This document is a solicitation for bids to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forest in Monterey, California. The scope of work includes rebuilding seven mechanically stabilized earth walls, replacing eight drainage culverts ranging in size from 24 to 72 inches in diameter, removing debris, grading, and repaving the existing 16 to 24 foot wide paved roadway. The anticipated schedule is to award the contract in May 2023 and complete construction between May 2023 and December 2023. The estimated cost range for the project is between $10-20 million. Principal work items include excavation, embankment construction, mechanically stabilized earth walls, riprap, roadway aggregate, asphalt pavement, concrete headwalls, culvert pipe and end sections, and equipment hours for traffic control. Bids are due by the date specified in the solicitation number 6982AF23B000014 issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 05/23/23
1 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Solcitation No:
Division: Central Federal Lands
State: CA County: Monterey
Federal Land: Los Padres National Forest Opened at: Lakewood
Opened by: Sheri Walsh
Date: 05/18/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Steve Manning Construction Inc ( $0.00 ) 5211 Churn Creek Road Redding, CA 96002
Herback General Engineering, LLC A2000- Bid item total= $ $3,756 Calculated item total= $ 37,560.00
$4,973,188.00 2531 Nowlin Road Minden, NV 89423
Stimpel-Wiebelhaus Associates $6,482,300.00 1168 Industrial Street Redding, CO 96002
Steve Manning Construction Inc $8,330,160.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $7,081,000.00
2 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 15101-0000 MOBILIZATION
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $1,174,690.00 Stimpel-Wiebelhaus Associates Lump Sum $600,000.00 Steve Manning Construction Inc Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $923,910.00
A1020 15201-0000 CONSTRUCTION SURVEY AND STAKING
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $64,260.00 Stimpel-Wiebelhaus Associates Lump Sum $60,000.00 Steve Manning Construction Inc Lump Sum $156,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00
A1040 15301-0000 CONTRACTOR QUALITY CONTROL
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $186,820.00 Stimpel-Wiebelhaus Associates Lump Sum $125,000.00 Steve Manning Construction Inc Lump Sum $90,000.00 Engineer's Estimate ALL LPSM Lump Sum $200,000.00
A1060 15401-0000 CONTRACTOR TESTING
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $181,200.00 Stimpel-Wiebelhaus Associates Lump Sum $250,000.00 Steve Manning Construction Inc Lump Sum $252,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A1080 15501-0000 CONSTRUCTION SCHEDULE
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $21,440.00 Stimpel-Wiebelhaus Associates Lump Sum $9,000.00 Steve Manning Construction Inc Lump Sum $28,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A1100 15701-0000 SOIL EROSION CONTROL
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $44,400.00 Stimpel-Wiebelhaus Associates Lump Sum $50,000.00 Steve Manning Construction Inc Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
3 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $12,200.00 Stimpel-Wiebelhaus Associates Lump Sum $2,500.00 Steve Manning Construction Inc Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A1140 15802-0000 WATERING FOR DUST CONTROL
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $242,400.00 Stimpel-Wiebelhaus Associates Lump Sum $50,000.00 Steve Manning Construction Inc Lump Sum $200,500.00 Engineer's Estimate ALL LPSM Lump Sum $80,000.00
A1160 20102-0000 CLEARING AND GRUBBING
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $29,950.00 Stimpel-Wiebelhaus Associates Lump Sum $100,000.00 Steve Manning Construction Inc Lump Sum $90,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A1180 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $34,880.00 Stimpel-Wiebelhaus Associates Lump Sum $100,000.00 Steve Manning Construction Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00
A1200 20401-0000 ROADWAY EXCAVATION
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $58.00 $265,640.00 Stimpel-Wiebelhaus Associates $60.00 $274,800.00 Steve Manning Construction Inc $149.00 $682,420.00 Engineer's Estimate 4,580 CUYD $220.00 $1,007,600.00
A1220 20420-0000 EMBANKMENT CONSTRUCTION
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $185.00 $70,300.00 Stimpel-Wiebelhaus Associates $135.00 $51,300.00 Steve Manning Construction Inc $180.00 $68,400.00 Engineer's Estimate 380 CUYD $260.00 $98,800.00
4 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1240 20441-0000 WASTE
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $99.50 $353,225.00 Stimpel-Wiebelhaus Associates $105.00 $372,750.00 Steve Manning Construction Inc $120.00 $426,000.00 Engineer's Estimate 3,550 CUYD $160.00 $568,000.00
A1260 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $530.00 $11,660.00 Stimpel-Wiebelhaus Associates $1,500.00 $33,000.00 Steve Manning Construction Inc $900.00 $19,800.00 Engineer's Estimate 22.0 CUYD $600.00 $13,200.00
A1280 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $521.00 $88,570.00 Stimpel-Wiebelhaus Associates $600.00 $102,000.00 Steve Manning Construction Inc $400.00 $68,000.00 Engineer's Estimate 170.0 CUYD $800.00 $136,000.00
A1300 25501-0000 MECHANICALLY STABILIZED EARTH WALL
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $179.00 $739,270.00 Stimpel-Wiebelhaus Associates $460.00 $1,899,800.00 Steve Manning Construction Inc $620.00 $2,560,600.00 Engineer's Estimate 4,130 SQFT $350.00 $1,445,500.00
A1320 25701-0200 CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL DESIGN
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $7,625.00 Stimpel-Wiebelhaus Associates Lump Sum $20,000.00 Steve Manning Construction Inc Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A1340 30202-2000 ROADWAY AGGREGATE, METHOD 2
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $111.00 $133,200.00 Stimpel-Wiebelhaus Associates $200.00 $240,000.00 Steve Manning Construction Inc $290.00 $348,000.00 Engineer's Estimate 1,200 TON $200.00 $240,000.00
5 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $469.00 $286,090.00 Stimpel-Wiebelhaus Associates $475.00 $289,750.00 Steve Manning Construction Inc $720.00 $439,200.00 Engineer's Estimate 610 TON $430.00 $262,300.00
A1380 40601-0000 FOG SEAL
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $4,950.00 $9,900.00 Stimpel-Wiebelhaus Associates $5,000.00 $10,000.00 Steve Manning Construction Inc $11,000.00 $22,000.00 Engineer's Estimate 2.0 TON $2,500.00 $5,000.00
A1400 41102-1000 PRIME COAT, METHOD 1
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $2.75 $9,900.00 Stimpel-Wiebelhaus Associates $4.00 $14,400.00 Steve Manning Construction Inc $7.00 $25,200.00 Engineer's Estimate 3,600 SQYD $3.00 $10,800.00
A1420 41105-0000 BLOTTER
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $558.00 $3,348.00 Stimpel-Wiebelhaus Associates $2,000.00 $12,000.00 Steve Manning Construction Inc $4,000.00 $24,000.00 Engineer's Estimate 6.0 TON $400.00 $2,400.00
A1440 41201-0000 TACK COAT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $4,950.00 $9,900.00 Stimpel-Wiebelhaus Associates $4,500.00 $9,000.00 Steve Manning Construction Inc $8,500.00 $17,000.00 Engineer's Estimate 2.0 TON $1,800.00 $3,600.00
A1460 60103-0000 CONCRETE, HEADWALL (AND WINGWALLS)
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $73,400.00 $220,200.00 Stimpel-Wiebelhaus Associates $75,000.00 $225,000.00 Steve Manning Construction Inc $97,000.00 $291,000.00 Engineer's Estimate 3 EACH $110,000.00 $330,000.00
6 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1480 60201-0800 24-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $470.00 $67,680.00 Stimpel-Wiebelhaus Associates $900.00 $129,600.00 Steve Manning Construction Inc $1,400.00 $201,600.00 Engineer's Estimate 144 LNFT $420.00 $60,480.00
A1500 60201-1000 36-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $493.00 $36,975.00 Stimpel-Wiebelhaus Associates $1,000.00 $75,000.00 Steve Manning Construction Inc $1,600.00 $120,000.00 Engineer's Estimate 75 LNFT $830.00 $62,250.00
A1520 60201-1200 48-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $530.00 $100,700.00 Stimpel-Wiebelhaus Associates $1,000.00 $190,000.00 Steve Manning Construction Inc $1,700.00 $323,000.00 Engineer's Estimate 190 LNFT $1,000.00 $190,000.00
A1540 60201-1600 72-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $992.00 $109,120.00 Stimpel-Wiebelhaus Associates $1,300.00 $143,000.00 Steve Manning Construction Inc $2,100.00 $231,000.00 Engineer's Estimate 110 LNFT $1,200.00 $132,000.00
A1560 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $2,154.00 $6,462.00 Stimpel-Wiebelhaus Associates $2,000.00 $6,000.00 Steve Manning Construction Inc $900.00 $2,700.00 Engineer's Estimate 3 EACH $2,500.00 $7,500.00
A1580 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $3,196.00 $3,196.00 Stimpel-Wiebelhaus Associates $3,000.00 $3,000.00 Steve Manning Construction Inc $1,000.00 $1,000.00 Engineer's Estimate 1 EACH $2,800.00 $2,800.00
7 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1600 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $4,697.00 $18,788.00 Stimpel-Wiebelhaus Associates $5,500.00 $22,000.00 Steve Manning Construction Inc $1,800.00 $7,200.00 Engineer's Estimate 4 EACH $4,000.00 $16,000.00
A1620 60210-1600 END SECTION FOR 72-INCH PIPE CULVERT
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $8,120.00 $8,120.00 Stimpel-Wiebelhaus Associates $9,000.00 $9,000.00 Steve Manning Construction Inc $2,200.00 $2,200.00 Engineer's Estimate 1 EACH $7,000.00 $7,000.00
A1640 60403-0000 INLET (CONCRETE BOX)
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $10,200.00 $40,800.00 Stimpel-Wiebelhaus Associates $15,000.00 $60,000.00 Steve Manning Construction Inc $8,250.00 $33,000.00 Engineer's Estimate 4 EACH $15,000.00 $60,000.00
A1660 60601-0000 SPILLWAY ASSEMBLY
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $7,445.00 $7,445.00 Stimpel-Wiebelhaus Associates $19,000.00 $19,000.00 Steve Manning Construction Inc $3,500.00 $3,500.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00
A1680 60602-0700 PIPE ANCHOR ASSEMBLY, 24-INCH
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $1,016.00 $12,192.00 Stimpel-Wiebelhaus Associates $9,500.00 $114,000.00 Steve Manning Construction Inc $1,200.00 $14,400.00 Engineer's Estimate 12 EACH $1,700.00 $20,400.00
A1700 60602-1100 PIPE ANCHOR ASSEMBLY, 48-INCH
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $1,415.00 $8,490.00 Stimpel-Wiebelhaus Associates $11,000.00 $66,000.00 Steve Manning Construction Inc $1,500.00 $9,000.00 Engineer's Estimate 6 EACH $3,200.00 $19,200.00
8 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1720 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $197.00 $11,820.00 Stimpel-Wiebelhaus Associates $250.00 $15,000.00 Steve Manning Construction Inc $170.00 $10,200.00 Engineer's Estimate 60 HOUR $350.00 $21,000.00
A1740 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $297.00 $17,820.00 Stimpel-Wiebelhaus Associates $230.00 $13,800.00 Steve Manning Construction Inc $280.00 $16,800.00 Engineer's Estimate 60 HOUR $350.00 $21,000.00
A1760 62201-2750 MOTOR GRADER
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $296.00 $17,760.00 Stimpel-Wiebelhaus Associates $270.00 $16,200.00 Steve Manning Construction Inc $290.00 $17,400.00 Engineer's Estimate 60 HOUR $350.00 $21,000.00
A1780 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $328.00 $19,680.00 Stimpel-Wiebelhaus Associates $250.00 $15,000.00 Steve Manning Construction Inc $310.00 $18,600.00 Engineer's Estimate 60 HOUR $350.00 $21,000.00
A1800 62301-0000 GENERAL LABOR
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $128.00 $15,360.00 Stimpel-Wiebelhaus Associates $110.00 $13,200.00 Steve Manning Construction Inc $120.00 $14,400.00 Engineer's Estimate 120 HOUR $300.00 $36,000.00
A1820 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST)
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $250.00 $10,000.00 Stimpel-Wiebelhaus Associates $300.00 $12,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Engineer's Estimate 40 HOUR $300.00 $12,000.00
9 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1840 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $250.00 $15,000.00 Stimpel-Wiebelhaus Associates $250.00 $15,000.00 Steve Manning Construction Inc $350.00 $21,000.00 Engineer's Estimate 60 HOUR $300.00 $18,000.00
A1860 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $250.00 $15,000.00 Stimpel-Wiebelhaus Associates $300.00 $18,000.00 Steve Manning Construction Inc $350.00 $21,000.00 Engineer's Estimate 60 HOUR $350.00 $21,000.00
A1880 62405-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $15.00 $44,700.00 Stimpel-Wiebelhaus Associates $30.00 $89,400.00 Steve Manning Construction Inc $40.00 $119,200.00 Engineer's Estimate 2,980 SQYD $12.00 $35,760.00
A1900 62511-2000 SEEDING, HYDRAULIC METHOD
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $2.50 $7,450.00 Stimpel-Wiebelhaus Associates $30.00 $89,400.00 Steve Manning Construction Inc $6.50 $19,370.00 Engineer's Estimate 2,980 SQYD $5.00 $14,900.00
A1920 62516-2000 MULCHING, HYDRAULIC METHOD
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $2.50 $7,450.00 Stimpel-Wiebelhaus Associates $30.00 $89,400.00 Steve Manning Construction Inc $6.50 $19,370.00 Engineer's Estimate 2,980 SQYD $5.00 $14,900.00
A1940 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $22.00 $65,560.00 Stimpel-Wiebelhaus Associates $50.00 $149,000.00 Steve Manning Construction Inc $20.00 $59,600.00 Engineer's Estimate 2,980 SQYD $15.00 $44,700.00
10 out of 10
Project No: CA ERFO FS LSPDR 2021-1(1)
Project Name: Nacimiento-Fergusson Rd
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1960 63308-0000 OBJECT MARKER (L-1)
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $368.00 $5,888.00 Stimpel-Wiebelhaus Associates $500.00 $8,000.00 Steve Manning Construction Inc $100.00 $1,600.00 Engineer's Estimate 16 EACH $500.00 $8,000.00
A1980 63308-3000 OBJECT MARKER, TYPE 3
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $436.00 $6,104.00 Stimpel-Wiebelhaus Associates $500.00 $7,000.00 Steve Manning Construction Inc $100.00 $1,400.00 Engineer's Estimate 14 EACH $500.00 $7,000.00
A2000 63309-0000 DELINEATOR
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $313.00 $37,560.00 Stimpel-Wiebelhaus Associates $500.00 $60,000.00 Steve Manning Construction Inc $100.00 $12,000.00 Engineer's Estimate 120 EACH $300.00 $36,000.00
A2020 63501-0000 TEMPORARY TRAFFIC CONTROL
Steve Manning Construction Inc Lump Sum $0.00 Herback General Engineering, LLC Lump Sum $25,000.00 Stimpel-Wiebelhaus Associates Lump Sum $50,000.00 Steve Manning Construction Inc Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $350,000.00
A2040 63701-0000 FIELD OFFICE
Steve Manning Construction Inc $0.00 $0.00 Herback General Engineering, LLC $30,000.00 $30,000.00 Stimpel-Wiebelhaus Associates $85,000.00 $85,000.00 Steve Manning Construction Inc $23,500.00 $23,500.00 Engineer's Estimate 1 EACH $30,000.00 $30,000.00
Total Schedule - All Items
Steve Manning Construction Inc $0.00 Herback General Engineering, LLC $4,973,188.00 Stimpel-Wiebelhaus Associates $6,482,300.00 Steve Manning Construction Inc $8,330,160.00 Engineer's Estimate $7,081,000.00
| 2023-05-23T11:57:22-0600 | |
| STEPHANIE ANN NAVARRO |
File details come from the government source that posted it. Updated .