Questions and Answers 09 21 2026 ND NP THRO 204(1) Buck Hill Road.pdf
PDF 93 KB Posted
- Attached to
- ND NP THRO 204(1) Buck Hill Road
- Solicitation number
- 6982AF25B000004
About this file
This is a Questions & Answers document for federal contract opportunity 6982AF25B000004, ND NP THRO 204(1) Buck Hill Road, dated September 21, 2026. The document addresses contractor inquiries regarding the landslide stabilization project scope currently in pre-solicitation phase.
The single Q&A addresses a contractor's inquiry about submitting a value-engineered alternative solution to the planned excavate/replace stabilization operation. Specifically, the contractor proposed using soil nail stabilization to minimize disturbance within the National Park. The Owner's response clarifies that contractors must bid the project in accordance with the plans as currently designed. However, the successful contractor is permitted to submit a value engineering (VE) proposal for Owner evaluation following contract award, allowing for consideration of alternative methodologies post-award rather than during the solicitation phase.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF25B000004
ND NP THRO 204(1) Buck Hill Road
Questions & Answers 9/21/26 Page | 1
Questions Answers
1Q. In response to the Buck Hill Road landslide stabilization scope that is currently in pre-solicitation, would the Owner be interested in a value engineered solution alternative to stabilize the landslide? The current description details a large excavate/replace operation, and we could likely minimize disturbance in the National Park with a soil nail stabilization option.
Please let me know if we can discuss.
1A. The Contractor needs to bid the plans as
is. The successful Contractor can submit a VE proposal for evaluation after award.