORK AS MAY BE NECESSARY TO PROVIDE A COMPLETED PROJECT.
7. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING UTILITIES. ANY DAMAGE TO EXISTING UTILITIES, WHETHER THE UTILITY WAS SHOWN OR NOT
ON THESE PLANS SHALL BE REPAIRED/REPLACED AT THE CONTRACTOR'S EXPENSE.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY OR UTILITIES CAUSED DURING CONSTRUCTION AND SHALL
COORDINATE WITH DIGGERS HOTLINE PRIOR TO CONSTRUCTION.
9. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING DIMENSION OR OBTAINING CLARIFICATION FROM THE
USFS BEFORE CONTINUING CONSTRUCTION.
10. WHEN CONTRADICTIONS OCCUR BETWEEN PLANS & SPECIFICATIONS, CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE
USFS BEFORE CONTINUING WITH CONSTRUCTION.
11. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS, REMOVED ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF
LEGALLY OFF-SITE.
12. THE CONTRACTOR SHALL KEEP AN APPROVED SET OF PLANS ON THE PROJECT SITE AT ALL TIMES. ANY ALTERATION OR VARIANCE FROM THESE PLANS, EXCEPT MINOR FIELD ADJUSTMENTS NEEDED TO MEET EXISTING FIELD CONDITIONS, SHALL FIRST BE APPROVED BY USFS AND WHEN NECESSARY THOSE
AGENCIES AFFECTED BY THE ALTERATION. ANY VARIATIONS FROM THESE PLANS SHALL BE DOCUMENTED ON THE CONSTRUCTION PRINTS AND
TRANSMITTED TO USFS.
13. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED WITHIN 3 CALENDAR DAYS OF FINAL GRADING.
14. ALL EXISTING PUBLIC LAND SURVEY CORNERS, PROPERTY CONTROLLING CORNERS AND ALIGNMENT CONTROL POINTS SHALL BE LOCATED AND PRESERVED
AS SHOWN ON THE PLANS OR AS DIRECTED BY THE USFS. IT MAY BE NECESSARY TO PLACE OR ADJUST MONUMENT BOXES AS REQUIRED.
15. THE CONTRACTOR SHALL NOT PARK ANY VEHICLES OR STORE ANY MATERIALS IN AREAS NOT APPROVED BY THE USFS.
16. THE GOVERNING SPECIFICATIONS SHALL BE THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14 PUBLISHED BY THE US DEPT. OF TRANSPORTATION AND THE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS.
17. THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A CONCRETE ARCH WITH WINGWALLS, APPROACH ROADWAY, TEMPORARY TRAFFIC CONTROL AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION.
18. THE CONTRACTOR SHALL CONTACT DIGGERS HOTLINE AT 1.800.242.8511 A MINIMUM OF 3 WORKING DAYS PRIOR TO ANY EXCAVATION. CONTRACTOR SHALL
CONDUCT OPERATIONS IN SUCH A MANNER AS TO INSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.
19. FOREST ROAD 1141.206 SHALL BE CLOSED TO TRAFFIC DURING CONSTRUCTION. THE CONTRACTING OFFICER SHALL BE NOTIFIED IN WRITING 2 WEEKS PRIOR
TO ANY PROPOSED CLOSURE. DURATION OF CLOSURE SHALL NOT EXCEED 45 CONSECUTIVE DAYS. ROAD CLOSURE SIGNING SHALL BE IN PLACE PRIOR TO
CLOSING ROAD. CLOSURE ADVANCE NOTICE SIGNING SHALL BE IN PLACE 7 DAYS IN ADVANCE.
20. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THE DETERMINATION OF EXPECTED SURFACE AND SUBSURFACE
WATER LEVELS THAT WILL EXIST DURING CONSTRUCTION.
21. PRIOR TO FULLY DEWATERING AND SAND BAG PLACEMENT ON THE DOWNSTREAM SIDE OF THE CULVERT. CONTRACTOR SHALL NET FISH AND AQUATIC
ORGANISMS IF OBSERVED AND RELOCATE DOWNSTREAM.
22. NO MATERIAL SHALL BE CLEANED OR ALLOWED TO ERODE INTO THE WATERCOURSE NOR SHALL MATERIAL BE PLACED INTO THE WATER COURSE EXCEPT
AS SHOWN ON THE PLANS.
23. WATER THAT IS REQUIRED TO BE PUMPED FOR DEWATERING SHALL BE FILTERED THROUGH A GEOTEXTILE BAG, OR EQUIVALENT PRIOR TO DISCHARGE. THE
BAG SHALL BE REPLACED WITH A CLEAN BAG WHEN EXISTING BAG IS FULL OR PLUGGED. THIS SHOULD BE INCIDENTAL TO ITEM 15713.
24. EMAT SHALL CONSIST OF 100% ORGANIC BIODEGRADABLE NETTING. ANY DISTURBED GROUND THAT IS LEFT AFTER 300 SQUARE YARDS OF EMAT IS USED, SHALL BE SEEDED AND MULCHED.
25. UNPROTECTED SLOPES NOT RECEIVING EMAT OR RIPRAP SHALL BE PREPARED, SEEDED AND MULCHED IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS.
26. ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE ON THIS PROJECT.
27. THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER IF HERITAGE RESOURCES OR HUMAN REMAINS ARE
ENCOUNTERED.
28. ANY HAUL ROADS USED SHALL BE MAINTAINED BY THE CONTRACTOR AS NEEDED AND AS DIRECTED BY THE CONTRACTING OFFICER.
29. THE CONTRACTOR SHALL PERFORM ALL WORK BETWEEN THE HOURS OF 6:00 AM AND 6:00 PM MONDAY THROUGH FRIDAY. NO WORK SHALL BE PERFORMED
ON FEDERAL HOLIDAYS OR WEEKENDS WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.
30. TREES SHALL BE CUT BETWEEN NOVEMBER 15TH AND MARCH 31ST. ALL TREE CUTTING HAS BEEN PREVIOUSLY COMPLETED BY THE GOVERNMENT.
31. NO DISPOSAL OF EXCESS MATERIAL OR STORAGE OF MATERIALS IN WETLANDS OR ON PRIVATE LANDS.
32. ALL EARTHWORK QUANTITIES ARE 'COMPACTED IN PLACE'.
33. ALL WORK MUST CONFORM TO ANY APPLICABLE STATE, USACE, OR COUNTY PERMITS WHICH ARE ALL HEREBY MADE A CONTRACT DOCUMENT. ALL
REQUIREMENTS WITHIN THE PERMITS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DIVERSION, DAMMING, OR PUMPING DURING CONSTRUCTION IS
THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH STATE REQUIREMENTS.
34. MINOR AMOUNTS OF CLEARING AND GRUBBING ARE REQUIRED FOR CULVERT REPLACEMENT. LIMBS, LOGS, & STUMPS MAY BE SCATTERED OUTSIDE THE
CLEARING LIMITS. THIS WORK SHALL BE PAID FOR UNDER BID ITEM 20103-CLEARING AND GRUBBING.
35. MANUFACTURER SHALL DESIGN THE CULVERT AND FOOTINGS AND FURNISH A SHOP DRAWING SUBMITTAL FOR FS APPROVAL PRIOR TO MANUFACTURE.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL RELATED TO CONSTRUCTION OF THE PROJECT. ALL TRAFFIC
CONTROL SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES AND FSSS 156.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ERECTION AND PLACEMENT OF ALL THE REQUIRED SIGNING AS OUTLINED IN
THE ABOVE MENTIONED MANUAL. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL SUCH OTHER TRAFFIC CONTROL DEVICES
WHICH WILL ADEQUATELY WARN AND ALERT DRIVERS OF CONSTRUCTION HAZARDS.
3. DEPENDING UPON THE TYPE AND LOCATION OF THE WORK ACTIVITIES, THE CONTRACTOR SHALL PLACE SPEED ADVISORY SIGNING
IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
4. IN ADDITION TO THE INDICATED WARNING SIGNS AND BARRICADES, TYPE 3 BARRICADES WITH FLASHING LIGHTS, SHALL BE PLACED
NEAR EACH PARTICULAR HAZARD AREA WHEN NECESSARY, OR AS DIRECTED BY CONTRACTING OFFICER, IN ACCORDANCE WITH THE
LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
5. TRAFFIC CONTROL PLAN SHALL BE SUBMITTED AND APPROVED BY THE USFS PRIOR TO PLACEMENT.
TRAFFIC CONTROL NOTES
GENERAL PLAN NOTES
MAINTENANCE LEVEL = 3
ADT = <100
DESIGN SPEED = 25 MPH
DESIGN LOADING = HL-93
DESIGN CRITERIA
7' 7'
4% C
ROW
N 4%
CROW
N
H
V
H
V
6" (COMPACTED DEPTH)
AGGREGATE SURFACE COURSE
EXISTING FILL OR STRUCTURAL BACKFILL
PROPOSED TYPICAL ROAD SECTION
SCALE: NONE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
IP1
100.00
BM1
97.54
BM2
93.41
TYPICAL DETAIL
NOT TO SCALE
PLAN VIEW
NOT TO SCALE
SIDE VIEW
NOT TO SCALE
FRONT VIEW
NOT TO SCALE
ANGLE BOTH ENDS OF FILTER FABRIC FENCE TO ASSURE SOIL
IS TRAPPED
INTERLOCK 2"X2"
POSTS AND ATTACH
5 FT VEGETATED BUFFER
TOP OF BANK
FILTER FABRIC
MATERIAL
USE STITCHED LOOPS
OVER 2"X2" POSTS
4 FT
6 IN
2.5 FT
6FT MIN. SPACING
4 FT
FILTER FABRIC MATERIAL
36" WIDE ROLLS
2.5 FT
1.5 FT
6 IN
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
EROSION CONTROL &
CONTROL PLAN
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-01 3 10
F
L
O
W
N Feet
0 10 20
EXISTING 87" X 63" X 56' CMPA TO BE REMOVED
EXISTING ROAD CL
EXISTING EDGE OF ROAD
SILT FENCE NOTES:
1. THE SILT FENCE SHALL BE PURCHASED IN A CONTINUOUS ROLL
CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS.
WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED
TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6 INCH
OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST.
ALTERNATIVELY, OVERLAP AND INTERLOCK TWO POSTS WITH
ATTACHED FABRIC AS APPROVED BY THE OWNER'S
REPRESENTATIVE.
2. THE SILT FENCE IS TO BE INSTALLED AT LOCATIONS SHOWN ON
THE PLAN ALONG THE DOWNHILL PERIMETER OF DISTURBED
AREAS. THE FENCE POST SHALL BE SPACED A MAXIMUM OF 10
FEET APART AND DRIVEN SECURELY INTO THE GROUND A MINIMUM
OF 24 INCHES APART.
3. THE FILTER FABRIC SHALL HAVE A MINIMUM VERTICAL BURIAL OF
6 INCHES. ALL EXCAVATED MATERIAL FROM SILT FENCE
INSTALLATION SHALL BE BACK-FILLED AND COMPACTED ALONG
THE ENTIRE DISTURBED AREA.
POINT TABLE
POINT #
NORTHING
5000.00
4873.92
5060.62
4962.74
EASTING
5000.00
4985.24
5036.12
5005.26
ELEVATION
100.00
90.62
97.54
93.41
DESCRIPTION
IP1
IP2
BM1
BM2
DEWATERING NOTES:
1. CONSTRUCTION SHOULD BE ATTEMPTED TO BE COMPLETED DURING DRY
CONDITIONS. IF NECESSARY, DEWATERING OF CONSTRUCTION WASTEWATER NEEDS
TO BE PUMPED TO A SETTLING BASIN, FILTER BAG, OR TO AN UPLAND LOCATION TO
INFILTRATE INTO THE GROUND. THIS WATER CANNOT BE DISCHARGED DIRECTLY TO
WATERWAYS OR WETLANDS.
INSTALL SILT FENCE AT TOE OF ALL DISTURBED
SLOPES AND ANY MATERIAL STOCKPILES (TYP)
PLACE SLOPE PROTECTION RIPRAP
18" DEPTH, CLASS 2, 705.02
15 CY THIS CORNER
9 CY ALL OTHER CORNERS
SOIL BORING 1
SOIL BORING 2
EROSION CONTROL PLAN
SILT FENCE DETAILS
SILT FENCE ESTIMATED QUANTITY: 270 LF
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
L E
V A
T I O
N
F
E E
T
E L E
V A
T I O
N
F
E E
T
STATION (FEET)
0+00
0+50
1+00
1+50
2+00
2+09.06
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
ROAD PLAN & PROFILE
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-02 4 10
STA 1+10.87
CL NEW CULVERT
EXISTING 87" X 63" X 56' CMPA TO BE REMOVED
PROPOSED CONSPAN (OR EQUIVALENT) CONCRETE ARCH
20' SPAN X 5' RISE X 36' LONG WITH HEADWALLS AND WINGWALLS
ON CONTRACTOR - DESIGNED STEM WALL FOOTINGS
EXISTING CONTOURS
PROPOSED SURFACE CONTOURS
EXISTING ROAD CL
MAINTAIN EXISTING ALIGNMENT
EXISTING EDGE OF ROAD
N Feet
0 10 20
BEGIN WORK STA 0+10
END WORK STA 1+75
SEE SHEET C-03 FOR STREAM
SIMULATION DETAILS
MAINTAIN EXISTING ROAD PROFILE
PROPOSED 20' SPAN X 5' RISE CONCRETE ARCH
C
O V
E R
CONTRACTOR-DESIGNED STEM WALL
FOOTINGS TIED TO BEDROCK
EXISTING CULVERT TO BE REMOVED
CONSTRUCTED STREAM CHANNEL
SEE SHEET C-04
ROAD PLAN VIEW
ROAD PROFILE VIEW
OBJECT MARKER SIGN (OM-3L)
OBJECT MARKER SIGN (OM-3R)
OBJECT MARKER SIGN (OM-3R)
OBJECT MARKER SIGN (OM-3L)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
V A
T I O
N
F
E E
T
4.00%
S T
A
B
E G
I N
T
R I B
U T
A R
Y
E
S T
A
E
N D
R I B
U T
A R
Y
E L
-0+20 0+00
0+50
1+00
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
STREAM PLAN &
PROFILE
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-03 5 10
STREAM JUNCTION WITH MAIN STEM
PROPOSED BANKS
PROPOSED ROCK WEIR
GRADE CONTROL STRUCTURES
(3) AT ~30' SPACING (TYP)
BEGIN STREAMBED RECONSTRUCTION
END STREAMBED
RECONSTRUCTION
PROPOSED STREAM BOTTOM
EXISTING CULVERT INVERT
PROPOSED BANK ELEVATION
THROUGH STRUCTURE
PROPOSED ROAD SECTION
12" TALL HEADWALL
STREAM PLAN VIEW
STREAM PROFILE VIEW
EXISTING STREAM BOTTOM
EXISTING ROAD SECTION
PROPOSED 20' SPAN X 5' RISE CONCRETE ARCH
TOF = 91.68'
BOF = 86.68'
36.0'
STREAM THALWEG
F L O
W
F
L
O
W
CONTRACTOR-DESIGNED STEM WALL
FOOTINGS TIED TO BEDROCK
Y
P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
H
V
H
V
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
CULVERT DETAILS
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-04 6 10
BOF ELEV = 86.68'
20.0'
2.0' 2.0' 6.0'
ASSUMED BEDROCK
STRUCTURAL BACKFILL 704.04
EXISTING SUBGRADE
4.0'
CONTRACTOR DESIGNED STEM WALL FOOTING
SUITABLE STRUCTURE EXCAVATION
MATERIAL PAID FOR AS EMBANKMENT CONSTRUCTION
AGGREGATE SURFACE COURSE 703.05
6" DEPTH
PROPOSED CONCRETE
ARCH
UPSTREAM END
Q100 WSE = 94.20'
BED CLASS 10 STREAM SIMULATION ROCK, 705.08
TOP OF CONSTRUCTED
STREAM BANKS @ 4%
CONSTRUCTED STREAM BOTTOM @ 4%
CONTRACTOR-DESIGNED STEM WALL
FOOTINGS TIED TO BEDROCK
PROPOSED 20' SPAN X 5' RISE CONCRETE ARCH
CONCRETE WINGWALLS
14' ROAD WIDTH
36.0'
TOF ELEV = 91.68'
NOTES:
1. STRUCTURAL DESIGN OF CULVERT, FOOTING, AND WINGWALLS BY A LICENSED ENGINEER IN ACCORDANCE WITH AASHTO
LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION, 2020 IS THE REPONSIBILITY OF THE CONTRACTOR. SHOP DRAWINGS
MUST BE SUBMITTED FOR APPROVAL.
2. STRUCTURE MUST BE DESIGNED FOR HL-93 LOADING AND SUPPORT A MINIMUM COVER OF 2.5'.
3. CONTRACTOR SHALL COMPLETE A LOAD RATING FOR THE CULVERT IN ACCORDANCE WITH THE AASHTO MBE, CURRENT
EDITION, USING LRFR METHODOLOGY. CANDE SOFTWARE SHALL BE USED TO PERFORM THE LOAD RATING UNLESS AN
ALTERNATE IS APPROVED BY THE REGIONAL BRIDGE ENGINEER. TRUCKS TO BE INCLUDED IN THE LOAD RATING ARE HL-93
INVENTORY / OPERATING, AASHTO LEGAL TRUCKS, NRL, SHV'S, AND ANY STATE LEGAL TRUCKS.
4. ALLOWABLE SOIL BEARING CAPACITY = 2,200 PSF
ALLOWABLE ROCK BEARING CAPACITY = 10,000 PSF
5. COMPACT STRUCTURAL BACKFILL IN ACCORDANCE WITH 208.10 (95% STANDARD PROCTOR)
6. BOTTOM OF FOOTING ELEVATION MAY BE RAISED OR STEPPED IF COMPENTENT BEDROCK IS ENCOUNTERED AT
SHALLOWER DEPTHS. TOP OF FOOTING ELEVATION TO REMAIN UNCHANGED.
