This document is a set of Questions and Answers related to the federal contract opportunity for the CA ERFO FS SNBER 2023-3(1) Santa Ana Road, Geotechnical Drilling project. The scope of work consists of geotechnical borings associated with the design and construction of the Santa Ana Road project, to be awarded by the Federal Highway Administration.

Key details include:

  • This is a service requirement subject to the Service Contract Act Wage Determinations, not a construction project, so an engineer's estimate will not be provided.
  • Shallow groundwater is expected at 5-15 feet depth in the borings near the Santa Ana River. No restrooms are onsite, so portable restrooms may be required.
  • Weekend work is allowed if necessary, and equipment/materials may be stored onsite. This is for geotechnical drilling, not a new well, so there are no diameter or casing requirements.
  • No permits, liquidated damages, bid bonds, or performance/payment bonds are required, as this is a service contract.
  • The anticipated start date is between November 2024 and January 2025, with work to be completed by the end of January 2025. Award will be made to the lowest priced technically acceptable offeror.

View the file

Other files

File Type Posted
Request for Quote 6982AF25Q000002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6982AF25Q000002

CA ERFO FS SNBER 2023-3(1) Santa Ana Road, Geotechnical Drilling

Question Answer

1. What is the Engineer’s Estimate? The Engineer’s Estimate is not releasable document. This requirement is NOT a construction project, this is a service requirement and subject to the Service Contract Act Wage Determinations, an estimated range will not be given.

2. If known what is the current depth to water?

Borings BH24-01 through BH24-06 are near the Santa Ana River. Shallow groundwater should be expected in these borings (likely 5- 15 feet in depth)

3. Are restrooms available onsite or should we provide a portable restroom?

No restrooms are onsite. Please add a line item for portable restrooms if desired.

4. Are there any work restrictions? No, there are no restrictions.

5. Is weekend work possible? Weekend work is allowed if necessary.

6. Can equipment and materials be placed onsite for the duration of this project?

Equipment and materials may be placed onsite for the duration of the requirement.

7. What is the casing diameter for the new well?

This is NOT a requirement for a new well.

This is for Geotechnical drilling for boring samples. There are no diameter requirements for the proposed geotechnical borings. 7.625 in – 9.625 in, is generally typical for an exploratory boring.

8. What is the diameter for the new well? See the answer for question number 7.

9. What is the required Contractor’s License type?

The License type is what is required by the State of California for the type of work being accomplished.

10. Does the Contractor obtain and pay for the permits?

Permits are not required for this requirement.

11. What are the liquidated damages? This is a Service requirement not a Construction requirement. Liquidated damages are not included in the terms and conditions.

12. Is a Bidders Bond required? No, a Bidders Bond is not required since this is not a construction project.

13. Are Performance and/or Payment Bonds required?

No, Performance and Payment Bonds are not required since this is not a construction project.

14. What is the start date? The start date will be coordinated between the FHWA Contracting Officer, Contracting Officer Representative, and the drilling contractor based on availability. FHWA

6982AF25Q000002

CA ERFO FS SNBER 2023-3(1) Santa Ana Road, Geotechnical Drilling anticipates a start date between November 2024 and January 2025.

15. What is the time for completion? Work will need to be completed by the end of January 2025.

16. If there were only one (1) bidder for this project, would they still be awarded if the estimate were within the Engineers’ Estimate.

Evaluation of Quotations: The Government will evaluate quotes and make lowest price technically acceptable award. A verification of past performance will be completed.