Plans - AZ 104(1) Mingus Mountain.pdf
PDF 16 MB Posted
- Attached to
- AZ FTFS 104(1), Mingus Mountain Federal contract opportunity
- Solicitation number
- 6982AF20B000027
About this file
This federal contract opportunity is for roadway work on AZ FTFS 104(1) Mingus Mountain in Yavapai County, Arizona. The project consists of paving approximately 1.5 miles of roadway and reconditioning 1 mile of gravel road leading to Mingus Mountain Recreation Area within the Prescott National Forest. Construction will require phasing, temporary traffic control measures, and timely completion to minimize disruptions to recreation area visitors. Significant work includes 2,400 tons of asphalt concrete pavement and 9,000 tons of aggregate base. The solicitation was issued by the Department of Transportation Federal Highway Administration for this work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabs.pdf | ||
| Mingus Bid Opening Summary.pdf | ||
| Amendment A001.pdf | ||
| QnA 8.4.2020.pdf | ||
| QnA 7.22.2020.pdf | ||
| Plans - AZ 104(1) Mingus Mountain - Signed Cover Sheet.pdf | ||
| 6982AF20B000027.pdf | ||
| Quick Start Guide_Opportunities 4 Contractors.pdf | ||
| cgp_permit.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts A G e n s h t\
.S y m .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts A G e n s h t\
.S y m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
A4
NO SCALE
SITE MAP
m il e s
P re s c o tt A
Z
Staging Area
Station 10+00
Begin Schedule A
AZ FTFS 104(1)
Station 85+84
Begin Option X
End Schedule A
AZ FTFS 104(1)
Station 141+00
End Option X
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts A G e n s h t\
S it e M a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
A6
NOTE:
Va ria ble
Exi stin g S lop e
1:3 1:3
Traveled Way Traveled Way
Varies
85+84 - 141+00
EXISTING TYPICAL SECTION
MINGUS MOUNTAIN ROAD
from 0" to 3".
Existing roadway aggregate depth varies
Ditch
1. Dimensions shown are approximate and may be varied by the CO.
2. Measure existing roadway widths according to 152.05(m).
Construction Limits
Match existing Match existing
NO SCALE
Normal Edge of Pavement
22' - 0"
10' 10'
1' Shoulder
1' Shoulder
OPTION X
ROADWAY AGGREGATE
TYPICAL SECTIONS
4" Roadway Aggregate, Method 2
85+84 - 141+00
TYPICAL SECTION
ROADWAY REHABILITATION
MINGUS MOUNTAIN ROAD
Existing ground
Existing ground
Project Length
Station to Station Roadway (ft)
5,516
Description
85+84 to 141+00 Roadway Aggregate
Match existing width 22 ft
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
A g g r e g a te S u r fa c e C o a r s e .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
SCHEDULE A
SUMMARY OF QUANTITIES
B1
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B .S u m m a r y o f
Q u a n ti ti e s S c h
A O p t
X .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
OPTION X
SUMMARY OF QUANTITIES
B2
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B .S u m m a r y o f
Q u a n ti ti e s S c h
A O p t
X .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
B3
SURFACING SUMMARY
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B .S u r fa c e S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
SIGNING SUMMARY
B4
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B
S ig n S u m m a r y .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
SUMMARY
PAVEMENT MARKINGS
B5
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B .P a v e m e n t
M a r k in g s .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
B6
CONTROL SUMMARY
TEMPORARY TRAFFIC
STATE PROJECT
P
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts B S u m m B
T e m p o r a r y T
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
DETAIL APPROVED FOR USE 12/2012
SUBEXCAVATION
NO SCALE C204-51
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
max.
2 ft
1 ft min.
6.
5.
4.
3.
2.
1.
NOTE:
the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the every 2 ft of subexcavation depth.
in bottom layers. Provide a 1 ft min. bench width for
Widen top of subexcavation area to allow for bench width
Do not place backfill material within the structural section.
Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
unless otherwise specified.
Replace unsuitable material according to Subsection 204.07
REVISED: 08/2014
STATE PROJECT
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts F C .d g n
U s e r m ig u e l.
z .m a r ti n e z
AZ
Mingus Mountain
AZ FTFS 104(1)
F1
See typical sections for structural section
Finished grade
Backfill with material according to Section 204
TYPICAL SECTION
SUBEXCAVATION
Geotextile
BENCH DETAIL
Total subexcavation width
Width of need according to Section 204
Backfill with material structural section
See typical sections for
Finished grade
401-A
NOTE:
AGGREGATE TRANSITION
Subgrade
Existing Aggregate Roadway Aggregate, Method 2 be varied by CO.
Dimensions are approximate and may 1.
Transition L = 120 ft.
K1
4"
3" 1:200 or flatte r
Existing Cattle guard
Remove roadway aggregate
6"
Asphalt Concrete
Roadway Aggregate
TRANSITION FOR ASPHALT
CATTLE GUARD
TRANSITION FOR AGGREGATE SURFACE
CATTLE GUARD
ON AGGREGATE SURFACE
TRANSITION LENGTH
Subgrade
Existing Aggregate
Roadway Aggregate, Method 2
4"
Existing Cattle guard
1:200 or flatte r
Transition L = 85 ft.
Transition L = 85 ft.
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts K S p A .d
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
WOOD POST SELECTION TABLE
Direction of traffic flow
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
5.
4.
3.
2.
1.
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Location
Rural Districts
Residence Districts
Business or
See table for hole size post, parallel to sign face.
Field drill holes through a secondary sign mounted below another sign.
exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Finish ground line
NO SCALE
rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil fit field conditions.
indicate overall post length. Select post lengths to 4 thru H1H is vulnerable to being struck when placed outside the clear zone.
Traffic barrier protection is required for all posts larger than
CL post
Backfill material
W
0.15X0.35X0.35X0.15X ty p
D
Z
.5
Y
H
H
H
V Y
Backfill material
W
0.125X0.25X0.25X0.25X0.125X
.5
Y Z
H
H
H
H ty p
D
V Y
V Y
H
Z ty p
D
Same post size
Same post size
Bottom of sign
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
H
Same post size
Backfill material
(See Post Selection table)
Notch depth (where required)
W
W
Backfill material
.5
Y
Z ty p
D
V Y
H
.5
Y
0.2X0.6X0.2X
STATE PROJECT
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
C .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r m ig u e l.
z .m a r ti n e z
NUMBER
SHEET
AZ
REVISED:
DETAIL APPROVED FOR USE 10/2009
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
Product of X-Y-Z in CUFT
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
For all retroflectorized signs where W > 25'
6 ft 5 ft
7 ft 2 ft
V may be reduced by 1 foot in rural districts for
22 ft (max.)
X=14 ft (min.) to maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
WOOD POSTS
INSTALLATION
PERMANENT SIGN
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
" oversized washer16 5" lock nut16
" bolt16
" bolt thru the post8
6" x 8" when located within the clear zone or if the post
T2
633-7
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
U
S C
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
C .d g n
M
A p r il
NOTE:
all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum
DELINEATORS
8' (max.)
2' (min.)
6' desired
3" min.
3" min.
m in
Install double delineators on 100-foot spacing for acceleration
REVISED: 08/2014
e e N o te s p a c e d a t c c d ia h o le s reflector by pulling into post cavity length required to prevent breaking
" inside dia. aluminum ferrule x8
A minimum of 12 holes spaced on 1" centers are required for
STATE PROJECT
NUMBER
SHEET
A
M C D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
C .d g n
U s e r m ig u e l.
z .m a r ti n e z
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
T3 Mingus Mountain
AZ FTFS 104(1)
AZ
633-A
U.S. CUSTOMARY SPECIAL
NO SCALE
(Accel/Decel Lanes)
Double delineator
(Object marker)
Triple delineator
(Normal application)
Single delineator
E d g e o f
P a v e m e n t
ATTACHMENT DETAIL
(for rigid metal posts)
POST DETAILS
(TYPE 1 - acrylic plastic lens)
DELINEATOR (RIGID)
NOTE:
(TYPE 2 - retroreflective sheeting)
DELINEATOR (FLEXIBLE)
LOCATION OF DELINEATOR
V a r ie s
SHEETING DETAIL
RETROREFLECTIVE
(both sides of post) material.
strip of retroreflective may be a single or triple delineators
Single, double, Delineator recommendations manufacturer's according to
Embed delineator
9.
8.
7.
6.
5.
4.
3.
2.
1.
See Subsection 718.05 for rigid post requirements.
as required.
Furnish anti-theft hardware for mounting retroreflectors all rigid posts. See Subsection 718.04.
delineator immediately behind the guardrail.
the edge of pavement and the delineator offset, locate the pavement. Where guardrail intrudes into the space between
Place delineators at a constant distance from the edge of the according to the manufacturer's recommendations.
CO. Provide delineators conforming to the MUTCD and install
Alternate delineator types may be used with approval of the recommendations.
Install reflective elements according to the manufacturer's and deceleration lanes or to mark changes in width.
to mark obstructions.
Use yellow reflective elements for triple delineators installed
Match the color of the reflective element with the edge line.
Typical rigid post
Typical reflective lens
Use aluminum bolts
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
See Note 10
W20-1
See Note 10
W20-1
G20-2 the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional)
W13-1P
(optional)
W13-1P xx
MPH
xx
MPH
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
Mingus Mountain
AZ FTFS 104(1)
T4
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow Traffic flow
Traffic flow
Double solid line: two pavement markers, side by side, spaced on allowed by the gap shown based on curvature.
DETAIL A DETAIL B
NOTE:
Two-way traffic
Passing zone both directions
DETAIL B1
Two-way traffic
Passing zone both directions
DETAIL A1
Two-way traffic
No passing zone one direction
DETAIL A2
Two-way traffic
No Passing zone one direction
DETAIL B2
Two-way traffic
No passing zone both directions
DETAIL A3
Two-way traffic
No Passing zone both directions
DETAIL B3
yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
On two- or three-lane roads, signs may be used instead of temporary patterns:
To substitute raised pavement markers for lines, use the following
2.
1.
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-2
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2016
REVISED:
4" Broken yellow
4" Broken yellow
4" Solid double
4" Solid double
4" Broken yellow and
2' broken line: two pavement markers spaced 2' apart
Single solid line: pavement markers spaced on 10' centers.
10' centers.
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
PAVEMENT MARKINGS
TEMPORARY
2' 18'
40'
2' 18'
40'
2' 38'
4" Broken yellow centerline
2' 38'
20'
20' pavement markings as shown on Standard 635-3.
Mingus Mountain
AZ FTFS 104(1)
T5
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
NO
CENTER
LINE
DO
NOT
PASS
DO
NOT
PASS
DO
NOT
PASS
PASS
WITH
CARE
PASS
WITH
CARE
PASS
WITH
CARE
NO
PASSING
ZONE
NO
PASSING
ZONE
NO
PASSING
ZONE
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-3
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
On curves with radius less than 500', reduce cycle length to 20'.
temporary traffic control zones greater than 3 miles long.
Repeat W8-12 after each major intersection and every 2 miles for
Repeat R4-1 at 1 mile intervals.
FOR UNMARKED PAVEMENTS
DELINEATION AND SIGNING
500'
500'
500'
500'
500' cycle length
40'
500' cycle length
40' cycle length
40'
Mingus Mountain
AZ FTFS 104(1)
T6
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12 each direction of travel.
Use permanent markings plan to determine no passing zones for
(optional)
W14-3
(optional)
W14-3
(optional)
W14-3
See Note 2
See Note 2
See Note 2
R4-1
R4-1
R4-1
See Note 6
R4-2
See Note 6
R4-2
See Note 6
R4-2
6.
5.
4.
3.
2.
1.
installed at the upstream end of the zone.
a no-passing zone only if a "DO NOT PASS" (R4-1) sign has been
Use the "PASS WITH CARE" (R4-2) sign at the downstream end of vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow vehicle positioning guides
Bi-directional yellow
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
Passing AllowedNo Passing ZonePassing Allowed
Two-way traffic
No Passing zone one direction
DETAIL B
Two-way traffic
No Passing zone both directions
DETAIL C
Two-way traffic
Passing zone both directions
DETAIL A
delineation.
Optionally use the vehicle positioning guides to provide additional up to 14 days when providing signs according to this standard.
The pavement on two- or three-lane roads may remain unmarked
Traffic flow the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the Contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
Spacing Table)
(See Length and
LENGTH AND SPACING TABLE
SPEED*
APPROACH
6.
5.
4.
3.
2.
1.
Spacing Table)
(See Length and WORK SPACE
See Note 4
G20-2
See Note 4
W20-1 W3-4
(optional)
W16-2P
W20-7
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C posted speed, not the advisory speed.
Approach speed based on the regulatory *
BUFFER SPACE
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
T7
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n
A p r il
FEDERAL LANDS HIGHWAY
Traffic flow
See Note 4
W20-1 W20-7W20-4
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
(optional)
W13-1P
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
ROAD WORK
END
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
Channelizing devices
Flagger location
Flagger location
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-6
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
SPACING IN FEET
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
Mingus Mountain
AZ FTFS 104(1)
T8
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n
A p r il
FEDERAL LANDS HIGHWAY
YIELD
TO
ONCOMING
TRAFFIC
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
xx
MPH
xx
MPH
xxx
FEET
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-7
STANDARD APPROVED FOR USE 6/2005
DRAFT 6/2014
REVISED:
(WITH YIELD SIGN)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
MPH FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
50 MPH.
50' - 100' 50' - 100' (optional)
See Note 6
10' min.
15'
Mingus Mountain
AZ FTFS 104(1)
T9
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
W20-4
W1-4
See Note 3
W20-1 W20-4 W3-2
R1-2
See Note 3
G20-2
See Note 3
G20-2 See Note 3
W20-1
Spacing Table)
(See Length and
WORK SPACE
(optional)
W13-1P
R1-2aP
(optional)
W13-1P
See Note 5
(optional)
W16-2P
7.
6.
5.
4.
3.
2.
1.
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
(optional) (optional) in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored
Requirements, Section 156.
For project specific minimum width, refer to Special Contract
Use the "YIELD AHEAD" (W3-2) sign when approach speeds exceed of the MUTCD.
If the surface is paved, install yield lines that comply with Section 3B.16
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field approaching traffic through and beyond the work site.
that must yield, and if drivers from both directions are able to see
Use this layout only if sufficient gaps in oncoming traffic exist for traffic
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
BA
BUFFER SPACE TAPER AREA A
(See Length and Spacing Table) VARIABLE TERMINATION AREA
Device spacing
BUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 4
(optional)
YIELD LINE
Channelizing devices light (optional)
Type B warning light (optional)
Type B warning
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4
E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NUMBER
SHEET
AZ
Mingus Mountain
AZ FTFS 104(1)
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
1.5
1.5
1.5
1.5
Mingus Mountain
AZ FTFS 104(1)
STATE PROJECT
NUMBER
SHEET
D e s ig n P r o je c ts A
Z M in g u s M o u n ta in R o a d w a y C
A D
D S h e e ts T T
S td
.d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
T10
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
| A-Gen_sht |
| 1. TTL_US |
| 2.Sym |
| 2.Sym |
| 4. Site Map |
| 5. TYP_Asphalt |
| 6. TYP_Aggregate Surface Coarse |
| B-Summ |
| B1.Summary of Quantities_SchA & Opt X |
| B1.Summary of Quantities_SchA & Opt X |
| B2.Surface Summary |
| B3. Sign Summary |
| B4.Pavement Markings |
| B5. Temporary TC |
| F-200 |
| C204-51 |
| K-400 |
| Sp401-A |
| T-600 |
| sp605-A |
| T1. C633-7 |
| T2. C633-51 |
| T3. Std635-1 |
| T4. Std635-2 |
| T5. Std635-3 |
| T6. Std635-5 |
| T7. Std635-6 |
| T8. Std635-7 |
| T9. Std635-14 |
File details come from the government source that posted it. Updated .