6982AF25B000024 Cedar Tree BidTabulationReport.pdf
PDF 811 KB Posted
- Solicitation number
- 6982AF25B000024
About this file
This is a Bid Tabulation Report for the Cedar Tree Tower Road and Parking project (Project No. CO NP MEVE 201(1)) located in Mesa Verde National Park, Montezuma County, Colorado. The solicitation (No. 6982AF25B000024) was opened on 11/13/2025 in Lakewood, CO by the Central Federal Lands division. Three contractors submitted bids: Steve Manning Construction Inc ($8,629,072.00), Central Southern Construction Corp. ($7,526,876.80), and TNT General Contractors ($7,515,564.25), all significantly lower than the engineer's base estimate of $5,482,000.00.
The bid includes both a base schedule and an optional schedule, with total bid amounts for the base plus option ranging from $8,277,106.35 to $9,390,152.00 across the three contractors. The project involves various construction activities including mobilization, surveying, road and parking area construction, asphalt paving, culvert work, masonry, traffic control, and environmental restoration. The bid tabulation details unit prices for numerous line items across categories such as labor, equipment, materials, and specialized services like tribal monitoring and archaeological services. The report was generated on 11/18/2025 by Denise Martinez, a contract specialist, though no contract award date was specified in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary - Cedar Tree Tower Road and Parking.pdf | ||
| Amendment A001 Cedar Tree.pdf | ||
| CO NP MEVE 201(1) AD Plans_Stamped_092625 (Complete).pdf | ||
| 6982AF25B000024 .pdf | ||
| A Physical Data.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND PARKING
Contractor Responsive? Base Schedule A Steve Manning Construction Inc $8,629,072.00 Central Southern Construction Corp. $7,526,876.80
TNT General Contractors $7,515,564.25 Engineer's Estimate $5,482,000.00
Contractor Responsive? Total Base Schedule A and Option(s): X Steve Manning Construction Inc $9,390,152.00 Central Southern Construction Corp. $8,980,757.40
TNT General Contractors $8,277,106.35 Engineer's Estimate $5,770,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
Contractor Responsive? Option: X Steve Manning Construction Inc $761,080.00 Central Southern Construction Corp. $1,453,880.60
TNT General Contractors $761,542.10 Engineer's Estimate $288,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER
ROAD AND PARKING
Division: Central Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 6982AF25B000024 Opened at: Lakewood, CO Opened by: Jorey Deml State: CO County: Montezuma Federal Land: Mesa Verde National
Park Bid Open Date and Time: 11/13/2025
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Steve Manning Construction Inc, 5211 Churn Creek Road, Redding, CA, 96002
$8,629,072.00
Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$7,526,876.80
TNT General Contractors, 1358 N 200 W, Nephi, UT, 84648
$7,515,564.25
Engineer's Estimate $5,482,000.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND
PARKING
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0010 15101-0000 MOBILIZATION Central Southern Construction Corp. $1,065,000.00
TNT General Contractors $975,300.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
11/18/2025
Contract Specialist
A0010 15101-0000 MOBILIZATION Steve Manning Construction Inc $750,000.00
Engineer's Estimate ALL LPSM LPSM $1,052,043.80
A0020 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING
Steve Manning Construction Inc 4.984 $11,000.00 $54,824.00
TNT General Contractors 4.984 $8,500.00 $42,364.00
Central Southern Construction Corp. 4.984 $5,200.00 $25,916.80
Engineer's Estimate 4.984 MILE $4,300.00 $21,431.20
A0030 15214-2000 SURVEY AND
STAKING,
RETAINING WALL
Central Southern Construction Corp. $15,600.00
Steve Manning Construction Inc $12,000.00
TNT General Contractors $3,360.00
Engineer's Estimate ALL LPSM LPSM $40,000.00
A0040 15215-1000 SURVEY AND
STAKING,
APPROACH ROAD
Central Southern Construction Corp. 3.000 $10,000.00 $30,000.00
TNT General Contractors 3.000 $3,360.00 $10,080.00
Steve Manning Construction Inc 3.000 $2,500.00 $7,500.00
Engineer's Estimate 3.000 EACH $1,500.00 $4,500.00
A0050 15215-3000 SURVEY AND
STAKING,
DRAINAGE
STRUCTURE
Steve Manning Construction Inc 9.000 $3,480.00 $31,320.00
TNT General Contractors 9.000 $3,360.00 $30,240.00
Central Southern Construction Corp. 9.000 $2,500.00 $22,500.00
Engineer's Estimate 9.000 EACH $1,400.00 $12,600.00
A0060 15215-7000 SURVEY AND
STAKING, PARKING
AREA
Steve Manning Construction Inc 4.000 $6,250.00 $25,000.00
Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00
TNT General Contractors 4.000 $3,360.00 $13,440.00
Engineer's Estimate 4.000 EACH $4,600.00 $18,400.00
A0070 15225-0000 SLOPE, REFERENCE,
AND CLEARING
AND GRUBBING
CONTROL
Steve Manning Construction Inc 0.550 $20,460.00 $11,253.00
Central Southern Construction Corp. 0.550 $10,000.00 $5,500.00
TNT General Contractors 0.550 $6,600.00 $3,630.00
Engineer's Estimate 0.550 MILE $15,000.00 $8,250.00
A0080 15236-2000 SURVEY CONTROL,
GRADE FINISHING
Steve Manning Construction Inc 1.100 $17,000.00 $18,700.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0080 15236-2000 SURVEY CONTROL,
GRADE FINISHING
TNT General Contractors 1.100 $6,600.00 $7,260.00
Central Southern Construction Corp. 1.100 $6,500.00 $7,150.00
Engineer's Estimate 1.100 MILE $7,600.00 $8,360.00
A0090 15301-0000 CONTRACTOR
QUALITY CONTROL
TNT General Contractors $757,375.00
Central Southern Construction Corp. $410,000.00
Steve Manning Construction Inc $216,000.00
Engineer's Estimate ALL LPSM LPSM $150,000.00
A0100 15401-0000 CONTRACTOR
TESTING
TNT General Contractors $757,375.00
Central Southern Construction Corp. $750,000.00
Steve Manning Construction Inc $240,000.00
Engineer's Estimate ALL LPSM LPSM $150,000.00
A0110 15501-0000 CONSTRUCTION
SCHEDULE
Central Southern Construction Corp. $60,000.00
Steve Manning Construction Inc $20,000.00
TNT General Contractors $2,500.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
A0120 15701-0000 SOIL EROSION
CONTROL
Central Southern Construction Corp. $175,000.00
Steve Manning Construction Inc $110,000.00
TNT General Contractors $66,140.00
Engineer's Estimate ALL LPSM LPSM $240,000.00
A0130 15802-0000 WATERING FOR
DUST CONTROL
TNT General Contractors $180,000.00
Central Southern Construction Corp. $100,000.00
Steve Manning Construction Inc $70,000.00
Engineer's Estimate ALL LPSM LPSM $65,000.00
A0140 20101-0000 CLEARING AND
GRUBBING
Central Southern Construction Corp. 2.000 $37,500.00 $75,000.00
Steve Manning Construction Inc 2.000 $27,000.00 $54,000.00
TNT General Contractors 2.000 $6,592.00 $13,184.00
Engineer's Estimate 2.000 ACRE $4,800.00 $9,600.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0150 20301-1100 REMOVAL OF GATE TNT General Contractors 2.000 $2,525.00 $5,050.00
Central Southern Construction Corp. 2.000 $2,000.00 $4,000.00
Steve Manning Construction Inc 2.000 $1,500.00 $3,000.00
Engineer's Estimate 2.000 EACH $3,000.00 $6,000.00
A0160 20301-1900 REMOVAL OF PIPE
CULVERT
TNT General Contractors 5.000 $4,800.00 $24,000.00
Central Southern Construction Corp. 5.000 $3,000.00 $15,000.00
Steve Manning Construction Inc 5.000 $2,500.00 $12,500.00
Engineer's Estimate 5.000 EACH $3,200.00 $16,000.00 A0170 20301-2400 REMOVAL OF SIGN TNT General
Contractors 24.000 $350.00 $8,400.00
Steve Manning Construction Inc 24.000 $250.00 $6,000.00
Central Southern Construction Corp. 24.000 $100.00 $2,400.00
Engineer's Estimate 24.000 EACH $190.00 $4,560.00
A0180 20301-2800 REMOVAL OF
STRUCTURES AND
OBSTRUCTIONS
Steve Manning Construction Inc 6.000 $4,000.00 $24,000.00
Central Southern Construction Corp. 6.000 $3,300.00 $19,800.00
TNT General Contractors 6.000 $1,200.00 $7,200.00
Engineer's Estimate 6.000 EACH $5,000.00 $30,000.00
A0190 20302-0300 REMOVAL OF CURB
AND GUTTER,
CONCRETE
Steve Manning Construction Inc 400.000 $42.00 $16,800.00
TNT General Contractors 400.000 $26.00 $10,400.00
Central Southern Construction Corp. 400.000 $20.00 $8,000.00
Engineer's Estimate 400.000 LNFT $30.00 $12,000.00
A0200 20302-0700 REMOVAL OF
FENCE
Steve Manning Construction Inc 170.000 $40.00 $6,800.00
Central Southern Construction Corp. 170.000 $10.00 $1,700.00
TNT General Contractors 170.000 $8.25 $1,402.50
Engineer's Estimate 170.000 LNFT $40.00 $6,800.00
A0210 20303-0300 REMOVAL OF
CONCRETE
Steve Manning Construction Inc 200.000 $82.00 $16,400.00
TNT General Contractors 200.000 $35.00 $7,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0210 20303-0300 REMOVAL OF
CONCRETE
Central Southern Construction Corp. 200.000 $25.00 $5,000.00
Engineer's Estimate 200.000 SQYD $50.00 $10,000.00
A0220 20303-3200 REMOVAL OF
SIDEWALK,
CONCRETE
Steve Manning Construction Inc 210.000 $82.00 $17,220.00
TNT General Contractors 210.000 $35.00 $7,350.00
Central Southern Construction Corp. 210.000 $25.00 $5,250.00
Engineer's Estimate 210.000 SQYD $100.00 $21,000.00 A0230 20402-0000 SUBEXCAVATION Steve Manning
Construction Inc 200.000 $837.00 $167,400.00
Central Southern Construction Corp. 200.000 $80.00 $16,000.00
TNT General Contractors 200.000 $4.25 $850.00
Engineer's Estimate 200.000 CUYD $100.00 $20,000.00
A0240 20420-0000 EMBANKMENT
CONSTRUCTION
Steve Manning Construction Inc 1,000.000 $684.00 $684,000.00
Central Southern Construction Corp. 1,000.000 $50.00 $50,000.00
TNT General Contractors 1,000.000 $4.25 $4,250.00
Engineer's Estimate 1,000.000 CUYD $100.00 $100,000.00
A0250 20425-1000 DITCH,
EXCAVATION
Steve Manning Construction Inc 60.000 $135.00 $8,100.00
Central Southern Construction Corp. 60.000 $100.00 $6,000.00
TNT General Contractors 60.000 $25.00 $1,500.00
Engineer's Estimate 60.000 LNFT $35.00 $2,100.00
A0260 20801-0000 STRUCTURE
EXCAVATION
Steve Manning Construction Inc 38.000 $700.00 $26,600.00
Central Southern Construction Corp. 38.000 $150.00 $5,700.00
TNT General Contractors 38.000 $125.00 $4,750.00
Engineer's Estimate 38.000 CUYD $100.00 $3,800.00
A0270 20803-0000 STRUCTURAL
BACKFILL
Steve Manning Construction Inc 38.000 $700.00 $26,600.00
Central Southern Construction Corp. 38.000 $120.00 $4,560.00
TNT General Contractors 38.000 $65.00 $2,470.00
Engineer's Estimate 38.000 CUYD $200.00 $7,600.00 A0280 25402-1000 LAGGING, TIMBER Steve Manning
Construction Inc 380.000 $910.00 $345,800.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0280 25402-1000 LAGGING, TIMBER TNT General Contractors 380.000 $285.00 $108,300.00
Central Southern Construction Corp. 380.000 $200.00 $76,000.00
Engineer's Estimate 380.000 SQFT $215.00 $81,700.00
A0290 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Steve Manning Construction Inc 1,200.000 $120.00 $144,000.00
Central Southern Construction Corp. 1,200.000 $80.00 $96,000.00
TNT General Contractors 1,200.000 $61.50 $73,800.00
Engineer's Estimate 1,200.000 TON $80.00 $96,000.00
A0300 30402-5200 FULL DEPTH
RECLAMATION,
METHOD 2, 4-INCH
DEPTH
Central Southern Construction Corp. 10,000.000 $15.00 $150,000.00
Steve Manning Construction Inc 10,000.000 $15.00 $150,000.00
TNT General Contractors 10,000.000 $0.46 $4,600.00
Engineer's Estimate 10,000.000 SQYD $3.00 $30,000.00
A0310 30402-5300 FULL DEPTH
RECLAMATION,
METHOD 2, 6-INCH
DEPTH
Central Southern Construction Corp. 14,000.000 $20.00 $280,000.00
Steve Manning Construction Inc 14,000.000 $17.00 $238,000.00
TNT General Contractors 14,000.000 $0.52 $7,280.00
Engineer's Estimate 14,000.000 SQYD $4.00 $56,000.00
A0320 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
Steve Manning Construction Inc 4,700.000 $298.00 $1,400,600.00
Central Southern Construction Corp. 4,700.000 $250.00 $1,175,000.00
TNT General Contractors 4,700.000 $220.00 $1,034,000.00
Engineer's Estimate 4,700.000 TON $200.00 $940,000.00 A0330 40601-0000 FOG SEAL Central Southern
Construction Corp. 50.000 $2,000.00 $100,000.00
Steve Manning Construction Inc 50.000 $2,000.00 $100,000.00
TNT General Contractors 50.000 $875.00 $43,750.00
Engineer's Estimate 50.000 TON $1,000.00 $50,000.00 A0340 40605-0000 BLOTTER Central Southern
Construction Corp. 200.000 $200.00 $40,000.00
TNT General Contractors 200.000 $180.00 $36,000.00
Steve Manning Construction Inc 200.000 $50.00 $10,000.00
Engineer's Estimate 200.000 TON $50.00 $10,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0350 40702-0200 CHIP SEAL, TYPE 1B Central Southern Construction Corp. 58,500.000 $6.00 $351,000.00
Steve Manning Construction Inc 58,500.000 $5.00 $292,500.00
TNT General Contractors 58,500.000 $3.10 $181,350.00
Engineer's Estimate 58,500.000 SQYD $5.00 $292,500.00
A0360 40711-0000 EMULSIFIED
ASPHALT
Steve Manning Construction Inc 110.000 $2,800.00 $308,000.00
TNT General Contractors 110.000 $1,325.00 $145,750.00
Central Southern Construction Corp. 110.000 $1,000.00 $110,000.00
Engineer's Estimate 110.000 TON $1,100.00 $121,000.00
A0370 41102-1000 PRIME COAT,
METHOD 1
Central Southern Construction Corp. 24,000.000 $5.00 $120,000.00
TNT General Contractors 24,000.000 $4.50 $108,000.00
Steve Manning Construction Inc 24,000.000 $3.90 $93,600.00
Engineer's Estimate 24,000.000 SQYD $1.50 $36,000.00 A0380 41201-0000 TACK COAT Steve Manning
Construction Inc 11.000 $2,800.00 $30,800.00
TNT General Contractors 11.000 $1,750.00 $19,250.00
Central Southern Construction Corp. 11.000 $1,500.00 $16,500.00
Engineer's Estimate 11.000 TON $1,200.00 $13,200.00
A0390 41402-2000 CRACKS, CLEANING
AND SEALING
Steve Manning Construction Inc 5.000 $20,000.00 $100,000.00
TNT General Contractors 5.000 $11,000.00 $55,000.00
Central Southern Construction Corp. 5.000 $10,000.00 $50,000.00
Engineer's Estimate 5.000 MILE $14,000.00 $70,000.00
A0400 41801-1000 ASPHALT
CONCRETE
PAVEMENT PATCH,
TYPE 1
TNT General Contractors 750.000 $580.00 $435,000.00
Steve Manning Construction Inc 750.000 $420.00 $315,000.00
Central Southern Construction Corp. 750.000 $100.00 $75,000.00
Engineer's Estimate 750.000 SQYD $200.00 $150,000.00
A0410 41801-2000 ASPHALT
CONCRETE
PAVEMENT PATCH,
TYPE 2
TNT General Contractors 250.000 $580.00 $145,000.00
Steve Manning Construction Inc 250.000 $420.00 $105,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0410 41801-2000 ASPHALT
CONCRETE
PAVEMENT PATCH,
TYPE 2
Central Southern Construction Corp. 250.000 $120.00 $30,000.00
Engineer's Estimate 250.000 SQYD $330.00 $82,500.00
A0420 50101-0800 MINOR CONCRETE
PAVEMENT,
REINFORCED, 8-
INCH DEPTH
Steve Manning Construction Inc 400.000 $500.00 $200,000.00
TNT General Contractors 400.000 $217.00 $86,800.00
Central Southern Construction Corp. 400.000 $160.00 $64,000.00
Engineer's Estimate 400.000 SQYD $220.00 $88,000.00
A0430 55201-0600 STRUCTURAL
CONCRETE, CLASS
C (AE)
Steve Manning Construction Inc 3.000 $12,000.00 $36,000.00
Central Southern Construction Corp. 3.000 $2,000.00 $6,000.00
TNT General Contractors 3.000 $775.00 $2,325.00
Engineer's Estimate 3.000 CUYD $4,000.00 $12,000.00
A0440 55401-1000 REINFORCING
STEEL
Steve Manning Construction Inc 40.000 $500.00 $20,000.00
TNT General Contractors 40.000 $500.00 $20,000.00
Central Southern Construction Corp. 40.000 $15.00 $600.00
Engineer's Estimate 40.000 LB $10.00 $400.00
A0450 55502-0000 STRUCTURAL
STEEL, PROVIDED,
FABRICATED, AND
ERECTED
Steve Manning Construction Inc 12,219.000 $25.00 $305,475.00
Central Southern Construction Corp. 12,219.000 $15.00 $183,285.00
TNT General Contractors 12,219.000 $10.25 $125,244.75
Engineer's Estimate 12,219.000 LB $15.00 $183,285.00
A0460 60201-0600 18-INCH PIPE
CULVERT
Steve Manning Construction Inc 110.000 $440.00 $48,400.00
Central Southern Construction Corp. 110.000 $320.00 $35,200.00
TNT General Contractors 110.000 $155.00 $17,050.00
Engineer's Estimate 110.000 LNFT $180.00 $19,800.00
A0470 60201-0800 24-INCH PIPE
CULVERT
Steve Manning Construction Inc 160.000 $510.00 $81,600.00
Central Southern Construction Corp. 160.000 $400.00 $64,000.00
TNT General Contractors 160.000 $198.00 $31,680.00
Engineer's Estimate 160.000 LNFT $320.00 $51,200.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0480 60210-0600 END SECTION FOR
18-INCH PIPE
CULVERT
Central Southern Construction Corp. 2.000 $2,000.00 $4,000.00
Steve Manning Construction Inc 2.000 $2,000.00 $4,000.00
TNT General Contractors 2.000 $1,165.00 $2,330.00
Engineer's Estimate 2.000 EACH $2,100.00 $4,200.00
A0490 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
Central Southern Construction Corp. 6.000 $2,500.00 $15,000.00
Steve Manning Construction Inc 6.000 $2,400.00 $14,400.00
TNT General Contractors 6.000 $1,445.00 $8,670.00
Engineer's Estimate 6.000 EACH $1,325.00 $7,950.00
A0500 60405-0000 MANHOLE
ADJUSTMENT
Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00
Central Southern Construction Corp. 1.000 $2,500.00 $2,500.00
TNT General Contractors 1.000 $1,955.00 $1,955.00
Engineer's Estimate 1.000 EACH $1,500.00 $1,500.00
A0510 60504-0000 GEOCOMPOSITE
SHEET DRAIN
SYSTEM
Steve Manning Construction Inc 13.000 $240.00 $3,120.00
Central Southern Construction Corp. 13.000 $200.00 $2,600.00
TNT General Contractors 13.000 $57.00 $741.00
Engineer's Estimate 13.000 SQYD $100.00 $1,300.00
A0520 60704-0000 CLEANING
CULVERT IN PLACE
Central Southern Construction Corp. 8.000 $5,000.00 $40,000.00
TNT General Contractors 8.000 $3,560.00 $28,480.00
Steve Manning Construction Inc 8.000 $2,400.00 $19,200.00
Engineer's Estimate 8.000 EACH $2,550.00 $20,400.00
A0530 60707-0300 LINING 18-INCH
PIPE CULVERT
TNT General Contractors 225.000 $325.00 $73,125.00
Steve Manning Construction Inc 225.000 $300.00 $67,500.00
Central Southern Construction Corp. 225.000 $180.00 $40,500.00
Engineer's Estimate 225.000 LNFT $300.00 $67,500.00
A0540 60902-1000 CURB AND
GUTTER,
CONCRETE, 12-
INCH DEPTH
Central Southern Construction Corp. 1,000.000 $75.00 $75,000.00
Steve Manning Construction Inc 1,000.000 $60.00 $60,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0540 60902-1000 CURB AND
GUTTER,
CONCRETE, 12-
INCH DEPTH
TNT General Contractors 1,000.000 $35.00 $35,000.00
Engineer's Estimate 1,000.000 LNFT $70.00 $70,000.00
A0550 60902-1700 CURB AND
GUTTER,
CONCRETE, 18-
INCH DEPTH
Central Southern Construction Corp. 2,000.000 $90.00 $180,000.00
Steve Manning Construction Inc 2,000.000 $80.00 $160,000.00
TNT General Contractors 2,000.000 $42.00 $84,000.00
Engineer's Estimate 2,000.000 LNFT $120.00 $240,000.00
A0560 60906-1000 GUTTER,
CONCRETE
Steve Manning Construction Inc 70.000 $350.00 $24,500.00
Central Southern Construction Corp. 70.000 $150.00 $10,500.00
TNT General Contractors 70.000 $28.00 $1,960.00
Engineer's Estimate 70.000 SQYD $350.00 $24,500.00
A0570 61001-0200 SIDEWALK,
COLORED
CONCRETE
TNT General Contractors 450.000 $185.00 $83,250.00
Central Southern Construction Corp. 450.000 $150.00 $67,500.00
Steve Manning Construction Inc 450.000 $100.00 $45,000.00
Engineer's Estimate 450.000 SQYD $230.00 $103,500.00
A0580 61004-1000 ACCESSIBILITY
RAMP, CONCRETE
Central Southern Construction Corp. 40.000 $200.00 $8,000.00
Steve Manning Construction Inc 40.000 $200.00 $8,000.00
TNT General Contractors 40.000 $48.00 $1,920.00
Engineer's Estimate 40.000 SQYD $380.00 $15,200.00
A0590 61108-1000 ADJUST WATER
VALVE
Central Southern Construction Corp. 3.000 $1,500.00 $4,500.00
Steve Manning Construction Inc 3.000 $1,500.00 $4,500.00
TNT General Contractors 3.000 $920.00 $2,760.00
Engineer's Estimate 3.000 EACH $1,200.00 $3,600.00
A0600 61108-2000 ADJUST FIRE
HYDRANT
TNT General Contractors 1.000 $5,825.00 $5,825.00
Central Southern Construction Corp. 1.000 $5,000.00 $5,000.00
Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00
Engineer's Estimate 1.000 EACH $4,900.00 $4,900.00
A0610 61108-3000 ADJUST WATER
METER
Steve Manning Construction Inc 2.000 $3,500.00 $7,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0610 61108-3000 ADJUST WATER
METER
Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00
TNT General Contractors 2.000 $5.00 $10.00
Engineer's Estimate 2.000 EACH $1,800.00 $3,600.00
A0620 61901-2250 FENCE, RAIL (2-
RAIL,
GOVERNMENT
FURNISHED
LUMBER)
Central Southern Construction Corp. 300.000 $100.00 $30,000.00
Steve Manning Construction Inc 300.000 $40.00 $12,000.00
TNT General Contractors 300.000 $38.00 $11,400.00
Engineer's Estimate 300.000 LNFT $165.00 $49,500.00
A0630 61902-1800 GATE, METAL, 24
FEET WIDTH
TNT General Contractors 3.000 $12,500.00 $37,500.00
Steve Manning Construction Inc 3.000 $12,000.00 $36,000.00
Central Southern Construction Corp. 3.000 $5,500.00 $16,500.00
Engineer's Estimate 3.000 EACH $18,500.00 $55,500.00
A0640 61921-1000 REMOVE AND
RESET FENCE
Steve Manning Construction Inc 150.000 $60.00 $9,000.00
TNT General Contractors 150.000 $55.00 $8,250.00
Central Southern Construction Corp. 150.000 $20.00 $3,000.00
Engineer's Estimate 150.000 LNFT $120.00 $18,000.00
A0650 62002-0000 STONE MASONRY
(GOVERNMENT
FURNISHED STONE)
Steve Manning Construction Inc 5.000 $5,000.00 $25,000.00
Central Southern Construction Corp. 5.000 $1,000.00 $5,000.00
TNT General Contractors 5.000 $225.00 $1,125.00
Engineer's Estimate 5.000 SQYD $550.00 $2,750.00
A0660 62013-2000 STONE MASONRY
WALL
(GOVERNMENT
FURNISHED STONE)
Steve Manning Construction Inc 10.000 $3,500.00 $35,000.00
Central Southern Construction Corp. 10.000 $1,000.00 $10,000.00
TNT General Contractors 10.000 $225.00 $2,250.00
Engineer's Estimate 10.000 SQYD $3,030.00 $30,300.00
A0670 62027-0000 REMOVE AND
RESET STONE
MASONRY
Steve Manning Construction Inc 100.000 $500.00 $50,000.00
Central Southern Construction Corp. 100.000 $150.00 $15,000.00
TNT General Contractors 100.000 $120.00 $12,000.00
Engineer's Estimate 100.000 LNFT $300.00 $30,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0680 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
Steve Manning Construction Inc 25.000 $200.00 $5,000.00
Central Southern Construction Corp. 25.000 $160.00 $4,000.00
TNT General Contractors 25.000 $155.00 $3,875.00
Engineer's Estimate 25.000 HOUR $170.00 $4,250.00
A0690 62201-0550 BACKHOE LOADER,
6 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
24-INCH WIDTH
TNT General Contractors 25.000 $225.00 $5,625.00
Central Southern Construction Corp. 25.000 $200.00 $5,000.00
Steve Manning Construction Inc 25.000 $200.00 $5,000.00
Engineer's Estimate 25.000 HOUR $160.00 $4,000.00
A0700 62201-0950 WHEEL LOADER, 3
CUBIC YARD
MINIMUM RATED
CAPACITY
TNT General Contractors 25.000 $225.00 $5,625.00
Central Southern Construction Corp. 25.000 $200.00 $5,000.00
Steve Manning Construction Inc 25.000 $200.00 $5,000.00
Engineer's Estimate 25.000 HOUR $215.00 $5,375.00
A0710 62201-1450 BULLDOZER, 350HP
MINIMUM
FLYWHEEL POWER
Steve Manning Construction Inc 25.000 $400.00 $10,000.00
Central Southern Construction Corp. 25.000 $300.00 $7,500.00
TNT General Contractors 25.000 $245.00 $6,125.00
Engineer's Estimate 25.000 HOUR $320.00 $8,000.00
A0720 62201-2850 MOTOR GRADER,
12 FOOT
MINIMUM BLADE
Steve Manning Construction Inc 25.000 $350.00 $8,750.00
TNT General Contractors 25.000 $275.00 $6,875.00
Central Southern Construction Corp. 25.000 $250.00 $6,250.00
Engineer's Estimate 25.000 HOUR $220.00 $5,500.00
A0730 62201-3150 HYDRAULIC
EXCAVATOR, 1.0
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
TNT General Contractors 25.000 $265.00 $6,625.00
Central Southern Construction Corp. 25.000 $250.00 $6,250.00
Steve Manning Construction Inc 25.000 $250.00 $6,250.00
Engineer's Estimate 25.000 HOUR $235.00 $5,875.00 A0740 62301-0000 GENERAL LABOR Steve Manning
Construction Inc 40.000 $120.00 $4,800.00
Central Southern Construction Corp. 40.000 $65.00 $2,600.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0740 62301-0000 GENERAL LABOR TNT General Contractors 40.000 $45.00 $1,800.00
Engineer's Estimate 40.000 HOUR $90.00 $3,600.00
A0750 62302-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
Central Southern Construction Corp. 40.000 $300.00 $12,000.00
Steve Manning Construction Inc 40.000 $200.00 $8,000.00
TNT General Contractors 40.000 $100.00 $4,000.00
Engineer's Estimate 40.000 HOUR $190.00 $7,600.00
A0760 62302-1100 SPECIAL LABOR,
HIRED SURVEY
SERVICES
Steve Manning Construction Inc 40.000 $350.00 $14,000.00
Central Southern Construction Corp. 40.000 $300.00 $12,000.00
TNT General Contractors 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $220.00 $8,800.00
A0770 62303-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES TRIBAL
MONITOR
Steve Manning Construction Inc $80,000.00
TNT General Contractors $65,000.00
Central Southern Construction Corp. $35,000.00
Engineer's Estimate ALL LPSM LPSM $24,000.00
A0780 62303-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
Steve Manning Construction Inc $100,000.00
Central Southern Construction Corp. $40,000.00
TNT General Contractors $18,000.00
Engineer's Estimate ALL LPSM LPSM $36,000.00
A0790 62401-0100 PROVIDING AND
PLACING TOPSOIL,
2-INCH DEPTH
TNT General Contractors 32.000 $105.00 $3,360.00
Steve Manning Construction Inc 32.000 $70.00 $2,240.00
Central Southern Construction Corp. 32.000 $50.00 $1,600.00
Engineer's Estimate 32.000 SQYD $25.00 $800.00
A0800 62406-0300 PLACING
CONSERVED
TOPSOIL, 4-INCH
DEPTH
Steve Manning Construction Inc 1.000 $62,000.00 $62,000.00
Central Southern Construction Corp. 1.000 $21,000.00 $21,000.00
TNT General Contractors 1.000 $9,755.00 $9,755.00
Engineer's Estimate 1.000 ACRE $24,000.00 $24,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0810 62510-2000 SEEDING,
HYDRAULIC
METHOD
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00
TNT General Contractors 1.000 $3,000.00 $3,000.00
Engineer's Estimate 1.000 ACRE $3,500.00 $3,500.00
A0820 62511-1000 SEEDING, DRY
METHOD
Central Southern Construction Corp. 32.000 $15.00 $480.00
Steve Manning Construction Inc 32.000 $10.00 $320.00
TNT General Contractors 32.000 $2.75 $88.00
Engineer's Estimate 32.000 SQYD $15.00 $480.00
A0830 62515-2000 MULCHING,
HYDRAULIC
METHOD
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Steve Manning Construction Inc 1.000 $6,500.00 $6,500.00
TNT General Contractors 1.000 $6,200.00 $6,200.00
Engineer's Estimate 1.000 ACRE $3,800.00 $3,800.00 A0840 63301-0000 SIGN SYSTEM TNT General
Contractors 35.000 $12,545.00 $439,075.00
Central Southern Construction Corp. 35.000 $3,000.00 $105,000.00
Steve Manning Construction Inc 35.000 $1,200.00 $42,000.00
Engineer's Estimate 35.000 EACH $1,100.00 $38,500.00 A0850 63309-0000 DELINEATOR Central Southern
Construction Corp. 8.000 $125.00 $1,000.00
TNT General Contractors 8.000 $115.00 $920.00
Steve Manning Construction Inc 8.000 $100.00 $800.00
Engineer's Estimate 8.000 EACH $80.00 $640.00
A0860 63316-1000 REMOVE AND
RESET SIGN
SYSTEM
Steve Manning Construction Inc 7.000 $900.00 $6,300.00
TNT General Contractors 7.000 $625.00 $4,375.00
Central Southern Construction Corp. 7.000 $125.00 $875.00
Engineer's Estimate 7.000 EACH $500.00 $3,500.00
A0870 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
Central Southern Construction Corp. 40.000 $10,000.00 $400,000.00
TNT General Contractors 40.000 $6,200.00 $248,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0870 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
Steve Manning Construction Inc 40.000 $2,000.00 $80,000.00
Engineer's Estimate 40.000 MILE $2,300.00 $92,000.00
A0880 63402-0400 PAVEMENT
MARKINGS, TYPE B,
BROKEN
Steve Manning Construction Inc 2.000 $7,000.00 $14,000.00
TNT General Contractors 2.000 $6,200.00 $12,400.00
Central Southern Construction Corp. 2.000 $5,280.00 $10,560.00
Engineer's Estimate 2.000 MILE $965.00 $1,930.00
A0890 63405-0500 PAVEMENT
MARKINGS, TYPE B,
TURN ARROW
Steve Manning Construction Inc 3.000 $800.00 $2,400.00
Central Southern Construction Corp. 3.000 $750.00 $2,250.00
TNT General Contractors 3.000 $165.00 $495.00
Engineer's Estimate 3.000 EACH $310.00 $930.00
A0900 63405-0550 PAVEMENT
MARKINGS, TYPE B,
STRAIGHT ARROW
Steve Manning Construction Inc 8.000 $800.00 $6,400.00
Central Southern Construction Corp. 8.000 $750.00 $6,000.00
TNT General Contractors 8.000 $165.00 $1,320.00
Engineer's Estimate 8.000 EACH $280.00 $2,240.00
A0910 63405-0850 PAVEMENT
MARKINGS, TYPE B,
ACCESSIBILITY
SYMBOL
Steve Manning Construction Inc 11.000 $800.00 $8,800.00
Central Southern Construction Corp. 11.000 $750.00 $8,250.00
TNT General Contractors 11.000 $175.00 $1,925.00
Engineer's Estimate 11.000 EACH $350.00 $3,850.00
A0920 63501-0000 TEMPORARY
TRAFFIC CONTROL
TNT General Contractors $625,500.00
Steve Manning Construction Inc $595,000.00
Central Southern Construction Corp. $350,000.00
Engineer's Estimate ALL LPSM LPSM $25,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER
ROAD AND PARKING
Division: Central Federal Lands
Schedule: X Schedule Type: Option Lead Designer:
Solicitation No. : 6982AF25B000024 Opened at: Lakewood, CO Opened by: Jorey Deml State: CO County: Montezuma Federal Land: Mesa Verde National
Park Bid Open Date and Time: 11/13/2025
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$1,453,880.60
TNT General Contractors, 1358 N 200 W, Nephi, UT, 84648
$761,542.10
Steve Manning Construction Inc, 5211 Churn Creek Road, Redding, CA, 96002
$761,080.00
Engineer's Estimate $288,000.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Project No. : CO NP MEVE 201(1) Project Name: CEDAR TREE TOWER ROAD AND
PARKING
Schedule: X Schedule Type: Option
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
X0010 15101-0000 MOBILIZATION Central Southern Construction Corp. $400,000.00
TNT General Contractors $85,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
11/18/2025
Contract Specialist
X0010 15101-0000 MOBILIZATION Steve Manning Construction Inc $70,000.00
Engineer's Estimate ALL LPSM LPSM $30,094.60
X0020 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING
Steve Manning Construction Inc 0.178 $30,000.00 $5,340.00
TNT General Contractors 0.178 $8,500.00 $1,513.00
Central Southern Construction Corp. 0.178 $5,200.00 $925.60
Engineer's Estimate 0.178 MILE $4,300.00 $765.40
X0030 15301-0000 CONTRACTOR
QUALITY CONTROL
Central Southern Construction Corp. $255,000.00
TNT General Contractors $85,000.00
Steve Manning Construction Inc $40,000.00
Engineer's Estimate ALL LPSM LPSM $4,000.00
X0040 15401-0000 CONTRACTOR
TESTING
Central Southern Construction Corp. $130,000.00
TNT General Contractors $65,000.00
Steve Manning Construction Inc $40,000.00
Engineer's Estimate ALL LPSM LPSM $4,000.00
X0050 15501-0000 CONSTRUCTION
SCHEDULE
Central Southern Construction Corp. $130,000.00
Steve Manning Construction Inc $10,000.00
TNT General Contractors $2,500.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
X0060 15701-0000 SOIL EROSION
CONTROL
Central Southern Construction Corp. $80,000.00
TNT General Contractors $34,250.00
Steve Manning Construction Inc $25,000.00
Engineer's Estimate ALL LPSM LPSM $9,000.00
X0070 20101-0000 CLEARING AND
GRUBBING
Steve Manning Construction Inc 0.300 $40,000.00 $12,000.00
Central Southern Construction Corp. 0.300 $35,000.00 $10,500.00
TNT General Contractors 0.300 $6,292.00 $1,887.60
Engineer's Estimate 0.300 ACRE $4,800.00 $1,440.00 X0080 20301-2400 REMOVAL OF SIGN TNT General
Contractors 6.000 $650.00 $3,900.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0080 20301-2400 REMOVAL OF SIGN Steve Manning Construction Inc 6.000 $400.00 $2,400.00
Central Southern Construction Corp. 6.000 $100.00 $600.00
Engineer's Estimate 6.000 EACH $190.00 $1,140.00
X0090 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Steve Manning Construction Inc 70.000 $190.00 $13,300.00
Central Southern Construction Corp. 70.000 $80.00 $5,600.00
TNT General Contractors 70.000 $65.00 $4,550.00
Engineer's Estimate 70.000 TON $80.00 $5,600.00
X0100 30402-5200 FULL DEPTH
RECLAMATION,
METHOD 2, 4-INCH
DEPTH
Steve Manning Construction Inc 2,200.000 $42.00 $92,400.00
Central Southern Construction Corp. 2,200.000 $15.00 $33,000.00
TNT General Contractors 2,200.000 $0.46 $1,012.00
Engineer's Estimate 2,200.000 SQYD $3.00 $6,600.00
X0110 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
Steve Manning Construction Inc 500.000 $298.00 $149,000.00
Central Southern Construction Corp. 500.000 $250.00 $125,000.00
TNT General Contractors 500.000 $220.00 $110,000.00
Engineer's Estimate 500.000 TON $200.00 $100,000.00 X0120 40601-0000 FOG SEAL Central Southern
Construction Corp. 1.000 $2,000.00 $2,000.00
Steve Manning Construction Inc 1.000 $2,000.00 $2,000.00
TNT General Contractors 1.000 $900.00 $900.00
Engineer's Estimate 1.000 TON $1,000.00 $1,000.00 X0130 40605-0000 BLOTTER Central Southern
Construction Corp. 16.000 $200.00 $3,200.00
TNT General Contractors 16.000 $182.00 $2,912.00
Steve Manning Construction Inc 16.000 $50.00 $800.00
Engineer's Estimate 16.000 TON $50.00 $800.00
X0140 41102-1000 PRIME COAT,
METHOD 1
Central Southern Construction Corp. 2,200.000 $5.00 $11,000.00
TNT General Contractors 2,200.000 $4.50 $9,900.00
Steve Manning Construction Inc 2,200.000 $2.20 $4,840.00
Engineer's Estimate 2,200.000 SQYD $1.50 $3,300.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0150 41201-0000 TACK COAT Steve Manning Construction Inc 1.000 $2,000.00 $2,000.00
TNT General Contractors 1.000 $1,750.00 $1,750.00
Central Southern Construction Corp. 1.000 $1,500.00 $1,500.00
Engineer's Estimate 1.000 TON $1,200.00 $1,200.00
X0160 60704-0000 CLEANING
CULVERT IN PLACE
Central Southern Construction Corp. 2.000 $5,000.00 $10,000.00
TNT General Contractors 2.000 $3,560.00 $7,120.00
Steve Manning Construction Inc 2.000 $2,600.00 $5,200.00
Engineer's Estimate 2.000 EACH $2,550.00 $5,100.00
X0170 60707-0300 LINING 18-INCH
PIPE CULVERT
TNT General Contractors 50.000 $325.00 $16,250.00
Steve Manning Construction Inc 50.000 $300.00 $15,000.00
Central Southern Construction Corp. 50.000 $180.00 $9,000.00
Engineer's Estimate 50.000 LNFT $300.00 $15,000.00
X0180 60901-2900 CURB, STONE, TYPE
1, 6-INCH DEPTH
Steve Manning Construction Inc 40.000 $650.00 $26,000.00
Central Southern Construction Corp. 40.000 $200.00 $8,000.00
TNT General Contractors 40.000 $32.00 $1,280.00
Engineer's Estimate 40.000 LNFT $250.00 $10,000.00
X0190 61108-1000 ADJUST WATER
VALVE
Steve Manning Construction Inc 1.000 $3,500.00 $3,500.00
Central Southern Construction Corp. 1.000 $1,500.00 $1,500.00
TNT General Contractors 1.000 $920.00 $920.00
Engineer's Estimate 1.000 EACH $1,200.00 $1,200.00
X0200 61108-3000 ADJUST WATER
METER
Steve Manning Construction Inc 2.000 $3,500.00 $7,000.00
Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00
TNT General Contractors 2.000 $920.00 $1,840.00
Engineer's Estimate 2.000 EACH $1,800.00 $3,600.00
X0210 62001-0300 CLASS A MASONRY,
COURSE POINTED
FINISH
Steve Manning Construction Inc 4.000 $10,000.00 $40,000.00
Central Southern Construction Corp. 4.000 $5,000.00 $20,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0210 62001-0300 CLASS A MASONRY,
COURSE POINTED
FINISH
TNT General Contractors 4.000 $375.00 $1,500.00
Engineer's Estimate 4.000 CUYD $530.00 $2,120.00 X0220 62002-0000 STONE MASONRY Steve Manning
Construction Inc 2.000 $5,000.00 $10,000.00
Central Southern Construction Corp. 2.000 $1,000.00 $2,000.00
TNT General Contractors 2.000 $375.00 $750.00
Engineer's Estimate 2.000 SQYD $550.00 $1,100.00 X0230 62301-0000 GENERAL LABOR Steve Manning
Construction Inc 10.000 $120.00 $1,200.00
Central Southern Construction Corp. 10.000 $65.00 $650.00
TNT General Contractors 10.000 $45.00 $450.00
Engineer's Estimate 10.000 HOUR $90.00 $900.00
X0240 62302-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
Central Southern Construction Corp. 10.000 $300.00 $3,000.00
Steve Manning Construction Inc 10.000 $200.00 $2,000.00
TNT General Contractors 10.000 $100.00 $1,000.00
Engineer's Estimate 10.000 HOUR $190.00 $1,900.00
X0250 62302-1100 SPECIAL LABOR,
HIRED SURVEY
SERVICES
Steve Manning Construction Inc 10.000 $350.00 $3,500.00
Central Southern Construction Corp. 10.000 $300.00 $3,000.00
TNT General Contractors 10.000 $150.00 $1,500.00
Engineer's Estimate 10.000 HOUR $220.00 $2,200.00
X0260 62303-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES (TRIBAL
MONITOR)
TNT General Contractors $35,000.00
Steve Manning Construction Inc $16,000.00
Central Southern Construction Corp. $10,000.00
Engineer's Estimate ALL LPSM LPSM $3,000.00
X0270 62303-1020 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
ARCHEOLOGICAL
SERVICES
Central Southern Construction Corp. $15,000.00
TNT General Contractors $15,000.00
Steve Manning Construction Inc $10,000.00
Engineer's Estimate ALL LPSM LPSM $4,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0280 62406-0300 PLACING
CONSERVED
TOPSOIL, 4-INCH
DEPTH
Steve Manning Construction Inc 0.300 $62,000.00 $18,600.00
Central Southern Construction Corp. 0.300 $21,000.00 $6,300.00
TNT General Contractors 0.300 $9,755.00 $2,926.50
Engineer's Estimate 0.300 ACRE $24,000.00 $7,200.00
X0290 62510-2000 SEEDING,
HYDRAULIC
METHOD
Central Southern Construction Corp. 0.300 $10,000.00 $3,000.00
Steve Manning Construction Inc 0.300 $3,500.00 $1,050.00
TNT General Contractors 0.300 $3,000.00 $900.00
Engineer's Estimate 0.300 ACRE $3,500.00 $1,050.00
X0300 62515-2000 MULCHING,
HYDRAULIC
METHOD
Central Southern Construction Corp. 0.300 $10,000.00 $3,000.00
Steve Manning Construction Inc 0.300 $6,500.00 $1,950.00
TNT General Contractors 0.300 $4,020.00 $1,206.00
Engineer's Estimate 0.300 ACRE $3,800.00 $1,140.00 X0310 63301-0000 SIGN SYSTEM Central Southern
Construction Corp. 33.000 $3,000.00 $99,000.00
Steve Manning Construction Inc 33.000 $1,200.00 $39,600.00
TNT General Contractors 33.000 $625.00 $20,625.00
Engineer's Estimate 33.000 EACH $1,100.00 $36,300.00 X0320 63309-0000 DELINEATOR Central Southern
Construction Corp. 5.000 $125.00 $625.00
TNT General Contractors 5.000 $115.00 $575.00
Steve Manning Construction Inc 5.000 $100.00 $500.00
Engineer's Estimate 5.000 EACH $80.00 $400.00
X0330 63316-1000 REMOVE AND
RESET SIGN
SYSTEM
Central Southern Construction Corp. 1.000 $1,000.00 $1,000.00
Steve Manning Construction Inc 1.000 $900.00 $900.00
TNT General Contractors 1.000 $625.00 $625.00
Engineer's Estimate 1.000 EACH $500.00 $500.00
X0340 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
TNT General Contractors 1.000 $62,000.00 $62,000.00
Central Southern Construction Corp. 1.000 $18,480.00 $18,480.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0340 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
Steve Manning Construction Inc 1.000 $10,000.00 $10,000.00
Engineer's Estimate 1.000 MILE $2,350.00 $2,350.00
X0350 63501-0000 TEMPORARY
TRAFFIC CONTROL
TNT General Contractors $180,000.00
Steve Manning Construction Inc $80,000.00
Central Southern Construction Corp. $50,000.00
Engineer's Estimate ALL LPSM LPSM $10,000.00
Report Generated on 11/18/2025 2:05 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]