QnA 7.22.2020.pdf

PDF 82 KB Posted

Attached to
AZ FTFS 104(1), Mingus Mountain Federal contract opportunity
Solicitation number
6982AF20B000027
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains questions and answers from a pre-bid meeting for a federal highway construction project. The project involves approximately 2.5 miles of roadwork on Mingus Mountain Road within the Prescott National Forest in Arizona, including 1.5 miles of asphalt paving and 1 mile of gravel import and reconditioning. Significant materials needed include 2,400 tons of asphalt and 9,000 tons of aggregate base. Bidders were advised that the asphalt binder grade should be a PG 64-22. Underdrain is a pay item with a plan quantity of 100 linear feet to be installed in locations determined by the contracting officer in lengths of approximately 30 feet. Flaggers and a traffic control supervisor are considered subsidiary to the traffic control item. The anticipated award should be within 60 days of bid opening per the FAR, and a notice to proceed will also be governed by the FAR. The Department of Transportation Federal Highway Administration is the contracting agency for this project.

View the file

Other files for this federal contract opportunity

Other files attached to AZ FTFS 104(1), Mingus Mountain, newest first.
File Type Posted
Bid Tabs.pdf PDF
Mingus Bid Opening Summary.pdf PDF
Amendment A001.pdf PDF
QnA 8.4.2020.pdf PDF
Plans - AZ 104(1) Mingus Mountain.pdf PDF
Plans - AZ 104(1) Mingus Mountain - Signed Cover Sheet.pdf PDF
Quick Start Guide_Opportunities 4 Contractors.pdf PDF
cgp_permit.pdf PDF
6982AF20B000027.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ FTFS 104(1), Mingus Mountain Road

July 22, 2020

Questions Answers 1 We would like to visit the site for the Mingus Mountain solicitation next week. Do we need to request this formally or are we able to visit the site as long as its business hours? Please advise

See FAR 52.236-27 Site Visit (Construction) of the solicitation

2 What is the anticipated Award? Award should be made within 60 days of the bid opening. However, see FAR Clause 52.211-10 on page C-3.

3 What is the anticipated NTP? See FAR Clause 52.211-10 on page C-3.

4 The project is over 7000’ in elevation and the closest weather stations are at 3500’ and 5000’ in elevation. Has the Government taken into consideration this elevation difference and potential weather difference?

Yes, the government has considered the project elevation and typical weather conditions.

5 Section 403. What is the PG Grade for the binder?

Looking at the subject solicitation, I cannot seem to find the specific Asphalt Binder Performance Grade called out anywhere. It references AASHTO M320 but I don’t see the specify the PG anywhere. Could you let me know which PG asphalt is desired for this job

For 403 mixes we ask that the contractor use a binder grade normally used by the state DOT in the area of the project. In this case a PG 64-22 binder would be appropriate.

6 Section 635.24 states “Measure flaggers, for each hour a person is actually performing the work. Do not measure time required to set up and take down required signage.” Please add a Bid Item for Flaggers.

Flaggers are intended to be subsidiary to Traffic control (lpsm), refer to Plans sheet B6. Handling of traffic control device and signs is prescribed to the TCS.

7 Section 635.24 states “Measure Traffic Control Supervisor by the week (7 consecutive days, beginning and ending at midnight on the same day of the week) for the work described in Subsection 156.09.” Please add a Bid Item for Traffic Control Supervisor.

TCS is intended to be subsidiary to Traffic control (lpsm), refer to Plans sheet B6.

8 Bid Item A0300 60501-0000 Standard Underdrain System 100 LNFT. Plan Quantity Summary state per CO. Is this 100 LNFT at one location or multiple locations? If multiple locations, what is the minimum LNFT per location?

The final quantity (length, location, and depth) will be determined by CO and will be field fitted, but for estimating purposes the contractor may assume 30 feet at any given location. The length of the underdrain will extend past the roadway typical section (A6) and daylight at a low point for positive drainage. The intent with this pay item is to relieve pressure underneath the pavement resulting from accumulated water at low points in the roadway.

9 Who is designated as the Construction Operations Engineer

(COE)?

The COE has not yet been determined.

10 Who is designated as the Project Engineer (PE)? The PE has not yet been determined.