Bid Tabulation NM FLAP TAO B007 John Dunn Bridges.pdf
PDF 655 KB Posted
- Attached to
- NM FLAP TAO B007(1) John Dunn Bridges
- Solicitation number
- 6982AF22B000009
About this file
This document contains a bid tabulation report for the NM FLAP TAO B007(1) John Dunn Bridges federal contract opportunity. The report details bids received from two contractors and the independent government estimate to rehabilitate the John Dunn Bridge #5243 and replace Bridge #3807 in Taos, New Mexico. Work on Bridge #5243 includes replacing loose railing, deck surfacing rehabilitation, timber member replacement, coating repair, and steel truss replacement. Bridge #3807 replacement involves removing the existing bridge and constructing a new 50-foot precast bridge with micropile foundations. Monitor Construction Company submitted the low bid of $2,842,253 while Siete, Inc.'s bid was $4,042,109. The engineer's estimate was $3,205,000. The contract is scheduled to be awarded by the Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 05/04/22
1 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF22B000009
Division: Central Federal Lands
State: NM County: Taos
Federal Land: BLM - Rio Grande del Norte National Monument Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 05/03/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Monitor Construction Company, Inc. $2,842,253.00 8 Old Highway Lane Sonoita, AZ 85637
Siete, Inc. $4,042,109.00 8155 Park Road Rye, CO 81069
Engineer's Estimate $3,205,000.00
Contract Specialist
05/04/2022
2 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
Monitor Construction Company, Inc. Lump Sum $284,000.00 Siete, Inc. Lump Sum $400,000.00 Engineer's Estimate ALL LPSM Lump Sum $438,777.75
A0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD
Monitor Construction Company, Inc. $7,000.00 $7,000.00 Siete, Inc. $3,000.00 $3,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00
A0030 15215-2000 SURVEY AND STAKING, BRIDGE
Monitor Construction Company, Inc. $12,000.00 $12,000.00 Siete, Inc. $30,000.00 $30,000.00 Engineer's Estimate 1 EACH $35,470.00 $35,470.00
A0040 15215-7000 SURVEY AND STAKING, PARKING AREA
Monitor Construction Company, Inc. $2,000.00 $2,000.00 Siete, Inc. $3,000.00 $3,000.00 Engineer's Estimate 1 EACH $20,000.00 $20,000.00
A0050 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Monitor Construction Company, Inc. $3,000.00 $300.00 Siete, Inc. $400,000.00 $40,000.00 Engineer's Estimate 0.10 MILE $58,900.00 $5,890.00
A0060 15236-2000 SURVEY CONTROL, GRADE FINISHING
Monitor Construction Company, Inc. $3,500.00 $350.00 Siete, Inc. $10,000.00 $1,000.00 Engineer's Estimate 0.10 MILE $35,600.00 $3,560.00
A0070 15301-0000 CONTRACTOR QUALITY CONTROL
Monitor Construction Company, Inc. Lump Sum $65,000.00 Siete, Inc. Lump Sum $175,000.00 Engineer's Estimate ALL LPSM Lump Sum $215,000.00
3 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0080 15401-0000 CONTRACTOR TESTING
Monitor Construction Company, Inc. Lump Sum $80,000.00 Siete, Inc. Lump Sum $175,000.00 Engineer's Estimate ALL LPSM Lump Sum $115,000.00
A0090 15501-0000 CONSTRUCTION SCHEDULE
Monitor Construction Company, Inc. Lump Sum $1,500.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0100 15701-0000 SOIL EROSION CONTROL
Monitor Construction Company, Inc. Lump Sum $55,000.00 Siete, Inc. Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0110 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Monitor Construction Company, Inc. Lump Sum $15,000.00 Siete, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0120 15802-0000 WATERING FOR DUST CONTROL
Monitor Construction Company, Inc. Lump Sum $5,000.00 Siete, Inc. Lump Sum $1,000.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
A0130 20101-0000 CLEARING AND GRUBBING
Monitor Construction Company, Inc. $55,000.00 $11,000.00 Siete, Inc. $500,000.00 $100,000.00 Engineer's Estimate 0.20 ACRE $18,000.00 $3,600.00
A0140 20301-0400 REMOVAL OF BRIDGE
Monitor Construction Company, Inc. $30,000.00 $30,000.00 Siete, Inc. $175,000.00 $175,000.00 Engineer's Estimate 1 EACH $75,000.00 $75,000.00
4 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0150 20301-2400 REMOVAL OF SIGN
Monitor Construction Company, Inc. $200.00 $400.00 Siete, Inc. $2,000.00 $4,000.00 Engineer's Estimate 2 EACH $270.00 $540.00
A0160 20420-0000 EMBANKMENT CONSTRUCTION
Monitor Construction Company, Inc. $55.00 $44,000.00 Siete, Inc. $100.00 $80,000.00 Engineer's Estimate 800 CUYD $100.00 $80,000.00
A0170 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
Monitor Construction Company, Inc. $420.00 $63,000.00 Siete, Inc. $300.00 $45,000.00 Engineer's Estimate 150 CUYD $200.00 $30,000.00
A0180 25101-2700 PLACED RIPRAP, METHOD B, CLASS 7
Monitor Construction Company, Inc. $450.00 $112,500.00 Siete, Inc. $325.00 $81,250.00 Engineer's Estimate 250 CUYD $300.00 $75,000.00
A0190 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED
Monitor Construction Company, Inc. $450.00 $6,750.00 Siete, Inc. $2,000.00 $30,000.00 Engineer's Estimate 15 CUYD $500.00 $7,500.00
A0200 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE
Monitor Construction Company, Inc. $65.00 $17,550.00 Siete, Inc. $75.00 $20,250.00 Engineer's Estimate 270 TON $64.00 $17,280.00
A0210 40301-0000 ASPHALT CONCRETE PAVEMENT
Monitor Construction Company, Inc. $300.00 $10,500.00 Siete, Inc. $300.00 $10,500.00 Engineer's Estimate 35 TON $150.00 $5,250.00
5 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 40702-0100 CHIP SEAL, TYPE 1A
Monitor Construction Company, Inc. $20.00 $7,500.00 Siete, Inc. $10.00 $3,750.00 Engineer's Estimate 375 SQYD $55.00 $20,625.00
A0230 41102-1000 PRIME COAT, METHOD 1
Monitor Construction Company, Inc. $5.00 $800.00 Siete, Inc. $10.00 $1,600.00 Engineer's Estimate 160 SQYD $3.00 $480.00
A0240 41105-0000 BLOTTER
Monitor Construction Company, Inc. $50.00 $15.00 Siete, Inc. $10.00 $3.00 Engineer's Estimate 0.3 TON $400.00 $120.00
A0250 41201-0000 TACK COAT
Monitor Construction Company, Inc. $1,500.00 $300.00 Siete, Inc. $2,000.00 $400.00 Engineer's Estimate 0.2 TON $4,000.00 $800.00
A0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
Monitor Construction Company, Inc. $100.00 $23,000.00 Siete, Inc. $35.00 $8,050.00 Engineer's Estimate 230 SQYD $35.00 $8,050.00
A0270 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Monitor Construction Company, Inc. $900.00 $120,600.00 Siete, Inc. $1,700.00 $227,800.00 Engineer's Estimate 134 CUYD $2,300.00 $308,200.00
A0280 55240-0000 GROUT
Monitor Construction Company, Inc. $550.00 $13,200.00 Siete, Inc. $500.00 $12,000.00 Engineer's Estimate 24 CUFT $300.00 $7,200.00
6 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0290 55302-3500 PRECAST, PRESTRESSED CONCRETE SLAB
Monitor Construction Company, Inc. $1,500.00 $382,500.00 Siete, Inc. $1,900.00 $484,500.00 Engineer's Estimate 255 LNFT $900.00 $229,500.00
A0300 55303-0000 PRESTRESSING SYSTEM
Monitor Construction Company, Inc. Lump Sum $48,000.00 Siete, Inc. Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0310 55401-1000 REINFORCING STEEL
Monitor Construction Company, Inc. $4.00 $46,436.00 Siete, Inc. $4.00 $46,436.00 Engineer's Estimate 11,609 LB $4.00 $46,436.00
A0320 55401-2000 REINFORCING STEEL, EPOXY COATED
Monitor Construction Company, Inc. $4.00 $25,996.00 Siete, Inc. $5.00 $32,495.00 Engineer's Estimate 6,499 LB $3.75 $24,371.25
A0330 55501-0000 STRUCTURAL STEEL
Monitor Construction Company, Inc. Lump Sum $3,500.00 Siete, Inc. Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
A0340 55601-0900 BRIDGE RAILING, STEEL (STAINED)
Monitor Construction Company, Inc. $365.00 $43,800.00 Siete, Inc. $2,000.00 $240,000.00 Engineer's Estimate 120 LNFT $600.00 $72,000.00
A0350 55720-0000 REPAIR STRUCTURAL TIMBER AND LUMBER
Monitor Construction Company, Inc. Lump Sum $27,000.00 Siete, Inc. Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
7 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0360 56301-2000 PAINTING, STEEL STRUCTURE
Monitor Construction Company, Inc. Lump Sum $477,140.00 Siete, Inc. Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $550,000.00
A0370 56320-0000 CONTAINMENT SYSTEM AND WORKER PROTECTION PLAN
