Tabulation of Bids - Veterans Memorial Road.pdf
PDF 667 KB Posted
- Attached to
- NM FLAP TAO CB110(1) Veterans Memorial Road
- Solicitation number
- 6982AF21B000022
About this file
This document is a bid tabulation report for the NM FLAP TAO CB110(1) Veterans Memorial Road project. The report details bids received from five contractors for construction services including site clearing, road construction, drainage installation, guardrails and signage, and temporary traffic control. Bid amounts ranged from $3.6M to $5.3M, with Genesis Design and Development submitting the lowest responsive bid of $3.6M. The engineer's estimate was $3.25M. Key services required include roadway construction, asphalt paving, drainage structures, guardrails, erosion control, traffic control, and seeding/mulching. The award date will be determined pending final review. The soliciting agency is the US Department of Transportation Federal Highway Administration for improvements to Veterans Memorial Road in Taos County, New Mexico.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 01/10/22
1 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000022
Division: Central Federal Lands
State: NM County: Taos
Federal Land: Grande del Norte National Monument Opened at: Lakewood
Opened by: Josephine Helms
Date: 01/06/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Genesis Design and Development, LLC $3,595,615.00 7033 Kalgan Rd NE Rio Rancho, NM 87144
GM Emulsion, LLC A0070 - unit price listed is $30,000.00 LPSM, total amount bid said $35,000.00 - $5k over A0090 - unit price listed is $10,000.00 LPSM, total amount bid said $15,000.00 - $5k over Total addition errors = $10k
$3,665,340.50 5935 Agua Fria Street Sante Fe, NM 87505
ARROW INDIAN CONTRACTORS, INC. $4,297,789.95
449 S. 48th St. Ste 101 Tempe, AZ 85281
LaForge and Budd Construction Company, Inc. $4,829,912.50 2020 North 21st Street Parsons, KS 67357
Steve Manning Construction Inc $5,341,689.00 P.O. Box 491660 Redding, CA 96049
Engineer's Estimate $3,250,000.00
2 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
Genesis Design and Development, LLC Lump Sum $350,000.00 GM Emulsion, LLC Lump Sum $125,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $325,919.64 LaForge and Budd Construction Company, Inc. Lump Sum $600,000.00 Steve Manning Construction Inc Lump Sum $520,000.00 Engineer's Estimate ALL LPSM Lump Sum $459,819.00
A0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Genesis Design and Development, LLC $5,000.00 $13,700.00 GM Emulsion, LLC $5,500.00 $15,070.00
ARROW INDIAN CONTRACTORS, INC. $22,181.10 $60,776.21
LaForge and Budd Construction Company, Inc. $12,000.00 $32,880.00 Steve Manning Construction Inc $10,000.00 $27,400.00 Engineer's Estimate 2.740 MILE $4,000.00 $10,960.00
A0030 15215-1000 SURVEY AND STAKING, APPROACH ROAD
Genesis Design and Development, LLC $500.00 $13,500.00 GM Emulsion, LLC $1,000.00 $27,000.00
ARROW INDIAN CONTRACTORS, INC. $1,109.05 $29,944.35
LaForge and Budd Construction Company, Inc. $3,000.00 $81,000.00 Steve Manning Construction Inc $1,500.00 $40,500.00 Engineer's Estimate 27 EACH $400.00 $10,800.00
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Genesis Design and Development, LLC $10,000.00 $10,000.00 GM Emulsion, LLC $5,000.00 $5,000.00
ARROW INDIAN CONTRACTORS, INC. $2,772.63 $2,772.63
LaForge and Budd Construction Company, Inc. $7,500.00 $7,500.00 Steve Manning Construction Inc $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $1,200.00 $1,200.00
A0050 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Genesis Design and Development, LLC $5,000.00 $13,700.00 GM Emulsion, LLC $2,000.00 $5,480.00
ARROW INDIAN CONTRACTORS, INC. $12,476.87 $34,186.62
LaForge and Budd Construction Company, Inc. $15,000.00 $41,100.00 Steve Manning Construction Inc $10,000.00 $27,400.00 Engineer's Estimate 2.74 MILE $6,700.00 $18,358.00
3 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0060 15301-0000 CONTRACTOR QUALITY CONTROL
Genesis Design and Development, LLC Lump Sum $50,000.00 GM Emulsion, LLC Lump Sum $10,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $207,947.85 LaForge and Budd Construction Company, Inc. Lump Sum $150,000.00 Steve Manning Construction Inc Lump Sum $86,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0070 15401-0000 CONTRACTOR TESTING
Genesis Design and Development, LLC Lump Sum $100,000.00 GM Emulsion, LLC Lump Sum $30,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $173,289.87 LaForge and Budd Construction Company, Inc. Lump Sum $125,000.00 Steve Manning Construction Inc Lump Sum $86,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0080 15501-0000 CONSTRUCTION SCHEDULE
Genesis Design and Development, LLC Lump Sum $25,000.00 GM Emulsion, LLC Lump Sum $10,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $7,431.66 LaForge and Budd Construction Company, Inc. Lump Sum $35,000.00 Steve Manning Construction Inc Lump Sum $83,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,500.00
A0090 15701-0000 SOIL EROSION CONTROL (TEMPORARY CONSTRUCTION CONTROLS)
Genesis Design and Development, LLC Lump Sum $50,000.00 GM Emulsion, LLC Lump Sum $10,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $181,133.66 LaForge and Budd Construction Company, Inc. Lump Sum $80,000.00 Steve Manning Construction Inc Lump Sum $18,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0100 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Genesis Design and Development, LLC Lump Sum $10,000.00 GM Emulsion, LLC Lump Sum $6,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $13,280.93 LaForge and Budd Construction Company, Inc. Lump Sum $30,000.00 Steve Manning Construction Inc Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
4 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0110 15802-0000 WATERING FOR DUST CONTROL
Genesis Design and Development, LLC Lump Sum $15,000.00 GM Emulsion, LLC Lump Sum $10,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $148,977.82 LaForge and Budd Construction Company, Inc. Lump Sum $30,000.00 Steve Manning Construction Inc Lump Sum $64,500.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
A0120 20101-0000 CLEARING AND GRUBBING
Genesis Design and Development, LLC $17,500.00 $70,000.00 GM Emulsion, LLC $5,000.00 $20,000.00
ARROW INDIAN CONTRACTORS, INC. $11,051.32 $44,205.28
LaForge and Budd Construction Company, Inc. $10,000.00 $40,000.00 Steve Manning Construction Inc $140,000.00 $560,000.00 Engineer's Estimate 4.00 ACRE $5,500.00 $22,000.00
A0130 20302-0100 REMOVAL OF BOX CULVERT
Genesis Design and Development, LLC $100.00 $6,500.00 GM Emulsion, LLC $500.00 $32,500.00
ARROW INDIAN CONTRACTORS, INC. $745.91 $48,484.15
LaForge and Budd Construction Company, Inc. $350.00 $22,750.00 Steve Manning Construction Inc $700.00 $45,500.00 Engineer's Estimate 65 LNFT $200.00 $13,000.00
A0140 20302-1200 REMOVAL OF GUARDRAIL
Genesis Design and Development, LLC $25.00 $15,875.00 GM Emulsion, LLC $20.00 $12,700.00
ARROW INDIAN CONTRACTORS, INC. $22.18 $14,084.30
LaForge and Budd Construction Company, Inc. $20.00 $12,700.00 Steve Manning Construction Inc $10.00 $6,350.00 Engineer's Estimate 635 LNFT $15.00 $9,525.00
A0150 20420-0000 EMBANKMENT CONSTRUCTION
Genesis Design and Development, LLC $25.00 $10,000.00 GM Emulsion, LLC $25.00 $10,000.00
ARROW INDIAN CONTRACTORS, INC. $61.32 $24,528.00
LaForge and Budd Construction Company, Inc. $95.00 $38,000.00 Steve Manning Construction Inc $675.00 $270,000.00 Engineer's Estimate 400 CUYD $32.00 $12,800.00
5 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0160 25101-2500 PLACED RIPRAP, METHOD B, CLASS 5
Genesis Design and Development, LLC $180.00 $27,000.00 GM Emulsion, LLC $350.00 $52,500.00
ARROW INDIAN CONTRACTORS, INC. $350.82 $52,623.00
LaForge and Budd Construction Company, Inc. $350.00 $52,500.00 Steve Manning Construction Inc $450.00 $67,500.00 Engineer's Estimate 150 CUYD $100.00 $15,000.00
A0170 30202-2000 ROADWAY AGGREGATE, METHOD 2
Genesis Design and Development, LLC $45.00 $202,500.00 GM Emulsion, LLC $65.00 $292,500.00
ARROW INDIAN CONTRACTORS, INC. $80.38 $361,710.00
LaForge and Budd Construction Company, Inc. $85.00 $382,500.00 Steve Manning Construction Inc $104.00 $468,000.00 Engineer's Estimate 4,500 TON $66.00 $297,000.00
A0180 30502-0600 FULL DEPTH RECLAMATION WITH CEMENT, 6-INCH DEPTH
Genesis Design and Development, LLC $9.00 $353,700.00 GM Emulsion, LLC $15.00 $589,500.00
ARROW INDIAN CONTRACTORS, INC. $4.66 $183,138.00
LaForge and Budd Construction Company, Inc. $9.00 $353,700.00 Steve Manning Construction Inc $7.00 $275,100.00 Engineer's Estimate 39,300 SQYD $9.00 $353,700.00
A0190 30510-0000 CEMENTITIOUS MATERIAL
Genesis Design and Development, LLC $225.00 $119,250.00 GM Emulsion, LLC $350.00 $185,500.00
ARROW INDIAN CONTRACTORS, INC. $285.58 $151,357.40
LaForge and Budd Construction Company, Inc. $500.00 $265,000.00 Steve Manning Construction Inc $585.00 $310,050.00 Engineer's Estimate 530 TON $200.00 $106,000.00
A0200 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Genesis Design and Development, LLC $175.00 $1,137,500.00 GM Emulsion, LLC $250.00 $1,625,000.00
ARROW INDIAN CONTRACTORS, INC. $194.08 $1,261,520.00
LaForge and Budd Construction Company, Inc. $260.00 $1,690,000.00 Steve Manning Construction Inc $242.00 $1,573,000.00 Engineer's Estimate 6,500 TON $150.00 $975,000.00
6 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0210 40601-0000 FOG SEAL
Genesis Design and Development, LLC $900.00 $15,300.00 GM Emulsion, LLC $950.00 $16,150.00
ARROW INDIAN CONTRACTORS, INC. $1,247.68 $21,210.56
LaForge and Budd Construction Company, Inc. $2,000.00 $34,000.00 Steve Manning Construction Inc $1,290.00 $21,930.00 Engineer's Estimate 17 TON $1,600.00 $27,200.00
A0220 41102-1000 PRIME COAT, METHOD 1
Genesis Design and Development, LLC $1.00 $39,300.00 GM Emulsion, LLC $0.75 $29,475.00
ARROW INDIAN CONTRACTORS, INC. $1.04 $40,872.00
LaForge and Budd Construction Company, Inc. $2.00 $78,600.00 Steve Manning Construction Inc $1.50 $58,950.00 Engineer's Estimate 39,300 SQYD $1.00 $39,300.00
A0230 41105-0000 BLOTTER
Genesis Design and Development, LLC $180.00 $12,600.00 GM Emulsion, LLC $100.00 $7,000.00
ARROW INDIAN CONTRACTORS, INC. $57.46 $4,022.20
LaForge and Budd Construction Company, Inc. $100.00 $7,000.00 Steve Manning Construction Inc $108.00 $7,560.00 Engineer's Estimate 70 TON $150.00 $10,500.00
A0240 41201-0000 TACK COAT
Genesis Design and Development, LLC $890.00 $15,130.00 GM Emulsion, LLC $950.00 $16,150.00
ARROW INDIAN CONTRACTORS, INC. $1,247.68 $21,210.56
LaForge and Budd Construction Company, Inc. $1,000.00 $17,000.00 Steve Manning Construction Inc $1,290.00 $21,930.00 Engineer's Estimate 17 TON $900.00 $15,300.00
A0250 60103-2080 CONCRETE, HEADWALL FOR 72-INCH EQUIVALENT DIAMETER PIPE CULVERT
Genesis Design and Development, LLC $50,000.00 $100,000.00 GM Emulsion, LLC $40,000.00 $80,000.00
ARROW INDIAN CONTRACTORS, INC. $65,453.61 $130,907.22
LaForge and Budd Construction Company, Inc. $40,000.00 $80,000.00 Steve Manning Construction Inc $127,000.00 $254,000.00 Engineer's Estimate 2 EACH $20,500.00 $41,000.00
7 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 60220-1200 6 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Genesis Design and Development, LLC $2,500.00 $137,500.00 GM Emulsion, LLC $1,300.00 $71,500.00
ARROW INDIAN CONTRACTORS, INC. $1,872.41 $102,982.55
LaForge and Budd Construction Company, Inc. $3,000.00 $165,000.00 Steve Manning Construction Inc $1,800.00 $99,000.00 Engineer's Estimate 55 LNFT $3,000.00 $165,000.00
A0270 60711-0000 REPAIRING DRAINAGE STRUCTURE
Genesis Design and Development, LLC Lump Sum $50,000.00 GM Emulsion, LLC Lump Sum $20,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $6,931.59 LaForge and Budd Construction Company, Inc. Lump Sum $15,000.00 Steve Manning Construction Inc Lump Sum $6,600.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0280 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Genesis Design and Development, LLC $250.00 $31,250.00 GM Emulsion, LLC $90.00 $11,250.00
ARROW INDIAN CONTRACTORS, INC. $187.15 $23,393.75
LaForge and Budd Construction Company, Inc. $198.00 $24,750.00 Steve Manning Construction Inc $100.00 $12,500.00 Engineer's Estimate 125 LNFT $72.00 $9,000.00
A0290 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Genesis Design and Development, LLC $5,000.00 $20,000.00 GM Emulsion, LLC $7,000.00 $28,000.00
ARROW INDIAN CONTRACTORS, INC. $6,931.59 $27,726.36
LaForge and Budd Construction Company, Inc. $6,575.00 $26,300.00 Steve Manning Construction Inc $6,800.00 $27,200.00 Engineer's Estimate 4 EACH $4,600.00 $18,400.00
A0300 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Genesis Design and Development, LLC $125.00 $5,000.00 GM Emulsion, LLC $175.00 $7,000.00
ARROW INDIAN CONTRACTORS, INC. $267.39 $10,695.60
LaForge and Budd Construction Company, Inc. $100.00 $4,000.00 Steve Manning Construction Inc $215.00 $8,600.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00
8 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0310 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Genesis Design and Development, LLC $125.00 $5,000.00 GM Emulsion, LLC $175.00 $7,000.00
ARROW INDIAN CONTRACTORS, INC. $295.13 $11,805.20
LaForge and Budd Construction Company, Inc. $100.00 $4,000.00 Steve Manning Construction Inc $215.00 $8,600.00 Engineer's Estimate 40 HOUR $140.00 $5,600.00
A0320 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Genesis Design and Development, LLC $150.00 $6,000.00 GM Emulsion, LLC $200.00 $8,000.00
ARROW INDIAN CONTRACTORS, INC. $419.89 $16,795.60
LaForge and Budd Construction Company, Inc. $150.00 $6,000.00 Steve Manning Construction Inc $215.00 $8,600.00 Engineer's Estimate 40 HOUR $170.00 $6,800.00
A0330 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Genesis Design and Development, LLC $110.00 $4,400.00 GM Emulsion, LLC $250.00 $10,000.00
ARROW INDIAN CONTRACTORS, INC. $406.03 $16,241.20
LaForge and Budd Construction Company, Inc. $150.00 $6,000.00 Steve Manning Construction Inc $215.00 $8,600.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A0340 62301-0000 GENERAL LABOR
Genesis Design and Development, LLC $75.00 $1,500.00 GM Emulsion, LLC $50.00 $1,000.00
ARROW INDIAN CONTRACTORS, INC. $89.18 $1,783.60
LaForge and Budd Construction Company, Inc. $50.00 $1,000.00 Steve Manning Construction Inc $100.00 $2,000.00 Engineer's Estimate 20 HOUR $60.00 $1,200.00
A0350 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL SURVEY ASSESSMENT)
Genesis Design and Development, LLC $150.00 $3,000.00 GM Emulsion, LLC $150.00 $3,000.00
ARROW INDIAN CONTRACTORS, INC. $222.95 $4,459.00
LaForge and Budd Construction Company, Inc. $150.00 $3,000.00 Steve Manning Construction Inc $215.00 $4,300.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00
9 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0360 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Genesis Design and Development, LLC $110.00 $13,200.00 GM Emulsion, LLC $150.00 $18,000.00
ARROW INDIAN CONTRACTORS, INC. $297.27 $35,672.40
LaForge and Budd Construction Company, Inc. $150.00 $18,000.00 Steve Manning Construction Inc $300.00 $36,000.00 Engineer's Estimate 120 HOUR $180.00 $21,600.00
A0370 62510-2000 SEEDING, HYDRAULIC METHOD
Genesis Design and Development, LLC $10,000.00 $20,000.00 GM Emulsion, LLC $10,000.00 $20,000.00
ARROW INDIAN CONTRACTORS, INC. $4,879.84 $9,759.68
LaForge and Budd Construction Company, Inc. $4,000.00 $8,000.00 Steve Manning Construction Inc $3,900.00 $7,800.00 Engineer's Estimate 2.0 ACRE $5,000.00 $10,000.00
A0380 62515-2000 MULCHING, HYDRAULIC METHOD
Genesis Design and Development, LLC $10,000.00 $20,000.00 GM Emulsion, LLC $10,000.00 $20,000.00
ARROW INDIAN CONTRACTORS, INC. $4,971.34 $9,942.68
LaForge and Budd Construction Company, Inc. $4,000.00 $8,000.00 Steve Manning Construction Inc $4,900.00 $9,800.00 Engineer's Estimate 2.0 ACRE $2,000.00 $4,000.00
A0390 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Genesis Design and Development, LLC $2.00 $231,460.00 GM Emulsion, LLC $0.35 $40,505.50
ARROW INDIAN CONTRACTORS, INC. $0.55 $63,651.50
LaForge and Budd Construction Company, Inc. $0.25 $28,932.50 Steve Manning Construction Inc $0.30 $34,719.00 Engineer's Estimate 115,730 LNFT $0.60 $69,438.00
A0400 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Genesis Design and Development, LLC Lump Sum $40,000.00 GM Emulsion, LLC Lump Sum $40,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $147,126.11 LaForge and Budd Construction Company, Inc. Lump Sum $100,000.00 Steve Manning Construction Inc Lump Sum $32,000.00 Engineer's Estimate ALL LPSM Lump Sum $38,500.00
10 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0410 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
Genesis Design and Development, LLC Lump Sum $25,000.00 GM Emulsion, LLC Lump Sum $35,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $67,457.30 LaForge and Budd Construction Company, Inc. Lump Sum $30,000.00 Steve Manning Construction Inc Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
A0420 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Genesis Design and Development, LLC $500.00 $2,000.00 GM Emulsion, LLC $2,500.00 $10,000.00
ARROW INDIAN CONTRACTORS, INC. $1,358.60 $5,434.40
LaForge and Budd Construction Company, Inc. $1,000.00 $4,000.00 Steve Manning Construction Inc $300.00 $1,200.00 Engineer's Estimate 4 EACH $200.00 $800.00
A0430 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
Genesis Design and Development, LLC $75.00 $6,750.00 GM Emulsion, LLC $100.00 $9,000.00
ARROW INDIAN CONTRACTORS, INC. $156.02 $14,041.80
LaForge and Budd Construction Company, Inc. $100.00 $9,000.00 Steve Manning Construction Inc $100.00 $9,000.00 Engineer's Estimate 90 EACH $80.00 $7,200.00
A0440 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Genesis Design and Development, LLC $10,000.00 $20,000.00 GM Emulsion, LLC $5,000.00 $10,000.00
ARROW INDIAN CONTRACTORS, INC. $5,268.01 $10,536.02
LaForge and Budd Construction Company, Inc. $5,000.00 $10,000.00 Steve Manning Construction Inc $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $8,500.00 $17,000.00
A0450 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Genesis Design and Development, LLC $250.00 $7,500.00 GM Emulsion, LLC $500.00 $15,000.00
ARROW INDIAN CONTRACTORS, INC. $381.24 $11,437.20
LaForge and Budd Construction Company, Inc. $300.00 $9,000.00 Steve Manning Construction Inc $430.00 $12,900.00 Engineer's Estimate 30 EACH $170.00 $5,100.00
11 out of 11Source Selection Information - See FAR 2.101 & 3.104
Project No: NM FLAP TAO CB110(1)
Project Name: Veterans Memorial Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0460 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Genesis Design and Development, LLC $1.00 $58,000.00 GM Emulsion, LLC $0.32 $18,560.00
ARROW INDIAN CONTRACTORS, INC. $0.52 $30,160.00
LaForge and Budd Construction Company, Inc. $0.15 $8,700.00 Steve Manning Construction Inc $0.20 $11,600.00 Engineer's Estimate 58,000 LNFT $0.20 $11,600.00
A0470 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Genesis Design and Development, LLC $125.00 $62,500.00 GM Emulsion, LLC $50.00 $25,000.00
ARROW INDIAN CONTRACTORS, INC. $148.63 $74,315.00
LaForge and Budd Construction Company, Inc. $50.00 $25,000.00 Steve Manning Construction Inc $75.00 $37,500.00 Engineer's Estimate 500 HOUR $40.00 $20,000.00
A0480 63701-0000 FIELD OFFICE
Genesis Design and Development, LLC $50,000.00 $50,000.00 GM Emulsion, LLC $15,000.00 $15,000.00
ARROW INDIAN CONTRACTORS, INC. $49,907.49 $49,907.49
LaForge and Budd Construction Company, Inc. $30,000.00 $30,000.00 Steve Manning Construction Inc $18,000.00 $18,000.00 Engineer's Estimate 1 EACH $13,000.00 $13,000.00
Total Schedule - All Items
Genesis Design and Development, LLC $3,595,615.00 GM Emulsion, LLC $3,665,340.50
ARROW INDIAN CONTRACTORS, INC. $4,297,789.95
LaForge and Budd Construction Company, Inc. $4,829,912.50 Steve Manning Construction Inc $5,341,689.00 Engineer's Estimate $3,250,000.00