HI FLAP CR 562(1)_Kilauea Hyd Report_2026.10.01.pdf
PDF 12 MB Posted
- Attached to
- HI FLAP CR562(1) Kilauea Point
- Solicitation number
- 6982AF27B000008
About this file
This is a Final Hydraulic Recommendations Technical Memorandum prepared by SSFM International, Inc. for the Kilauea Point Access Improvements project (HI FLAP CR 562(1)) dated November 12, 2024. The report presents comprehensive hydrologic and hydraulic analysis and design recommendations for drainage improvements along Kolo Road and Kilauea Road on Kauai's north shore, totaling approximately 1.72 miles. The analysis utilized EPA SWMM 5.1 software modeling with over 70 tributary subbasins to evaluate existing and proposed drainage conditions across varying storm recurrence intervals (2-year, 10-year, 25-year, 50-year, 100-year, and 200-year events). Design criteria conform to Federal Lands Highway Project Development and Design Manual (2018), Hawaii Department of Transportation standards, AASHTO guidelines, and County of Kauai stormwater runoff system requirements, with design storms specified as 25-year for culverts, 10-year for roadside ditches and on-grade inlets, and 50-year for sump locations.
The report identifies existing drainage infrastructure limitations and proposes targeted mitigation measures including installation of catch basins, drywells, and slotted curbs to manage increased runoff from the new 8-foot-wide concrete sidewalk. Recommended drywell spacing varies from 75 feet (42-inch diameter) to 600 feet (96-inch diameter) based on infiltration capacity requirements for a 2-year storm event. Specific drainage improvements are recommended at Kolo Road/Kilauea Road intersection, Keneke Street roundabout, and locations between stations 128+40 and 183+40 along Kilauea Road, with slotted curbs and spillway provisions for the vehicle parking area at the Wildlife Refuge entrance. The analysis includes detailed hydraulic calculations for the existing 48-inch culvert at station 174+72, confirming adequate capacity with outlet velocities ranging from 5.89 to 12.67 feet per second for 10-year through 100-year events. Peak flow rate summaries and subcatchment runoff data are tabulated in appendices for both existing and proposed conditions across all design storm frequencies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KĪLAUEA POINT ACCESS IMPROVEMENTS
HI FLAP CR: 562(1)
Final Hydraulic Recommendations Technical
Memorandum
Report
BY
501 Sumner Street, Suite 620
Honolulu, Hawaiʻi 96817
For
Federal Highways Administration
Central Federal Lands Highway Division
November 12, 2024
2019.083.001 Kilauea Road Project HI FLAP: CR562(1) Hydrology and Hydraulics Report (Final Submittal) Page 1
Statement of SSFM International, Inc.’s Quality Process
It is the policy of SSFM to have a consistent and systematic approach to the development and review of its reports and other project deliverables.
All projects and products of our service are subject to a quality process and in no case will the quality review be eliminated. The main purpose of this process is to assure:
Clarity, completeness, coordination, and accuracy of documents.
That the project, study or investigation meets the Client's objectives.
That the requirements of our Agreement with the Client have been met, and the Client has received the value of the fee to be paid.
The Preparation of This Deliverable Was The
Responsibility of and Completed By:
signature date
The Quality Review of This Deliverable Was The
Responsibility of and Completed By:
signature date
Nov 12, 2024
Nov 12, 2024
Expiration Date of License 04/30/2028
Final Hydraulic Recommendations Technical Memorandum
Kīlauea Point Access Improvements
1. Introduction
The location of the Kīlauea Wildlife National Refuge (Kīlauea Road) is on the island of Kauaʻi.
The project corridor includes Kolo Road and Kīlauea Road, extending from the intersection at
Kūhiō Highway (Hwy 56) through the north end of Kīlauea Road, at the entry to the Kīlauea
Wildlife National Refuge.
The project scope includes pavement rehabilitation on the existing roadway, with full-depth pavement on aggregate base course for roadway widening segments. Provisions for guardrail, sidewalk, two mini-roundabouts, striping, and pedestrian crossings establish a safe and accessible corridor for pedestrians and bicyclists and parking lot reconstruction. The total project length is approximately 1.72 miles.
The work on Kīlauea Road is for the Federal Highway Administration (FHWA). The Central
Federal Lands Highway Division (CFLHD) and the County of Kauaʻi (CoK).
This Hydraulic Recommendations Technical Memorandum summarizes the existing drainage conditions, recommended drainage improvements and the applicable hydrologic and hydraulic design methods used in developing the plan set.
1.1 Site / Project Location
The project involves the installation of a pedestrian pathway in the community of Kīlauea on the island of Kauaʻi. Improvements of the pathway provide for pedestrian access through Kīlauea to
Kīlauea Point. The pathway is to start north of Kūhiō Highway near the Kolo Road intersection and extend along Kīlauea Road to the existing parking area at the Kīlauea Wildlife Refuge Park.
The map of the project location is in Figure 1.
1.2 Drainage Criteria References
Drainage analysis and design work associated with the proposed improvements are as per the methods, guidelines, and criteria set forth by the CFLHD, American Association of State Highway and Transportation Officials (AASHTO), Hawaiʻi Department of Transportation highway design standards (HDOT), and County of the Kauaʻi Stormwater Runoff System Manual.
The primary references are:
• Federal Lands Highway Project Development and Design Manual (PDDM), 2018.
• HDOT, Design Criteria for Highway Drainage, dated June 15, 2019.
• HDOT, Stormwater Permanent Best Management Practices Manual, April 2015.
• County of Kauaʻi, Dept of Public Works, Stormwater Runoff System Manual July 2001.
2. Watershed Hydrology
2.1 Hydrologic Methods
Watershed hydrologic analysis for Kīlauea Road was determined using the EPA SWMM 5.1 software. The Stormwater Management Model (SWMM) is a simulation model used for a single event or long-term simulation of water runoff quantity and quality in primarily urban environments.
The model has a variety of input parameters such as rainfall data, amount of pervious and impervious area, infiltration, and watershed slope to estimate the stormwater runoff. The following is a list of typical values used to model the sub-catchments characteristics throughout the study areas:
• Impervious percentage, urban: 25% to 90%
• Impervious percentage, rural: 0% to 5%
• Initial abstractions; 0.05 to 0.1 inches
• Soil infiltration; 0.5 in. minimum, 3.0 in/hr maximum
• Sub-catchment slope; 0.5% to 8%
• Sub-catchment width: 20ft to 350ft
Under ideal conditions, the estimated runoff routes from the modeling analysis would be calibrated to measured rainfall data and corresponding runoff rates as may be measured in creeks and/or storm sewer pipes. Unfortunately, there is no measured flow data available for the drainage network within the project area, and as such, field verification and calibration are not possible.
The modeling parameters used within this study are similar to those used on projects of similar scope and nature. Although field measurement data may not be available, anecdotal information can also yield valuable insight into the performance of an existing drainage system. This information can be obtained from local maintenance staff and residents regarding past problem areas and recurring flooding events to assist in validating the predicted runoff rates and flow routes.
2.2 Topography
The community of Kīlauea is in the northern portion of Kauaʻi, situated makai (ocean side) of
Kūhiō Highway (Highway 56). Kīlauea is an urban residential area surrounded by plantation and agricultural lands, whose history dates back to the 1880s.
The project is within the western portion of the Kīlauea's residential town core, situated on flat benchlands with no natural watercourses. The topography is very flat, sloping gently towards the ocean at an average of approximately 1%.
Just east of the project area, Kīlauea Stream flows through the community of Kīlauea. The stream is relatively large and varies significantly in width and slope as the channel consists of flat segments and steep sections with waterfalls. Kīlauea Stream is a naturally occurring stream with headwaters in the Keālia Forest Reserve at the 2,600 ft elevation.
There is an existing storm drainage system throughout the southern portion of the town area to collect runoff from the roadways. The storm drainage system discharges into an open channel that flows northwesterly away from the town area.
Remnants of a historical canal are also present through part of the town area, including culverts across the roadways and open channels through residential properties. The origin of this canal begins at the upstream stone dam site (refer to Figure 1), a location where flows on Kīlauea Stream historically split into various irrigation canals - one flowing west to Wai Koa Plantation another flowing north to Kīlauea town. Kūhiō Highway bisects the irrigation canal before it reaches
Kīlauea town, with no crossing culvert observed, and the irrigation canal is temporarily cut-off / infilled. The irrigation canal re-emerges north of Kolo Road. A resident interviewed in 2016 during a field reconnaissance provided anecdotal information that the canal through Kīlauea town is dry and has not conveyed flows since approximately 2005.
2.3 Existing Drainage System
The proposed pathway is alongside Kolo Road and Kīlauea Road, starting near Kūhiō Highway and extending through the town area and ending at the Kīlauea Wildlife refuge.
The drainage assessment has been developed based on field site observations, topographic surveys, field measurements, topographic mapping, and additional research. Underground storm drainage pipes and inlets exist along Kīlauea Road and in the town area per surveys along the project alignment. The County of Kauaʻi indicated that they do not have any as-built drawings of the existing drainage infrastructure.
The primary conveyance of the drainage from the road and pathway is through shallow grass swales fronting properties and driveways. The capture of storm surface runoff at some intersections in the town area is by the existing drainage inlets and conveyed through pipes and culverts, while in some areas are no inlets and the runoff ponds and ultimately infiltrates to-ground.
There is little to no drainage infrastructure along Kīlauea Road, proceeding north from the town area.
Kolo Road – Between Kūhiō Highway and Kīlauea Road
Within this area of the project, there is no identified drainage infrastructure. Surface runoff generally follows the existing shallow swales along the edge of the pavement. The northern portions of Kolo Road, from the north side of Kīlauea Road, slope towards the Kūhiō Highway.
No culverts or drainage infrastructure was noted within this vicinity or at the intersection.
The areas near the Kolo Road/Kīlauea Road intersection have no defined outlet, with evidence of surface ponding near the intersection, particularly in the southeast quadrant, near the existing utility pole.
Kīlauea Road – Between Kolo Road and Oka Street
Sta 101+00 to Sta 118+00
In the southern portion of Kīlauea town, there are existing drainage inlets and an underground storm drainage system along Kīlauea Road. Inlets at the intersection of Lokela Street drain via storm drainage pipes north on Kīlauea Road to Koma Street, joining additional inlets and piped west on Kaikala Street. The existing swale on the east side of Kīlauea Road has limited capacity and is not well defined in the vicinity of the bus stop at Koma Street. Some overtopping of the roadway centerline can be expected in the area of Koma Street intersection.
The drainage piping continues on Kaikala Street and discharges into an open channel west of
Kaikala Street.
Kīlauea Road – Between Oka Street and Keneke Street (central town area)
Sta 118+00 to Sta 123+00
In the central portion of the town area, drainage along Kīlauea Road between Oka Street and
Keneke Street is conveyed southwards to existing drainage inlets at the intersection of Kīlauea
Road and Oka Street. The inlets discharge across Kīlauea Road and form the start of the southern drainage channel, which flows through the old sugar mill property and combines with the drainage outlet from the southern portion of the town.
The southern drainage channel is the primary receiving and conveyance system for the stormwater runoff from Kīlauea town. The channel meanders through the agricultural lands for 1.5 miles before discharging into the ocean at the western side of Kauapea Beach.
Kīlauea Road – Near Titcomb Street (northern town area)
At the northern end of the town, in the 4141 Block of Kīlauea Road (Sta 134+35), there is an existing 60"± culvert, however the majority of the culvert is blocked due to significant debris and sediment build-up. Only the top 6” to 8” of the culvert is visible. The culvert has a concrete headwall and 16" of freeboard to the road surface.
The existing culvert is part of the historical irrigation canal, originating at the "stone dam" site on
Kīlauea Stream. Downstream of Kīlauea Road, the historic irrigation canal no longer contains well-defined sections and may be partially infilled. Topographic mapping indicates that the irrigation canal flows through the agricultural lands and discharges at Kauapea Beach, as shown in Figure 1.
Kīlauea Road – Near Kauapea Road
Between Kīlauea town and Kauapea Road (Sta 168+00), the project area is flat with roadside swales and no drainage infrastructure. The road is undulating, resulting in runoff ponding in localized areas and infiltrating into the permeable soils. Thus, these drainage areas act as "sinks" with no defined outlet.
In the 3650 Block of Kīlauea Road (Sta 174+70), there is an existing 48in concrete culvert with a headwall and 20 inches of freeboard to the road surface. The culvert outlets to an open channel, referred to as the Northern Drainage Channel, with rip-rap outlet protection and excessively overgrown vegetation.
Kīlauea Road – Near the Wildlife Refuge
Sta 177+00 to Sta 187+00
Within the northern limits of the project, there are no defined drainage facilities. Roadway runoff generally sheets-flows or collects in small swales along the edge of the roadway, until it can exit the right of way and follow the contours in a north-westerly direction.
Near the entrance to the Wildlife Refuge, runoff from the roadway surface is directed towards the existing driveway and then follows the south edge of the driveway onto the Wildlife Refuge site.
Some erosion and ponding issues have been noted along the driveway and within the Wildlife
Refuge property.
3. Drainage Facilities Design
3.1 Design Criteria
The following section summarizes the hydrologic design requirements per Federal Lands
Highway's PDDM and County of Kauaʻi storm drainage standards.
Table 3.1 – Hydrologic Design Standards
Facility Criteria Description Design Storm
(Years)
Culverts Cross Culverts 25
Roadside culverts 10
Roadside Ditches Ditches 10
Inlets for Pavement drainage On-grade 10
Sump 50
Storm Drains On-grade 10
Sump 50
The County of Kauaʻi storm drainage standards, as presented within the Stormwater System
Runoff Manual, are summarized below:
• The design of the local drainage system shall convey the peak runoff of a minor storm event with minimal disturbance to the development. A minor storm event is a 2-year recurrence interval storm for less than 100 acres of drainage areas.
• The primary drainage system's design shall convey the peak runoff from the 100-year recurrence interval storm to minimize health, life hazard, damage to structures, and interruption to traffic and services.
Street conveyance is an integral part of the storm drainage system and may be used to transport storm runoff up to the allowable street flooding limits. Street rights of way (ROW) are used as the drainage channel to convey frequent and infrequent storm runoff. The allowable limits for street flooding shall be as follows:
Table 3.2 – Summary of County of Kauaʻi allowable flooding limits
Description Allowable Flooding
Minor and Dead End Minor Storm (2-yr): Flow may spread up to the crown of the street
All Streets Major Storm (100-yr): Flow may flood up to an elevation where buildings shall not be under inundation with a minimum freeboard of 1 foot.
Storm Runoff detention Maintain storm runoff to peak pre-development rates.
3.2 Rainfall Information
Precipitation information for the Kīlauea area was obtained from the National Oceanic
Atmospheric Administration (NOAA) National Weather Service's Hydrometeorological Design
Studies Center. Data is available for a variation of return frequency events and durations, as summarized in Table 2.
Table 3.3 – Rainfall Depths (inches)
Duration 1:2yr 1:10yr 1:25yr 1:50yr 1:100yr 1:200yr
1 hour 1.92 3.14 3.91 4.53 5.18 5.87
24 hour 6.72 11.5 14.6 17.1 19.8 22.7
3.3 Soil Conditions
According to the "General Soils Map" for the island of Kauaʻi, prepared by the U.S. Department of Agriculture Soil Conservation Service, the soil within the project site is classified as well-draining with moderately to fine gradation subsoils. Figure 2 illustrates the soil classification of the area.
Soils within the project area, between Kīlauea town and the ocean, Līhuʻe – Puhi soils are well-draining and fine-textured. The soils have an organically rich, fertile surficial layer typical of prime agricultural or farmlands.
Soils near the ocean and lighthouse consist of volcanic and intrusive rocks, with outcrops to the surface and infrequent interbedded sedimentary beds in the subsoils.
The characterization of the soils is moderate to highly permeable, with slow runoff rates and less vulnerable to erosion.
3.4 Flood Hazard Mapping
The flood hazard mapping for the project is in Figure 3. This mapping is from the State of
Hawaiʻi's Department of Land and Natural Resources, and the basis is on FEMA's flood insurance maps dated September 16, 2005.
As shown in the mapping, the project area is outside the flood hazard area as it is elevated well above sea level and does not include any natural watercourses that could either convey excessive floodwaters or act as a source for oceanic backwater, wave run-up, or tsunami potential.
The identification of the entire project area is in the flood zone designated as "Zone X," which is defined as moderate to low risk and represents the minimum flood hazard with less than 0.2 percent chance of an annual flood (1 in 500-year return period).
4. Hydrologic / Hydraulic Analysis
4.1 Introduction
The estimation of the peak runoff rates is for the existing conditions and the proposed conditions, including the pedestrian pathway addition. The development of the flow rates is from the EPA
SWMM model.
The project area is relatively flat, with undulating sections, and has limited drainage infrastructure beyond the town area. Shallow swales are present throughout the town area and the project alignment along Kīlauea Road, with limited to no evidence of frequent or significant ponding, erosion, or flood damage. Isolated drainage inlets exist periodically at well-defined low points and intersections throughout the town.
Due to the undulations in Kīlauea Road, between the town area and Wildlife Refuge Park, the drainage catchments, and swales in the northern portion of the project are not contiguous, creating depressions or "sinks" where the localized runoff collects/ponds before infiltrating in the ground.
There were no visible signs of frequent flooding or substantive standing water present in the various depressions; thus, these areas may experience localized ponding during major rainfall events, but the depth likely does not reach the road surface.
For the drainage analysis, the subdividing of the contributing watershed is into more than 70 tributary subbasins. The majority of the subbasins include the Kīlauea Road corridor, and the various parameters, such as existing impervious areas, were estimated based on the topographic mapping. The adjacent, offsite areas were also included within the stormwater model to include offsite contributions. Figures A1 to A7 illustrate the existing drainage basin boundaries.
4.2 Existing Drainage Flows
The estimation of the peak flows along the project alignment for varying return period rainfall events was completed using the storm water model. In locations with "sinks" or drainage basins with no drainage outlet, the peak flow modeled is overly conservative because it does not model peak flow attenuation that results from the actual field conditions consisting of sheet flow, undulations, and natural depressions. Appendix A tabulates the peak runoff rates from the sub-catchment areas.
Several outlets or overland flow locations were included within the EPA SWMM model to estimate the peak flow rates and volumes at locations where runoff is to exit the roadway corridor.
These locations have been defined to compare the existing and proposed conditions and determine appropriate measures to mitigate the potential increases based on the net increase in impervious surfaces. The following table summarizes the existing peak flow rates at the discharge locations where the runoff would exit the roadway corridor.
Table 4.1 – Summary of Outfall Loading, Existing Conditions
Location Model ID 2-Yr Peak
Flow (cfs)
10-Yr Peak
Flow (cfs)
100-Yr Peak
Flow (cfs)
Kolo Road
500+20 Rt. 180 0.57 0.95 1.58
500+20 Lt. 182 0.64 1.41 2.54
505+05 Rt. 184 1.2 2.19 3.91
Kīlauea Road
109+30 Lt. J130 12.0 24.0 37.0
118+65 Lt. 126 27.0 52.6 99.4
128+50 Lt. 138 6.41 14.4 33.4
139+50 Lt. 148 0 0 0.29
141+00 Lt. 150 0.01 0.74 2.42
144+00 Rt. 152 6.76 16.2 37.4
145+35 Lt. 154 1.76 2.99 4.8
146+00 Lt. 128 0.23 0.46 0.9
154+00 Lt. 130 0.97 2.07 4.77
154+40 Rt. 156 7.26 21.7 47.6
155+85 Lt. 132 2.22 9.74 33.5
166+00 Lt. 134 5.10 14.2 34.8
175+85 Lt. 158 7.31 26.1 64.5
181+00 Lt. 162 1.70 6.85 24.4
183+50 Lt. 164 3.74 13.2 30.1
185+30 Lt. 198 0.15 0.35 0.67
186+50 Lt. 136 2.59 6.59 16.8
During the larger rainfall events, several areas were noted to include surface ponding. To maintain continuity of flow within the model, several overflow routes were included, which would reflect the anticipated overland flow route, and allow comparison of results for the existing and proposed runoff conditions as the runoff exits the roadway corridor.
4.3 Future / Project Drainage Flows
The proposed pedestrian path and the resulting increase in the impervious areas were added to the stormwater model to estimate the peak flow rates within the drainage system. Figures B1 to B7 depict the proposed model conditions. The peak runoff rates from the sub-catchment areas are in
Appendix B. The proposed drainage patterns remain consistent with the existing drainage patterns with the same outlet or discharge locations where runoff exits the roadway corridor. The amount of impervious area within each subbasin was increased based on the addition of the concrete sidewalk to determine the peak flow rates under proposed conditions.
Based on the County of Kauaʻi criteria to minimize the impact from the increased impervious surfacing, maintain existing runoff conditions, and provide water quality improvements, several drywells or similar detention/water quality treatment devices would be required along the project corridor. The following table provides a summary of the available storage within typical shallow drywells, the required storage to contain the increased runoff, and the resulting horizontal spacing of drywells. The summary below is based on the increased runoff from the sidewalk construction for the 1 in 2-year storm event using a sidewalk width of 8 feet and a rainfall depth of 1.92 inches.
The drywell storage is intended to fully contain and infiltrate the net increase in runoff based on the conversion from the existing pervious surfacing to the proposed concrete walkway.
Table 4.2 - Summary of Drywell Storage and Spacing to Detain Increased Runoff
Description Drywell Diameter
42 inches 72 inches 96 inches
Depth (ft) 4 6 8
Available Storage (ft3) 61 250 493
Contributing Sidewalk Length (ft) 75 300 600
Total Sidewalk Runoff (ft3) 96 384 768
Net Increase in Sidewalk Runoff (ft3) 62.4 250 499
As presented in the table above, to detain and infiltrate the net increase in runoff, the drywell spacing would vary from 75ft intervals with a 42in diameter drywell, to 600ft intervals with a 96in diameter drywell.
Since the majority of the project is within rural, undeveloped areas, and surface runoff will discharge to grassed fields or heavily vegetated areas along the roadside, the increased runoff will readily dissipate without adverse impacts to downstream areas. As such, the recommended drywell placement has been limited to locations where runoff may be more concentrated and can be readily intercepted by a catch basin and/or drywell. These include the grassed swales which collect the sidewalk runoff and at the vehicle parking area at the north end of the project.
The following table summarizes the peak flow rates for the proposed conditions at the discharge locations under various recurrence intervals.
Table 4.3 – Summary of Outfall Loading, Proposed Conditions
In comparing Tables 4.1 and 4.3, the proposed pathway has minimal impact on peak stormwater flows at the discharge locations along the project alignment. Table 4.4 summarizes the change in peak flow rate at the various discharge locations for the existing and proposed conditions. The mitigation of anticipated increase in flow rates and provisions for water quality improvements requires the installation of infiltration facilities such as drywells at locations where the roadway runoff may concentrate within a proposed gutter line or swale. In addition to mitigating potential increases in runoff, the infiltration facilities help alleviate existing surface ponding issues in areas such as the intersection of Kolo Road and Kīlauea Road. The addition of drain inlets and drywells, particularly at the Kolo Road intersection and at the north end of the project assists in mitigating the increased impervious areas minimizing impacts on the downstream areas.
For the vehicle parking area at the north end of the project, the roadway runoff will be intercepted by the curb and concrete gutter beginning at Sta 185+81 and extending along the west pavement edge. The curb will discharge into the proposed concrete ditch that will be constructed as part of the Main Entry Improvement Works for the Wildlife Refuge. Runoff that may be generated from
Location Model ID 2-Yr Peak
Flow (cfs)
10-Yr Peak
Flow (cfs)
100-Yr Peak
Flow (cfs)
Kolo Road
500+51 Rt. 180 0.73 1.39 2.69
500+51 Lt. 182 0.74 1.36 2.67
505+05 Rt. 184OF 0.78 2.27 3.35
Kīlauea Road
109+30 Lt. J130 13.0 26.5 42.0
118+65 Lt. 126 27.5 55.1 110.8
128+50 Lt. 138OF 6.06 13.9 33.1
139+50 Lt. 148OF 0.56 1.67 3.40
141+00 Lt. 150 1.06 2.41 5.01
144+00 Rt. 152 6.96 16.5 38.6
145+35 Lt. 154 0.09 0.10 0.13
146+00 Lt. 128OF 0 0.01 0.26
154+00 Lt. 130OF 1.15 2.43 5.54
154+40 Rt. 156 7.37 21.7 45.9
155+85 Lt. 132 2.60 10.0 34.3
166+00 Lt. 134 5.38 14.8 36.0
175+85 Lt. 158 7.36 26.1 64.5
181+00 Lt. 162 1.85 7.30 28.0
183+50 Lt. 164 2.51 8.96 20.7
185+30 Lt. 198 0.88 1.44 2.37
186+50 Lt. 136 2.99 8.85 20.0 off-site areas, east of Kilauea Road will be conveyed across the width of Kilauea Road, and continue in a westerly direction, consistent with existing conditions.
Table 4.4– Summary of Changes in Outfall Loading
Location Model ID 2-Yr Peak
Flow (cfs)
10-Yr Peak
Flow (cfs)
100-Yr Peak
Flow (cfs)
Kolo Road
500+20 Rt. 180 0.16 0.44 1.11
500+20 Lt. 182 0.1 -0.05 0.13
505+05 Rt. 184 -0.42 0.08 -0.56
Kīlauea Road 0 0 0
109+30 Lt. J130 1.0 2.5 5.0
118+65 Lt. 126 0.5 2.5 11.4
128+50 Lt. 138 -0.35 -0.5 -0.3
139+50 Lt. 148 0.56 1.67 3.11
141+00 Lt. 150 1.05 1.67 2.59
144+00 Rt. 154 0.2 0.3 1.2
145+35 Lt. 152 -1.67 -2.89 -4.67
146+00 Lt. 128 -0.23 -0.45 -0.64
154+00 Lt. 130 0.18 0.36 0.77
154+40 Rt. 156 0.11 0 -1.7
155+85 Lt. 132 0.38 0.26 0.8
166+00 Lt. 134 0.28 0.6 1.2
175+85 Lt. 158 0.05 0 0
181+00 Lt. 162 0.15 0.45 3.6
183+50 Lt. 164 -1.23 -4.24 -9.38
185+30 Lt. 198 0.73 1.09 1.7
186+50 Lt. 136 0.40 2.26 3.15
Total 1.95 6.05 18.51
4.4 Proposed Drainage System
Kīlauea Road – Between Kolo Road and Lokela Street
Sta 101+00 to Sta 106+00
Within the southern limits of the project, there is an existing shallow drainage swale along the east side of Kīlauea Road, beginning near station 102+25 and draining towards Lokela Street. The proposed sidewalk will reduce the available space for this roadside swale and will reduce the conveyance capacity within this area significantly. The peak flow rates, including the roadway runoff and from the adjacent residential area is estimated to be in the range of 3.4 cfs. The available depth within the roadside swale is limited to approximately 1.5 to 2 inches in some areas (near Sta
105+00) and will result in ponding and flow above the sidewalk during the 2-year runoff event.
The approximate inundation depth within this area is estimated to be 2 to 3 inches above the sidewalk. Within this same roadway segment, south of Lokela Street, the depth of flow in the existing swale is in the range of 2 to 2.5 inches for the 2-year recurrence interval.
Site constraints limit the amount of grading that can be accomplished to reinstate the drainage swale. To maintain an equivalent hydraulic capacity without overtopping the sidewalk, a piped drainage system with catch basin and storm drainage pipe would be required, though may not be cost effective.
There is also a shallow swale along the west side of the roadway with available depths in the range of 2 to 3 inches, particularly approaching Lokela Street. A speed hump is proposed near station
103+75. The speed hump extends towards the edge of pavement which will reduce the conveyance capacity of the swale and will increase the depth of flow on the upstream side. Based on the estimated 2-year design flow rate, the depth of flow would increase from approximately 1.3 inches to 1.7 inches near the speed hump.
Kīlauea Road
Sta 106+00 to Sta 109+00
Within this roadway segment, the proposed sidewalk is located on the east side of Kīlauea Road.
The conveyance capacity of the existing swale is reduced and expected to exceed the crown elevation. In addition, the surface drainage is being directed to the west of the existing bus shelter.
With 2-year flow rates anticipated to be in the range of 2.1cfs, the surface flow can be expected to exceed the centerline elevation, similar to the existing conditions.
Sta 109+00 to Sta 125+00
Between roadway station 109+00 to 125+00, there is little to no change in impervious areas or drainage routes. The existing intersection at Kīlauea Road and Keneke Street will be converted to a roundabout configuration, however the extent of impervious area and drainage paths will remain consistent with the existing conditions.
With the construction of the round-about and sidewalk at Keneke Street, the surface drainage patterns will change slightly. The existing drain inlet/manhole in the northeast quadrant of the intersection will be located within the limits of the new sidewalk. As such, changes in the surface drainage will be required to maintain positive drainage. The drain inlet/manhole will be re-constructed to include a gutter inlet along the edge of pavement to collect roadway runoff, and a drain inlet behind the curb to collect runoff in the boulevard area. The structure is located very close to the existing right of way, and shoring will likely be required to facilitate construction and limit the amount of excavation at the right of way boundary.
Sta 125+00 to Sta 168+20
Between road station 125+00 to 168+20, the proposed sidewalk will be constructed on the west side of Kīlauea Road. The gradient within the segment of the corridor is quite flat with minor undulations in the roadway profile and generally slopes towards the west. Where feasible the sidewalk will slope to the west and runoff will sheet flow in the adjacent vegetation. In locations where runoff will be concentrated in grassed swales, catch basins and drywells will be provided to collect the increased runoff and promote infiltration to-ground. Catch basins and drywell have been proposed at the following locations:
• Sta 128+40
• Sta 139+20
• Sta 148+35
Sta 168+20 to Sta 183+40
Nearing the north end of the project, the sidewalk will be adjacent to edge of pavement and a curb will be constructed along the left edge of pavement to improve pedestrian safety. The curb will extend from approximately Sta 168+20 to Sta 183+40. To limit the flow depth and width of spread along the curb line, a slotted curb will be provided which will allow some flow to traverse the sidewalk and sheet flow into the vegetated areas along the western edge of the corridor. The curb cuts will be 12” wide and will be spaced at 10ft intervals. The average width of spread along the curb is estimated to be in the range of 3ft during the 2-year storm event, with a maximum spread of approximately 5.4 ft at the low point near 175+40, which is in conformance with the County standards to permit flooding up to the crown of the road. The curb cut near the low point will be widened from 12 inches to 24 inches to minimize the depth of ponding at the curb and the corresponding and width of spread. The depth of flow at the low point is approximately 1.3 inches.
