6982AF25B000024 Cedar Tree BidTabulationReport.pdf

PDF 811 KB Posted

Attached to
CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking
Solicitation number
6982AF25B000024
Issued by

About this file

This is a Bid Tabulation Report for the Cedar Tree Tower Road and Parking project (Project No. CO NP MEVE 201(1)) located in Mesa Verde National Park, Montezuma County, Colorado. The solicitation (No. 6982AF25B000024) was opened on 11/13/2025 in Lakewood, CO by the Central Federal Lands division. Three contractors submitted bids: Steve Manning Construction Inc ($8,629,072.00), Central Southern Construction Corp. ($7,526,876.80), and TNT General Contractors ($7,515,564.25), all significantly lower than the engineer's base estimate of $5,482,000.00.

The bid includes both a base schedule and an optional schedule, with total bid amounts for the base plus option ranging from $8,277,106.35 to $9,390,152.00 across the three contractors. The project involves various construction activities including mobilization, surveying, road and parking area construction, asphalt paving, culvert work, masonry, traffic control, and environmental restoration. The bid tabulation details unit prices for numerous line items across categories such as labor, equipment, materials, and specialized services like tribal monitoring and archaeological services. The report was generated on 11/18/2025 by Denise Martinez, a contract specialist, though no contract award date was specified in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND PARKING

Contractor Responsive? Base Schedule A Steve Manning Construction Inc $8,629,072.00 Central Southern Construction Corp. $7,526,876.80

TNT General Contractors $7,515,564.25 Engineer's Estimate $5,482,000.00

Contractor Responsive? Total Base Schedule A and Option(s): X Steve Manning Construction Inc $9,390,152.00 Central Southern Construction Corp. $8,980,757.40

TNT General Contractors $8,277,106.35 Engineer's Estimate $5,770,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

Contractor Responsive? Option: X Steve Manning Construction Inc $761,080.00 Central Southern Construction Corp. $1,453,880.60

TNT General Contractors $761,542.10 Engineer's Estimate $288,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER

ROAD AND PARKING

Division: Central Federal Lands

Schedule: A Schedule Type: Base Lead Designer:

Solicitation No. : 6982AF25B000024 Opened at: Lakewood, CO Opened by: Jorey Deml State: CO County: Montezuma Federal Land: Mesa Verde National

Park Bid Open Date and Time: 11/13/2025

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Steve Manning Construction Inc, 5211 Churn Creek Road, Redding, CA, 96002

$8,629,072.00

Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$7,526,876.80

TNT General Contractors, 1358 N 200 W, Nephi, UT, 84648

$7,515,564.25

Engineer's Estimate $5,482,000.00

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND

PARKING

Schedule: A Schedule Type: Base

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0010 15101-0000 MOBILIZATION Central Southern Construction Corp. $1,065,000.00

TNT General Contractors $975,300.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

11/18/2025

Contract Specialist

A0010 15101-0000 MOBILIZATION Steve Manning Construction Inc $750,000.00

Engineer's Estimate ALL LPSM LPSM $1,052,043.80

A0020 15210-3000 CENTERLINE,

VERIFICATION AND

STAKING

Steve Manning Construction Inc 4.984 $11,000.00 $54,824.00

TNT General Contractors 4.984 $8,500.00 $42,364.00

Central Southern Construction Corp. 4.984 $5,200.00 $25,916.80

Engineer's Estimate 4.984 MILE $4,300.00 $21,431.20

A0030 15214-2000 SURVEY AND

STAKING,

RETAINING WALL

Central Southern Construction Corp. $15,600.00

Steve Manning Construction Inc $12,000.00

TNT General Contractors $3,360.00

Engineer's Estimate ALL LPSM LPSM $40,000.00

A0040 15215-1000 SURVEY AND

STAKING,

APPROACH ROAD

Central Southern Construction Corp. 3.000 $10,000.00 $30,000.00

TNT General Contractors 3.000 $3,360.00 $10,080.00

Steve Manning Construction Inc 3.000 $2,500.00 $7,500.00

Engineer's Estimate 3.000 EACH $1,500.00 $4,500.00

A0050 15215-3000 SURVEY AND

STAKING,

DRAINAGE

STRUCTURE

Steve Manning Construction Inc 9.000 $3,480.00 $31,320.00

TNT General Contractors 9.000 $3,360.00 $30,240.00

Central Southern Construction Corp. 9.000 $2,500.00 $22,500.00

Engineer's Estimate 9.000 EACH $1,400.00 $12,600.00

A0060 15215-7000 SURVEY AND

STAKING, PARKING

AREA

Steve Manning Construction Inc 4.000 $6,250.00 $25,000.00

Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00

TNT General Contractors 4.000 $3,360.00 $13,440.00

Engineer's Estimate 4.000 EACH $4,600.00 $18,400.00

A0070 15225-0000 SLOPE, REFERENCE,

AND CLEARING

AND GRUBBING

CONTROL

Steve Manning Construction Inc 0.550 $20,460.00 $11,253.00

Central Southern Construction Corp. 0.550 $10,000.00 $5,500.00

TNT General Contractors 0.550 $6,600.00 $3,630.00

Engineer's Estimate 0.550 MILE $15,000.00 $8,250.00

A0080 15236-2000 SURVEY CONTROL,

GRADE FINISHING

Steve Manning Construction Inc 1.100 $17,000.00 $18,700.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0080 15236-2000 SURVEY CONTROL,

GRADE FINISHING

TNT General Contractors 1.100 $6,600.00 $7,260.00

Central Southern Construction Corp. 1.100 $6,500.00 $7,150.00

Engineer's Estimate 1.100 MILE $7,600.00 $8,360.00

A0090 15301-0000 CONTRACTOR

QUALITY CONTROL

TNT General Contractors $757,375.00

Central Southern Construction Corp. $410,000.00

Steve Manning Construction Inc $216,000.00

Engineer's Estimate ALL LPSM LPSM $150,000.00

A0100 15401-0000 CONTRACTOR

TESTING

TNT General Contractors $757,375.00

Central Southern Construction Corp. $750,000.00

Steve Manning Construction Inc $240,000.00

Engineer's Estimate ALL LPSM LPSM $150,000.00

A0110 15501-0000 CONSTRUCTION

SCHEDULE

Central Southern Construction Corp. $60,000.00

Steve Manning Construction Inc $20,000.00

TNT General Contractors $2,500.00

Engineer's Estimate ALL LPSM LPSM $10,000.00

A0120 15701-0000 SOIL EROSION

CONTROL

Central Southern Construction Corp. $175,000.00

Steve Manning Construction Inc $110,000.00

TNT General Contractors $66,140.00

Engineer's Estimate ALL LPSM LPSM $240,000.00

A0130 15802-0000 WATERING FOR

DUST CONTROL

TNT General Contractors $180,000.00

Central Southern Construction Corp. $100,000.00

Steve Manning Construction Inc $70,000.00

Engineer's Estimate ALL LPSM LPSM $65,000.00

A0140 20101-0000 CLEARING AND

GRUBBING

Central Southern Construction Corp. 2.000 $37,500.00 $75,000.00

Steve Manning Construction Inc 2.000 $27,000.00 $54,000.00

TNT General Contractors 2.000 $6,592.00 $13,184.00

Engineer's Estimate 2.000 ACRE $4,800.00 $9,600.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0150 20301-1100 REMOVAL OF GATE TNT General Contractors 2.000 $2,525.00 $5,050.00

Central Southern Construction Corp. 2.000 $2,000.00 $4,000.00

Steve Manning Construction Inc 2.000 $1,500.00 $3,000.00

Engineer's Estimate 2.000 EACH $3,000.00 $6,000.00

A0160 20301-1900 REMOVAL OF PIPE

CULVERT

TNT General Contractors 5.000 $4,800.00 $24,000.00

Central Southern Construction Corp. 5.000 $3,000.00 $15,000.00

Steve Manning Construction Inc 5.000 $2,500.00 $12,500.00

Engineer's Estimate 5.000 EACH $3,200.00 $16,000.00 A0170 20301-2400 REMOVAL OF SIGN TNT General

Contractors 24.000 $350.00 $8,400.00

Steve Manning Construction Inc 24.000 $250.00 $6,000.00

Central Southern Construction Corp. 24.000 $100.00 $2,400.00

Engineer's Estimate 24.000 EACH $190.00 $4,560.00

A0180 20301-2800 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

Steve Manning Construction Inc 6.000 $4,000.00 $24,000.00

Central Southern Construction Corp. 6.000 $3,300.00 $19,800.00

TNT General Contractors 6.000 $1,200.00 $7,200.00

Engineer's Estimate 6.000 EACH $5,000.00 $30,000.00

A0190 20302-0300 REMOVAL OF CURB

AND GUTTER,

CONCRETE

Steve Manning Construction Inc 400.000 $42.00 $16,800.00

TNT General Contractors 400.000 $26.00 $10,400.00

Central Southern Construction Corp. 400.000 $20.00 $8,000.00

Engineer's Estimate 400.000 LNFT $30.00 $12,000.00

A0200 20302-0700 REMOVAL OF

FENCE

Steve Manning Construction Inc 170.000 $40.00 $6,800.00

Central Southern Construction Corp. 170.000 $10.00 $1,700.00

TNT General Contractors 170.000 $8.25 $1,402.50

Engineer's Estimate 170.000 LNFT $40.00 $6,800.00

A0210 20303-0300 REMOVAL OF

CONCRETE

Steve Manning Construction Inc 200.000 $82.00 $16,400.00

TNT General Contractors 200.000 $35.00 $7,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0210 20303-0300 REMOVAL OF

CONCRETE

Central Southern Construction Corp. 200.000 $25.00 $5,000.00

Engineer's Estimate 200.000 SQYD $50.00 $10,000.00

A0220 20303-3200 REMOVAL OF

SIDEWALK,

CONCRETE

Steve Manning Construction Inc 210.000 $82.00 $17,220.00

TNT General Contractors 210.000 $35.00 $7,350.00

Central Southern Construction Corp. 210.000 $25.00 $5,250.00

Engineer's Estimate 210.000 SQYD $100.00 $21,000.00 A0230 20402-0000 SUBEXCAVATION Steve Manning

Construction Inc 200.000 $837.00 $167,400.00

Central Southern Construction Corp. 200.000 $80.00 $16,000.00

TNT General Contractors 200.000 $4.25 $850.00

Engineer's Estimate 200.000 CUYD $100.00 $20,000.00

A0240 20420-0000 EMBANKMENT

CONSTRUCTION

Steve Manning Construction Inc 1,000.000 $684.00 $684,000.00

Central Southern Construction Corp. 1,000.000 $50.00 $50,000.00

TNT General Contractors 1,000.000 $4.25 $4,250.00

Engineer's Estimate 1,000.000 CUYD $100.00 $100,000.00

A0250 20425-1000 DITCH,

EXCAVATION

Steve Manning Construction Inc 60.000 $135.00 $8,100.00

Central Southern Construction Corp. 60.000 $100.00 $6,000.00

TNT General Contractors 60.000 $25.00 $1,500.00

Engineer's Estimate 60.000 LNFT $35.00 $2,100.00

A0260 20801-0000 STRUCTURE

EXCAVATION

Steve Manning Construction Inc 38.000 $700.00 $26,600.00

Central Southern Construction Corp. 38.000 $150.00 $5,700.00

TNT General Contractors 38.000 $125.00 $4,750.00

Engineer's Estimate 38.000 CUYD $100.00 $3,800.00

A0270 20803-0000 STRUCTURAL

BACKFILL

Steve Manning Construction Inc 38.000 $700.00 $26,600.00

Central Southern Construction Corp. 38.000 $120.00 $4,560.00

TNT General Contractors 38.000 $65.00 $2,470.00

Engineer's Estimate 38.000 CUYD $200.00 $7,600.00 A0280 25402-1000 LAGGING, TIMBER Steve Manning

