QnA_10.9.2019.pdf
PDF 115 KB Posted
- Attached to
- CA FLAP NEV 40(1) Donner Pass Road
- Solicitation number
- 6982AF19B000002
About this file
This document contains questions and answers from an advertisement for a federal-aid highway project located on Donner Pass Road in California. The project will rehabilitate 6.54 miles of existing pavement and widen shoulders to include bike lanes between Interstate 80 Exit 174 in Soda Springs and the Truckee city limits. Significant work includes roadway excavation, rock excavation, aggregate base, asphalt pavement, guardrail installation, erosion control, and traffic control. The cost range is estimated between $10 million to $14 million. Construction is planned from spring 2020 to fall 2021. Type L pavement markings must be installed at 90 mils and will be recessed a minimum of 0.11 inches. Either epoxy paint or preformed thermoplastic can be used for the 400 linear feet of blue longitudinal lines, though paint is preferred for consistency. The Federal Highway Administration is the agency managing the federal-aid highway project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabs.pdf | ||
| Bid Opening Summary Donner Pass.pdf | ||
| A009.pdf | ||
| A008.pdf | ||
| A007.pdf | ||
| A006.pdf | ||
| A005.pdf | ||
| A004.pdf | ||
| QnA_11.1.2019.pdf | ||
| A003.pdf | ||
| QnA_10.30.2019.pdf | ||
| A002.pdf | ||
| QnA_10.28.2019.pdf | ||
| A001.pdf | ||
| QnA_10.17.2019.pdf | ||
| QnA_10.3.2019.pdf | ||
| Geotech_Report.pdf | ||
| Donner_Pass_Road_X-Z_Sheets_Stamped.pdf | ||
| Pavements_Report.pdf | ||
| 6982AF19B000002.pdf | ||
| Hydraulics_Report.pdf | ||
| Donner_Pass_Plans.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
CA FLAP NEV 40(1) Donner Pass Road
October 1, 2019
Questions Answers
1 Requesting clarification for bid item A2120 63402-2300
PAVEMENT MARKINGS, TYPE L, SOLID:
What is the required formulation for Type L Markings for the above referenced project (4:1) or (98:2)? Caltrans always requires
4:1 within this region as this is the most common equipment available for this region.
Use a 4:1 formulation.
2 For the blue this would have to be a 98:2 material as blue is not manufactured as a 4:1. Will Type D epoxy Paint or Preformed
Thermoplastic be acceptable for the 400 LF of Blue 4” Lines?
Yes, either would be acceptable. However, Paint is preferred to remain consistent with other longitudinal markings.
3 What is the required mill thickness for the Type L Pavement markings 60Mils, 90Mils, ETC
Install the pavement markings at 90Mils
4 Are the Type L Line being recessed and if So what is the required depth of the recess?
Recess depth should be a minimum of .11 inches.
October 9, 2019
Questions Answers
5 Does the MMA on this project get recessed? Yes