Questions and Answers 6982AF25Q000006 .pdf

PDF 143 KB Posted

Attached to
GEOTECHNICAL DRILLING – CA FLAP ALP 4(1) HOT SPRINGS ROAD
Solicitation number
6982AF25Q000006
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a geotechnical drilling federal contract opportunity issued by the Department of Transportation Federal Highway Administration. The Q&A addresses four key contractor inquiries related to the 6982AF25Q000006 solicitation for geotechnical drilling at CA FLAP ALP 4(1) Hot Springs Road. Specific clarifications include requirements for traffic control (must be overseen by a certified traffic control supervisor per MUTCD standards), borehole backfill procedures (must comply with applicable regulations), acceptable borehole capping materials (cold patch is permitted), and compliance statement requirements for FAR 52.212-5 (statements only required under specific award conditions).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6982AF25Q000006

GEOTECHNICAL DRILLING – CA FLAP ALP 4(1) HOT SPRINGS ROAD

Questions and Answers April 9, 2025

Question Answers Received: April 7, 2025

1. Traffic Control: we usually do traffic control for our jobs. We are not certified traffic controller. Can we do the traffic control, or you would want a sub to do the traffic control?

Traffic control should be overseen by a certified traffic control supervisor and be performed according to MUTCD standards.

2. Insufficient cuttings to backfill the hole: can we use sand?

Backfill borings in accordance with applicable regulations.

3. Capping Borehole 2: can we use cold patch or pre mixed concrete?

Cold patch is acceptable

4. FAR 52.212-5, Section d on page 26: do we need a statement that we will comply with sections d? (Related to sealed bid, >$250K, 52.215-2)

A statement will only be required prior to award and only if the award exceeds the simplified acquisition threshold and/or when there is not adequate price competition.