This federal contract solicitation is for storm repair work along Palomarin Road within Point Reyes National Seashore in California. The project includes embankment slope repairs and stabilization adjacent to a culvert crossing Arroyo Hondo Creek, where a slope failure occurred due to heavy rainfall and runoff in late 2022 and early 2023. The work will be performed in natural resource sensitive areas and is subject to environmental constraints that may impact the construction schedule and operations. The solicitation was issued by the Department of Transportation Federal Highway Administration. It provides details on the location and nature of the required repair work but does not specify pricing terms, response dates, or other procurement details.

View the file

Other files

File Type Posted
Tabulation of Bids Palomarin 3.15.24.pdf PDF
Bid Opening Summary Palomarin Road.pdf PDF
Amendment A002.pdf PDF
QnA 3.04.24.pdf PDF
QnA 2.23.24.pdf PDF
6982AF24B000002 Interested Vendors 2.23.24.pdf PDF
QnA 2.9.24.pdf PDF
CA_ERFO_NP_PORE_2023-1(1) Plans.pdf PDF
6982AF24B000002.pdf PDF
FP-14.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A001 02/23/2024 HFLCEO230501PR CA ERFO NP PORE 2023-1(1)

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: CONTRACT SPECIALIST NAME

6905001

6982AF24B000002

02/07/2024

0*

*See Item 14

IFB

Remove and replace Table of Contents, A-6, E-8, E-10, E-11, E-25 with the attached corresponding pages. Remove Appendix A in its entirety.

Plans Remove and replace sheets B1, C1, and G1 with the attached corresponding pages.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE

SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................ A-4

Solicitation Provisions .....................................................................................................B-7

Contract Clauses ..............................................................................................................C-1

Construction Wage Rate Requirement ............................................................................ D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-16 Division 200 ................................................................................................................... E-25 Division 300 ................................................................................................................... E-28 Division 400 ......................................................................................................... SEE FP-14 Division 500 ......................................................................................................... SEE FP-14 Division 600 ................................................................................................................... E-29 Division 700 ......................................................................................................... SEE FP-14

APPENDICES

Appendix A .......................................................................................................... 404 Permit

PROJECT OVERVIEW

This project includes embankment slope repairs and stabilization on Palomarin Road adjacent to the culvert crossing at Arroyo Hondo Creek within Point Reyes National Seashore, CA. The embankment slope failure occurred as a result of the heavy Atmospheric River storm and extreme runoff in December 2022 and January 2023.

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

Amendment A001 02.23.2024

Leslie.Karsten Cross-Out

A - 6

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0100 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0140 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0160 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0180 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0200 15701-0000 SOIL EROSION CONTROL

ALL LPSM $___LPSM_____ $____________

A0220 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A001 A0240 20103-0000 CLEARING AND GRUBBING

285 SQYD $____________ $____________

A001 A0260 25201-0000 SPECIAL ROCK EMBANKMENT

380 CUYD $____________ $____________

A0280 30202-2000 ROADWAY AGGREGATE, METHOD 2

90 TON $____________ $____________

A0300 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

20 HOUR $____________ $____________

A0320 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

40 HOUR $____________ $____________

A0340 62301-0000 GENERAL LABOR

20 HOUR $____________ $____________

A0360 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

290 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:CA ERFO NP PORE 2023-1(1)

Project Name:Storm Repairs

Amendment A001 02.23.2024

E-8

CA ERFO NP PORE 2023-1(1)

STORM REPAIRS

PMIS No. 334576

Section Description Material Material Property Or Specification

Frequency Certification Sample

722 Anchor Material As specified As applicable 1 per shipment per material type

725 Miscellaneous materials As specified As applicable

1 per shipment per material type

Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

107.01 Laws to be Observed. Add the following:

Section 401 and 404 of the Clean Water Act.

Comply with the terms and conditions of any permits that authorize the discharge of dredged or fill material in waters of the U.S., including Section 404 permits and Section 401 water quality certifications.

107.02 Protection and Restoration of Property and Landscape.

Add the following at the end of the fifth paragraph:

If any of the landscape, outside of the construction limits or within the construction limits, that is designated to be protected or to remain is disturbed, the Contractor will restore or mitigate the area as determined by the CO, at no additional cost to the Government.

Restore all areas used as staging and/or stockpiling areas to their pre-construction condition at no cost to the Government.

There are no known utilities within the project limits.

107.10 Environmental Protection.

(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq. Add the following:

(4) Do not ford running streams with construction equipment. Obtain approval from the CO to use temporary bridges or other structures whenever crossings are necessary.

(5) Immediately clear ephemeral drainages, intermittent and perennial streams, lakes and reservoirs of all work items, debris or other obstructions placed by or resulting from construction operations.

Amendment A001 02.23.2024

E-10

STORM REPAIRS

PMIS No. 334576 construction activities within California red-legged frog aquatic breeding habitat, including drainages and wetlands.

(3) Submit resumes and qualifications for the biological monitor at least 14 days prior to commencing construction. Qualified biologists shall have a minimum of a Bachelor’s Degree in the biological sciences and previous experience performing similar studies.

(4) Construction personnel will be taught how to identify the California red-legged frog.

Notify the CO immediately if a California red-legged frog is seen in or near proposed project activities. If the California red-legged frog is spotted within the construction site, work will cease within 100 feet of the animal, the biological monitor will evaluate the animal, and the animal will not be disturbed if it is not in danger and will be allowed to exit the work area on its own. Work may continue after the animal has exited the work site.

(5) To minimize impacts, BMPs must be in place to protect the stream, its banks, and the surrounding riparian habitat.

(6) The Arroyo Hondo stream, starting 0.35 miles south of the project, will be clearly delineated and no disturbance will occur further south of that delineation.

(7) For clearing and grubbing operations, cut vegetation horizontally, parallel to the ground, no closer than 18 inches above the ground to avoid hitting any red legged frog that may be sitting on the ground. Cut brush will then be moved from the area, and the biological monitor will search for frogs by gently raking the ground before the remaining vegetation is completely removed.

(8) Dewater according to Section 208.07, 401 water quality certification and Section 404 nationwide permit 14 for all in water work.

107.11 Protection of Forests, Parks, and Public Lands. Add the following:

Comply with the Point Reyes National Seashore Fire Management Plan below:

Fire Plan. Contact Point Reyes National Seashore Fire Management Officer to obtain a current copy of the Fire Step Up Plan (latest edition). Keep a current copy on-site and follow all applicable requirements and restrictions.

Fire Danger Rating – High:

All fires are banned within the National Seashore. Only self-contained gas stoves, self-contained charcoal barbecues (such as Weber’s) and the PORE-provided cooking grills are allowed in designated campgrounds and picnic areas.

Fire Danger Rating – Very High, Extreme, or Red Flag Warning:

Amendment A001 02.23.2024

E-11

STORM REPAIRS

PMIS No. 334576

All fires, including charcoal fires, are banned within the Seashore. Only self-contained gas stoves are allowed in designated campgrounds and picnic areas. All smoking is banned on all PORE trails and in backcountry areas in the PORE.

Do not use equipment such as chain saws, lawn mowers, weed eaters, welders, and other potential ignition sources outside of developed areas in the PORE. Developed areas are defined as areas where administrative or recreation facilities are situated, where the grounds are hardened (i.e., compacted dirt, chip-seal, gravel), and where vegetation within the area or surrounding the site is intensively managed on a year around basis (i.e., mowed, grazed, trimmed, irrigated). Developed areas may also include areas where defensible space (30 foot clearance of vegetation) has been established. Exemptions to this must have mitigation measures in place pre-approved by the Fire Duty Officer and the Superintendent.

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

Limit operations according to Subsection 107.10(e) and Section 156.

Limit operations as follows:

(a) Do not draw water for dust control from surface waters.

(b) No on-site work, including mobilization shall be performed until after 4/22/2024

(c) No work shall be performed below the ordinary high water mark of Arroyo Hondo Creek prior to the government receiving the Section 404 permit and Section 401 water quality certification (expected prior to 4/15/2024).

Perform no work except to maintain traffic control devices, erosion control devices, the roadway driving surface, and to control dust during the listed Federal holidays and surrounding days as shown in Table 108-2.

Amendment A001 02.23.2024

E-25

STORM REPAIRS

PMIS No. 334576

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

157.04 General. Delete the entire subsection and substitute the following:

Provide and implement a site-specific soil erosion and sediment control plan coordinated with the Contractor’s operations. Develop a soil erosion and sediment control plan to include necessary measures to prevent erosion and keep eroded soil particles from leaving the construction site. Submit the soil erosion and sediment control plan to the CO for approval 30 days prior to the start of ground disturbing activities.

Do not modify the approved type, size, or location of controls or practices without prior approval from the CO.

When soil erosion and sediment control measures are not functioning as intended, take immediate corrective action to eliminate or minimize pollutants in stormwater discharges from the project.

If wood chips are used, do not import without approval from the CO.

Provide certified weed free devices.

Do not use monofilament plastic for erosion or sediment control products.

Perform dewatering as per Section 208 and in accordance with the Section 404 permit and Section 401 water quality certification.

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Construction Requirements

203.05 Disposing of Material. Add the following:

Remove debris at the culvert outlet, prior to beginning construction activities, as shown on the plans, and as directed and approved by the CO.

(a) Remove from Project. Add the following:

Secure clearances according to Subsection 107.10.

(b) Burn. Delete the subsection.

(c) Bury. Delete the subsection.

Amendment A001 02.23.2024

Appendix A 404 Permit

Amendment A001 02.23.2024

US Army Corps of Engineers®

2021 Nationwide Permits

Index of 2021 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions1

Nationwide Permits

1. Aids to Navigation

2. Structures in Artificial Canals

3. Maintenance

4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

5. Scientific Measurement Devices

6. Survey Activities

7. Outfall Structures and Associated Intake Structures

8. Oil and Gas Structures on the Outer Continental Shelf

9. Structures in Fleeting and Anchorage Areas

10. Mooring Buoys

11. Temporary Recreational Structures

12. Oil or Natural Gas Pipeline Activities

13. Bank Stabilization

14. Linear Transportation Projects

15. U.S. Coast Guard Approved Bridges

16. Return Water From Upland Contained Disposal Areas

17. Hydropower Projects

18. Minor Discharges

19. Minor Dredging

20. Response Operations for Oil or Hazardous Substances

21. Surface Coal Mining Activities

22. Removal of Vessels

23. Approved Categorical Exclusions

24. Indian Tribe or State Administered Section 404 Programs

25. Structural Discharges

27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities

28. Modifications of Existing Marinas

29. Residential Developments

30. Moist Soil Management for Wildlife

31. Maintenance of Existing Flood Control Facilities

1 The 2021 Nationwide Permits, General Conditions, District Engineer’s Decision, Further Information, and Def initions were published in the Federal Register on January 13, 2021 (86 FR 2744, and the correction at 86 FR 27274) and December 27, 2021 (86 FR 73522).