Construction Inc 380.000 $910.00 $345,800.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0280 25402-1000 LAGGING, TIMBER TNT General Contractors 380.000 $285.00 $108,300.00

Central Southern Construction Corp. 380.000 $200.00 $76,000.00

Engineer's Estimate 380.000 SQFT $215.00 $81,700.00

A0290 30202-2000 ROADWAY

AGGREGATE,

METHOD 2

Steve Manning Construction Inc 1,200.000 $120.00 $144,000.00

Central Southern Construction Corp. 1,200.000 $80.00 $96,000.00

TNT General Contractors 1,200.000 $61.50 $73,800.00

Engineer's Estimate 1,200.000 TON $80.00 $96,000.00

A0300 30402-5200 FULL DEPTH

RECLAMATION,

METHOD 2, 4-INCH

DEPTH

Central Southern Construction Corp. 10,000.000 $15.00 $150,000.00

Steve Manning Construction Inc 10,000.000 $15.00 $150,000.00

TNT General Contractors 10,000.000 $0.46 $4,600.00

Engineer's Estimate 10,000.000 SQYD $3.00 $30,000.00

A0310 30402-5300 FULL DEPTH

RECLAMATION,

METHOD 2, 6-INCH

DEPTH

Central Southern Construction Corp. 14,000.000 $20.00 $280,000.00

Steve Manning Construction Inc 14,000.000 $17.00 $238,000.00

TNT General Contractors 14,000.000 $0.52 $7,280.00

Engineer's Estimate 14,000.000 SQYD $4.00 $56,000.00

A0320 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

Steve Manning Construction Inc 4,700.000 $298.00 $1,400,600.00

Central Southern Construction Corp. 4,700.000 $250.00 $1,175,000.00

TNT General Contractors 4,700.000 $220.00 $1,034,000.00

Engineer's Estimate 4,700.000 TON $200.00 $940,000.00 A0330 40601-0000 FOG SEAL Central Southern

Construction Corp. 50.000 $2,000.00 $100,000.00

Steve Manning Construction Inc 50.000 $2,000.00 $100,000.00

TNT General Contractors 50.000 $875.00 $43,750.00

Engineer's Estimate 50.000 TON $1,000.00 $50,000.00 A0340 40605-0000 BLOTTER Central Southern

Construction Corp. 200.000 $200.00 $40,000.00

TNT General Contractors 200.000 $180.00 $36,000.00

Steve Manning Construction Inc 200.000 $50.00 $10,000.00

Engineer's Estimate 200.000 TON $50.00 $10,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0350 40702-0200 CHIP SEAL, TYPE 1B Central Southern Construction Corp. 58,500.000 $6.00 $351,000.00

Steve Manning Construction Inc 58,500.000 $5.00 $292,500.00

TNT General Contractors 58,500.000 $3.10 $181,350.00

Engineer's Estimate 58,500.000 SQYD $5.00 $292,500.00

A0360 40711-0000 EMULSIFIED

ASPHALT

Steve Manning Construction Inc 110.000 $2,800.00 $308,000.00

TNT General Contractors 110.000 $1,325.00 $145,750.00

Central Southern Construction Corp. 110.000 $1,000.00 $110,000.00

Engineer's Estimate 110.000 TON $1,100.00 $121,000.00

A0370 41102-1000 PRIME COAT,

METHOD 1

Central Southern Construction Corp. 24,000.000 $5.00 $120,000.00

TNT General Contractors 24,000.000 $4.50 $108,000.00

Steve Manning Construction Inc 24,000.000 $3.90 $93,600.00

Engineer's Estimate 24,000.000 SQYD $1.50 $36,000.00 A0380 41201-0000 TACK COAT Steve Manning

Construction Inc 11.000 $2,800.00 $30,800.00

TNT General Contractors 11.000 $1,750.00 $19,250.00

Central Southern Construction Corp. 11.000 $1,500.00 $16,500.00

Engineer's Estimate 11.000 TON $1,200.00 $13,200.00

A0390 41402-2000 CRACKS, CLEANING

AND SEALING

Steve Manning Construction Inc 5.000 $20,000.00 $100,000.00

TNT General Contractors 5.000 $11,000.00 $55,000.00

Central Southern Construction Corp. 5.000 $10,000.00 $50,000.00

Engineer's Estimate 5.000 MILE $14,000.00 $70,000.00

A0400 41801-1000 ASPHALT

CONCRETE

PAVEMENT PATCH,

TYPE 1

TNT General Contractors 750.000 $580.00 $435,000.00

Steve Manning Construction Inc 750.000 $420.00 $315,000.00

Central Southern Construction Corp. 750.000 $100.00 $75,000.00

Engineer's Estimate 750.000 SQYD $200.00 $150,000.00

A0410 41801-2000 ASPHALT

CONCRETE

PAVEMENT PATCH,

TYPE 2

TNT General Contractors 250.000 $580.00 $145,000.00

Steve Manning Construction Inc 250.000 $420.00 $105,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0410 41801-2000 ASPHALT

CONCRETE

PAVEMENT PATCH,

TYPE 2

Central Southern Construction Corp. 250.000 $120.00 $30,000.00

Engineer's Estimate 250.000 SQYD $330.00 $82,500.00

A0420 50101-0800 MINOR CONCRETE

PAVEMENT,

REINFORCED, 8-

INCH DEPTH

Steve Manning Construction Inc 400.000 $500.00 $200,000.00

TNT General Contractors 400.000 $217.00 $86,800.00

Central Southern Construction Corp. 400.000 $160.00 $64,000.00

Engineer's Estimate 400.000 SQYD $220.00 $88,000.00

A0430 55201-0600 STRUCTURAL

CONCRETE, CLASS

C (AE)

Steve Manning Construction Inc 3.000 $12,000.00 $36,000.00

Central Southern Construction Corp. 3.000 $2,000.00 $6,000.00

TNT General Contractors 3.000 $775.00 $2,325.00

Engineer's Estimate 3.000 CUYD $4,000.00 $12,000.00

A0440 55401-1000 REINFORCING

STEEL

Steve Manning Construction Inc 40.000 $500.00 $20,000.00

TNT General Contractors 40.000 $500.00 $20,000.00

Central Southern Construction Corp. 40.000 $15.00 $600.00

Engineer's Estimate 40.000 LB $10.00 $400.00

A0450 55502-0000 STRUCTURAL

STEEL, PROVIDED,

FABRICATED, AND

ERECTED

Steve Manning Construction Inc 12,219.000 $25.00 $305,475.00

Central Southern Construction Corp. 12,219.000 $15.00 $183,285.00

TNT General Contractors 12,219.000 $10.25 $125,244.75

Engineer's Estimate 12,219.000 LB $15.00 $183,285.00

A0460 60201-0600 18-INCH PIPE

CULVERT

Steve Manning Construction Inc 110.000 $440.00 $48,400.00

Central Southern Construction Corp. 110.000 $320.00 $35,200.00

TNT General Contractors 110.000 $155.00 $17,050.00

Engineer's Estimate 110.000 LNFT $180.00 $19,800.00

A0470 60201-0800 24-INCH PIPE

CULVERT

Steve Manning Construction Inc 160.000 $510.00 $81,600.00

Central Southern Construction Corp. 160.000 $400.00 $64,000.00

TNT General Contractors 160.000 $198.00 $31,680.00

Engineer's Estimate 160.000 LNFT $320.00 $51,200.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0480 60210-0600 END SECTION FOR

18-INCH PIPE

CULVERT

Central Southern Construction Corp. 2.000 $2,000.00 $4,000.00

Steve Manning Construction Inc 2.000 $2,000.00 $4,000.00

TNT General Contractors 2.000 $1,165.00 $2,330.00

Engineer's Estimate 2.000 EACH $2,100.00 $4,200.00

A0490 60210-0800 END SECTION FOR

24-INCH PIPE

CULVERT

Central Southern Construction Corp. 6.000 $2,500.00 $15,000.00

Steve Manning Construction Inc 6.000 $2,400.00 $14,400.00

TNT General Contractors 6.000 $1,445.00 $8,670.00

Engineer's Estimate 6.000 EACH $1,325.00 $7,950.00

A0500 60405-0000 MANHOLE

ADJUSTMENT

Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00

Central Southern Construction Corp. 1.000 $2,500.00 $2,500.00

TNT General Contractors 1.000 $1,955.00 $1,955.00

Engineer's Estimate 1.000 EACH $1,500.00 $1,500.00

A0510 60504-0000 GEOCOMPOSITE

SHEET DRAIN

SYSTEM

Steve Manning Construction Inc 13.000 $240.00 $3,120.00

Central Southern Construction Corp. 13.000 $200.00 $2,600.00

TNT General Contractors 13.000 $57.00 $741.00

Engineer's Estimate 13.000 SQYD $100.00 $1,300.00

A0520 60704-0000 CLEANING

CULVERT IN PLACE

Central Southern Construction Corp. 8.000 $5,000.00 $40,000.00

TNT General Contractors 8.000 $3,560.00 $28,480.00

Steve Manning Construction Inc 8.000 $2,400.00 $19,200.00

Engineer's Estimate 8.000 EACH $2,550.00 $20,400.00

A0530 60707-0300 LINING 18-INCH

PIPE CULVERT

TNT General Contractors 225.000 $325.00 $73,125.00

Steve Manning Construction Inc 225.000 $300.00 $67,500.00

Central Southern Construction Corp. 225.000 $180.00 $40,500.00

Engineer's Estimate 225.000 LNFT $300.00 $67,500.00

A0540 60902-1000 CURB AND

GUTTER,

CONCRETE, 12-

INCH DEPTH

Central Southern Construction Corp. 1,000.000 $75.00 $75,000.00

Steve Manning Construction Inc 1,000.000 $60.00 $60,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0540 60902-1000 CURB AND

GUTTER,

CONCRETE, 12-

INCH DEPTH

TNT General Contractors 1,000.000 $35.00 $35,000.00

Engineer's Estimate 1,000.000 LNFT $70.00 $70,000.00

A0550 60902-1700 CURB AND

GUTTER,

CONCRETE, 18-

INCH DEPTH

Central Southern Construction Corp. 2,000.000 $90.00 $180,000.00

Steve Manning Construction Inc 2,000.000 $80.00 $160,000.00

TNT General Contractors 2,000.000 $42.00 $84,000.00

Engineer's Estimate 2,000.000 LNFT $120.00 $240,000.00

A0560 60906-1000 GUTTER,

CONCRETE

Steve Manning Construction Inc 70.000 $350.00 $24,500.00

Central Southern Construction Corp. 70.000 $150.00 $10,500.00

TNT General Contractors 70.000 $28.00 $1,960.00

Engineer's Estimate 70.000 SQYD $350.00 $24,500.00

A0570 61001-0200 SIDEWALK,

COLORED

CONCRETE

TNT General Contractors 450.000 $185.00 $83,250.00

Central Southern Construction Corp. 450.000 $150.00 $67,500.00

Steve Manning Construction Inc 450.000 $100.00 $45,000.00

Engineer's Estimate 450.000 SQYD $230.00 $103,500.00

A0580 61004-1000 ACCESSIBILITY

RAMP, CONCRETE

Central Southern Construction Corp. 40.000 $200.00 $8,000.00

Steve Manning Construction Inc 40.000 $200.00 $8,000.00

TNT General Contractors 40.000 $48.00 $1,920.00

Engineer's Estimate 40.000 SQYD $380.00 $15,200.00

A0590 61108-1000 ADJUST WATER

VALVE

Central Southern Construction Corp. 3.000 $1,500.00 $4,500.00

Steve Manning Construction Inc 3.000 $1,500.00 $4,500.00

TNT General Contractors 3.000 $920.00 $2,760.00

Engineer's Estimate 3.000 EACH $1,200.00 $3,600.00

A0600 61108-2000 ADJUST FIRE

HYDRANT

TNT General Contractors 1.000 $5,825.00 $5,825.00

Central Southern Construction Corp. 1.000 $5,000.00 $5,000.00

Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00

Engineer's Estimate 1.000 EACH $4,900.00 $4,900.00

A0610 61108-3000 ADJUST WATER

METER

Steve Manning Construction Inc 2.000 $3,500.00 $7,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0610 61108-3000 ADJUST WATER

METER

Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00

TNT General Contractors 2.000 $5.00 $10.00

Engineer's Estimate 2.000 EACH $1,800.00 $3,600.00

A0620 61901-2250 FENCE, RAIL (2-

RAIL,

GOVERNMENT

FURNISHED

LUMBER)

Central Southern Construction Corp. 300.000 $100.00 $30,000.00

Steve Manning Construction Inc 300.000 $40.00 $12,000.00

TNT General Contractors 300.000 $38.00 $11,400.00

Engineer's Estimate 300.000 LNFT $165.00 $49,500.00

A0630 61902-1800 GATE, METAL, 24

FEET WIDTH

TNT General Contractors 3.000 $12,500.00 $37,500.00

Steve Manning Construction Inc 3.000 $12,000.00 $36,000.00

Central Southern Construction Corp. 3.000 $5,500.00 $16,500.00

Engineer's Estimate 3.000 EACH $18,500.00 $55,500.00

A0640 61921-1000 REMOVE AND

RESET FENCE

Steve Manning Construction Inc 150.000 $60.00 $9,000.00

TNT General Contractors 150.000 $55.00 $8,250.00

Central Southern Construction Corp. 150.000 $20.00 $3,000.00

Engineer's Estimate 150.000 LNFT $120.00 $18,000.00

A0650 62002-0000 STONE MASONRY

(GOVERNMENT

FURNISHED STONE)

Steve Manning Construction Inc 5.000 $5,000.00 $25,000.00

Central Southern Construction Corp. 5.000 $1,000.00 $5,000.00

TNT General Contractors 5.000 $225.00 $1,125.00

Engineer's Estimate 5.000 SQYD $550.00 $2,750.00

A0660 62013-2000 STONE MASONRY

WALL

(GOVERNMENT

FURNISHED STONE)

Steve Manning Construction Inc 10.000 $3,500.00 $35,000.00

Central Southern Construction Corp. 10.000 $1,000.00 $10,000.00

TNT General Contractors 10.000 $225.00 $2,250.00

Engineer's Estimate 10.000 SQYD $3,030.00 $30,300.00

A0670 62027-0000 REMOVE AND

RESET STONE

MASONRY

Steve Manning Construction Inc 100.000 $500.00 $50,000.00

Central Southern Construction Corp. 100.000 $150.00 $15,000.00

TNT General Contractors 100.000 $120.00 $12,000.00

Engineer's Estimate 100.000 LNFT $300.00 $30,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0680 62201-0200 DUMP TRUCK, 8

CUBIC YARD

MINIMUM

CAPACITY

Steve Manning Construction Inc 25.000 $200.00 $5,000.00

Central Southern Construction Corp. 25.000 $160.00 $4,000.00

TNT General Contractors 25.000 $155.00 $3,875.00

Engineer's Estimate 25.000 HOUR $170.00 $4,250.00

A0690 62201-0550 BACKHOE LOADER,

6 CUBIC FOOT

MINIMUM RATED

CAPACITY BUCKET,

24-INCH WIDTH

TNT General Contractors 25.000 $225.00 $5,625.00

Central Southern Construction Corp. 25.000 $200.00 $5,000.00

Steve Manning Construction Inc 25.000 $200.00 $5,000.00

Engineer's Estimate 25.000 HOUR $160.00 $4,000.00

A0700 62201-0950 WHEEL LOADER, 3

CUBIC YARD

MINIMUM RATED

CAPACITY

TNT General Contractors 25.000 $225.00 $5,625.00

Central Southern Construction Corp. 25.000 $200.00 $5,000.00

Steve Manning Construction Inc 25.000 $200.00 $5,000.00

Engineer's Estimate 25.000 HOUR $215.00 $5,375.00

A0710 62201-1450 BULLDOZER, 350HP

MINIMUM

FLYWHEEL POWER

Steve Manning Construction Inc 25.000 $400.00 $10,000.00

Central Southern Construction Corp. 25.000 $300.00 $7,500.00

TNT General Contractors 25.000 $245.00 $6,125.00

Engineer's Estimate 25.000 HOUR $320.00 $8,000.00

A0720 62201-2850 MOTOR GRADER,

12 FOOT

MINIMUM BLADE

Steve Manning Construction Inc 25.000 $350.00 $8,750.00

TNT General Contractors 25.000 $275.00 $6,875.00

Central Southern Construction Corp. 25.000 $250.00 $6,250.00

Engineer's Estimate 25.000 HOUR $220.00 $5,500.00

A0730 62201-3150 HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD

MINIMUM

CAPACITY WITH

THUMB

ATTACHMENT

TNT General Contractors 25.000 $265.00 $6,625.00

Central Southern Construction Corp. 25.000 $250.00 $6,250.00

Steve Manning Construction Inc 25.000 $250.00 $6,250.00

Engineer's Estimate 25.000 HOUR $235.00 $5,875.00 A0740 62301-0000 GENERAL LABOR Steve Manning

Construction Inc 40.000 $120.00 $4,800.00

Central Southern Construction Corp. 40.000 $65.00 $2,600.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0740 62301-0000 GENERAL LABOR TNT General Contractors 40.000 $45.00 $1,800.00

Engineer's Estimate 40.000 HOUR $90.00 $3,600.00

A0750 62302-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES

Central Southern Construction Corp. 40.000 $300.00 $12,000.00

Steve Manning Construction Inc 40.000 $200.00 $8,000.00

TNT General Contractors 40.000 $100.00 $4,000.00

Engineer's Estimate 40.000 HOUR $190.00 $7,600.00

A0760 62302-1100 SPECIAL LABOR,

HIRED SURVEY

SERVICES

Steve Manning Construction Inc 40.000 $350.00 $14,000.00

Central Southern Construction Corp. 40.000 $300.00 $12,000.00

TNT General Contractors 40.000 $150.00 $6,000.00

Engineer's Estimate 40.000 HOUR $220.00 $8,800.00

A0770 62303-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES TRIBAL

MONITOR

Steve Manning Construction Inc $80,000.00

TNT General Contractors $65,000.00

Central Southern Construction Corp. $35,000.00

Engineer's Estimate ALL LPSM LPSM $24,000.00

A0780 62303-1020 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES,

ARCHEOLOGICAL

SERVICES

Steve Manning Construction Inc $100,000.00

Central Southern Construction Corp. $40,000.00

TNT General Contractors $18,000.00

Engineer's Estimate ALL LPSM LPSM $36,000.00

A0790 62401-0100 PROVIDING AND

PLACING TOPSOIL,

2-INCH DEPTH

TNT General Contractors 32.000 $105.00 $3,360.00

Steve Manning Construction Inc 32.000 $70.00 $2,240.00

Central Southern Construction Corp. 32.000 $50.00 $1,600.00

Engineer's Estimate 32.000 SQYD $25.00 $800.00

A0800 62406-0300 PLACING

CONSERVED

TOPSOIL, 4-INCH

DEPTH

Steve Manning Construction Inc 1.000 $62,000.00 $62,000.00

Central Southern Construction Corp. 1.000 $21,000.00 $21,000.00

TNT General Contractors 1.000 $9,755.00 $9,755.00

Engineer's Estimate 1.000 ACRE $24,000.00 $24,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0810 62510-2000 SEEDING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00

Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00

TNT General Contractors 1.000 $3,000.00 $3,000.00

Engineer's Estimate 1.000 ACRE $3,500.00 $3,500.00

A0820 62511-1000 SEEDING, DRY

METHOD

Central Southern Construction Corp. 32.000 $15.00 $480.00

Steve Manning Construction Inc 32.000 $10.00 $320.00

TNT General Contractors 32.000 $2.75 $88.00

Engineer's Estimate 32.000 SQYD $15.00 $480.00

A0830 62515-2000 MULCHING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00

Steve Manning Construction Inc 1.000 $6,500.00 $6,500.00

TNT General Contractors 1.000 $6,200.00 $6,200.00

Engineer's Estimate 1.000 ACRE $3,800.00 $3,800.00 A0840 63301-0000 SIGN SYSTEM TNT General

Contractors 35.000 $12,545.00 $439,075.00

Central Southern Construction Corp. 35.000 $3,000.00 $105,000.00

Steve Manning Construction Inc 35.000 $1,200.00 $42,000.00

Engineer's Estimate 35.000 EACH $1,100.00 $38,500.00 A0850 63309-0000 DELINEATOR Central Southern

Construction Corp. 8.000 $125.00 $1,000.00

TNT General Contractors 8.000 $115.00 $920.00

Steve Manning Construction Inc 8.000 $100.00 $800.00

Engineer's Estimate 8.000 EACH $80.00 $640.00

A0860 63316-1000 REMOVE AND

RESET SIGN

SYSTEM

Steve Manning Construction Inc 7.000 $900.00 $6,300.00

TNT General Contractors 7.000 $625.00 $4,375.00

Central Southern Construction Corp. 7.000 $125.00 $875.00

Engineer's Estimate 7.000 EACH $500.00 $3,500.00

A0870 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

Central Southern Construction Corp. 40.000 $10,000.00 $400,000.00

TNT General Contractors 40.000 $6,200.00 $248,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0870 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

Steve Manning Construction Inc 40.000 $2,000.00 $80,000.00

Engineer's Estimate 40.000 MILE $2,300.00 $92,000.00

A0880 63402-0400 PAVEMENT

MARKINGS, TYPE B,

BROKEN

Steve Manning Construction Inc 2.000 $7,000.00 $14,000.00

TNT General Contractors 2.000 $6,200.00 $12,400.00

Central Southern Construction Corp. 2.000 $5,280.00 $10,560.00

Engineer's Estimate 2.000 MILE $965.00 $1,930.00

A0890 63405-0500 PAVEMENT

MARKINGS, TYPE B,

TURN ARROW

Steve Manning Construction Inc 3.000 $800.00 $2,400.00

Central Southern Construction Corp. 3.000 $750.00 $2,250.00

TNT General Contractors 3.000 $165.00 $495.00

Engineer's Estimate 3.000 EACH $310.00 $930.00

A0900 63405-0550 PAVEMENT

MARKINGS, TYPE B,

STRAIGHT ARROW

Steve Manning Construction Inc 8.000 $800.00 $6,400.00

Central Southern Construction Corp. 8.000 $750.00 $6,000.00

TNT General Contractors 8.000 $165.00 $1,320.00

Engineer's Estimate 8.000 EACH $280.00 $2,240.00

A0910 63405-0850 PAVEMENT

MARKINGS, TYPE B,

ACCESSIBILITY

SYMBOL

Steve Manning Construction Inc 11.000 $800.00 $8,800.00

Central Southern Construction Corp. 11.000 $750.00 $8,250.00

TNT General Contractors 11.000 $175.00 $1,925.00

Engineer's Estimate 11.000 EACH $350.00 $3,850.00

A0920 63501-0000 TEMPORARY

TRAFFIC CONTROL

TNT General Contractors $625,500.00

Steve Manning Construction Inc $595,000.00

Central Southern Construction Corp. $350,000.00

Engineer's Estimate ALL LPSM LPSM $25,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER

ROAD AND PARKING

Division: Central Federal Lands

Schedule: X Schedule Type: Option Lead Designer:

Solicitation No. : 6982AF25B000024 Opened at: Lakewood, CO Opened by: Jorey Deml State: CO County: Montezuma Federal Land: Mesa Verde National

Park Bid Open Date and Time: 11/13/2025

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$1,453,880.60

TNT General Contractors, 1358 N 200 W, Nephi, UT, 84648

$761,542.10

Steve Manning Construction Inc, 5211 Churn Creek Road, Redding, CA, 96002

$761,080.00

Engineer's Estimate $288,000.00

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND

PARKING

Schedule: X Schedule Type: Option

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

X0010 15101-0000 MOBILIZATION Central Southern Construction Corp. $400,000.00

TNT General Contractors $85,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

11/18/2025

Contract Specialist

X0010 15101-0000 MOBILIZATION Steve Manning Construction Inc $70,000.00

Engineer's Estimate ALL LPSM LPSM $30,094.60

X0020 15210-3000 CENTERLINE,

VERIFICATION AND

STAKING

Steve Manning Construction Inc 0.178 $30,000.00 $5,340.00

TNT General Contractors 0.178 $8,500.00 $1,513.00

Central Southern Construction Corp. 0.178 $5,200.00 $925.60

Engineer's Estimate 0.178 MILE $4,300.00 $765.40

X0030 15301-0000 CONTRACTOR

QUALITY CONTROL

Central Southern Construction Corp. $255,000.00

TNT General Contractors $85,000.00

Steve Manning Construction Inc $40,000.00

Engineer's Estimate ALL LPSM LPSM $4,000.00

X0040 15401-0000 CONTRACTOR

TESTING

Central Southern Construction Corp. $130,000.00

TNT General Contractors $65,000.00

Steve Manning Construction Inc $40,000.00

Engineer's Estimate ALL LPSM LPSM $4,000.00

X0050 15501-0000 CONSTRUCTION

SCHEDULE

Central Southern Construction Corp. $130,000.00

Steve Manning Construction Inc $10,000.00

TNT General Contractors $2,500.00

Engineer's Estimate ALL LPSM LPSM $10,000.00

X0060 15701-0000 SOIL EROSION

CONTROL

Central Southern Construction Corp. $80,000.00

TNT General Contractors $34,250.00

Steve Manning Construction Inc $25,000.00

Engineer's Estimate ALL LPSM LPSM $9,000.00

X0070 20101-0000 CLEARING AND

GRUBBING

Steve Manning Construction Inc 0.300 $40,000.00 $12,000.00

Central Southern Construction Corp. 0.300 $35,000.00 $10,500.00

TNT General Contractors 0.300 $6,292.00 $1,887.60

Engineer's Estimate 0.300 ACRE $4,800.00 $1,440.00 X0080 20301-2400 REMOVAL OF SIGN TNT General

Contractors 6.000 $650.00 $3,900.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0080 20301-2400 REMOVAL OF SIGN Steve Manning Construction Inc 6.000 $400.00 $2,400.00

Central Southern Construction Corp. 6.000 $100.00 $600.00

Engineer's Estimate 6.000 EACH $190.00 $1,140.00

X0090 30202-2000 ROADWAY

AGGREGATE,

METHOD 2

Steve Manning Construction Inc 70.000 $190.00 $13,300.00

Central Southern Construction Corp. 70.000 $80.00 $5,600.00

TNT General Contractors 70.000 $65.00 $4,550.00

Engineer's Estimate 70.000 TON $80.00 $5,600.00

X0100 30402-5200 FULL DEPTH

RECLAMATION,

METHOD 2, 4-INCH

DEPTH

Steve Manning Construction Inc 2,200.000 $42.00 $92,400.00

Central Southern Construction Corp. 2,200.000 $15.00 $33,000.00

TNT General Contractors 2,200.000 $0.46 $1,012.00

Engineer's Estimate 2,200.000 SQYD $3.00 $6,600.00

X0110 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

Steve Manning Construction Inc 500.000 $298.00 $149,000.00

Central Southern Construction Corp. 500.000 $250.00 $125,000.00

TNT General Contractors 500.000 $220.00 $110,000.00

Engineer's Estimate 500.000 TON $200.00 $100,000.00 X0120 40601-0000 FOG SEAL Central Southern

Construction Corp. 1.000 $2,000.00 $2,000.00

Steve Manning Construction Inc 1.000 $2,000.00 $2,000.00

TNT General Contractors 1.000 $900.00 $900.00

Engineer's Estimate 1.000 TON $1,000.00 $1,000.00 X0130 40605-0000 BLOTTER Central Southern

Construction Corp. 16.000 $200.00 $3,200.00

TNT General Contractors 16.000 $182.00 $2,912.00

Steve Manning Construction Inc 16.000 $50.00 $800.00

Engineer's Estimate 16.000 TON $50.00 $800.00

X0140 41102-1000 PRIME COAT,

METHOD 1

Central Southern Construction Corp. 2,200.000 $5.00 $11,000.00

TNT General Contractors 2,200.000 $4.50 $9,900.00

Steve Manning Construction Inc 2,200.000 $2.20 $4,840.00

Engineer's Estimate 2,200.000 SQYD $1.50 $3,300.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0150 41201-0000 TACK COAT Steve Manning Construction Inc 1.000 $2,000.00 $2,000.00

TNT General Contractors 1.000 $1,750.00 $1,750.00

Central Southern Construction Corp. 1.000 $1,500.00 $1,500.00

Engineer's Estimate 1.000 TON $1,200.00 $1,200.00

X0160 60704-0000 CLEANING

CULVERT IN PLACE

Central Southern Construction Corp. 2.000 $5,000.00 $10,000.00

TNT General Contractors 2.000 $3,560.00 $7,120.00

Steve Manning Construction Inc 2.000 $2,600.00 $5,200.00

Engineer's Estimate 2.000 EACH $2,550.00 $5,100.00

X0170 60707-0300 LINING 18-INCH

PIPE CULVERT

TNT General Contractors 50.000 $325.00 $16,250.00

Steve Manning Construction Inc 50.000 $300.00 $15,000.00

Central Southern Construction Corp. 50.000 $180.00 $9,000.00

Engineer's Estimate 50.000 LNFT $300.00 $15,000.00

X0180 60901-2900 CURB, STONE, TYPE

1, 6-INCH DEPTH

Steve Manning Construction Inc 40.000 $650.00 $26,000.00

Central Southern Construction Corp. 40.000 $200.00 $8,000.00

TNT General Contractors 40.000 $32.00 $1,280.00

Engineer's Estimate 40.000 LNFT $250.00 $10,000.00

X0190 61108-1000 ADJUST WATER

VALVE

Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00

Central Southern Construction Corp. 1.000 $1,500.00 $1,500.00

TNT General Contractors 1.000 $920.00 $920.00

Engineer's Estimate 1.000 EACH $1,200.00 $1,200.00

X0200 61108-3000 ADJUST WATER

METER

Steve Manning Construction Inc 2.000 $3,500.00 $7,000.00

Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00

TNT General Contractors 2.000 $920.00 $1,840.00

Engineer's Estimate 2.000 EACH $1,800.00 $3,600.00

X0210 62001-0300 CLASS A MASONRY,

COURSE POINTED

FINISH

Steve Manning Construction Inc 4.000 $10,000.00 $40,000.00

Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0210 62001-0300 CLASS A MASONRY,

COURSE POINTED

FINISH

TNT General Contractors 4.000 $375.00 $1,500.00

Engineer's Estimate 4.000 CUYD $530.00 $2,120.00 X0220 62002-0000 STONE MASONRY Steve Manning

Construction Inc 2.000 $5,000.00 $10,000.00

Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00

TNT General Contractors 2.000 $375.00 $750.00

Engineer's Estimate 2.000 SQYD $550.00 $1,100.00 X0230 62301-0000 GENERAL LABOR Steve Manning

Construction Inc 10.000 $120.00 $1,200.00

Central Southern Construction Corp. 10.000 $65.00 $650.00

TNT General Contractors 10.000 $45.00 $450.00

Engineer's Estimate 10.000 HOUR $90.00 $900.00

X0240 62302-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES

Central Southern Construction Corp. 10.000 $300.00 $3,000.00

Steve Manning Construction Inc 10.000 $200.00 $2,000.00

TNT General Contractors 10.000 $100.00 $1,000.00

Engineer's Estimate 10.000 HOUR $190.00 $1,900.00

X0250 62302-1100 SPECIAL LABOR,

HIRED SURVEY

SERVICES

Steve Manning Construction Inc 10.000 $350.00 $3,500.00

Central Southern Construction Corp. 10.000 $300.00 $3,000.00

TNT General Contractors 10.000 $150.00 $1,500.00

Engineer's Estimate 10.000 HOUR $220.00 $2,200.00

X0260 62303-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES (TRIBAL

MONITOR)

TNT General Contractors $35,000.00

Steve Manning Construction Inc $16,000.00

Central Southern Construction Corp. $10,000.00

Engineer's Estimate ALL LPSM LPSM $3,000.00

X0270 62303-1020 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES,

ARCHEOLOGICAL

SERVICES

Central Southern Construction Corp. $15,000.00

TNT General Contractors $15,000.00

Steve Manning Construction Inc $10,000.00

Engineer's Estimate ALL LPSM LPSM $4,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0280 62406-0300 PLACING

CONSERVED

TOPSOIL, 4-INCH

DEPTH

Steve Manning Construction Inc 0.300 $62,000.00 $18,600.00

Central Southern Construction Corp. 0.300 $21,000.00 $6,300.00

TNT General Contractors 0.300 $9,755.00 $2,926.50

Engineer's Estimate 0.300 ACRE $24,000.00 $7,200.00

X0290 62510-2000 SEEDING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 0.300 $10,000.00 $3,000.00

Steve Manning Construction Inc 0.300 $3,500.00 $1,050.00

TNT General Contractors 0.300 $3,000.00 $900.00

Engineer's Estimate 0.300 ACRE $3,500.00 $1,050.00

X0300 62515-2000 MULCHING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 0.300 $10,000.00 $3,000.00

Steve Manning Construction Inc 0.300 $6,500.00 $1,950.00

TNT General Contractors 0.300 $4,020.00 $1,206.00

Engineer's Estimate 0.300 ACRE $3,800.00 $1,140.00 X0310 63301-0000 SIGN SYSTEM Central Southern

Construction Corp. 33.000 $3,000.00 $99,000.00

Steve Manning Construction Inc 33.000 $1,200.00 $39,600.00

TNT General Contractors 33.000 $625.00 $20,625.00

Engineer's Estimate 33.000 EACH $1,100.00 $36,300.00 X0320 63309-0000 DELINEATOR Central Southern

Construction Corp. 5.000 $125.00 $625.00

TNT General Contractors 5.000 $115.00 $575.00

Steve Manning Construction Inc 5.000 $100.00 $500.00

Engineer's Estimate 5.000 EACH $80.00 $400.00

X0330 63316-1000 REMOVE AND

RESET SIGN

SYSTEM

Central Southern Construction Corp. 1.000 $1,000.00 $1,000.00

Steve Manning Construction Inc 1.000 $900.00 $900.00

TNT General Contractors 1.000 $625.00 $625.00

Engineer's Estimate 1.000 EACH $500.00 $500.00

X0340 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

TNT General Contractors 1.000 $62,000.00 $62,000.00

Central Southern Construction Corp. 1.000 $18,480.00 $18,480.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0340 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

Steve Manning Construction Inc 1.000 $10,000.00 $10,000.00

Engineer's Estimate 1.000 MILE $2,350.00 $2,350.00

X0350 63501-0000 TEMPORARY

TRAFFIC CONTROL

TNT General Contractors $180,000.00

Steve Manning Construction Inc $80,000.00

Central Southern Construction Corp. $50,000.00

Engineer's Estimate ALL LPSM LPSM $10,000.00

Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

File details come from the government source that posted it. Updated .