A008.pdf
PDF 15 MB Posted
- Attached to
- CA FLAP NEV 40(1) Donner Pass Road
- Solicitation number
- 6982AF19B000002
About this file
This solicitation and related federal contract opportunity document outline requirements for a road construction project in California. The project will rehabilitate approximately 6.54 miles of Donner Pass Road from I-80 Exit 174 in Soda Springs to the Truckee city limits, including widening shoulders for bike lanes, improving drainage, adding signage and striping, and installing guardrail. Significant work items include 7,500 cubic yards of roadway excavation, 195 cubic yards of rock excavation, 12,000 cubic yards of aggregate base, and 20,000 tons of asphalt pavement. The cost range is estimated between $10-14 million. Construction is planned to take place from spring 2020 to fall 2021, with anticipated advertisement in late winter 2019, bid opening in late winter to early spring 2020, and award and notice to proceed in early spring 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabs.pdf | ||
| Bid Opening Summary Donner Pass.pdf | ||
| A009.pdf | ||
| A007.pdf | ||
| A006.pdf | ||
| A005.pdf | ||
| A004.pdf | ||
| QnA_11.1.2019.pdf | ||
| A003.pdf | ||
| QnA_10.30.2019.pdf | ||
| A002.pdf | ||
| QnA_10.28.2019.pdf | ||
| A001.pdf | ||
| QnA_10.17.2019.pdf | ||
| QnA_10.9.2019.pdf | ||
| QnA_10.3.2019.pdf | ||
| Pavements_Report.pdf | ||
| Hydraulics_Report.pdf | ||
| Donner_Pass_Plans.pdf | ||
| 6982AF19B000002.pdf | ||
| Geotech_Report.pdf | ||
| Donner_Pass_Road_X-Z_Sheets_Stamped.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF19B000002
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
09/23/2019
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CA FLAP NEV 40(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Ryan Phillips, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 1/29/20 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53-236-1(e)
X
X
X
X
X
A-1 Amendment A008
A - 5
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA FLAP NEV 40(1)
Project Name:Donner Pass Road Improvements
A - 6
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL
ALL LPSM $___LPSM_____ $____________
A0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD
77 EACH $____________ $____________
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
11 EACH $____________ $____________
A0100 15215-7000 SURVEY AND STAKING, PARKING AREA
9 EACH $____________ $____________
A0120 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
6.400 MILE $____________ $____________
A0140 15236-2000 SURVEY CONTROL, GRADE FINISHING
6.400 MILE $____________ $____________
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0180 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0200 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0220 15701-0000 SOIL EROSION CONTROL (Erosion Control)
ALL LPSM $___LPSM_____ $____________
A0240 15701-0000 SOIL EROSION CONTROL (Sediment Control)
ALL LPSM $___LPSM_____ $____________
A0260 15701-0000 SOIL EROSION CONTROL (Non-Stormwater Control)
ALL LPSM $___LPSM_____ $____________
A0280 15704-1200 SOIL EROSION CONTROL, ROCK MULCH
20 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 7
A0300 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0320 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A0340 20101-0000 CLEARING AND GRUBBING
38.5 ACRE $____________ $____________
A0360 20220-1000 REMOVAL, INDIVIDUAL TREE
105 EACH $____________ $____________
A0380 20301-0700 REMOVAL OF DELINEATOR
416 EACH $____________ $____________
A0400 20301-1100 REMOVAL OF GATE
3 EACH $____________ $____________
A0420 20301-1200 REMOVAL OF HEADWALL
5 EACH $____________ $____________
A0440 20301-1400 REMOVAL OF INLET
11 EACH $____________ $____________
A0460 20301-2300 REMOVAL OF SIGN/MARKER
63 EACH $____________ $____________
A008 A0470 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
200 EACH $____________ $____________
A0480 20302-1200 REMOVAL OF GUARDRAIL
4,932 LNFT $____________ $____________
A0500 20302-2100 REMOVAL OF PIPE CULVERT
285 LNFT $____________ $____________
A0520 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
52,200 SQYD $____________ $____________
A0540 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
25 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 8
A008 A0560 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL LPSM $___LPSM_____ $____________
A0580 20401-0000 ROADWAY EXCAVATION
7,500 CUYD $____________ $____________
A0600 20402-0000 SUBEXCAVATION
250 CUYD $____________ $____________
A0620 20421-0000 ROCK EXCAVATION
195 CUYD $____________ $____________
A0640 20425-1000 DITCH, EXCAVATION
900 LNFT $____________ $____________
A0660 20441-0000 WASTE
5,000 CUYD $____________ $____________
A0680 20442-0000 SLOPE SCALING
20 CUYD $____________ $____________
A0700 20501-0000 CONTROLLED BLAST HOLE
2,900 LNFT $____________ $____________
A0720 20702-1000 GEOTEXTILE FILTER, CLASS 2, TYPE E
200 SQYD $____________ $____________
A0740 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
48 CUYD $____________ $____________
A0760 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
4 CUYD $____________ $____________
A0780 25210-0000 ROCKERY
665 SQFT $____________ $____________
A0800 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
7,800 SQFT $____________ $____________
A0820 26002-0000 ROCK DOWEL
60 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 9
A0840 26005-0000 SHEAR PIN
20 EACH $____________ $____________
A0860 30202-2000 ROADWAY AGGREGATE, METHOD 2
12,200 TON $____________ $____________
A0880 30301-2000 SHOULDER RECONDITIONING
10.491 MILE $____________ $____________
A0900 30302-1000 DITCH RECONDITIONING
700 LNFT $____________ $____________
A0920 30401-5000 FULL DEPTH RECLAMATION, METHOD 2
3.100 MILE $____________ $____________
A0960 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
20,000 TON $____________ $____________
A0980 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
200 TON $____________ $____________
A1020 40303-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1, WEDGE AND LEVELING COURSE
4,150 TON $____________ $____________
A1040 40601-0000 FOG SEAL
55 TON $____________ $____________
A1060 41102-0000 PRIME COAT
65,500 SQYD $____________ $____________
A1080 41105-0000 BLOTTER
190 TON $____________ $____________
A1100 41201-0000 TACK COAT
110 TON $____________ $____________
A1120 50207-0000 CONCRETE PAVEMENT RESTORATION, CRACKING AND SEATING
PAVEMENT
51,000 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 10
A1140 55401-1000 REINFORCING STEEL
178 LB $____________ $____________
A1160 56603-0000 REINFORCED SHOTCRETE
900 SQYD $____________ $____________
A1180 60101-0000 CONCRETE
3.0 CUYD $____________ $____________
A1200 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
A1220 60201-0400 12-INCH PIPE CULVERT
35 LNFT $____________ $____________
A1240 60201-0500 15-INCH PIPE CULVERT
20 LNFT $____________ $____________
A1260 60201-0600 18-INCH PIPE CULVERT
285 LNFT $____________ $____________
A1280 60201-0800 24-INCH PIPE CULVERT
245 LNFT $____________ $____________
A1300 60201-0900 30-INCH PIPE CULVERT
50 LNFT $____________ $____________
A1320 60201-1100 42-INCH PIPE CULVERT
60 LNFT $____________ $____________
A1340 60201-1200 48-INCH PIPE CULVERT
45 LNFT $____________ $____________
A1360 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT
2 EACH $____________ $____________
A1380 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
1 EACH $____________ $____________
A1400 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
7 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 11
A1420 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
2 EACH $____________ $____________
A1440 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
2 EACH $____________ $____________
A1460 60401-0000 MANHOLE
2 EACH $____________ $____________
A1480 60403-1200 INLET, FLH TYPE 5A
23 EACH $____________ $____________
A1500 60403-2300 INLET, FLH TYPE 7B
3 EACH $____________ $____________
A1520 60405-0000 MANHOLE ADJUSTMENT
60 EACH $____________ $____________
A1540 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
7,400 LNFT $____________ $____________
A1560 60905-1000 GUTTER, CONCRETE
145 LNFT $____________ $____________
A1580 61108-4000 ADJUST VALVE BOX
45 EACH $____________ $____________
A1600 61505-1000 ACCESSIBILITY RAMP, CONCRETE
1 EACH $____________ $____________
A1620 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
4,350 LNFT $____________ $____________
A1640 61702-0600 TERMINAL SECTION, TYPE FLARED
27 EACH $____________ $____________
A1660 61702-0800 TERMINAL SECTION TYPE TANGENT
4 EACH $____________ $____________
A1680 61702-1200 TERMINAL SECTION, TYPE LST
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 12
A1700 61707-1000 STRUCTURE TRANSITION RAILING, G4 SYSTEM
27 LNFT $____________ $____________
A1720 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM
81 LNFT $____________ $____________
A1740 61801-0000 CONCRETE BARRIER
75 LNFT $____________ $____________
A1760 61902-0000 GATE
1 EACH $____________ $____________
A1780 61902-1600 GATE, METAL, 20 FEET WIDTH
2 EACH $____________ $____________
A1800 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A1820 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH
80 HOUR $____________ $____________
A1840 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
A1860 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
80 HOUR $____________ $____________
A1880 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
80 HOUR $____________ $____________
A1900 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A1920 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
A1940 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
80 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 13
A1960 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
80 HOUR $____________ $____________
A1980 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
14,000 SQYD $____________ $____________
A2000 62510-2000 SEEDING, HYDRAULIC METHOD
8.3 ACRE $____________ $____________
A2020 62515-2000 MULCHING, HYDRAULIC METHOD
8.3 ACRE $____________ $____________
A2040 63301-0000 SIGN SYSTEM
97 EACH $____________ $____________
A2060 63309-1000 DELINEATOR, TYPE SNOW POLE
355 EACH $____________ $____________
A2080 63316-1000 REMOVE AND RESET SIGN
2 EACH $____________ $____________
A2100 63318-1000 SNOW POLE HOLDER
115 EACH $____________ $____________
A2120 63402-2300 PAVEMENT MARKINGS, TYPE L, SOLID
26.0 MILE $____________ $____________
A2140 63403-0400 PAVEMENT MARKINGS, TYPE D
500 SQFT $____________ $____________
A2160 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
35 EACH $____________ $____________
A2180 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
A2200 63407-0200 RECESSED PAVEMENT MARKER, BI-DIRECTIONAL REFLECTIVE
1,450 EACH $____________ $____________
A2220 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
A - 14
A008 A2225 63713-0000 FIELD OFFICE SERVICES
18 MO $____________ $____________
A008 A2230 64502-0000 LOCATE UTILITIES
40 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP NEV 40(1)
"General Decision Number: CA20200007 01/03/2020
Superseded General Decision Number: CA20190007
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.
BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);
DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
ASBE0016-001 08/01/2019
AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &
SONOMA COUNTIES
AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)
Area 1......................$ 68.11 23.32
Area 2......................$ 54.26 23.30
ASBE0016-007 01/01/2019
AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO
& YUBA COUNTIES
AREA 2: MARIN & NAPA COUNTIES
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
AREA 1......................$ 30.81 22.71
AREA 2......................$ 36.53 9.27
BOIL0549-002 10/01/2016
BOILERMAKER
(1) Marin & Solano Counties.$ 43.28 37.91
(2) Remaining Counties......$ 39.68 35.71
BRCA0003-001 08/01/2019
MARBLE FINISHER..................$ 35.41 16.45
BRCA0003-004 05/01/2019
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES
AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY
COUNTIES
BRICKLAYER
AREA 1......................$ 43.24 21.63
AREA 2......................$ 45.92 26.70
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-008 07/01/2019
TERRAZZO FINISHER................$ 37.58 17.33
TERRAZZO WORKER/SETTER...........$ 48.53 26.84
BRCA0003-010 04/01/2019
TILE FINISHER
Area 1......................$ 27.31 14.75
Area 2......................$ 27.10 16.50
Area 3......................$ 29.94 16.38
Area 4......................$ 28.06 15.82
Tile Layer
Area 1......................$ 45.51 17.64
Area 2......................$ 45.15 19.06
Area 3......................$ 49.90 19.16
Area 4......................$ 46.77 19.08
AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba
AREA 2: Alpine, Amador
AREA 3: Marin, Napa, Solano, Siskiyou
AREA 4: Sonoma
BRCA0003-014 08/01/2019
MARBLE MASON.....................$ 49.42 27.86
CARP0034-001 07/01/2019
Diver
Assistant Tender, ROV
Tender/Technician...........$ 49.75 33.40
Diver standby...............$ 55.73 33.40
Diver Tender................$ 54.73 33.40
Diver wet...................$ 99.27 33.40
Manifold Operator (mixed gas)........................$ 59.73 33.40
Manifold Operator (Standby).$ 54.73 33.40
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be
$1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2019
Piledriver.......................$ 50.75 33.40
* CARP0035-001 08/01/2019
AREA 1: MARIN, NAPA, SOLANO & SONOMA
AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO
AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA
Drywall Installers/Lathers:
Area 1......................$ 50.50 30.64
Area 3......................$ 45.12 30.64
Area 4......................$ 43.77 30.64
Drywall Stocker/Scrapper
Area 1......................$ 25.25 17.86
Area 3......................$ 22.56 17.86
Area 4......................$ 21.89 17.86
* CARP0035-009 07/01/2019
Marin County
CARPENTER
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0035-010 07/01/2017
AREA 1: Marin, Napa, Solano & Sonoma Counties
AREA 2: Monterey, San Benito and Santa Cruz
AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties
Modular Furniture Installer
Area 1
Installer I................$ 24.91 19.63
Installer II...............$ 22.18 20.42
Lead Installer.............$ 29.06 20.92
Master Installer...........$ 33.28 20.92
Area 2
Installer I................$ 22.96 20.42
Installer II...............$ 20.01 20.42
Lead Installer.............$ 25.93 20.92
Master Installer...........$ 29.56 20.92
Area 3
Installer I................$ 22.01 20.42
Installer II...............$ 19.24 20.42
Lead Installer.............$ 24.81 20.92
Master Installer...........$ 31.83 20.92
CARP0046-001 07/01/2019
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Carpenters
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-002 07/01/2019
Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 42.27 30.20
Millwright..................$ 45.77 31.79
CARP0152-003 07/01/2019
Amador County
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 43.27 30.20
Millwright..................$ 45.77 31.79
CARP0180-001 07/01/2019
Solano County
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0751-001 07/01/2019
Napa and Sonoma Counties
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP1599-001 07/01/2019
Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 43.27 30.20
Millwright..................$ 45.77 31.79
ELEC0180-001 06/01/2019
NAPA AND SOLANO COUNTIES
CABLE SPLICER....................$ 56.26 24.16
ELECTRICIAN......................$ 50.01 23.98
ELEC0180-003 12/01/2018
NAPA AND SOLANO COUNTIES
Sound & Communications
Installer...................$ 38.42 19.70
Technician..................$ 44.18 19.88
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0340-002 02/01/2018
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,
NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES
Communications System
Installer...................$ 29.35 3%+15.35
Technician..................$ 33.75 3%+15.35
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.
B. FIRE ALARM SYSTEMS
Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems
Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and
Data Acquisition) PCM (Pulse Code Modulation)
Inventory Control Systems Digital Data Systems
Broadband and Baseband and Carriers Point of Sale
Systems VSAT Data Systems Data Communication
Systems RF and Remote Control Systems Fiber Optic
Data Systems WORK EXCLUDED Raceway systems are not covered
(excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0340-003 08/01/2018
ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA
(West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES
ELECTRICIAN
Remaining area..............$ 40.06 28.54
Sierra Army Depot, Herlong..$ 48.83 18.54
Tunnel work.................$ 41.01 18.54
CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.
ELEC0401-005 07/01/2019
ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and
SIERRA (east of the main watershed divide) COUNTIES:
ELECTRICIAN......................$ 40.50 19.39
ELEC0551-004 06/01/2019
MARIN AND SONOMA COUNTIES
ELECTRICIAN......................$ 51.40 22.83
ELEC0551-005 12/01/2018
MARIN & SONOMA COUNTIES
Installer...................$ 38.42 20.11
Technician..................$ 44.18 20.29
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0659-006 01/01/2019
DEL NORTE, MODOC and SISKIYOU COUNTIES
ELECTRICIAN......................$ 35.19 16.80
ELEC0659-008 02/01/2019
DEL NORTE, MODOC & SISKIYOU COUNTIES
Line Construction
(1) Cable Splicer...........$ 59.09 20.22
(2) Lineman, Pole Sprayer, Heavy Line Equipment Man....$ 52.76 19.96
(3) Tree Trimmer............$ 31.10 11.32
(4) Line Equipment Man......$ 52.76 19.96
(5) Powdermen, Jackhammermen...............$ 33.80 13.35
(6) Groundman...............$ 33.24 14.79
* ELEC1245-004 06/01/2019
ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 58.09 19.36
(2) Equipment specialist
(operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 46.40 18.17
(3) Groundman...............$ 35.47 17.79
(4) Powderman...............$ 49.55 3%+17.65
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2019
ELEVATOR MECHANIC................$ 67.56 34.125+a+b
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
ENGI0003-008 07/01/2017
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 44.77 31.25
(2) Dredge Dozer; Heavy duty repairman.............$ 39.81 31.25
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 38.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 35.39 31.25
AREA 2:
(1) Leverman...............$ 46.77 31.25
(2) Dredge Dozer; Heavy duty repairman.............$ 41.81 31.25
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 40.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 37.39 31.25
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2
AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
ELDORADO COUNTY:
Area 1: North Central part
FRESNO COUNTY:
GLENN COUNTY:
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
MADERA COUNTY:
Area 1: Except Eastern part
MARIPOSA COUNTY
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of
Sierra County
PLACER COUNTY:
Area 1: Al but the Central portion
PLUMAS COUNTY:
Area 1: Western portion
SHASTA COUNTY:
Area 1: All but the Northeastern corner
SIERRA COUNTY:
Area 1: Western part
SISKIYOU COUNTY:
Area 1: Central part
SONOMA COUNTY:
Area 1: All but the Northwestern corner
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity
Counties
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with
Shasta County
TUOLUMNE COUNTY:
ENGI0003-018 06/26/2017
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 44.67 30.39
GROUP 2.....................$ 43.14 30.39
GROUP 3.....................$ 41.66 30.39
GROUP 4.....................$ 40.28 30.39
GROUP 5.....................$ 39.01 30.39
GROUP 6.....................$ 37.69 30.39
GROUP 7.....................$ 36.55 30.39
GROUP 8.....................$ 35.41 30.39
GROUP 8-A...................$ 33.20 30.39
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39
Oiler......................$ 36.63 30.39
Truck crane oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39
Oiler......................$ 36.36 30.39
Truck crane oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39
Hydraulic..................$ 38.32 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 39.01 30.39
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 45.89 30.39
Oiler......................$ 36.63 30.39
Truck crane oiler..........$ 39.20 30.39
GROUP 2
Lifting devices............$ 44.07 30.39
Oiler......................$ 36.36 30.39
Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Lifting devices............$ 42.39 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Lifting devices............$ 40.62 30.39
GROUP 5
Lifting devices............$ 39.32 30.39
GROUP 6
Lifting devices............$ 37.98 30.39
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39
Oiler......................$ 36.63 30.39
Truck Crane Oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39
Oiler......................$ 36.36 30.39
Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39
Hydraulic..................$ 38.32 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 39.01 30.39
GROUP 5
Cranes.....................$ 35.13 30.39
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 40.77 30.39
GROUP 1-A..................$ 43.24 30.39
GROUP 2....................$ 39.51 30.39
GROUP 3....................$ 38.18 30.39
GROUP 4....................$ 37.04 30.39
GROUP 5....................$ 35.90 30.39
UNDERGROUND:
GROUP 1....................$ 40.67 30.39
GROUP 1-A..................$ 43.14 30.39
GROUP 2....................$ 39.41 30.39
GROUP 3....................$ 38.08 30.39
GROUP 4....................$ 36.94 30.39
GROUP 5....................$ 35.80 30.39
FOOTNOTE: Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;
Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2
cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu.
yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar;
Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer
(mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller;
Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types);
Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper;
Boom- type backfilling machine; Assistant plant engineer;
Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant);
Grouting machine operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson;
Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self-propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar;
Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson;
Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over
100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu.
yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar
(boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar
(boom truck) - under 15 tons;
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu.
yds.; Self-propelled boom-type lifting device over 45 tons;
Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig
GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer;
Forklift, 10 tons and over; Heavy-duty repairperson/welder
GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson;
Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and
Steel Erectors]
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MARIN, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO,
SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA,
TRINITY, YOLO, YUBA
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner with Shasta County
Area 1: All but the Central portion
Area 2: Reaminder
Area 1: All but the Western border with mendocino & Trinity
Area 1: East Central part and the Northeaster border with
ENGI0003-019 07/26/2017
SEE AREA DESCRIPTIONS BELOW
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 34.05 28.73
AREA 2.....................$ 36.05 28.73
GROUP 2
AREA 1.....................$ 30.45 28.73
AREA 2.....................$ 32.45 28.73
GROUP 3
AREA 1.....................$ 25.84 28.73
AREA 2.....................$ 27.84 28.73
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
CALAVERAS COUNTY:
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
FRESNO COUNTY
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
LAKE COUNTY:
Area 1: Southern part with Shasta County
MADERA COUNTY
MARIPOSA COUNTY
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
MONTEREY COUNTY
Area 2: Southwestern part
Area 1: All but the Central portion
Area 2: Reaminder
Area 1: All but the Western border with mendocino & Trinity
Area 1: East Central…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .