Bid Opening Summary Donner Pass.pdf

PDF 66 KB Posted

Attached to
CA FLAP NEV 40(1) Donner Pass Road
Solicitation number
6982AF19B000002
Issued by

About this file

This summary covers a bid opening for the Donner Pass Road Project and the related federal contract opportunity. The bid opening summary lists four bidders for the Donner Pass Road Project in Lakewood, Colorado, with bid amounts ranging from $16.5 million to $17.6 million. Herback General Engineering submitted the lowest bid of $16.5 million. The engineer's estimate for the project was $12.1 million.

The federal contract opportunity provides additional details on the Donner Pass Road Project. The project will rehabilitate and widen 6.54 miles of roadway and add bike lanes from I-80 Exit 174 in Soda Springs, California to the Truckee city limits. Significant work includes roadway excavation, rock excavation, aggregate base, asphalt pavement, guardrail and erosion control. The estimated cost range is $10-14 million. The construction duration is spring 2020 to fall 2021. The anticipated advertisement is late winter 2019, bid opening is late winter to early spring 2020, and award is late winter to early spring 2020.

View the file

Other files

File Type Posted
Bid Tabs.pdf PDF
A009.pdf PDF
A008.pdf PDF
A007.pdf PDF
A006.pdf PDF
A005.pdf PDF
A004.pdf PDF
QnA_11.1.2019.pdf PDF
A003.pdf PDF
QnA_10.30.2019.pdf PDF
A002.pdf PDF
QnA_10.28.2019.pdf PDF
A001.pdf PDF
QnA_10.17.2019.pdf PDF
QnA_10.9.2019.pdf PDF
QnA_10.3.2019.pdf PDF
Geotech_Report.pdf PDF
Hydraulics_Report.pdf PDF
Donner_Pass_Plans.pdf PDF
Pavements_Report.pdf PDF
Donner_Pass_Road_X-Z_Sheets_Stamped.pdf PDF
6982AF19B000002.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Donner Pass Road Project Number: CA FLAP NEV 40(1)

Bid Opening Date: 1/29/2020 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Craig Holsopple

Amendments: A001 – A009

Bidder’s Name Bid Total

1.Herback General Engineering Minden NV

A: 16,515,011.30

2. Hooker Creek, Inc.

Red Bluff, CA

A: 17,417,417.00

3. Steve Manning Construction, Inc.

Redding, CA

A: 17,555,967.00

4.

A:

5.

6.

7.

Engineer’s Estimate

A $12,077,390.00

All bids subject to verification