The calculations for the width of spread have been provided in Appendix C.
Sta 183+40 to Sta 186+88
At the north end of the project, in the vehicle parking area, the existing drainage pattern will remain consistent with existing conditions with the surface drainage flowing in the north-west direction.
Beginning at Sta 185+81 a concrete curb along the west pavement edge will intercept the roadway runoff and convey the flow off-site. A paved spillway will be constructed to convey the flow from the curb terminus on Kilauea Road, into the proposed concrete-lined drainage swale that will be constructed as part of the Main Entry Improvements being undertaken by the Wildlife Refuge.
Kolo Road
With the exception of the catch basin and drywell on the east side of the Kolo Road/Kīlauea Road intersection, the Kolo Road corridor will not include additional drainage infrastructure. The proposed catchbasin and drywell are intended to intercept the surface runoff approaching the intersection from the east and promote infiltration prior to the flow reaching the crosswalk.
The Hawaiʻi Department of Transportation (HDOT) is in the final stages of detailed design of the intersection improvements at Kolo Road and Kūhiō Highway, and the proposed highway improvements will include the addition of a storm drainage collection system. As such, the installation of drywells and catch basins on Kolo Road, approaching the Kūhiō Highway intersection, are not recommended since the HDOT drainage system will collect and convey the runoff from this area.
4.5 Culvert Crossing Station 174+72
The existing culvert crossing at Sta 174+72 was analyzed using the HY-8 software as published by the Federal Highways Administration. The existing culvert is a 48-inch diameter concrete culvert, with mitered end walls. There is an existing rip rap spillway at the culvert exit. Based on the recent field visits, the culvert and energy dissipation appear to be in good condition.
The upstream contributing drainage area includes approximately 35.6 acres of largely undeveloped land to the east of Kīlauea Road. The peak flow rates for the 10-year, 25-year, 50-year and 100-year storm events, along with the depth of flow in the culverts are summarized in Table 4.4. A copy of the hydraulic plot for the 100-year discharge is shown as Figure 4.1.
Table 4.4– Summary of Culvert Data
Recurrence Interval 10-Year 25-Year 50-Year 100-Year
Peak Flow Rate (cfs) 13.7 30.0 47.0 66.7
Depth of Flow (ft) 0.95 1.43 1.83 2.25
Outlet Velocity (ft/s) 5.89 9.91 11.39 12.67
Figure 4.1
Hydraulic Plot – Culvert Sta 174+72; 100-Year Flow
5. Conclusions / Recommendations
The proposed pathway segment will extend alongside Kīlauea Road, through the town area to the
Wildlife Refuge Park and lighthouse. The pathway increases the impervious area and stormwater runoff along the alignment, albeit minimally, to the existing runoff from Kīlauea Road, the adjacent town area, and agricultural lands.
The design of the proposed pathway is parallel and offsetting Kīlauea Road and follows the existing topography, which is generally flat and undulating, resulting in a lower runoff potential.
Along Kolo Road, the surface drainage generally follows the edge of the pavement, with runoff directed towards the Kūhiō Highway intersection. There are no existing drain inlets or culverts noted at the intersection, and runoff appears to flow across the pavement towards the south side of
Kūhiō Highway. For the proposed conditions, the surface runoff from the south side of Kolo Road will be collected in the roadside swales and gutter on the south side of Kolo Road and travel west towards Kūhiō Highway. HDOT is in the final phases of design for the Kūhiō Highway intersection improvements, which will include a new storm drainage collection system to service the intersection.
A catch basin and drywell are proposed on the east side of the Kolo Road intersection to intercept surface runoff that approaches the intersection in the south-east quadrant.
Through Kīlauea town (Kolo Road to Titcomb Street), runoff from the pathway can be conveyed and accommodated by the existing drainage inlets, piped system, and outfalls to the Southern drainage channel and historic irrigation canals as shown in Figure 1. The new sidewalk will be situated close to the edge of pavement and the existing swales will be maintained adjacent to the new sidewalk. The existing hydraulic capacity will be maintained to the maximum extent possible and will connect to the existing drainage facilities. There will be some loss in conveyance capacity on Kīlauea Road near Lokela Street with the construction of the sidewalks and elevated speed humps. Some ponding above the sidewalk is anticipated between Sta 103+00 and Sta 105+00. The approximate inundation depth within this area is estimated to be 2 to 3 inches above the sidewalk, for the 2-year recurrence interval.
In addition, the drainage systems within the proposed roundabouts are to be maintained. Surface connection to the existing drainage routes, with slotted curbs and sidewalk culverts will be used to provide positive drainage. The overall runoff patterns and existing storm drainage facilities remain consistent with existing conditions. A new catch basin and drain inlet structure will be constructed at the Keneke Street intersection, to capture roadway runoff and a drain inlet will be installed adjacent to the catch basin to collect surface flow behind the sidewalk. Additional catch basins and drywells have been proposed where runoff from the sidewalks is concentrated in a swale and the flow can be readily intercepted.
There is little to no existing drainage infrastructure north of the town area. New infrastructure including additional inlets and localized infiltration measures are proposed to collect surface flow and promote infiltration. Runoff from the pathway will be conveyed through grassed swales and new drainage inlets/catch basins with shallow drywells to provide storage and promote infiltration.
N
KĪLAUEA POINT NATIONAL WILDLIFE REFUGE
03/09/22
SOUTHERN
DRAINAGE
CHANNEL
IRRIGATION
CANAL
NORTHERN DRAINAGE
CHANNEL
FIGURE 2 - SOILS MAPPING
Project Location
FIGURE 3 - FIRM MAPPING
PROJECT
LOCATION
MODEL SCHEMATIC AND
SUBCATCHMENT RUNOFF
EXISTING CONDITIONS
APPENDIX A
MODEL SCHEMATIC
Figure A1
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
Figure A2
6+
5+
4+
3+
2+
1+
7+
8+
9+
0+
1+
2+
3+
Figure A3
3+
4+
5+
6+
7+
8+
0+
1+
2+
3+
4+
Figure A4
4+
5+
6+
7+
8+
0+
2+
3+
5+
6+
7+
8+
9+
Figure A5
0+
1+
9+
2+
3+
5+
7+
9+
162+00
161+00
160+00
Figure A6
7+
6+
5+
4+
3+
162+00
8+
9+
0+
1+
2+
3+
4+
Figure A7
5+
6+
7+
8+
9+
0+
1+
2+
3+
4+
5+
00 18 6+
Subcatchment Runoff Summary
Total Total Total Total Imperv Perv Total Total Peak
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Runoff
Subcatchment in in in in in in in 10^6 gal CFS Coeff
2 1.92 0.00 0.00 1.13 0.39 0.81 0.81 0.03 1.72 0.422
4 1.92 0.00 0.00 0.27 1.55 0.15 1.70 0.00 0.36 0.884
6 1.92 0.00 0.00 0.06 1.86 0.04 1.90 0.00 0.28 0.988
10 1.92 0.00 0.00 0.58 1.15 0.21 1.36 0.01 0.96 0.709
12 1.92 0.00 0.00 0.20 1.65 0.10 1.75 0.01 0.87 0.909
14 1.92 0.00 0.00 0.29 1.52 0.13 1.65 0.01 0.84 0.859
16 1.92 0.00 0.00 0.56 1.17 0.22 1.39 0.01 0.87 0.723
18 1.92 0.00 0.00 0.34 1.45 0.14 1.59 0.01 0.94 0.830
20 1.92 0.00 0.00 0.71 0.99 0.24 1.23 0.01 0.91 0.643
22 1.92 0.00 0.00 0.29 1.53 0.14 1.67 0.01 0.65 0.869
24 1.92 0.00 0.00 0.41 1.35 0.19 1.55 0.01 0.57 0.805
26 1.92 0.00 0.00 0.42 1.35 0.16 1.51 0.01 0.97 0.787
28 1.92 0.00 0.00 0.49 1.26 0.18 1.44 0.01 0.89 0.752
30 1.92 0.00 0.00 0.58 1.15 0.21 1.36 0.01 0.64 0.709
32 1.92 0.00 0.00 0.75 0.92 0.27 1.19 0.01 0.63 0.619
34 1.92 0.00 0.00 0.51 1.20 0.25 1.44 0.00 0.47 0.751
36 1.92 0.00 0.00 0.83 0.76 0.35 1.12 0.00 0.33 0.581
38 1.92 0.00 0.00 0.71 0.99 0.23 1.23 0.01 0.93 0.638
40 1.92 0.00 0.00 1.08 0.57 0.29 0.85 0.01 0.75 0.445
42 1.92 0.00 0.00 0.66 1.05 0.22 1.27 0.01 0.92 0.663
44 1.92 0.00 0.00 0.94 0.72 0.28 1.00 0.01 0.82 0.521
46 1.92 0.00 0.00 0.84 0.87 0.22 1.10 0.01 1.11 0.571
48 1.92 0.00 0.00 0.91 0.78 0.25 1.03 0.01 0.82 0.534
50 1.92 0.00 0.00 0.78 0.78 0.39 1.16 0.00 0.23 0.606
52 1.92 0.00 0.00 0.78 0.77 0.39 1.17 0.00 0.16 0.609
54 1.92 0.00 0.00 0.94 0.77 0.22 0.99 0.02 1.19 0.516
56 1.92 0.00 0.00 0.87 0.84 0.23 1.07 0.01 0.82 0.556
58 1.92 0.00 0.00 1.04 0.63 0.27 0.90 0.01 1.13 0.467
60 1.92 0.00 0.00 0.98 0.70 0.25 0.95 0.01 1.09 0.495
62 1.92 0.00 0.00 0.73 0.97 0.24 1.21 0.01 0.69 0.631
64 1.92 0.00 0.00 0.95 0.72 0.27 0.99 0.01 0.74 0.515
66 1.92 0.00 0.00 0.37 1.41 0.17 1.58 0.00 0.47 0.824
68 1.92 0.00 0.00 1.03 0.53 0.38 0.91 0.01 0.48 0.473
70 1.92 0.00 0.00 0.62 1.11 0.21 1.32 0.01 0.66 0.689
72 1.92 0.00 0.00 1.23 0.41 0.29 0.70 0.01 0.76 0.363
74 1.92 0.00 0.00 0.49 1.24 0.23 1.46 0.00 0.37 0.762
Existing Conditions, 2-Yr
76 1.92 0.00 0.00 1.11 0.41 0.41 0.82 0.00 0.41 0.428
78 1.92 0.00 0.00 0.61 1.03 0.30 1.34 0.00 0.18 0.697
80 1.92 0.00 0.00 0.96 0.54 0.44 0.98 0.00 0.25 0.513
82 1.92 0.00 0.00 0.57 1.17 0.20 1.37 0.01 0.68 0.713
84 1.92 0.00 0.00 0.97 0.67 0.31 0.97 0.01 0.76 0.506
86 1.92 0.00 0.00 0.53 1.21 0.20 1.41 0.01 0.69 0.733
88 1.92 0.00 0.00 1.04 0.63 0.27 0.90 0.01 0.64 0.468
90 1.92 0.00 0.00 0.28 1.52 0.16 1.68 0.01 1.40 0.877
92 1.92 0.00 0.00 1.32 0.39 0.61 0.61 0.10 3.53 0.319
94 1.92 0.00 0.00 1.18 0.49 0.27 0.75 0.10 7.80 0.393
96 1.92 0.00 0.00 0.99 0.48 0.47 0.95 0.01 1.46 0.494
98 1.92 0.00 0.00 1.12 0.49 0.32 0.81 0.06 5.01 0.423
100 1.92 0.00 0.00 1.11 0.49 0.34 0.83 0.05 4.47 0.432
102 1.92 0.00 0.00 1.15 0.49 0.29 0.78 0.18 14.85 0.406
104 1.92 0.00 0.00 1.42 0.49 0.02 0.51 0.07 7.44 0.267
106 1.92 0.00 0.00 1.80 0.10 0.03 0.13 0.04 4.81 0.066
108 1.92 0.00 0.00 1.50 0.10 0.32 0.42 0.05 2.46 0.219
110 1.92 0.00 0.00 1.79 0.10 0.04 0.13 0.03 3.32 0.069
112 1.92 0.00 0.00 1.40 0.10 0.43 0.53 0.06 2.64 0.274
114 1.92 0.00 0.00 1.38 0.02 0.53 0.55 0.05 2.06 0.287
116 1.92 0.00 0.00 1.55 0.00 0.38 0.38 0.12 4.19 0.197
118 1.92 0.00 0.00 1.40 0.04 0.49 0.53 0.07 2.93 0.274
120 1.92 0.00 0.00 1.65 0.02 0.25 0.27 0.19 6.69 0.141
122 1.92 0.00 0.00 1.84 0.00 0.08 0.08 0.01 1.01 0.043
144 1.92 0.00 0.00 0.33 1.47 0.16 1.63 0.00 0.57 0.850
146 1.92 0.00 0.00 0.66 1.00 0.30 1.29 0.00 0.45 0.674
160 1.92 0.00 0.00 1.46 0.00 0.46 0.46 0.09 3.08 0.241
166 1.92 0.00 0.00 0.45 1.27 0.23 1.50 0.01 0.83 0.783
168 1.92 0.00 0.00 0.36 1.41 0.19 1.60 0.00 0.39 0.833
170 1.92 0.00 0.00 0.57 1.09 0.30 1.39 0.00 0.25 0.723
172 1.92 0.00 0.00 0.40 1.35 0.21 1.56 0.00 0.38 0.812
174 1.92 0.00 0.00 0.66 0.95 0.33 1.29 0.00 0.26 0.670
86a 1.92 0.00 0.00 0.48 1.20 0.27 1.47 0.00 0.65 0.766
186 1.92 0.00 0.00 0.89 0.62 0.43 1.05 0.00 0.45 0.548
188 1.92 0.00 0.00 1.01 0.38 0.58 0.97 0.00 0.15 0.504
96a 1.92 0.00 0.00 1.02 0.48 0.43 0.92 0.01 1.15 0.477
Subcatchment in in in in in in in 10^6 gal CFS Coeff
Existing Conditions, 2-Yr
Subcatchment in in in in in in in 10^6 gal CFS Coeff
2 3.14 0.00 0.00 1.17 0.63 2.02 2.02 0.08 5.11 0.642
4 3.14 0.00 0.00 0.27 2.52 0.42 2.94 0.00 0.65 0.936
6 3.14 0.00 0.00 0.06 3.03 0.10 3.13 0.00 0.47 0.996
10 3.14 0.00 0.00 0.61 1.90 0.69 2.58 0.02 1.93 0.823
12 3.14 0.00 0.00 0.20 2.73 0.28 3.01 0.02 1.74 0.958
14 3.14 0.00 0.00 0.30 2.51 0.40 2.91 0.02 1.67 0.925
16 3.14 0.00 0.00 0.58 1.93 0.69 2.62 0.02 1.72 0.833
18 3.14 0.00 0.00 0.36 2.40 0.44 2.84 0.02 1.92 0.905
20 3.14 0.00 0.00 0.75 1.64 0.80 2.44 0.02 1.80 0.777
22 3.14 0.00 0.00 0.30 2.51 0.41 2.92 0.01 1.24 0.931
24 3.14 0.00 0.00 0.42 2.22 0.57 2.79 0.01 1.08 0.888
26 3.14 0.00 0.00 0.44 2.24 0.51 2.75 0.02 2.00 0.875
28 3.14 0.00 0.00 0.52 2.09 0.59 2.68 0.02 1.82 0.852
30 3.14 0.00 0.00 0.61 1.90 0.69 2.58 0.01 1.27 0.823
32 3.14 0.00 0.00 0.80 1.51 0.88 2.39 0.01 1.22 0.762
34 3.14 0.00 0.00 0.53 1.95 0.72 2.67 0.01 0.89 0.852
36 3.14 0.00 0.00 0.86 1.24 1.08 2.32 0.01 0.65 0.740
38 3.14 0.00 0.00 0.76 1.64 0.79 2.43 0.02 1.86 0.773
40 3.14 0.00 0.00 1.19 0.93 1.05 1.99 0.02 1.47 0.633
42 3.14 0.00 0.00 0.71 1.74 0.75 2.48 0.02 1.86 0.790
44 3.14 0.00 0.00 1.02 1.19 0.97 2.16 0.02 1.61 0.689
46 3.14 0.00 0.00 0.92 1.44 0.82 2.26 0.03 2.26 0.721
48 3.14 0.00 0.00 1.00 1.29 0.90 2.18 0.02 1.66 0.696
50 3.14 0.00 0.00 0.81 1.26 1.13 2.39 0.00 0.46 0.762
52 3.14 0.00 0.00 0.80 1.26 1.14 2.40 0.00 0.32 0.765
54 3.14 0.00 0.00 1.05 1.28 0.84 2.12 0.04 2.46 0.676
56 3.14 0.00 0.00 0.95 1.38 0.85 2.23 0.02 1.68 0.710
58 3.14 0.00 0.00 1.14 1.03 1.00 2.03 0.03 2.24 0.648
60 3.14 0.00 0.00 1.09 1.16 0.93 2.09 0.03 2.18 0.666
62 3.14 0.00 0.00 0.78 1.61 0.80 2.41 0.02 1.38 0.768
64 3.14 0.00 0.00 1.03 1.19 0.96 2.15 0.02 1.46 0.683
66 3.14 0.00 0.00 0.38 2.32 0.51 2.83 0.01 0.89 0.901
68 3.14 0.00 0.00 1.09 0.86 1.23 2.09 0.01 0.97 0.664
70 3.14 0.00 0.00 0.65 1.83 0.71 2.54 0.01 1.33 0.809
72 3.14 0.00 0.00 1.38 0.67 1.11 1.79 0.02 1.48 0.569
74 3.14 0.00 0.00 0.51 2.02 0.68 2.70 0.01 0.69 0.859
Existing Conditions, 10-Yr
74 3.14 0.00 0.00 0.51 2.02 0.68 2.70 0.01 0.69 0.859
76 3.14 0.00 0.00 1.18 0.67 1.33 2.00 0.01 0.85 0.636
78 3.14 0.00 0.00 0.63 1.68 0.89 2.57 0.00 0.35 0.818
80 3.14 0.00 0.00 0.99 0.88 1.32 2.20 0.01 0.55 0.701
82 3.14 0.00 0.00 0.60 1.93 0.66 2.59 0.01 1.37 0.826
84 3.14 0.00 0.00 1.04 1.09 1.05 2.14 0.02 1.47 0.682
86 3.14 0.00 0.00 0.56 1.99 0.64 2.64 0.01 1.38 0.839
88 3.14 0.00 0.00 1.14 1.03 1.01 2.04 0.02 1.27 0.649
90 3.14 0.00 0.00 0.28 2.47 0.44 2.92 0.02 2.45 0.929
92 3.14 0.00 0.00 1.42 0.64 1.75 1.75 0.29 10.23 0.556
94 3.14 0.00 0.00 1.32 0.80 1.04 1.85 0.24 15.40 0.588
96 3.14 0.00 0.00 1.03 0.79 1.38 2.17 0.03 3.26 0.690
98 3.14 0.00 0.00 1.22 0.80 1.15 1.95 0.14 9.81 0.621
100 3.14 0.00 0.00 1.19 0.80 1.18 1.98 0.12 8.78 0.630
102 3.14 0.00 0.00 1.28 0.80 1.09 1.89 0.43 29.10 0.602
104 3.14 0.00 0.00 1.72 0.80 0.64 1.44 0.21 14.97 0.459
106 3.14 0.00 0.00 2.21 0.16 0.78 0.94 0.31 10.85 0.299
108 3.14 0.00 0.00 1.70 0.16 1.29 1.45 0.19 5.91 0.462
110 3.14 0.00 0.00 2.15 0.16 0.84 1.00 0.22 7.93 0.319
112 3.14 0.00 0.00 1.51 0.16 1.49 1.65 0.18 7.09 0.525
114 3.14 0.00 0.00 1.46 0.03 1.69 1.72 0.15 7.52 0.548
116 3.14 0.00 0.00 1.72 0.00 1.44 1.44 0.44 14.85 0.457
118 3.14 0.00 0.00 1.49 0.06 1.61 1.67 0.24 10.28 0.533
120 3.14 0.00 0.00 1.96 0.03 1.15 1.19 0.81 24.54 0.378
122 3.14 0.00 0.00 2.00 0.00 1.16 1.16 0.20 7.51 0.370
144 3.14 0.00 0.00 0.34 2.41 0.47 2.88 0.01 1.06 0.918
146 3.14 0.00 0.00 0.68 1.63 0.89 2.52 0.01 0.85 0.802
160 3.14 0.00 0.00 1.57 0.00 1.59 1.59 0.30 11.89 0.505
166 3.14 0.00 0.00 0.47 2.07 0.67 2.74 0.01 1.54 0.873
168 3.14 0.00 0.00 0.37 2.30 0.54 2.84 0.01 0.71 0.905
170 3.14 0.00 0.00 0.58 1.77 0.85 2.63 0.00 0.47 0.836
172 3.14 0.00 0.00 0.41 2.20 0.59 2.80 0.01 0.69 0.891
174 3.14 0.00 0.00 0.68 1.55 0.97 2.52 0.00 0.51 0.802
86a 3.14 0.00 0.00 0.49 1.96 0.75 2.71 0.01 1.21 0.863
186 3.14 0.00 0.00 0.92 1.01 1.27 2.28 0.01 0.97 0.725
188 3.14 0.00 0.00 1.03 0.63 1.60 2.23 0.00 0.35 0.709
96a 3.14 0.00 0.00 1.07 0.79 1.32 2.11 0.03 2.47 0.674
Existing Conditions, 10-Yr
Subcatchment in in in in in in in 10^6 gal CFS Coeff
2 5.18 0.00 0.00 1.20 1.04 4.07 4.07 0.17 11.43 0.787
4 5.18 0.00 0.00 0.28 4.14 0.86 5.00 0.01 1.13 0.965
6 5.18 0.00 0.00 0.06 4.97 0.20 5.17 0.01 0.78 0.999
10 5.18 0.00 0.00 0.64 3.14 1.52 4.66 0.04 3.71 0.899
12 5.18 0.00 0.00 0.21 4.52 0.60 5.12 0.03 3.29 0.988
14 5.18 0.00 0.00 0.31 4.15 0.86 5.01 0.03 3.17 0.967
16 5.18 0.00 0.00 0.60 3.19 1.50 4.69 0.03 3.27 0.905
18 5.18 0.00 0.00 0.37 3.99 0.95 4.94 0.03 3.73 0.954
20 5.18 0.00 0.00 0.78 2.71 1.78 4.50 0.04 3.46 0.868
22 5.18 0.00 0.00 0.30 4.14 0.88 5.01 0.02 2.25 0.968
24 5.18 0.00 0.00 0.43 3.65 1.22 4.87 0.02 1.98 0.940
26 5.18 0.00 0.00 0.46 3.72 1.12 4.84 0.04 3.95 0.934
28 5.18 0.00 0.00 0.54 3.46 1.30 4.76 0.03 3.54 0.919
30 5.18 0.00 0.00 0.64 3.14 1.52 4.66 0.02 2.44 0.899
32 5.18 0.00 0.00 0.83 2.49 1.95 4.44 0.02 2.32 0.858
34 5.18 0.00 0.00 0.54 3.20 1.54 4.74 0.01 1.62 0.916
36 5.18 0.00 0.00 0.89 2.04 2.34 4.38 0.01 1.26 0.846
38 5.18 0.00 0.00 0.80 2.71 1.77 4.48 0.04 3.59 0.865
40 5.18 0.00 0.00 1.25 1.54 2.45 3.99 0.04 2.84 0.770
42 5.18 0.00 0.00 0.74 2.87 1.67 4.54 0.04 3.60 0.877
44 5.18 0.00 0.00 1.06 1.96 2.23 4.19 0.04 3.09 0.809
46 5.18 0.00 0.00 0.97 2.39 1.90 4.30 0.06 4.45 0.830
48 5.18 0.00 0.00 1.05 2.13 2.08 4.21 0.04 3.22 0.813
50 5.18 0.00 0.00 0.82 2.08 2.39 4.47 0.01 0.90 0.863
52 5.18 0.00 0.00 0.82 2.08 2.40 4.48 0.00 0.62 0.865
54 5.18 0.00 0.00 1.12 2.13 2.01 4.14 0.07 4.88 0.799
56 5.18 0.00 0.00 1.00 2.29 1.97 4.26 0.04 3.28 0.823
58 5.18 0.00 0.00 1.20 1.70 2.34 4.04 0.06 4.31 0.780
60 5.18 0.00 0.00 1.15 1.91 2.19 4.10 0.06 4.24 0.792
62 5.18 0.00 0.00 0.81 2.66 1.81 4.46 0.03 2.67 0.862
64 5.18 0.00 0.00 1.09 1.96 2.20 4.17 0.04 2.82 0.805
66 5.18 0.00 0.00 0.39 3.82 1.10 4.92 0.01 1.65 0.949
68 5.18 0.00 0.00 1.13 1.41 2.71 4.12 0.02 1.95 0.795
70 5.18 0.00 0.00 0.68 3.03 1.58 4.61 0.03 2.56 0.890
72 5.18 0.00 0.00 1.47 1.11 2.65 3.76 0.05 2.88 0.726
74 5.18 0.00 0.00 0.52 3.32 1.45 4.77 0.01 1.27 0.921
Existing Conditions, 100-Yr
76 5.18 0.00 0.00 1.22 1.09 2.93 4.03 0.02 1.79 0.778
78 5.18 0.00 0.00 0.64 2.77 1.87 4.64 0.01 0.64 0.896
80 5.18 0.00 0.00 1.02 1.46 2.82 4.27 0.01 1.14 0.825
82 5.18 0.00 0.00 0.63 3.19 1.47 4.67 0.03 2.65 0.901
84 5.18 0.00 0.00 1.08 1.80 2.37 4.17 0.04 2.83 0.804
86 5.18 0.00 0.00 0.58 3.30 1.42 4.71 0.03 2.65 0.910
88 5.18 0.00 0.00 1.20 1.70 2.35 4.04 0.03 2.44 0.781
90 5.18 0.00 0.00 0.28 4.07 0.90 4.97 0.03 4.18 0.959
92 5.18 0.00 0.00 1.49 1.05 3.74 3.74 0.62 24.36 0.722
94 5.18 0.00 0.00 1.41 1.33 2.50 3.82 0.49 29.81 0.738
96 5.18 0.00 0.00 1.05 1.30 2.95 4.24 0.06 6.83 0.819
98 5.18 0.00 0.00 1.28 1.32 2.64 3.95 0.28 19.17 0.763
100 5.18 0.00 0.00 1.25 1.31 2.67 3.99 0.25 17.29 0.770
102 5.18 0.00 0.00 1.35 1.32 2.56 3.88 0.89 56.38 0.749
104 5.18 0.00 0.00 1.86 1.33 2.04 3.36 0.49 29.46 0.650
106 5.18 0.00 0.00 2.40 0.26 2.54 2.80 0.91 26.96 0.540
108 5.18 0.00 0.00 1.82 0.26 3.13 3.39 0.44 14.84 0.654
110 5.18 0.00 0.00 2.31 0.26 2.64 2.90 0.64 19.77 0.559
112 5.18 0.00 0.00 1.58 0.26 3.39 3.65 0.39 17.59 0.704
114 5.18 0.00 0.00 1.50 0.05 3.71 3.76 0.33 19.87 0.725
116 5.18 0.00 0.00 1.82 0.00 3.39 3.39 1.05 38.13 0.655
118 5.18 0.00 0.00 1.55 0.10 3.59 3.69 0.52 26.41 0.713
120 5.18 0.00 0.00 2.15 0.05 2.99 3.04 2.08 60.98 0.587
122 5.18 0.00 0.00 2.07 0.00 3.17 3.17 0.54 25.77 0.612
144 5.18 0.00 0.00 0.34 3.97 1.00 4.96 0.01 1.92 0.958
146 5.18 0.00 0.00 0.70 2.68 1.91 4.58 0.01 1.60 0.884
160 5.18 0.00 0.00 1.64 0.00 3.59 3.59 0.69 31.29 0.693
166 5.18 0.00 0.00 0.47 3.41 1.40 4.81 0.02 2.77 0.929
168 5.18 0.00 0.00 0.38 3.78 1.13 4.91 0.01 1.26 0.948
170 5.18 0.00 0.00 0.59 2.92 1.78 4.70 0.01 0.86 0.907
172 5.18 0.00 0.00 0.42 3.62 1.25 4.87 0.01 1.24 0.940
174 5.18 0.00 0.00 0.69 2.55 2.04 4.59 0.01 0.96 0.886
86a 5.18 0.00 0.00 0.50 3.23 1.55 4.78 0.02 2.15 0.922
186 5.18 0.00 0.00 0.94 1.66 2.69 4.36 0.02 1.95 0.841
188 5.18 0.00 0.00 1.04 1.04 3.27 4.31 0.00 0.67 0.831
96a 5.18 0.00 0.00 1.10 1.30 2.87 4.17 0.05 5.14 0.805
Existing Conditions, 100-Yr
MODEL SCHEMATIC AND
SUBCATCHMENT RUNOFF
PROPOSED CONDITIONS
APPENDIX B
Figure B1
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
Figure B2
6+
5+
4+
3+
2+
1+
7+
8+
9+
0+
1+
2+
Figure B3
4+
5+
6+
7+
0+
1+
2+
3+
4+
5+
8+
Figure B4
5+
6+
7+
8+
9+
0+
2+
3+
4+
5+
7+
8+
9+
Figure B5
9+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
160+00
161+00
Figure B6
162+…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .