QnA 03 29 2023.pdf

PDF 783 KB Posted

Attached to
UT FTBL 7133(1) Canyon Rims Road
Solicitation number
6982AF23B000007
Issued by

About this file

This document provides details for the federal contract opportunity UT FTBL 7133(1) Canyon Rims Road. The contract involves rehabilitating and improving approximately 37.7 miles of roadway within the Canyon Rims Special Recreation Management Area located south of Moab, Utah. Specifically, Schedule A of the contract covers rehabilitating 9.28 miles of Needles Overlook Road, including pavement patching, chip sealing, full depth reclamation, pavement overlay, roadway slope flattening, drainage improvements, vegetation clearing, and signage and striping replacements. Option X extends rehabilitation work by an additional 1.52 miles along Needles Overlook Road. Option Y constructs turn lanes and acceleration/deceleration lanes on US Highway 191 near its intersection with Needles Overlook Road to address safety concerns. The work will be performed for the Bureau of Land Management and is solicited through the Federal Highway Administration.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for UT FTBL 7133(1), Canyon Rims Road

3/29/2023

Questions Response

1 A0720 SPECIAL LABOR, HIRED TECHNICAL SERVICES

X0540 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Y0800 SPECIAL LABOR, HIRED TECHNICAL SERVICES

These items have a unit measure of Lump Sum. My questions is shouldn’t these be by the Hour? In other FHWA projects we have bid this has been the case.

If they are to be lump sum can you direct me to where I can find what is to be included in this Lump Sum Item?

Invitation For Bid states on page E-48 the following:

623.05 Biological Surveying Services.

(a) Furnish a qualified biologist experienced in surveying for nesting birds in similar habitats in Utah. Submit resume of the biologist to the CO for approval a minimum 14 days prior to beginning bird nest surveying activity.

(b) Furnish supporting tools and equipment (e.g., calculator, computer, and software, and appropriate and commonly used tools for the assigned task).

Prepare field notes in an approved format. All field notes become the property of the Government upon completion of the work.

Does this mean that we need to have a biologist complete a nesting bird survey for each construction area as part of each bid schedule?

Line Items A0720, X0540, and Y0800., Pay Item Number 62303- 1000, SPECIAL LABOR, HIRED TECHNICAL SERVICES are for nesting bird surveys by a qualified biologist in accordance with Section 623.05 as designated by “Biologist” in the Remarks column of the Summary of Quantities table. This Pay Item is by the lump sum because it is dependent on the contractors methods and timing for each construction area. Other Hired Technical Services, by the hour, are not anticipated to be needed for this project.

File details come from the government source that posted it. Updated .