7. EXCESS OR UNSUITABLE EXCAVATION MATERIAL MAY BE USED TO FLATTEN ROAD SIDE SLOPES ADJACENT TO CROSSING.
MATERIAL MAY NOT BE PLACED IN WETLANDS.
8. MAINTAIN CLEAR COVER OVER CONCRETE REINFORCEMENT IN ACCORDANCE WITH SPECIFICATIN SECTION 554.
9. CONCRETE SHALL BE AIR-ENTRAINED IN ACCORDANCE WITH SPECIFICATION SECTION 552.
EXISTING CULVERT
TO BE REMOVED
CULVERT ELEVATION
CULVERT END SECTION
SLOPE PROTECTION RIPRAP
18" DEPTH, CLASS 2, 705.02
12" HEADWALL
STRUCTURE EXCAVATION LMITS
TOF = 91.68'
CROWN ELEV = 96.68'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
BOTTOM ROCKS ARE BURIED FOOTER ROCKS
BOTTOM ROCKS ARE BURIED FOOTER ROCKS
LAST ROCK AT TOP
OF BANK
F L
O W
FLOW
FLOW
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
ROCK WEIR DETAILS
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-05 7 10
PROFILE VIEW
CROSS SECTION VIEW
PLAN VIEW
FOOTER ROCK DETAIL
BANKFULL WIDTH ~ 16.0'
NOTES:
1. BOULDERS SHALL BE 28" TO 36" AND BE ANGULAR SO THEY CAN BE KEYED
TOGETHER FOR STABILITY.
2. FOOTER ROCKS SHALL BE BURIED AT LEAST 24" WITH TOPS AT FINAL GRADE.
3. TOP ROW OF ROCKS SHOULD BE PLACED AGAINST THE FOOTER ROCKS AND
SLIGHTLY UPSTREAM TO LIMIT MOVEMENT.
4. WELL GRADED MATERIAL SHALL BE PLACED ON UPSTREAM EDGE TO SEAL HOLES
BETWEEN ROCKS.
5. IF SHALLOW BEDROCK IS ENCOUNTERED, EXCAVATE A NARROW CHANNEL IN THE
ROCK TO BED BOULDERS.
6. CONSTRUCTION OF ROCK WEIRS IS INCIDENTAL TO PAY ITEM 64801 STREAMBED
SIMULATION ROCK.
7. EXISTING STREAMBED MATERIAL WITHIN THE WORK LIMITS OF THE PROJECT OR
EXCESS EXCAVATION MATERIAL MAY BE USED FOR STREAMBED SIMULATION IF IT
MEETS THE APPROPRIATE SIZE REQUIREMENTS.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+00.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+25.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+50.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+75.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+00.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+25.00
0 10 20 300-10-20-30
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
ROAD SECTIONS
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-06 8 10
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+50.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
1+75.00
0 10 20 300-10-20-30
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
2+00.00
0 10 20 300-10-20-30
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
ROAD SECTIONS
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-07 9 10
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
(~100.25' PLAN ELEVATION) (~100.17' PLAN ELEVATION)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 4/2
3 1 2:
P
HA
MP
ST
ON
C :\U
SE
RS
\P
HA
MP
ST
ON
\B
OX
\6A
OP
\D
W G\
6A
OP
_W
OR
KI
NG
.D W
G;
R09
EASTERN REGION
6 AOP
HOOSIER NATIONAL
FOREST
TELL CITY RANGER DISTRICT
SOIL BORINGS
05/31/2023
P. HAMPSTON
P. HAMPSTON
J. NEUKAM
C-08 10 10
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| 6AOP_Working-COVER SHEET |
| OLE1 |
| 6AOP_Working-NOTES & QTY |
| OLE1 |
| 6AOP_Working-EC PLAN |
| OLE1 |
| 6AOP_Working-ROAD PLAN & PROF |
| OLE1 |
| 6AOP_Working-STREAM PLAN & PROFILE |
| OLE1 |
| 6AOP_Working-CULVERT DETAILS |
| OLE1 |
| 6AOP_Working-ROCK WEIR DETAILS |
| OLE1 |
| 6AOP_Working-ROAD XS |
| OLE1 |
| 6AOP_Working-ROAD XS (2) |
| OLE1 |
| 6AOP_Working-SOIL BORINGS |
| OLE1 |