Amendment A001 02.23.2024

32. Completed Enforcement Actions

33. Temporary Construction, Access, and Dewatering

34. Cranberry Production Activities

35. Maintenance Dredging of Existing Basins

36. Boat Ramps

37. Emergency Watershed Protection and Rehabilitation

38. Cleanup of Hazardous and Toxic Waste

39. Commercial and Institutional Developments

40. Agricultural Activities

41. Reshaping Existing Drainage Ditches

42. Recreational Facilities

43. Stormwater Management Facilities

44. Mining Activities

45. Repair of Uplands Damaged by Discrete Events

46. Discharges in Ditches

48. Commercial Shellfish Mariculture Activities

49. Coal Remining Activities

50. Underground Coal Mining Activities

51. Land-Based Renewable Energy Generation Facilities

52. Water-Based Renewable Energy Generation Pilot Projects

53. Removal of Low-Head Dams

54. Living Shorelines

55. Seaweed Mariculture Activities

56. Finfish Mariculture Activities

57. Electric Utility Line and Telecommunications Activities

58. Utility Line Activities for Water and Other Substances

59. Water Reclamation and Reuse Facilities

Nationwide Permit General Conditions

1. Navigation

2. Aquatic Life Movements

3. Spawning Areas

4. Migratory Bird Breeding Areas

5. Shellfish Beds

6. Suitable Material

7. Water Supply Intakes

8. Adverse Effects from Impoundments

9. Management of Water Flows

10. Fills Within 100-Year Floodplains

11. Equipment

12. Soil Erosion and Sediment Controls

13. Removal of Temporary Fills

14. Proper Maintenance

15. Single and Complete Project

Amendment A001 02.23.2024

16. Wild and Scenic Rivers

17. Tribal Rights

18. Endangered Species

19. Migratory Birds and Bald and Golden Eagles

20. Historic Properties

21. Discovery of Previously Unknown Remains and Artifacts

22. Designated Critical Resource Waters

23. Mitigation

24. Safety of Impoundment Structures

25. Water Quality

26. Coastal Zone Management

27. Regional and Case-by-Case Conditions

28. Use of Multiple Nationwide Permits

29. Transfer of Nationwide Permit Verifications

30. Compliance Certification

31. Activities Affecting Structures or Works Built by the United States

32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Nationwide Permit Definitions

Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Ecological reference Enhancement Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Loss of waters of the United States Navigable waters Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Re-establishment

Amendment A001 02.23.2024

Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Tribal lands Tribal rights Vegetated shallows Waterbody

Nationwide Permits

1. Aids to Navigation. The placement of aids to navigation and regulatory markers that are approved by and installed in accordance with the requirements of the U.S. Coast Guard (see 33 CFR, chapter I, subchapter C, part 66). (Authority: Section 10 of the Rivers and Harbors Act of 1899 (Section 10))

2. Structures in Artificial Canals. Structures constructed in artificial canals within principally residential developments where the connection of the canal to a navigable water of the United States has been previously authorized (see 33 CFR 322.5(g)).

(Authority: Section 10)

3. Maintenance. (a) The repair, rehabilitation, or replacement of any previously authorized, currently serviceable structure or fill, or of any currently serviceable structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for it in the original permit or the most recently authorized modification. Minor deviations in the structure's configuration or filled area, including those due to changes in materials, construction techniques, requirements of other regulatory agencies, or current construction codes or safety standards that are necessary to make the repair, rehabilitation, or replacement are authorized. This NWP also authorizes the removal of previously authorized structures or fills. Any stream channel modification is limited to the minimum necessary for the repair, rehabilitation, or replacement of the structure or fill; such modifications, including the removal of material from the stream channel, must be immediately adjacent to the project. This NWP also authorizes the removal of accumulated sediment and debris within, and in the immediate vicinity of, the structure or fill. This NWP also authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire or other discrete events, provided the

Amendment A001 02.23.2024 repair, rehabilitation, or replacement is commenced, or is under contract to commence, within two years of the date of their destruction or damage. In cases of catastrophic events, such as hurricanes or tornadoes, this two-year limit may be waived by the district engineer, provided the permittee can demonstrate funding, contract, or other similar delays.

(b) This NWP also authorizes the removal of accumulated sediments and debris outside the immediate vicinity of existing structures (e.g., bridges, culverted road crossings, water intake structures, etc.). The removal of sediment is limited to the minimum necessary to restore the waterway in the vicinity of the structure to the approximate dimensions that existed when the structure was built, but cannot extend farther than 200 feet in any direction from the structure. This 200 foot limit does not apply to maintenance dredging to remove accumulated sediments blocking or restricting outfall and intake structures or to maintenance dredging to remove accumulated sediments from canals associated with outfall and intake structures. All dredged or excavated materials must be deposited and retained in an area that has no waters of the United States unless otherwise specifically approved by the district engineer under separate authorization.

(c) This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to conduct the maintenance activity. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges of dredged or fill material, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows.

After conducting the maintenance activity, temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate.

(d) This NWP does not authorize maintenance dredging for the primary purpose of navigation. This NWP does not authorize beach restoration. This NWP does not authorize new stream channelization or stream relocation projects.

Notification: For activities authorized by paragraph (b) of this NWP, the permittee must submit a pre-construction notification to the district engineer prior to commencing the activity (see general condition 32). The pre-construction notification must include information regarding the original design capacities and configurations of the outfalls, intakes, small impoundments, and canals. (Authorities: Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (Sections 10 and 404))

Note: This NWP authorizes the repair, rehabilitation, or replacement of any previously authorized structure or fill that does not qualify for the Clean Water Act Section 404(f) exemption for maintenance.

Amendment A001 02.23.2024

4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities.

Fish and wildlife harvesting devices and activities such as pound nets, crab traps, crab dredging, eel pots, lobster traps, duck blinds, and clam and oyster digging, fish aggregating devices, and small fish attraction devices such as open water fish concentrators (sea kites, etc.). This NWP does not authorize artificial reefs or impoundments and semi-impoundments of waters of the United States for the culture or holding of motile species such as lobster, or the use of covered oyster trays or clam racks. (Authorities: Sections 10 and 404)

5. Scientific Measurement Devices. Devices, whose purpose is to measure and record scientific data, such as staff gages, tide and current gages, meteorological stations, water recording and biological observation devices, water quality testing and improvement devices, and similar structures. Small weirs and flumes constructed primarily to record water quantity and velocity are also authorized provided the discharge of dredged or fill material is limited to 25 cubic yards. Upon completion of the use of the device to measure and record scientific data, the measuring device and any other structures or fills associated with that device (e.g., foundations, anchors, buoys, lines, etc.) must be removed to the maximum extent practicable and the site restored to pre-construction elevations. (Authorities: Sections 10 and 404)

6. Survey Activities. Survey activities, such as core sampling, seismic exploratory operations, plugging of seismic shot holes and other exploratory-type bore holes, exploratory trenching, soil surveys, sampling, sample plots or transects for wetland delineations, and historic resources surveys. For the purposes of this NWP, the term “exploratory trenching” means mechanical land clearing of the upper soil profile to expose bedrock or substrate, for the purpose of mapping or sampling the exposed material. The area in which the exploratory trench is dug must be restored to its pre-construction elevation upon completion of the work and must not drain a water of the United States. In wetlands, the top 6 to 12 inches of the trench should normally be backfilled with topsoil from the trench. This NWP authorizes the construction of temporary pads, provided the discharge of dredged or fill material does not exceed 1/10-acre in waters of the U.S. Discharges of dredged or fill material and structures associated with the recovery of historic resources are not authorized by this NWP.

Drilling and the discharge of excavated material from test wells for oil and gas exploration are not authorized by this NWP; the plugging of such wells is authorized. Fill placed for roads and other similar activities is not authorized by this NWP. The NWP does not authorize any permanent structures. The discharge of drilling mud and cuttings may require a permit under Section 402 of the Clean Water Act. (Authorities: Sections 10 and 404)

7. Outfall Structures and Associated Intake Structures. Activities related to the construction or modification of outfall structures and associated intake structures, where the effluent from the outfall is authorized, conditionally authorized, or specifically exempted by, or otherwise in compliance with regulations issued under the National Pollutant Discharge Elimination System Program (Section 402 of the Clean Water Act).

Amendment A001 02.23.2024

The construction of intake structures is not authorized by this NWP unless they are directly associated with an authorized outfall structure.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity. (See general condition 32.) (Authorities:

Sections 10 and 404)

8. Oil and Gas Structures on the Outer Continental Shelf. Structures for the exploration, production, and transportation of oil, gas, and minerals on the outer continental shelf within areas leased for such purposes by the Department of the Interior, Bureau of Ocean Energy Management. Such structures shall not be placed within the limits of any designated shipping safety fairway or traffic separation scheme, except temporary anchors that comply with the fairway regulations in 33 CFR 322.5(l). The district engineer will review such proposals to ensure compliance with the provisions of the fairway regulations in 33 CFR 322.5(l). Any Corps review under this NWP will be limited to the effects on navigation and national security in accordance with 33 CFR 322.5(f), as well as 33 CFR 322.5(l) and 33 CFR part 334. Such structures will not be placed in established danger zones or restricted areas as designated in 33 CFR part 334, nor will such structures be permitted in EPA or Corps-designated dredged material disposal areas.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity. (See general condition 32.) (Authority:

Section 10)

9. Structures in Fleeting and Anchorage Areas. Structures, buoys, floats, and other devices placed within anchorage or fleeting areas to facilitate moorage of vessels where such areas have been established for that purpose. (Authority: Section 10)

10. Mooring Buoys. Non-commercial, single-boat, mooring buoys. (Authority: Section 10)

11. Temporary Recreational Structures. Temporary buoys, markers, small floating docks, and similar structures placed for recreational use during specific events such as water skiing competitions and boat races or seasonal use, provided that such structures are removed within 30 days after use has been discontinued. At Corps of Engineers reservoirs, the reservoir managers must approve each buoy or marker individually.

(Authority: Section 10)

12. Oil or Natural Gas Pipeline Activities. Activities required for the construction, maintenance, repair, and removal of oil and natural gas pipelines and associated facilities in waters of the United States, provided the activity does not result in the loss of greater than 1/2-acre of waters of the United States for each single and complete project.

Amendment A001 02.23.2024

Oil or natural gas pipelines: This NWP authorizes discharges of dredged or fill material into waters of the United States and structures or work in navigable waters for crossings of those waters associated with the construction, maintenance, or repair of oil and natural gas pipelines. There must be no change in pre-construction contours of waters of the United States. An “oil or natural gas pipeline” is defined as any pipe or pipeline for the transportation of any form of oil or natural gas, including products derived from oil or natural gas, such as gasoline, jet fuel, diesel fuel. heating oil, petrochemical feedstocks, waxes, lubricating oils, and asphalt.

Material resulting from trench excavation may be temporarily sidecast into waters of the United States for no more than three months, provided the material is not placed in such a manner that it is dispersed by currents or other forces. The district engineer may extend the period of temporary side casting for no more than a total of 180 days, where appropriate. In wetlands, the top 6 to 12 inches of the trench should normally be backfilled with topsoil from the trench. The trench cannot be constructed or backfilled in such a manner as to drain waters of the United States (e.g., backfilling with extensive gravel layers, creating a french drain effect). Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line crossing of each waterbody.

Oil or natural gas pipeline substations: This NWP authorizes the construction, maintenance, or expansion of substation facilities (e.g., oil or natural gas or gaseous fuel custody transfer stations, boosting stations, compression stations, metering stations, pressure regulating stations) associated with an oil or natural gas pipeline in non-tidal waters of the United States, provided the activity, in combination with all other activities included in one single and complete project, does not result in the loss of greater than 1/2-acre of waters of the United States. This NWP does not authorize discharges of dredged or fill material into non-tidal wetlands adjacent to tidal waters of the United States to construct, maintain, or expand substation facilities.

Foundations for above-ground oil or natural gas pipelines: This NWP authorizes the construction or maintenance of foundations for above-ground oil or natural gas pipelines in all waters of the United States, provided the foundations are the minimum size necessary.

Access roads: This NWP authorizes the construction of access roads for the construction and maintenance of oil or natural gas pipelines, in non-tidal waters of the United States, provided the activity, in combination with all other activities included in one single and complete project, does not cause the loss of greater than 1/2-acre of non-tidal waters of the United States. This NWP does not authorize discharges of dredged or fill material into non-tidal wetlands adjacent to tidal waters for access roads.

Access roads must be the minimum width necessary (see Note 2, below). Access roads must be constructed so that the length of the road minimizes any adverse effects on waters of the United States and must be as near as possible to pre-construction contours and elevations (e.g., at grade corduroy roads or geotextile/gravel roads).

Amendment A001 02.23.2024

Access roads constructed above pre-construction contours and elevations in waters of the United States must be properly bridged or culverted to maintain surface flows.

This NWP may authorize oil or natural gas pipelines in or affecting navigable waters of the United States even if there is no associated discharge of dredged or fill material (see 33 CFR part 322). Oil or natural gas pipelines routed in, over, or under section 10 waters without a discharge of dredged or fill material may require a section 10 permit.

This NWP authorizes, to the extent that Department of the Army authorization is required, temporary structures, fills, and work necessary for the remediation of inadvertent returns of drilling fluids to waters of the United States through sub-soil fissures or fractures that might occur during horizontal directional drilling activities conducted for the purpose of installing or replacing oil or natural gas pipelines. These remediation activities must be done as soon as practicable, to restore the affected waterbody. District engineers may add special conditions to this NWP to require a remediation plan for addressing inadvertent returns of drilling fluids to waters of the United States during horizontal directional drilling activities conducted for the purpose of installing or replacing oil or natural gas pipelines.

This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to conduct the oil or natural gas pipeline activity.

Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges of dredged or fill material, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. After construction, temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if: (1) a section 10 permit is required; (2) the discharge will result in the loss of greater than 1/10-acre of waters of the United States;

or (3) the proposed oil or natural gas pipeline activity is associated with an overall project that is greater than 250 miles in length and the project purpose is to install new pipeline (vs. conduct repair or maintenance activities) along the majority of the distance of the overall project length. If the proposed oil or gas pipeline is greater than 250 miles in length, the pre-construction notification must include the locations and proposed impacts (in acres or other appropriate unit of measure) for all crossings of waters of the United States that require DA authorization, including those crossings authorized by an NWP would not otherwise require pre-construction notification. (See general condition 32.) (Authorities: Sections 10 and 404)

Note 1: Where the oil or natural gas pipeline is constructed, installed, or maintained in navigable waters of the United States (i.e., section 10 waters) within the coastal United States, the Great Lakes, and United States territories, a copy of the NWP verification

Amendment A001 02.23.2024 will be sent by the Corps to the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), for charting the oil or natural gas pipeline to protect navigation.

Note 2: For oil or natural gas pipeline activities crossing a single waterbody more than one time at separate and distant locations, or multiple waterbodies at separate and distant locations, each crossing is considered a single and complete project for purposes of NWP authorization. Oil or natural gas pipeline activities must comply with 33 CFR 330.6(d).

Note 3: Access roads used for both construction and maintenance may be authorized, provided they meet the terms and conditions of this NWP. Access roads used solely for construction of the oil or natural gas pipeline must be removed upon completion of the work, in accordance with the requirements for temporary fills.

Note 4: Pipes or pipelines used to transport gaseous, liquid, liquescent, or slurry substances over navigable waters of the United States are considered to be bridges, and may require a permit from the U.S. Coast Guard pursuant to the General Bridge Act of 1946. However, any discharges of dredged or fill material into waters of the United States associated with such oil or natural gas pipelines will require a section 404 permit (see NWP 15).

Note 5: This NWP authorizes oil or natural gas pipeline maintenance and repair activities that do not qualify for the Clean Water Act section 404(f) exemption for maintenance of currently serviceable fills or fill structures.

Note 6: For NWP 12 activities that require pre-construction notification, the PCN must include any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings that require Department of the Army authorization but do not require pre-construction notification (see paragraph (b)(4) of general condition 32). The district engineer will evaluate the PCN in accordance with Section D, “District Engineer’s Decision.” The district engineer may require mitigation to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see general condition 23).

13. Bank Stabilization. Bank stabilization activities necessary for erosion control or prevention, such as vegetative stabilization, bioengineering, sills, rip rap, revetment, gabion baskets, stream barbs, and bulkheads, or combinations of bank stabilization techniques, provided the activity meets all of the following criteria:

(a) No material is placed in excess of the minimum needed for erosion protection;

(b) The activity is no more than 500 feet in length along the bank, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse

Amendment A001 02.23.2024 environmental effects (an exception is for bulkheads – the district engineer cannot issue a waiver for a bulkhead that is greater than 1,000 feet in length along the bank);

(c) The activity will not exceed an average of one cubic yard per running foot, as measured along the length of the treated bank, below the plane of the ordinary high water mark or the high tide line, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse environmental effects;

(d) The activity does not involve discharges of dredged or fill material into special aquatic sites, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse environmental effects;

(e) No material is of a type, or is placed in any location, or in any manner, that will impair surface water flow into or out of any waters of the United States;

(f) No material is placed in a manner that will be eroded by normal or expected high flows (properly anchored native trees and treetops may be used in low energy areas);

(g) Native plants appropriate for current site conditions, including salinity, must be used for bioengineering or vegetative bank stabilization;

(h) The activity is not a stream channelization activity; and

(i) The activity must be properly maintained, which may require repairing it after severe storms or erosion events. This NWP authorizes those maintenance and repair activities if they require authorization.

This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to construct the bank stabilization activity. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges of dredged or fill material, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows.

After construction, temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if the bank stabilization activity: (1) involves discharges of dredged or fill material into special aquatic sites; or (2) is in excess of 500 feet in length; or (3) will involve the discharge of dredged or fill material of greater than an average of one cubic yard per running foot as measured along the length of the

Amendment A001 02.23.2024 treated bank, below the plane of the ordinary high water mark or the high tide line. (See general condition 32.) (Authorities: Sections 10 and 404)

Note: In coastal waters and the Great Lakes, living shorelines may be an appropriate option for bank stabilization, and may be authorized by NWP 54.

14. Linear Transportation Projects. Activities required for crossings of waters of the United States associated with the construction, expansion, modification, or improvement of linear transportation projects (e.g., roads, highways, railways, trails, driveways, airport runways, and taxiways) in waters of the United States. For linear transportation projects in non-tidal waters, the discharge of dredged or fill material cannot cause the loss of greater than 1/2-acre of waters of the United States. For linear transportation projects in tidal waters, the discharge of dredged or fill material cannot cause the loss of greater than 1/3-acre of waters of the United States. Any stream channel modification, including bank stabilization, is limited to the minimum necessary to construct or protect the linear transportation project; such modifications must be in the immediate vicinity of the project.

This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to construct the linear transportation project. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges of dredged or fill material, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows.

Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate.

This NWP cannot be used to authorize non-linear features commonly associated with transportation projects, such as vehicle maintenance or storage buildings, parking lots, train stations, or aircraft hangars.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if: (1) the loss of waters of the United States exceeds 1/10-acre; or (2) there is a discharge of dredged or fill material in a special aquatic site, including wetlands. (See general condition 32.) (Authorities: Sections 10 and 404)

Note 1: For linear transportation projects crossing a single waterbody more than one time at separate and distant locations, or multiple waterbodies at separate and distant locations, each crossing is considered a single and complete project for purposes of NWP authorization. Linear transportation projects must comply with 33 CFR 330.6(d).

Amendment A001 02.23.2024

Note 2: Some discharges of dredged or fill material for the construction of farm roads or forest roads, or temporary roads for moving mining equipment, may qualify for an exemption under Section 404(f) of the Clean Water Act (see 33 CFR 323.4).

Note 3: For NWP 14 activities that require pre-construction notification, the PCN must include any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings that require Department of the Army authorization but do not require pre-construction notification (see paragraph (b)(4) of general condition 32). The district engineer will evaluate the PCN in accordance with Section D, “District Engineer’s Decision.” The district engineer may require mitigation to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see general condition 23).

15. U.S. Coast Guard Approved Bridges. Discharges of dredged or fill material incidental to the construction of a bridge across navigable waters of the United States, including cofferdams, abutments, foundation seals, piers, and temporary construction and access fills, provided the construction of the bridge structure has been authorized by the U.S. Coast Guard under Section 9 of the Rivers and Harbors Act of 1899 or other applicable laws. Causeways and approach fills are not included in this NWP and will require a separate Clean Water Act Section 404 permit. (Authority: Section 404 of the Clean Water Act (Section 404))

16. Return Water From Upland Contained Disposal Areas. Return water from an upland contained dredged material disposal area. The return water from a contained disposal area is administratively defined as a discharge of dredged material by 33 CFR 323.2(d), even though the disposal itself occurs in an area that has no waters of the United States and does not require a section 404 permit. This NWP satisfies the technical requirement for a section 404 permit for the return water where the quality of the return water is controlled by the state through the Clean Water Act Section 401 certification procedures. The dredging activity may require a section 404 permit (33 CFR 323.2(d)), and will require a section 10 permit if located in navigable waters of the United States.

(Authority: Section 404)

17. Hydropower Projects. Discharges of dredged or fill material associated with hydropower projects having: (a) Less than 10,000 kW of total generating capacity at existing reservoirs, where the project, including the fill, is licensed by the Federal Energy Regulatory Commission (FERC) under the Federal Power Act of 1920, as amended; or (b) a licensing exemption granted by the FERC pursuant to Section 408 of the Energy Security Act of 1980 (16 U.S.C. 2705 and 2708) and Section 30 of the Federal Power Act, as amended.

Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity. (See general condition 32.) (Authority:

Section 404)

Amendment A001 02.23.2024

18. Minor Discharges. Minor discharges of dredged or fill material into all waters of the United States, provided the activity meets all of the following criteria:

(a) The quantity of discharged dredged or fill material and…