ND NP THRO 204(1) Buck Hill Road
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 6982AF25B000004
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Medora, North Dakota, United States
- Points of contact
-
- Stephanie Navarro cflacquisitions@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration intends to solicit roadway rehabilitation and parking lot reconstruction at Buck Hill Road (Route 204) within Theodore Roosevelt National Park in Billings County, North Dakota, with responses due September 30, 2026, and anticipates a HUBZone set-aside.
Work is performed entirely within the national park near Medora, North Dakota, in mountainous terrain at elevation 2,500 to 2,800 feet. The project comprises three major components: approximately one mile of roadway rehabilitation including pulverization, new aggregate placement, hot asphalt concrete pavement, and guardrail replacement; approximately 1,000 linear feet of deep subexcavation to address an existing landslide, involving removal of unsuitable material to ten feet depth and replacement with suitable material, geosynthetic reinforcement, and subsurface drainage; and reconstruction of the existing Buck Hill Overlook parking lot with expanded capacity and accommodation for larger vehicles. Roadway work includes new paved ditches, concrete curb and gutter, drainage inlets, culverts, striping, and signage. A geotechnical report will accompany the PS&E package.
The solicitation calls for one base schedule with no options. Contractors must bid in accordance with current plans as designed; value-engineering proposals for alternative methodologies such as soil nail stabilization are permitted for owner evaluation following contract award, not during solicitation. NAICS 237310 (Highway, Street, and Bridge Construction) applies.
Notice text
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Full and Open Competition with a HUBZone Set-Aside
PROJECT DESCRIPTION: ND NP THRO 204(1) Buck Hill Road
Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options.
SCOPE OF THE WORK:
The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot.
The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage.
The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package.
Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area.
Project restrictions include the following:
- The Contractor may close Buck Hill Road for the duration of construction.
- A Paleontological Monitor will be present for all ground disturbing activities.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 11,000 cubic yards of subexcavation
- 1,000 linear feet of geocomposite sheet drain
- 2,000 tons of hot asphalt concrete pavement
- 5,000 tons of roadway aggregate
- 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused)
- 5,100 linear feet of concrete curb and gutter (tan and onyx colored)
- 650 square yards of concrete sidewalk (tan colored)
- 1,600 linear feet of guardrail
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award - January 2027
Construction – April 2027 through November 2027
ESTIMATED COST RANGE:
Between $5,000,000 and $10,000,000
Files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 09 21 2026 ND NP THRO 204(1) Buck Hill Road.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| ND NP THRO 204(1) Buck Hill Road | Solicitation | |
| This notice | Pre-Solicitation | |
| ND NP THRO 204(1) Buck Hill Road - Pre-Bid Meeting | Special Notice | |
| ND NP THRO 204(1) Buck Hill Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Asphalt Repair at Carl Sandburg Historic Site | Interior Business Center | Total Small Business | |
| Road Maintenance - Sheyenne. Roadway reconditioning and aggregate surface place and aggregate spot surfacing | Forest Service | Total Small Business | |
| CO-rocky MTN arsnl NWR-patch hill road | — | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity