This document contains questions and answers regarding requests for proposals for multiple bridge construction contracts in California. The solicitations seek designs for modular steel girder bridges with structural steel decking and vehicular railings according to provided plans. The bridges will be fully designed by fabricators. Abutment details are included in plans but final dimensions will be coordinated with manufacturers. Both listed projects involve full replacements of existing bridges that were previously damaged and removed. Resumes submitted with proposals will not count toward the 20-page limit for responses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for RFPs:

MATOC, California Road & Bridge Construction, Volumes I, II, and III

September 26, 2023

Questions Response 1 Each proposal calls for it to be replaced with a new steel manufactured bridge. Can you provide the manufacturer's name, number and address, also the design and plans of the bridge?

The bridges are fabricator‐designed and furnished. Provide modular steel girder with structural steel decking, and steel vehicular railing as shown in the plans. See Section 555 of the SCRs for additional requirements

2 Can you provide the plans and details for the concrete abutment?

The abutment details are included in the provided plans. Based on the contractor/fabricator design pre‐fabricated steel bridge, final dimensions and elevations would be coordinated with the bridge manufacturer before ordering materials.

3 The existing bridge to be maintained or are they to be replaced with a new steel bridge?

Both the Alder Creek Bridge and Powderhorn Bridge projects are full bridge replacements. Remove existing bridge elements as indicated in the plans and SCRs. Superstructure elements were completely damaged by fire and previously removed.

4 Can you provide plans for the manufactured steel bridge for each of the Task Order Proposals?

The bridges are fabricator‐designed and furnished. Provide modular steel girder with structural steel decking, and steel vehicular railing as shown in the plans. See Section 555 of the SCRs for additional requirements.

5 Can you provide the name of the manufacturer for each of the bridges for each of the Task Order Proposals?

See response to #4

6 Will requested resumes be excluded from the page count? Yes. See Volume I, 6982AF23R000006 (Base Contract), page A‐10, for what is allowed to not count towards the 20 page limit. Bidders Information pages are not counted in the 20 page limit. See Bidders Information, page B‐2, #7, b.