Donner_Pass_Plans.pdf

PDF 56 MB Posted

Attached to
CA FLAP NEV 40(1) Donner Pass Road
Solicitation number
6982AF19B000002
Issued by

About this file

This document contains plans and specifications for a federal-aid highway project located on Donner Pass Road from I-80 Exit 174 in Soda Springs, California to the Truckee city limits. The project will rehabilitate the existing pavement and widen shoulders for bike lanes along 6.54 miles of the road. Selected pullouts will also be paved and improvements include drainage, signing, striping, and guardrail. The typical section will feature a 22-foot traveled way with 4-foot paved shoulders serving as Class II bike lanes. Significant construction quantities include 7,500 cubic yards of roadway excavation, 195 cubic yards of rock excavation, 12,000 cubic yards of aggregate base, and 20,000 tons of asphalt pavement. Other elements consist of 6,000 linear feet of guardrail and lump sum items for erosion control and traffic control. The cost range is estimated between $10 million to $14 million and construction duration is scheduled from spring 2020 to fall 2021.

Plans

View the file

Other files

File Type Posted
Bid Tabs.pdf PDF
Bid Opening Summary Donner Pass.pdf PDF
A009.pdf PDF
A008.pdf PDF
A007.pdf PDF
A006.pdf PDF
A005.pdf PDF
A004.pdf PDF
QnA_11.1.2019.pdf PDF
A003.pdf PDF
QnA_10.30.2019.pdf PDF
A002.pdf PDF
QnA_10.28.2019.pdf PDF
A001.pdf PDF
QnA_10.17.2019.pdf PDF
QnA_10.9.2019.pdf PDF
QnA_10.3.2019.pdf PDF
Pavements_Report.pdf PDF
Geotech_Report.pdf PDF
Donner_Pass_Road_X-Z_Sheets_Stamped.pdf PDF
Hydraulics_Report.pdf PDF
6982AF19B000002.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .