6982AF22B000020 Questions and Answers 9 19 2022.pdf

PDF 81 KB Posted

Attached to
AZ/NV BR LCDO Hoover Dam Parking Lot Rehab
Solicitation number
6982AF22B000020
Issued by

About this file

This document provides questions and answers regarding solicitation number 6982AF22B000020 for the AZ/NV BR LCDO Hoover Dam Parking Lot Rehab project. The scope of work involves pavement preservation for 17 parking lots along the Hoover Dam Access Road, including full depth patching, crack sealing, surface treatment, permanent pavement markings, permanent signing, slope failure repair on the mainline, and rock lining under recently installed guardrail. Estimated work quantities include 48,500 square yards of fog seal, 4.2 miles of crack sealing, 250 square yards of asphalt patching, 425 cubic yards of riprap, 13.5 miles of pavement markings, and 105 pavement marking symbols and 65 sign systems. Construction must be performed either during daytime or nighttime hours with 7 days' notice required to switch operations. The majority of work cannot be performed in the roadway and can only be done during daytime hours. The estimated value of the project is between $700,000 and $2,000,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for 6982AF22B000020 - AZ/NV BR LCDO HOOVER PARKING – Hoover Dam Parking Lots Rehab

September 15, 2022

Questions Answers

1. I understand there is not a formal site visit scheduled for this solicitation. Is there a contact that we can schedule a site visit with that would have some knowledge about the site and project?

All project and site specific questions must be submitted per the solicitation by email. There are no restrictions for viewing the project site on your own.

2. Is there any available plans/drawings or specs on the Flashing Beacons?

Please see the Special Contract Requirements (SCRs), Division 600, Section 633 – Permanent Traffic Control

September 19, 2022

Question Answer

1. The majority of the work is not being done in the roadway; can construction be done during the daytime?

Please see the Special Contract Requirements (SCRs), Division 100, Section 108 – Prosecution and Progress, of the Solicitation. See Pages E-12 and E-13, which state the following, “

(e) Only perform work during daytime or nighttime operations. Do not perform work during both daytime and nighttime operations during the same week. A week for scheduling is considered Sunday – Saturday. Provide 7 days’ notice to the CO when switching hours of operation. Surface treatments may only be performed during daytime operations.

(f) When installing signs in the NVDOT Right of Way, perform work between 9:00pm – 5:30am.