Monitor Construction Company, Inc. Lump Sum $200,000.00 Siete, Inc. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0380 56401-1000 BEARING DEVICE, ELASTOMERIC
Monitor Construction Company, Inc. $1,200.00 $12,000.00 Siete, Inc. $5,000.00 $50,000.00 Engineer's Estimate 10 EACH $2,000.00 $20,000.00
A0390 56701-0000 MICROPILE
Monitor Construction Company, Inc. $850.00 $414,800.00 Siete, Inc. $750.00 $366,000.00 Engineer's Estimate 488 LNFT $750.00 $366,000.00
A0400 56705-0000 MICROPILE LOAD VERIFICATION TEST
Monitor Construction Company, Inc. $35,000.00 $35,000.00 Siete, Inc. $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $14,000.00 $14,000.00
A0410 56706-0000 MICROPILE PROOF LOAD TEST
Monitor Construction Company, Inc. $6,500.00 $26,000.00 Siete, Inc. $25,000.00 $100,000.00 Engineer's Estimate 4 EACH $9,000.00 $36,000.00
A0420 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS (STAINED)
Monitor Construction Company, Inc. $60.00 $10,500.00 Siete, Inc. $175.00 $30,625.00 Engineer's Estimate 175 LNFT $100.00 $17,500.00
8 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0430 61702-0000 TERMINAL SECTION TYPE END ANCHOR
Monitor Construction Company, Inc. $2,400.00 $7,200.00 Siete, Inc. $4,000.00 $12,000.00 Engineer's Estimate 3 EACH $6,000.00 $18,000.00
A0440 61707-0000 STRUCTURE TRANSITION RAILING (METAL BARRIER)
Monitor Construction Company, Inc. $52.00 $1,976.00 Siete, Inc. $500.00 $19,000.00 Engineer's Estimate 38 LNFT $180.00 $6,840.00
A0450 61801-0000 CONCRETE BARRIER (TYPE 32)
Monitor Construction Company, Inc. $200.00 $8,000.00 Siete, Inc. $600.00 $24,000.00 Engineer's Estimate 40 LNFT $300.00 $12,000.00
A0460 61804-1000 TERMINAL SECTION, TYPE 1 (TRANSITION)
Monitor Construction Company, Inc. $2,500.00 $2,500.00 Siete, Inc. $5,000.00 $5,000.00 Engineer's Estimate 1 EACH $7,000.00 $7,000.00
A0470 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Monitor Construction Company, Inc. $100.00 $2,000.00 Siete, Inc. $100.00 $2,000.00 Engineer's Estimate 20 HOUR $115.00 $2,300.00
A0480 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Monitor Construction Company, Inc. $80.00 $1,600.00 Siete, Inc. $100.00 $2,000.00 Engineer's Estimate 20 HOUR $145.00 $2,900.00
A0490 62301-0000 GENERAL LABOR
Monitor Construction Company, Inc. $50.00 $2,000.00 Siete, Inc. $50.00 $2,000.00 Engineer's Estimate 40 HOUR $60.00 $2,400.00
9 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Monitor Construction Company, Inc. $150.00 $1,500.00 Siete, Inc. $150.00 $1,500.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
A0510 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Monitor Construction Company, Inc. $160.00 $1,600.00 Siete, Inc. $150.00 $1,500.00 Engineer's Estimate 10 HOUR $300.00 $3,000.00
A0520 62510-2000 SEEDING, HYDRAULIC METHOD
Monitor Construction Company, Inc. $15,000.00 $3,000.00 Siete, Inc. $7,000.00 $1,400.00 Engineer's Estimate 0.20 ACRE $3,000.00 $600.00
A0530 62515-2000 MULCHING, HYDRAULIC METHOD
Monitor Construction Company, Inc. $5,500.00 $1,100.00 Siete, Inc. $7,000.00 $1,400.00 Engineer's Estimate 0.20 ACRE $3,300.00 $660.00
A0540 63301-0000 SIGN SYSTEM
Monitor Construction Company, Inc. $810.00 $3,240.00 Siete, Inc. $1,600.00 $6,400.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00
A0550 63308-3000 OBJECT MARKER, TYPE 3
Monitor Construction Company, Inc. $310.00 $3,100.00 Siete, Inc. $125.00 $1,250.00 Engineer's Estimate 10 EACH $415.00 $4,150.00
A0560 63501-0000 TEMPORARY TRAFFIC CONTROL
Monitor Construction Company, Inc. Lump Sum $32,500.00 Siete, Inc. Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
10 out of 10
Project No: NM FLAP TAO B007(1)
Project Name: John Dunn Bridges
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0570 63701-0000 FIELD OFFICE
Monitor Construction Company, Inc. $30,000.00 $30,000.00 Siete, Inc. $45,000.00 $45,000.00 Engineer's Estimate 1 EACH $33,000.00 $33,000.00
Total Schedule - All Items
Monitor Construction Company, Inc. $2,842,253.00 Siete, Inc. $4,042,109.00 Engineer's Estimate $3,205,000.00