QnA 12.22.22 Cheney.pdf

PDF 93 KB Posted

Attached to
KS FLAP KIN 50(1) Cheney Reservoir Access Road
Solicitation number
6982AF22B000035
Issued by

About this file

This document contains questions and answers from an advertisement for a federal local access project solicitation. The project is located in Cheney Reservoir in Kingman County, Kansas and involves rehabilitating 2 miles of roadway providing access to recreational facilities at the reservoir. The scope of work includes shoulder widening and regrading to improve safety and access, as well as a 2.5 inch asphalt concrete overlay. Questions addressed approval of a previously used state DOT mix design and the use of temporary traffic signals. The related federal contract opportunity involves a solicitation from the Federal Highway Administration and Department of Transportation for the KS FLAP KIN 50(1) Cheney Reservoir Access Road project. The project description and scope of work details match those outlined in the questions and answers.

View the file

Other files

File Type Posted
Tabulation of Bids KS FLAP KIN 50(1).pdf PDF
Bid Opening Summary KS FLAP KIN 50(1).pdf PDF
QnA 1.6.23.pdf PDF
A002.pdf PDF
A001 Cheney.pdf PDF
QnA 12.15.22.pdf PDF
KS FLAP 50(1) KIN 100 Plans_Sealed_Signed.pdf PDF
6982AF22B000035.pdf PDF
FP-14.pdf PDF
KS FLAP KIN 50(1) 100 Final Pavement Report rev.pdf PDF
KS FLAP KIN 50(1) 100 Drainage Design Report rev.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for KS FLAP KIN50(1) Cheney Reservoir Access

December 22, 2022

Questions Answers 1 Is this project tax exempt? Refer to clause 52.229-3 Federal, State, and Local Taxes on sheet C-12 of the IFB.

2 Will use of temporary traffic signals be allowed rather than use of flaggers?

Submit a traffic control plan in accordance with Section 104, 156, and 635 of the FP and SCR’s, MUTCD, and Sheet T9 of the plans for approval by the CO in coordination with the project partners. Note 4 on Sheet T9 states “CO to close only portion of roadway where work will be performed.

Construction zone may move each day.”

3 Our paving contractor is requesting using a previously approved KDOT asphalt mix design used in Kingman County, KS on K-42 Hwy. Would this be acceptable?

Per FP-14 403.02(a), A KDOT mix approved for use in the last 12 months may be used. Table 403-1 can be disregarded if it conflicts with state DOT standards.