This document is a Pavement Design Report prepared by Shannon & Wilson for the Central Federal Lands Highway Division (CFLHD) project HI FLAP CR 562(1) at Kilauea Point National Wildlife Refuge in Kaua'i County, Hawaii. The report presents comprehensive pavement design recommendations for the rehabilitation and reconstruction of Kilauea Road, Kolo Road, and the Kilauea Point Overlook turnaround, covering approximately 1.72 miles of roadway.

The subsurface investigation, conducted on February 3, 2022, included seven borings (SW-01 through SW-07) advanced to 5.5 feet depth, revealing primarily stiff to very stiff silt and elastic silt subgrade with AASHTO classification A-7-5. Laboratory testing established a subgrade R-value of 20, corresponding to a resilient modulus of 12,100 psi. Corrosion testing indicated highly corrosive subsurface conditions with resistivity of 2,700 ohm-centimeters and water-soluble sulfate concentration of 0.02% by weight. The pavement design recommendations, based on 1993 AASHTO methodology with 20-year design life and 2% annual growth rate, specify flexible pavement sections ranging from 4.5 to 5.5 inches of asphalt concrete pavement (ACP) over 4 to 8 inches of crushed aggregate base (CAB), with design ESALs ranging from 150,000 to 767,500 depending on location and traffic conditions. For the round-about intersections, rigid pavement (8.0 inches of Portland Cement Concrete) is recommended. Construction specifications reference FP-14 federal standards, with particular attention to subgrade preparation challenges including potential over-excavation requirements of 2 to 6 feet based on plasticity characteristics, proof-rolling procedures, and material specifications for both ACP and CAB layers. The report includes detailed appendices with boring logs, laboratory test results, photographs, and pavement design calculations supporting the recommendations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTED TO:

Atkins North America, Inc.

7604 Technology Way, Ste.

Denver, Colorado 80237

BY:

Shannon & Wilson 5900 W 38th Ave Wheat Ridge, CO 80212

(303) 825-3800 www.shannonwilson.com

PAVEMENT DESIGN REPORT

HI FLAP CR 562(1)

Kilauea Point National Wildlife Refuge

KAUA'I COUNTY, HAWAII

September 2023

Shannon & Wilson No: 107654-001

Kilauea Point National Wildlife Refuge

Pavement Design Report

107654-001 September 2023 ii

CO

NT

EN

TS

CONTENTS

1 Introduction

2 Site and Project Description

3 Subsurface Investigation and Laboratory testing

3.1 Field Investigation

3.2 Geotechnical Laboratory Testing

4 Subsurface Conditions

4.1 Regional Geology

4.2 Existing Pavement Thicknesses

4.3 Pavement Subgrade

4.4 Groundwater

5 Pavement Assessment

6 Pavement Design Recommendations

6.1 Design Methodology

6.2 Traffic Loading

6.3 Design Subgrade

6.4 Recommended Pavement Sections

6.5 Corrosion Testing

7 Construction and Material Specifications

7.1 Site Preparation

7.2 Earthwork

7.2.1 General

7.2.2 Subgrade Preparation

7.2.3 Fill Placement

7.2.4 Bulking and Swelling Factor

7.2.5 Proof-Rolling

7.3 Paving Materials

8 Closure

9 References iii

CO

NT

EN

Exhibits Exhibit 4-1: Grain size distribution of existing CAB Exhibit 6-1: Traffic Study Locations Exhibit 6-2: Data Source for ESAL Calculations Exhibit 6-3: Recommended Pavement Sections Exhibit 7-1: Recommended Materials for Pavements

Figures Figure 1: Vicinity Map Figure 2: Site and Exploration Plan

Appendices Appendix A: Subsurface Explorations Appendix B: Laboratory Test Results Appendix C: Photographs Appendix D: Pavement Design Calculations Important Information

Pavement Design Report

107654-001 September 2023

1 INTRODUCTION

This report summarizes the results of our subsurface exploration and laboratory testing program and presents pavement design recommendations and construction considerations for the proposed improvements to Kilauea Road, Kolo Road, and Kilauea Point Overlook as part of the Central Federal Lands Highway Division (CFLHD) project HI FLAP CR 562(1) Kilauea Point National Wildlife Refuge (the Project) located in Kaua'i County, Hawaii. Our scope of services was specified in Task Order 2, Subcontractor Number 1009739 with Atkins North America, Inc. (Atkins) dated August 15, 2021. Our conclusions and recommendations in this report are based on:

The limitations of our approved scope, schedule, and budget described in our contract;

Our understanding of the Project and information provided by Atkins;

Subsurface conditions observed in the borings at the time our explorations were completed; and

The results of testing performed on samples collected from the explorations.

The objective of our geotechnical studies was to provide recommendations and construction considerations, as presented herein, for the proposed roadway reconstruction. The authorized scope of services was based on this objective, and this report should not be used for other purposes without Shannon & Wilson’s review. If a service is not specifically indicated in this report, do not assume that it was performed.

2 SITE AND PROJECT DESCRIPTION

The site is located along Kilauea Road extending from the town of Kilauea to the Kilauea Point Overlook (refer to Figures 1 and 2). The Project is approximately 1.72 miles in length and includes Kilauea Road from the intersection with Kolo Road to the termination of Kilauea Road at the Kilauea Point Overlook turnaround and entrance to the National Wildlife Refuge. In addition, a small portion of Kolo Road from Kuhio Highway (State Route 56) to Kilauea Road is included as part of the Project. Kilauea Road and Kolo Road are two-lane (a single lane in each direction) roads, paved with asphalt concrete pavement (ACP), and are approximately 20- to 24-feet wide and 24-feet wide, respectively. On the west side of the roadway, near the overlook, a gravel pullout area is commonly used for overflow parking. Concrete sidewalks are present along the west side of the roadway between Kolo Road and Keneke Street. Between Keneke Street and Iwalani Road an existing separated asphalt paved path is located on the west side of the roadway. No

Pavement Design Report

107654-001 September 2023 existing trail or sidewalk facilities are present from Iwalani Street to the end of the Project at the overlook.

We understand that the Project includes rehabilitation or reconstruction of the existing pavement with minor widening along with incorporation of a new sidewalk along Kilauea Road from the town to the overlook. Two Portland Cement Concrete (PCC) round-a-bouts will be constructed at the intersection of Kilauea Road and Kolo Road and Kilauea Road and Keneke Street. We understand that the Project will also include pavement preservation with a 2-inch mill and overlay to provide a new, seamless wearing surface adjacent to new widening areas. In addition, the parking lot at the Kilauea Point Overlook turnaround will be reconfigured.

3 SUBSURFACE INVESTIGATION AND LABORATORY

TESTING

3.1 Field Investigation

Shannon & Wilson conducted a field exploration program on February 3, 2022, to explore subsurface conditions along the proposed roadway alignment. The subsurface exploration program consisted of drilling and sampling seven borings along Kolo Road and Kilauea Road, designated as borings SW-01 through SW-04, SW-05A and SW-05B, and SW-06 and SW-07. (Boring SW-05A encountered an abandoned metal pipe and backfill associated with the installation of the pipe. An offset boring, SW-05B was then completed.) Refer to Figure 2 for the approximate boring locations. Except for boring SW-05A, the borings were advanced to a depth of 5.5 feet below the existing roadway grade. Boring SW-05A was stopped at 1.9 feet when the metal pipe was encountered.

Appendix A presents a discussion of the drilling and sampling procedures used to complete the borings. Appendix A also presents the individual exploration logs and an explanation of the symbols and terminology used. Refer to Appendix C for drilling photos.

3.2 Geotechnical Laboratory Testing

We completed geotechnical laboratory tests on selected samples retrieved from the borings to estimate index and engineering properties. The index tests included natural water content, grain size analysis, hydrometer analysis, and Atterberg limits. The engineering property tests included specific gravity, corrosion, and Hveem stabilometer (R-value). The laboratory test results as well as a discussion of the testing procedures are included in

Pavement Design Report

107654-001 September 2023

Appendix B. The natural water content, fines content, and Atterberg limits are also shown on the individual boring logs included in Appendix A.

4 SUBSURFACE CONDITIONS

4.1 Regional Geology

Kaua’i is one of the oldest of the Hawaiian Islands and consists of a shield volcano, built up by thousands of basaltic lava flows. Based on our review of the geologic maps of the Island of Kaua’i (Sherrod and others, 2007, and MacDonald and others, 1947), the surficial deposits consist of the Koloa volcanic series consisting of lava flows and vent deposits.

4.2 Existing Pavement Thicknesses

The pavement section across the Project alignment ranged from 5-½ to 1-½ inches thick.

Below the pavement, crushed aggregate base (CAB) was encountered in all borings. The existing pavement and CAB thicknesses at each boring location are provided in Table A-1 in Appendix A and summarized below:

Kolo Road and Kilauea Road from Kolo Road to Titcomb Street: ACP ranging from 5 to 5-½ inches over 4 inches CAB.

Kilauea Road from Titcomb Street to Kilauea Point Overlook: ACP ranging from 1-½ inches to 4 inches over CAB ranging from 4 to 5 inches.

A sample of the existing CAB was collected from boring SW-02 and a grain size analysis was completed on the material. Refer to Exhibit 4-1 for gradation results of the existing CAB along with the minimum and maximum specification limits for FP-14 Section 703.05 Grading Designation D (USDOT and FHWA, 2014).

Pavement Design Report

107654-001 September 2023

Exhibit 4-1: Grain size distribution of existing CAB, Minimum and maximum specification limits of FP-14

703.05 Grading Designation D are shown for comparison.

4.3 Pavement Subgrade

Subsurface conditions below the existing pavements generally consisted of medium stiff to very stiff silt and elastic silt with varying percentages of sand [AASHTO soil classification A-7-5]. Boring SW-05A encountered fill materials associated with the backfill of the abandoned water line.

Our observations are specific to the locations, depths, and dates noted on the exploration logs in Appendix A and may not be applicable to all areas of the site. There is no number of explorations or amount of laboratory testing that can precisely predict the characteristics, quality, or distribution of subsurface conditions at every location throughout the site.

Variations in the subsurface conditions may occur between and below the borings. Also, the passage of time or intervening causes (natural and humanmade) may result in changes to the conditions of the site and subsurface conditions.

4" 3" 2" 1- 1/

2"

1" 3/ 4"

1/ 2"

3/ 8"

#4 #8 #1

#1

#2

#3

#4

#5

#6

#1

#1

#2

0.010.1110100

Pe rc en t F in er b y

W ei gh t

Grain Size in Millimeters

GRAIN SIZE DISTRIBUTION

Boring SW-02, Sample G-1; Existing CAB

FP-14 CAB Grading Designation D - Min. Limit

FP-14 CAB Grading Designation D - Max. Limit

U. S. S t a n d a r d G r a I n S I z e

Pavement Design Report

107654-001 September 2023

4.4 Groundwater

Groundwater was not encountered in any of our borings during drilling. However, fluctuations of groundwater levels at the site are possible and will depend on many factors, including seasonal variations and local precipitation. Nevertheless, groundwater is not anticipated to affect the design or construction of the Project.

5 PAVEMENT ASSESSMENT

To evaluate the condition of the existing roadway pavement for potential rehabilitation options, we performed a visual pavement survey to assess the overall pavement condition and to identify areas of distress and typical crack patterns. The U.S. Fish and Wildlife Services (FWS, undated) has developed a rating system to quantify levels of distress and to describe roadway conditions of asphalt pavements. Their five levels of pavement condition for asphalt are summarized below:

Asphalt Concrete Pavement

Excellent: Recently constructed or overlaid road where construction or overlay was performed correctly. No maintenance required.

Good: Low extent longitudinal and transverse cracks. All cracks are ¼ inch or less with little or no crack erosion. Patches are in good condition and applied correctly. Routine maintenance recommended.

Fair: Roads are in good structural condition with little or no fatigue cracking.

Longitudinal, transverse, and edge cracking is at medium extent and severity. Block cracking is extensive. Any patches are in good condition. Preventative maintenance recommended.

Poor: Road beginning to show signs of structural distress. Fatigue cracking is medium to high extent and medium severity. Cracking is severe. Surface may have severe block cracking and show. Patches are in fair to poor condition. There is moderate distortion or rutting and occasional potholes. Rehabilitation recommended.

Failed: Road is severely deteriorated. Signs of structural failure appear along with severe and extensive fatigue cracking, distortion, potholes, or extensive patches in poor condition. Reconstruction recommended.

Using the FWS visual rating system, we conducted our assessment survey on October 20, 2021. We understand that new pavement was placed along Kolo Road and Kilauea Road from Kolo Road to Titcomb Street in 2021. General pavement conditions by segment are summarized below:

Pavement Design Report

107654-001 September 2023

Kolo Road and Kilauea Road from Kolo Road to Titcomb Street: Excellent condition.

Recently constructed.

Kilauea Road, Titcomb Street to Overlook: Poor to fair condition. Extensive fatigue cracking, longitudinal cracking.

6 PAVEMENT DESIGN RECOMMENDATIONS

Based on discussions with CFLHD and Atkins, we understand the Project will include rehabilitation and reconstruction for the existing roadways and parking lots. Performance of a pavement system depends on the pavement material and thicknesses, subgrade strength, traffic loads and repetitions, design life, and subgrade drainage characteristics.

The following sections discuss each of these aspects as they relate to the Project.

6.1 Design Methodology

Our pavement design and results are based on the design procedures presented in the 1993 AASHTO Guide for the Design of Pavement Structures with guidance from the U.S.

Department of Transportation and Federal Highway Administration (FHWA) Federal Lands Highway Project Development and Design Manual (PDDM), dated March 2008.

6.2 Traffic Loading

Average annual daily traffic (AADT) and traffic distributions are required to calculate an 18-kip equivalent single axle loading (ESAL) for design of pavements. For the Kolo Road and Kilauea Road traffic loading, Kaua’i County and Atkins provided traffic counts from the Hawaii Department of Transportation (HDOT), as well as a MH Corbin Traffic Analyzer Study. The HDOT counts were completed on March 25 and 26, 2021 for Kolo Road and December 17 and 18, 2018 for Kilauea Road. The MH Corbin Traffic Analyzer Study was completed from March 12 through March 21, 2022. The location of the two HDOT study locations, as well as the MH Corbin traffic counter locations, are shown in Exhibit 6-1.

Pavement Design Report

107654-001 September 2023

Exhibit 6-1: Traffic Study Locations

The HDOT traffic study included a comprehensive vehicle breakdown by FHWA vehicle classification at each location. The MH Corbin Traffic Analyzer Study included AADT and vehicle classification counts for passenger vehicles, vans and pickups, busses and trucks, and tractor trailers. Kaua’i County representatives indicated that the vehicle distribution from the MH Corbin Traffic Analyzer Study likely overcounted large vehicles due to "inherent errors associated with our traffic counters". Therefore, we used the AADT data from the MH Corbin Traffic Analyzer Study and the traffic distribution from the HDOT traffic study, as recommended by Kaua’i County.

We assumed a 20-year design life and an annually compounded growth rate of 2% for all ESAL calculations. A summary of the roadway segment and data sources for the AADT and traffic distribution is provided in Exhibit 6-2.

Pavement Design Report

107654-001 September 2023

Exhibit 6-2: Data Source for ESAL Calculations

Location AADT Traffic Distribution

Kilauea Point Overlook Turnaround MH Corbin #3 HDOT Kilauea Road Study

Kilauea Rd – Titcomb St to Kilauea Point Overlook Turnaround MH Corbin #3 HDOT Kilauea Road Study

Kilauea Rd – Kolo Rd to Titcomb St MH Corbin #2 HDOT Kilauea Road Study

Kolo Rd MH Corbin #1 HDOT Kolo Road Study

Kilauea Rd Round-abouts MH Corbin #2 HDOT Kilauea Road Study

Refer to Appendix C for the assumptions and flexible pavement equivalency factors used in the ESAL calculations.

6.3 Design Subgrade

The subsurface explorations completed along the roadway primarily consisted of silt to elastic silt subgrade. We performed a single R-value test on a soil subgrade sample obtained from boring SW-04, which indicated a value of 20. For our pavement analysis, we used an AASHTO correlation (1993) between R-value and resilient modulus, which calculates to a resilient modulus value of approximately 12,100 pounds per square inch (psi).

6.4 Recommended Pavement Sections

Using the AASHTO procedures and the parameters outlined in Appendix C, we recommend the pavement sections in Exhibit 6-3. Refer to the flexible pavement calculations provided in Appendix D for additional information and design parameters.

Pavement Design Report

107654-001 September 2023

Exhibit 6-3: Recommended Pavement Sections

Location Design(1) ESAL Paving Type

Paving Alternative

Recommended(4) Pavement Section

Kilauea Point Overlook 150,000 Reconstruction - 4.5 in. ACP over 8 in. CAB over separation geotextile

Kilauea Rd – Titcomb St to Kilauea Point

Overlook 150,000

Rehabilitation Alt. 1 4.5 in. ACP over 4 in. (min.) Existing CAB(2)

Widening Alt. 2 4.5 in. ACP over 4 in. CAB over separation geotextile

Kilauea Rd – Kolo Rd to Titcomb St

511,000 Widening Alt. 1 5.0 in. ACP over 8 in. CAB over separation geotextile

Alt. 2 5.5 in. ACP over 6 in. CAB over separation geotextile

Kolo Rd 607,000 Widening Alt. 1 5.0 in. ACP over 8 in. CAB over separation geotextile

Alt. 2 5.5 in. ACP over 6 in. CAB over separation geotextile

Kilauea Rd Round-abouts 767,500 Round-abouts - 8.0 in. PCC(3) over 6 in. CAB over separation geotextile

NOTES:

Kilauea Road and Kolo Road ESALs are for flexible pavements, and the Kilauea Rd round-about ESALs are for rigid pavements.

Assumes existing CAB is 4 inches.

Assumes PCC has 1.25-inch dowels and a maximum spacing between transverse joints of 15 feet.

Refer to Section 7.3 for recommended ACP paving materials.

ACP = Asphalt Concrete Pavement; CAB = Crushed Aggregate Base; in.= inches; PCC = Portland Cement Concrete

For paving Alternative 1 for the rehabilitation of Kilauea Road (from Titcomb Street to the Kilauea Point Overlook), the existing ACP should be removed by milling to expose the existing CAB. New ACP will then be paved on the existing CAB. We understand that the Project will also include pavement preservation with a 2-inch mill and overlay to provide a new, seamless wearing surface adjacent to new widening areas.

6.5 Corrosion Testing

The soil encountered at the Project site can be corrosive to substructure elements. To assist in estimating the corrosion potential at the site, a silt subgrade sample from boring SW-04 was tested for pH, resistivity, water soluble sulfates, and chlorides. The results are presented in Table B-1 in Appendix B and discussed in further details below.

The resistivity measured in the sample was 2,700 ohm-centimeters. Based on correlations developed by Roberge (2012), these values suggest highly corrosive subsurface conditions for metal in contact with subsurface materials across the site.

Pavement Design Report

107654-001 September 2023

The concentration of water-soluble sulfates measured in the samples were 0.02% by weight. Based on classifications as defined by ACI-318-19 (ACI, 2019), these test results suggest an exposure class S0 on concrete exposed to site soils.

The test results and the above discussion are provided to assist the designer in the selection of project materials, concrete type, or other features with respect to corrosion.

7 CONSTRUCTION AND MATERIAL SPECIFICATIONS

The applicability of the pavement recommendations provided in Exhibit 6-3are contingent on good construction practice. Poor construction techniques may alter conditions from those upon which our recommendations are based and therefore result in poor performance. Our analyses assumed that this project is constructed according to FP-14 U.S.

Customary Units (USDOT and FHWA, 2014) construction standards. The following sections provide additional construction considerations for this project.

7.1 Site Preparation

All surface and subsurface structures associated with current development of the site, including utility poles, fence poles, underground utilities, and other deleterious material, should be removed. Any existing surficial topsoil and soil containing visible organics should be stripped and removed from all areas.

7.2 Earthwork

7.2.1 General

Earthwork, including placement of fill and subgrade preparation, should conform to the requirements provided in the FP-14 U.S. Customary Units, (USDOT and FHWA, 2014) and the recommendations provided in the following sections.

7.2.2 Subgrade Preparation

Proper subgrade preparation is required for adequate pavement performance. Areas of exposed subgrade should be prepared in accordance with FP-14 Section 204.11.

Subgrades with high moisture contents, plasticity indices (PI) and silt contents, such as those encountered at the Project site, are often prone to pumping when subjected to repeated construction traffic. To mitigate against potential constructability issues (pumping subgrade and or achieving compaction of subgrade), Section 11.3.2.1.3 of the PDDM

Pavement Design Report

107654-001 September 2023 indicates that subexcavation (over-excavation and removal of excavated material from the site) should consist of:

2 feet for subgrades with a PI ranging from 15 to 25, 2 to 4 feet for subgrades with a PI ranging from 25 to 35 or a LL ranging from 50 to 60, and

4 to 6 feet for subgrades with a PI greater than 35 or a LL greater than 60.

Based on the testing completed on samples collected throughout the Project corridor, the subgrade would require a subexcavation depth ranging from 2 to 6 feet.

While the PDDM provides the above over-excavation guidance, it also notes that the subexcavation requirements should account for the traffic volume and project significance when selecting a subexcavation depth. In this regard, Kaua’i County has indicated that other projects underlain by similar materials have been successfully completed throughout Kaua’i County without the need for significant overexcavation, particularly for minor widening projects.

Based on Kaua’i County experience, the team decided to not recommend roadway-wide over-excavation of the subgrade and instead to provide a contingency for partial over-excavation during construction. Kaua’i County representatives believe that assuming 5% of the exposed subgrade or exposed CAB area will require over-excavation is conservative for this project and, therefore, we recommend including such a quantity in the Project budget.

We recommend that the Project contract supplements provide language that the Contractor will need to carefully control the movement of equipment around the site, minimize the passage of equipment over exposed subgrades, minimize the presence of loose uncompacted soil at the subgrade over night and during wet weather (roll the disturbed ground prior to departing the site to reduce the potential for soil moisture increases in the event of rainfall), and incorporate provisions to prevent the ponding of surface water on the exposed subgrade. Even with these precautions, compaction of the material will be difficult and extra working time should be anticipated. Placement and compaction testing should be monitored on a full-time basis to assist in this process.

For Paving Alternative 1 for Kilauea Road (from Titcomb Street to the Kilauea Point Overlook), the existing CAB will be incorporated as part of the new pavement section. We recommend recompacting the exposed CAB in accordance with FP-14 Section 303.05 for roadbed reconditioning. To keep the underlying subgrade from fouling the CAB, we do not recommend scarifying the existing CAB. Instead, we recommend compacting the existing CAB in place, repairing soft and unstable area, and then proof-rolling (Section 8.2.4).

Pavement Design Report

107654-001 September 2023

7.2.3 Fill Placement

All subgrade material and fill should be compacted to a dense/firm and unyielding condition. On-site subgrade and fill materials should be compacted to at least 95% maximum density, as determined by AASHTO T 180 or T 99, as presented in FP-14 Section

204. Fill should be placed in uniform, horizontal layers not exceeding 8 inches in loose thickness for heavy, self-propelled compactors, or 4 inches for hand-operated mechanical compactors. The appropriate lift thickness will depend on the Contractor’s equipment as well as the moisture content and quality of the fill material.

7.2.4 Bulking and Swelling Factor

The swell factor is the ratio of in-situ unit weight (γin-situ) to the compacted state unit weights (γcompacted). Negative swell factors denote shrinkage, a decrease in soil volume in going from the in-situ state to the compacted state. Positive factors denote swell, an increase in soil volume in going from the in-situ state to the compacted state. The bulking factor is the ratio of in-situ unit weight to the loose state (γloose) that occurs during excavation and transport.

Refer to the below equations:

𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹 = γ𝑖𝑖𝑖𝑖−𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 γ𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐

− 1 𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹 = γ𝑖𝑖𝑖𝑖−𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 γ𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙

− 1

For cuts in the native silt subgrade encountered in our borings, it is our opinion that a swell factor ranging from -10% to -20% and a bulking factor ranging from 15% to 35% could be considered, based on our experience and data provided by the FHWA earthwork design website (2023).

7.2.5 Proof-Rolling

Any exposed CAB that will remain in place as part of the new pavement section should be proof-rolled. In addition, we recommend proof-rolling, or probing excavation areas in widenings, to determine suitability of the subgrade. The silts and elastic silts encountered throughout the Project area can be difficult to pass a proof-roll. In areas that are identified as being loose, soft, or yielding during proof-rolling or probing, we recommend:

1. Overexcavating the pavement section a depth of 24 inches below the pavement section.

2. Placing a separation geotextile (FP-14 714.01 Class 1 Type C or E).

3. Backfilling with (a) Crushed Aggregate (FP-14 703.06), (b) Structural Backfill, (FP-14 704.04), (c) Select Granular Backfill (FP-14 704.08), or (d) Unclassified Borrow (FP-14 704.06) with the additional requirement of a maximum particle size of 3 inches.

Pavement Design Report

107654-001 September 2023

7.3 Paving Materials

The following Exhibit summarizes our recommendations for pavement material selection using the FP-14 specifications. Based on the Project estimated paving quantities, we understand that the ACP material will utilize FP-14 Section 403, which uses the local department of transportation mix design.

Exhibit 7-1: Recommended Materials for Pavements

Material FP-14 Specification Additional Requirements/Comments

CAB Section 302 Reference FP-14 703.06

ACP Section 403 (FP-14) Using HDOT Section 401

(2005)

Wearing Coarse and Lower Lifts Aggregate Gradation: HDOT Mix No.

IV, 1/2-inch NMAS PG Binder: PG 64-16

Separation Geotextile

714.01 Class 1, Woven, Type E

NOTE:

ACB = Asphalt Concrete Base; ACP = Asphalt Concrete Pavement; CAB = Crushed Aggregate Base; HDOT = Hawaii Department of Transportation; NMAS = Nominal Maximum Aggregate Size; PG = Performance Grade

The binder selection procedure is based on the anticipated pavement temperatures, traffic patterns, and local availability. According to the Hawaii Department of Transportation (HDOT) Standard Specification (2005) PG 64-16 is available and used for state mixes in Hawaii. The PDDM specifies the use of software developed by the FHWA Long Term Pavement Performance (LTPP) Bind Version 3.1Beta (2005) to determine an appropriate binder for a 95% reliability performance for both high and low temperature ranges. PG 64- 16 meets the LTPP 95% reliability performance.

Based on discussions with Kaua’i County and Atkins, we understand that the ACP thickness provided in Exhibit 6-3 will consist of two lifts of HDOT Type IV, ½-inch nominal maximum aggregate size (NMAS) aggregate gradation. To achieve the specified ACP thicknesses, we recommend the following:

4.5 inches of ACP: a bottom lift thickness of 2.5 inches over a top lift thickness of 2.0 inches.

5 inches of ACP: a bottom lift thickness of 2.5 inches over a top lift thickness of 2.5 inches.

5.5 inches of ACP: a bottom lift thickness of 3.0 inches over a top lift thickness of 2.5 inches.

A tack coat should be placed between subsequent lifts if the underlying lift is left uncovered for greater than 24 hours.

Pavement Design Report

107654-001 September 2023

8 CLOSURE

This report has been prepared for the exclusive use of Atkins and the Central Federal Lands Highway Division for the purpose of providing pavement recommendations for the Kilauea Road, Kolo Road, and Kilauea Point Overlook improvements project. This pavement design report should not be used without our approval if any of the following occurs:

Assumptions stated in this report have changed.

Project details change or new information becomes available such that our analyses and recommendations may be affected.

A substantial period of time has passed since the date of this report.

If any of these occur, we should be retained to review the applicability of our analyses and recommendations.

Within the limitations of scope, schedule and budget, the analyses, conclusions, and recommendations presented in this report were prepared in accordance with generally accepted professional geotechnical and geological principles and practice in this area at the time this report was prepared. We make no other warranty, either express or implied.

Shannon & Wilson has prepared “Important Information about Your Geotechnical Report,” to assist you and others in understanding the use and limitations of our reports.

Pavement Design Report

107654-001 September 2023

9 REFERENCES

American Concrete Institute (ACI), 2019, Building code requirements for structural concrete and commentary, Farmington Hills, Mich., ACI 318-19.

American Association of State Highway and Transportation Officials (AASHTO), 1993, AASHTO guide for design of pavement structures: Washington, D.C., AASHTO, 2 v.

Federal Highway Administration (FHWA), 2023, Earthwork Design, accessed September 2023, available: https://highways.dot.gov/federal-lands/pddm/dpg/earthwork-design.

FHWA Long Term Pavement Performance (LTPP) Bind Version 3.1Beta, September 15, 2005.

Hawaii Department of Transportation (HDOT), 2005, Standard Specifications, available:

https://hidot.hawaii.gov/highways/s2005-standard-specifications/

MacDonald, G.A., Davis, D.A., and Cox, D.C., 1947, Geology and Ground-water resources of the Island of Kauai, Hawaii, Hawaii Commission on Water Resource Management, Water Resources Bulletin 13, 1:62,500.

Roberge, P.R., 2012, Handbook of corrosion engineering, Second Edition: McGraw-Hill, New York, New York.

Sherrod, D.R., Sinton, J.M., Watkins, S.E., and Brunt, K.M., 2007, Geologic Map of the State of Hawai'i, Sheet 2--Island of Kaua'i, U.S. Geological Survey, Open-File Report OF- 2001-1089, 1:100,000.

U.S. Department of Transportation (USDOT), Federal Highway Administration (FHWA), 2014, Distress Identification Manual for the Long-Term Pavement Performance Program, Publication No. FHWA-HRT-13-092 Revised May 2014.

USDOT, FHWA, 2014, Federal standard specifications for construction of roads and bridges on Federal Highway projects, FP-14 English Units: U.S. Department of Transportation and Federal Highway Administration, available:

https://highways.dot.gov/federal-lands/specs

USDOT, FHWA, 2008, Federal Lands Highway project development and design manual (PDDM): U.S. Department of Transportation and Federal Highway Administration; available: https://highways.dot.gov/federal-lands/pddm

U.S. Fish and Wildlife Service (FWS), undated. Road Inventory Program Rating System.

Kauai

Lihue

Kilauea

VICINITY MAP

FIG. 1

Geotechnical and Environmental Consultants

SHANNON & WILSON, INC.

HI FLAP CR 562(1)

Kilauea Point National Wildlife Refuge

Kaua'i County, Hawaii

Map adapted from aerial imagery provided by

Google Earth Pro, reproduced by permission granted by Google Earth ™ Mapping Service.

NOTE

Approximate Scale in Miles

3 6

September 2023 107654-001

F i l e n a m e

P

D

E N s

C

F L

H

I

K i l a u e a D r a f t i n g

F d w g

D a t e o g i n

B

W V

MT

PROJECT

LOCATION

Hawaii

HONOLULU

Lihue

NI'IHAU

KAUAI

O'AHU

MOLOKA'I

LANA'I

KAHO'OLAWE

MAUI

HAWAI'I

Project

Location

107654-001

SITE AND EXPLORATION PLAN

FIG. 2

HI FLAP CR 562(1)

Kilauea Point National Wildlife Refuge

Kaua'i Country Hawaii

September 2023

Geotechnical and Environmental Consultants

SHANNON & WILSON, INC.

F i l e n a m e

P

D

E N s

C

F L

H

I

K i l a u e a D r a f t i n g F d w g

D t e o g i n

B

W V

Geotechnical Boring Designation and

Approximate Location

LEGEND

SW-01

1. Map adapted from aerial imagery provided by Google Earth

Pro, reproduced by permission granted by Google Earth ™.

2. Borings based on field GPS measurements during drilling.

NOTES

SW-01

SW-02

SW-03

SW-04

SW-05B SW-05A

SW-07

SW-06

Kolo Rd

K i l a u e

R d

K e n e k e

S t

Kilauea

Iwalani Rd

Kilauea Point

Overlook

750 1500

Approximate Scale in Feet

Pavement Design Report

107654-001 September 2023 9/19/2023-107654-001_AA.docx A-i

AP

PE

ND

IX

A : S

UB

SU

RF

AC

E

EX

PL

OR

AT

IO

NS

Appendix A: Subsurface Ex plorations

Appendix A

Subsurface Explorations

CONTENTS

A.1 Introduction ........................................................................................................................... A-1

A.2 Explorations ........................................................................................................................... A-1

A.2.1 Soil Classification System........................................................................................ A-1

A.2.2 Standard Penetration Test (SPT) ............................................................................ A-1

A.2.3 Pocket Penetrometer ................................................................................................ A-2

A.2.4 Bulk Sampling .......................................................................................................... A-2

Summary of Existing Pavement Section Thickness

Soil Description and Log Key

Table Table A-1:

Figures Figure A-1:

Figure A-2 through A-9: Log of Borings SW-01 through SW-07

A-1

AP

PE

ND

IX

A : S

UB

SU

RF

AC

E

EX

PL

OR

AT

A.1 INTRODUCTION

Shannon & Wilson’s field exploration program was conducted on February 3, 2022, and consisted of drilling eight borings, designated SW-01 through SW-07 including an offset boring at SW-05. Boring locations are shown on Figure 2. Photographs of drilling locations are provided in Appendix C. The methods used to conduct the field exploration program are described below.

A.2 EXPLORATIONS

The borings were coordinated (including subcontractor coordination, traffic control, and utility locates) and observed by a Shannon & Wilson field representative. Individual boring logs are presented in Figures A-2 through A-9. These exploration logs represent our interpretation of the contents of the field logs and select results of laboratory testing. The borings were drilled by Valley Well Drilling, LLC of Kapolei, Hawaii (under subcontract to Shannon & Wilson) using a trailer mounted Diedrich D-25 drill rig. Except for boring SW- 05A, the borings were advanced to a depth of 5.5 feet below existing grade utilizing 4-inch solid-stem-auger drilling methods. Boring SW-05A was stopped at 1.9 feet when an abandoned metal pipe was encountered. Groundwater was not encountered during drilling in any of the borings. On completion of drilling, the borings were backfilled with concrete and patched with asphalt caps. Boring SW-05B was drilled approximately three feet south from SW-05A.

A.2.1 Soil Classification System

During exploration, our representative collected samples and prepared field logs of the explorations. Soil classification for this project was based on ASTM Designation: D2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System), and ASTM Designation: D2488, Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). Soils were also classified using the AASHTO Soil Classification System based on AASHTO Standard M 145. The Unified Soil Classification System is summarized in Figure A-1.

A.2.2 Standard Penetration Test (SPT)

Disturbed samples were obtained in the borings in general accordance with the Standard Penetration Test (SPT) (ASTM Designation: D1586). The SPT consists of driving a 2-inch outside diameter, 1.375-inch inside diameter split-spoon sampler a distance of 18 inches

Pavement Design Report

107654-001 September 2023 A-2

AP

PE

ND

IX

A : S

UB

SU

RF

AC

E

EX

PL

OR

AT

with a 140-pound hammer free-falling a distance of 30 inches. An automatic hammer system was used to advance the samplers. During sampling, the Shannon & Wilson field representative recorded the number of blows for each 6-inch increment of penetration and summed the blow counts for the last two 6-inch increments. This sum is recorded as the penetration resistance number, or N-value. If high penetration resistance prevented driving the total length of the sampler, the Shannon & Wilson field representative recorded the partial penetration depth and blow count. The N-values provide a means for evaluating the relative density or compactness of cohesionless (granular) soils and consistency or stiffness of cohesive (fine-grained) soils (see Figure A-1). The raw N-values are shown on the individual boring logs. Representative portions of the split-spoon sample obtained in conjunction with the SPT were placed in a screw-top plastic jar and transported to our laboratory.

A.2.3 Pocket Penetrometer

Select cohesive soil samples were tested in the field using a pocket penetrometer. The penetrometer estimates the unconfined compressive strength of a clay soil by shearing the clay with a one-quarter-inch-diameter penetrometer and measuring the resistance (in units of tons per square foot) with a calibrated spring. Where taken, the field measurements from the pocket penetrometer are shown on the individual boring logs.

A.2.4 Bulk Sampling

Bulk soil samples were obtained by collecting the drill cuttings from the upper 4 feet of boring SW-04. Approximately 20 to 30 pounds of cuttings were placed in a plastic bag and transported to our laboratory for further analysis and testing.

Pavement Design Report

Roadway Range Boring Asphalt

Thickness Base Course

Thickness

(in) (in)

Kolo Road SW-01 5 4

SW-02 5 1/2 4

SW-03 5 4

SW-04 4 4

SW-05A 2 4

SW-05B 2 5

SW-06 1 1/2 4

SW-07 1 1/2 4

NOTES:

in = inches

Kilauea Road:

Titcomb St to Overlook

Table A-1 - Summary of Existing Pavement Section Thickness

Kilauea Road:

Kolo Road to Titcomb St

107654-001 Page 1 of 1 September 2023

Kaua'i County, Hawaii

107654-001September 2023

COBBLES

GRAVEL

FINES

SAND

Sheet 1 of 3

S&W INORGANIC SOIL CONSTITUENT DEFINITIONS

CONSTITUENT2

COHESIONLESS SOILS

Silt, Lean Clay, Elastic Silt, or

Fat Clay 3

PERCENTAGES TERMS 1, 2

Trace

Few

Little

Some

Mostly

WELL AND BACKFILL SYMBOLS

Bentonite Cement Grout

Bentonite Grout

Bentonite Chips

Silica Sand

Perforated or Screened Casing

SHANNON & WILSON, INC.

Geotechnical and Environmental Consultants

Absence of moisture, dusty, dry to the touch

Damp but no visible water

Visible free water, from below water table

FIG. A-1

Shannon & Wilson, Inc. (S&W), uses a soil identification system modified from the Unified Soil Classification System (USCS). Elements of the USCS and other definitions are provided on this and the following pages. Soil descriptions are based on visual-manual procedures (ASTM D2488) and laboratory testing procedures (ASTM D2487), if performed.

STANDARD PENETRATION TEST (SPT)

SPECIFICATIONS

Hammer:

Sampler:

N-Value:

Dry

Moist

Wet

MOISTURE CONTENT TERMS

Modifying (Secondary)

Precedes major constituent

Major

Minor Follows major constituent

1All percentages are by weight of total specimen passing a 3-inch sieve.

2The order of terms is: Modifying Major with Minor.

3Determined based on behavior.

4Determined based on which constituent comprises a larger percentage.

5Whichever is the lesser constituent.

COARSE-GRAINED

SOILS

(less than 50% fines)1

NOTE: Penetration resistances (N-values) shown on boring logs are as recorded in the field and have not been corrected for hammer efficiency, overburden, or other factors.

PARTICLE SIZE DEFINITIONS

RELATIVE DENSITY / CONSISTENCY

Sand or Gravel 4

30% or more coarse-grained:

Sandy or Gravelly 4

More than 12% fine-grained:

Silty or Clayey 3

15% to 30% coarse-grained:

with Sand or with Gravel 4

30% or more total coarse-grained and lesser coarse-grained constituent is 15% or more:

with Sand or with Gravel 5

Very soft Soft Medium stiff Stiff Very stiff Hard

Very loose Loose Medium dense Dense Very dense

RELATIVE

DENSITY

FINE-GRAINED SOILS

(50% or more fines)1

COHESIVE SOILS

< 2 2 - 4 4 - 8

8 - 15 15 - 30

> 30

1Gravel, sand, and fines estimated by mass. Other constituents, such as organics, cobbles, and boulders, estimated by volume.

2Reprinted, with permission, from ASTM D2488 - 09a Standard Practice for Description and Identification of Soils (Visual-Manual Procedure), copyright ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428.

A copy of the complete standard may be obtained from ASTM International, www.astm.org.

140 pounds with a 30-inch free fall.

Rope on 6- to 10-inch-diam. cathead 2-1/4 rope turns, > 100 rpm

NOTE: If automatic hammers are used, blow counts shown on boring logs should be adjusted to account for efficiency of hammer.

10 to 30 inches long Shoe I.D. = 1.375 inches Barrel I.D. = 1.5 inches Barrel O.D. = 2 inches

Sum blow counts for second and third 6-inch increments.

Refusal: 50 blows for 6 inches or less; 10 blows for 0 inches.

RELATIVE

CONSISTENCY

N, SPT,

BLOWS/FT.

5% to 12% fine-grained:

with Silt or with Clay 3

15% or more of a second coarse-grained constituent:

with Sand or with Gravel 5

< 5%

5 to 10%

15 to 25%

30 to 45%

50 to 100%

Surface Cement Seal

Asphalt or Cap

Slough

Inclinometer or Non-perforated Casing

Vibrating Wire Piezometer

N, SPT,

BLOWS/FT.

< 4 4 - 10

10 - 30 30 - 50

> 50

DESCRIPTION

< #200 (0.075 mm = 0.003 in.)

#200 to #40 (0.075 to 0.4 mm; 0.003 to 0.02 in.)

#40 to #10 (0.4 to 2 mm; 0.02 to 0.08 in.)

#10 to #4 (2 to 4.75 mm; 0.08 to 0.187 in.)

SIEVE NUMBER AND/OR APPROXIMATE SIZE

#4 to 3/4 in. (4.75 to 19 mm; 0.187 to 0.75 in.)

3/4 to 3 in. (19 to 76 mm)

3 to 12 in. (76 to 305 mm)

> 12 in. (305 mm)

Fine Coarse

Fine Medium Coarse

BOULDERS

SOIL CLASSIFICATION

AND LOG KEY

_B O

R

IN

G _C

LA

S

S

-0

_K

IL

A U

E A

.G P

J S

W N

E W

.G D

T

/1 9/

Kilauea Point National Wildlife Refuge

Kaua'i County, Hawaii

September 2023

GC

SC

Inorganic

Organic

(more than 50% of coarse fraction retained on No. 4 sieve)

MAJOR DIVISIONS GROUP/GRAPHIC

SYMBOL

CH

OH

ML

CL

TYPICAL IDENTIFICATIONS

Gravel

Sand

Silty Sand; Silty Sand with Gravel

Clayey Sand; Clayey Sand with Gravel

Clayey Gravel; Clayey Gravel with Sand

Sheet 2 of 3

Gravels

Primarily organic matter, dark in color, and organic odor

SW

(more than 12% fines)

Silts and Clays

Silts and Clays

(more than 50% retained on No.

200 sieve)

(50% or more of coarse fraction passes the No. 4 sieve)

(liquid limit less than 50)

(liquid limit 50 or more)

Organic

Inorganic

FINE-GRAINED

SOILS

SM

Sands

Silty or Clayey Gravel

Silt; Silt with Sand or Gravel; Sandy or Gravelly Silt

Organic Silt or Clay; Organic Silt or Clay with Sand or Gravel; Sandy or Gravelly Organic Silt or Clay

HIGHLY-

ORGANIC

SOILS

COARSE-

GRAINED

SOILS

GW

Geotechnical and Environmental Consultants

SHANNON & WILSON, INC.

(less than 5% fines)

PT

(more than 12% fines)

MH

SP

GP

GM

Silty or Clayey Sand

Silty Gravel; Silty Gravel with Sand

(50% or more passes the No.

200 sieve) Elastic Silt; Elastic Silt with Sand or Gravel; Sandy or Gravelly Elastic Silt

Fat Clay; Fat Clay with Sand or Gravel;

Sandy or Gravelly Fat Clay

Organic Silt or Clay; Organic Silt or Clay with Sand or Gravel; Sandy or Gravelly Organic Silt or Clay

Poorly Graded Sand; Poorly Graded Sand with Gravel

Well-Graded Sand; Well-Graded Sand with Gravel

Well-Graded Gravel; Well-Graded Gravel with Sand

Poorly Graded Gravel; Poorly Graded Gravel with Sand

Lean Clay; Lean Clay with Sand or Gravel; Sandy or Gravelly Lean Clay

Peat or other highly organic soils (see

ASTM D4427)

FIG. A-1

OL

(less than 5% fines)

NOTES

1. Dual symbols (symbols separated by a hyphen, i.e., SP-SM, Sand with Silt) are used for soils with between 5% and 12% fines or when the liquid limit and plasticity index values plot in the CL-ML area of the plasticity chart. Graphics shown on the logs for these soil types are a combination of the two graphic symbols (e.g., SP and SM).

2. Borderline symbols (symbols separated by a slash, i.e., CL/ML, Lean Clay to Silt; SP-SM/SM, Sand with Silt to Silty Sand) indicate that the soil properties are close to the defining boundary between two groups.

SOIL CLASSIFICATION

AND LOG KEY

_B O

R

IN

G _C

LA

S

S

-0

_K

IL

A U

E A

.G P

J S

W N

E W

.G D

T

/1 9/

NOTE: No. 4 size = 4.75 mm = 0.187 in.; No. 200 size = 0.075 mm = 0.003 in.

UNIFIED SOIL CLASSIFICATION SYSTEM (USCS)

(Modified From USACE Tech Memo 3-357, ASTM D2487, and ASTM D2488)

Kilauea Point National Wildlife Refuge

Kaua'i County, Hawaii

September 2023

Weak

Moderate

Strong

VISUAL-MANUAL CRITERIA

A 1/8-in. thread cannot be rolled at any water content.

A thread can barely be rolled and a lump cannot be formed when drier than the plastic limit.

A thread is easy to roll and not much time is required to reach the plastic limit. The thread cannot be rerolled after reaching the plastic limit. A lump crumbles when drier than the plastic limit.

It take considerable time rolling and kneading to reach the plastic limit. A thread can be rerolled several times after reaching the plastic limit. A lump can be formed without crumbling when drier than the plastic limit.

SHANNON & WILSON, INC.

Geotechnical and Environmental Consultants Sheet 3 of 3

Interbedded

Laminated

Fissured

Slickensided

Blocky

Lensed

Homogeneous

Alternating layers of varying material or color with layers at least 1/4-inch thick; singular: bed.

Alternating layers of varying material or color with layers less than 1/4-inch thick; singular:

lamination.

Breaks along definite planes or fractures with little resistance.

Fracture planes appear polished or glossy;

sometimes striated.

Cohesive soil that can be broken down into small angular lumps that resist further breakdown.

Inclusion of small pockets of different soils, such as small lenses of sand scattered through a mass of clay.

Same color and appearance throughout.

At Time of Drilling Diameter Elevation Feet Iron Oxide Gallons Horizontal Hollow Stem Auger Inside Diameter Inches Pounds Magnesium Oxide Millimeter Manganese Oxide Not Applicable or Not Available Nonplastic Outside Diameter Observation Well Pounds per Cubic Foot Photo-Ionization Detector Pressuremeter Test Parts per Million Pounds per Square Inch Polyvinyl Chloride Rotations per Minute Standard Penetration Test Unified Soil Classification System Unconfined Compressive Strength Vibrating Wire Piezometer Vertical Weight of Hammer Weight of Rods Weight

ATD

Diam.

Elev.

ft.

FeO gal.

Horiz.

HSA

I.D.

in.

lbs.

MgO mm

MnO

NA

NP

O.D.

OW

pcf

PID

PMT

ppm psi

PVC

rpm

SPT

USCS

qu

VWP

Vert.

WOH

WOR

Wt.

STRUCTURE TERMS1

1Reprinted, with permission, from ASTM D2488 - 09a Standard Practice for Description and Identification of Soils (Visual-Manual Procedure), copyright ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428. A copy of the complete standard may be obtained from ASTM International, www.astm.org.

2Adapted, with permission, from ASTM D2488 - 09a Standard Practice for Description and Identification of Soils (Visual-Manual Procedure), copyright ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428. A copy of the complete standard may be obtained from ASTM International, www.astm.org.

ACRONYMS AND ABBREVIATIONS

Poorly Graded

Well-Graded

Irregular patches of different colors.

Soil disturbance or mixing by plants or animals.

Nonsorted sediment; sand and gravel in silt and/or clay matrix.

Material brought to surface by drilling.

Material that caved from sides of borehole.

Disturbed texture, mix of strengths.

Mottled

Bioturbated

Diamict

Cuttings

Slough

Sheared

DESCRIPTION

Nonplastic

Low

Medium

High

ADDITIONAL TERMS

PLASTICITY2

CEMENTATION TERMS1

GRADATION TERMS

APPROX.

PLASITICTY

INDEX

RANGE

< 4

4 to 10

10 to 20

> 20

PARTICLE ANGULARITY AND SHAPE TERMS1

FIG. A-1

Angular

Subangular

Subrounded

Rounded

Flat

Elongated

Sharp edges and unpolished planar surfaces.

Similar to angular, but with rounded edges.

Nearly planar sides with well-rounded edges.

Smoothly curved sides with no edges.

Width/thickness ratio > 3.

Length/width ratio > 3.

Narrow range of grain sizes present or, within the range of grain sizes present, one or more sizes are missing (Gap Graded). Meets criteria in ASTM D2487, if tested.

Full range and even distribution of grain sizes present. Meets criteria in ASTM D2487, if tested.

Crumbles or breaks with handling or slight finger pressure Crumbles or breaks with considerable finger pressure Will not crumble or break with finger pressure

SOIL CLASSIFICATION

AND LOG KEY

_B O

R

IN

G _C

LA

S

S

-0

_K

IL

A U

E A

.G P

J S

W N

E W

.G D

T

/1 9/

2.75

0.4

0.8

5.5

S -1

S -2

5 inches of asphalt.

4 inches of base course.

Stiff to very stiff, red to red-brown, Silt (ML); moist; trace sand. [A-7-5]

BOTTOM OF BORING

COMPLETED ON 02/03/2022

G ro un dw at er

N ot

E nc ou nt er ed

D ur in g

D ril lin g

~ 22.20757° ~ -159.41149°

Solid-Stem Auger Valley Well Drilling Diedrich D-25 Trailer

LEGEND

Drilling Method:

Drilling Company:

Drill Rig Equipment:

Other Comments:

SOIL DESCRIPTION

HI FLAP CR 562(1)

Kilauea Point National Wildlife Refuge

Kaua'i County, Hawaii

P oc ke t

P en ts f

D ep th , f t.

Latitude:

Longitude:

Station:

Offset:

20 40

Standard Penetration Test

LOG OF BORING SW-01

4 in.

AWJ

Cathead

September 2023

Sample Not Recovered

Hole Diam.:

Rod Type.:

Hammer Type:

SHANNON & WILSON, INC.

5.5 ft.

FIG. A-2

S am pl es

Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual.

FINAL

NOTES

1. Refer to Figure A-1 for explanation of symbols, codes, abbreviations, and definitions.

2. The discussion in the text of this report is necessary for a proper understanding of the nature of the subsurface materials.

3. Groundwater level, if indicated above, is for the date specified and may vary.

4. USCS designation is based on visual-manual classification and selected lab testing.

5. The boring location was determined using a recreational grade GPS unit.

S ym bo l

0 60

Total Depth:

Top Elevation:

Vert. Datum:

Horiz. Datum:

20 40

Geotechnical and Environmental Consultants

107654-001

G ro un d

W at er

D ep th , f t.

M A

S T

E R

_L O

G _E

_P O

C K

E T

P E

N _L

A T

LO

N G

4-

1_

K

IL

A U

E A

.G P

J D

E N

V E

R

.G D

T

/1 9/

140 lbs / 30 inches (blows/foot)PENETRATION RESISTANCE

Hammer Wt. & Drop:

Plastic Limit Liquid Limit Natural Water Content

% Fines % Water Content

(<0.075mm)

0.5

0.8

4.0

5.5

G -1

S -1

S -2

5-1/2 inches of asphalt.

4 inches of base course.

Very stiff, yellow-brown, Elastic Silt (MH);

moist. [A-7-5]

Medium stiff, red-brown, Elastic Silt (MH);

moist. [A-7-5]

BOTTOM OF BORING

COMPLETED ON 02/03/2022

G ro un dw at er

N ot

E nc ou nt er ed

D ur in g

D ril lin g

~ 22.21012° ~ -159.40865°

Solid-Stem Auger Valley Well Drilling Diedrich D-25 Trailer

LEGEND

Drilling Method:

Drilling…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .