This tabulation of bids report summarizes bids received for the CA FLAP NEV 40(1) Donner Pass Road Improvements project. The project will rehabilitate 6.54 miles of Donner Pass Road including resurfacing the existing pavement, widening shoulders for bike lanes, improving drainage, signing, striping, and guardrail. Significant work includes 7,500 cubic yards of roadway excavation, 195 cubic yards of rock excavation, 12,000 cubic yards of aggregate base, 20,000 tons of asphalt pavement, 6,000 linear feet of guardrail. Herback General Engineering submitted the low bid of $16,515,011.30. Hooker Creek submitted the second low bid of $17,417,417.00, and Steve Manning Construction the third low bid of $17,555,967.00. The engineer's estimate was $12,077,390.00. Award is pending.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary Donner Pass.pdf | ||
| A009.pdf | ||
| A008.pdf | ||
| A007.pdf | ||
| A006.pdf | ||
| A005.pdf | ||
| A004.pdf | ||
| QnA_11.1.2019.pdf | ||
| A003.pdf | ||
| QnA_10.30.2019.pdf | ||
| A002.pdf | ||
| QnA_10.28.2019.pdf | ||
| A001.pdf | ||
| QnA_10.17.2019.pdf | ||
| QnA_10.9.2019.pdf | ||
| QnA_10.3.2019.pdf | ||
| Geotech_Report.pdf | ||
| Hydraulics_Report.pdf | ||
| Donner_Pass_Plans.pdf | ||
| Pavements_Report.pdf | ||
| Donner_Pass_Road_X-Z_Sheets_Stamped.pdf | ||
| 6982AF19B000002.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 01/30/20
1 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF19B000002
Division: Central Federal Lands
State: CA County: Placer, Nevada
Federal Land: Tahoe National Forest Opened at: Lakewood, CO
Opened by: Craig Holsopple
Date: 01/30/20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Herback General Engineering, LLC $16,515,011.30 2531 Nowlin Road Minden, NV 89423
Hooker Creek, Inc. $17,417,417.00 1015 Anderson St.
Red Bluff, CA 96080
Steve Manning Construction Inc $17,555,967.00 P.O. Box 491660 Redding, CA 96049
Engineer's Estimate $12,077,390.00
2 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Herback General Engineering, LLC Lump Sum $1,227,000.00 Hooker Creek, Inc. Lump Sum $1,740,000.00 Steve Manning Construction Inc Lump Sum $1,700,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,508,778.00
A0040 15214-2000 SURVEY AND STAKING, RETAINING WALL
Herback General Engineering, LLC Lump Sum $5,860.00 Hooker Creek, Inc. Lump Sum $27,000.00 Steve Manning Construction Inc Lump Sum $17,100.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00
A0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD
Herback General Engineering, LLC $485.00 $37,345.00 Hooker Creek, Inc. $555.00 $42,735.00 Steve Manning Construction Inc $375.00 $28,875.00 Engineer's Estimate 77 EACH $750.00 $57,750.00
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Herback General Engineering, LLC $650.00 $7,150.00 Hooker Creek, Inc. $1,100.00 $12,100.00 Steve Manning Construction Inc $1,900.00 $20,900.00 Engineer's Estimate 11 EACH $1,200.00 $13,200.00
A0100 15215-7000 SURVEY AND STAKING, PARKING AREA
Herback General Engineering, LLC $700.00 $6,300.00 Hooker Creek, Inc. $1,150.00 $10,350.00 Steve Manning Construction Inc $2,420.00 $21,780.00 Engineer's Estimate 9 EACH $3,000.00 $27,000.00
A0120 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Herback General Engineering, LLC $6,500.00 $41,600.00 Hooker Creek, Inc. $10,650.00 $68,160.00 Steve Manning Construction Inc $6,880.00 $44,032.00 Engineer's Estimate 6.400 MILE $9,500.00 $60,800.00
3 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15236-2000 SURVEY CONTROL, GRADE FINISHING
Herback General Engineering, LLC $4,400.00 $28,160.00 Hooker Creek, Inc. $13,000.00 $83,200.00 Steve Manning Construction Inc $5,680.00 $36,352.00 Engineer's Estimate 6.400 MILE $9,400.00 $60,160.00
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
Herback General Engineering, LLC Lump Sum $231,000.00 Hooker Creek, Inc. Lump Sum $370,000.00 Steve Manning Construction Inc Lump Sum $302,500.00 Engineer's Estimate ALL LPSM Lump Sum $90,500.00
A0180 15401-0000 CONTRACTOR TESTING
Herback General Engineering, LLC Lump Sum $261,700.00 Hooker Creek, Inc. Lump Sum $325,000.00 Steve Manning Construction Inc Lump Sum $435,600.00 Engineer's Estimate ALL LPSM Lump Sum $275,000.00
A0200 15501-0000 CONSTRUCTION SCHEDULE
Herback General Engineering, LLC Lump Sum $24,000.00 Hooker Creek, Inc. Lump Sum $15,000.00 Steve Manning Construction Inc Lump Sum $31,250.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00
A0220 15701-0000 SOIL EROSION CONTROL (Erosion Control)
Herback General Engineering, LLC Lump Sum $51,600.00 Hooker Creek, Inc. Lump Sum $40,000.00 Steve Manning Construction Inc Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0240 15701-0000 SOIL EROSION CONTROL (Sediment Control)
Herback General Engineering, LLC Lump Sum $125,200.00 Hooker Creek, Inc. Lump Sum $161,000.00 Steve Manning Construction Inc Lump Sum $252,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
4 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 15701-0000 SOIL EROSION CONTROL (Non-Stormwater Control)
Herback General Engineering, LLC Lump Sum $9,600.00 Hooker Creek, Inc. Lump Sum $71,000.00 Steve Manning Construction Inc Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0280 15704-1200 SOIL EROSION CONTROL, ROCK MULCH
Herback General Engineering, LLC $140.00 $2,800.00 Hooker Creek, Inc. $71.00 $1,420.00 Steve Manning Construction Inc $250.00 $5,000.00 Engineer's Estimate 20 SQYD $200.00 $4,000.00
A0300 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Herback General Engineering, LLC Lump Sum $21,520.00 Hooker Creek, Inc. Lump Sum $39,000.00 Steve Manning Construction Inc Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0320 15802-0000 WATERING FOR DUST CONTROL
Herback General Engineering, LLC Lump Sum $165,000.00 Hooker Creek, Inc. Lump Sum $145,000.00 Steve Manning Construction Inc Lump Sum $232,800.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00
A0340 20101-0000 CLEARING AND GRUBBING
Herback General Engineering, LLC $3,900.00 $150,150.00 Hooker Creek, Inc. $1,400.00 $53,900.00 Steve Manning Construction Inc $7,500.00 $288,750.00 Engineer's Estimate 38.5 ACRE $4,000.00 $154,000.00
A0360 20220-1000 REMOVAL, INDIVIDUAL TREE
Herback General Engineering, LLC $925.00 $97,125.00 Hooker Creek, Inc. $825.00 $86,625.00 Steve Manning Construction Inc $750.00 $78,750.00 Engineer's Estimate 105 EACH $775.00 $81,375.00
5 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 20301-0700 REMOVAL OF DELINEATOR
Herback General Engineering, LLC $73.00 $30,368.00 Hooker Creek, Inc. $15.00 $6,240.00 Steve Manning Construction Inc $20.00 $8,320.00 Engineer's Estimate 416 EACH $25.00 $10,400.00
A0400 20301-1100 REMOVAL OF GATE
Herback General Engineering, LLC $735.00 $2,205.00 Hooker Creek, Inc. $1,000.00 $3,000.00 Steve Manning Construction Inc $900.00 $2,700.00 Engineer's Estimate 3 EACH $1,000.00 $3,000.00
A0420 20301-1200 REMOVAL OF HEADWALL
Herback General Engineering, LLC $86.00 $430.00 Hooker Creek, Inc. $1,300.00 $6,500.00 Steve Manning Construction Inc $1,200.00 $6,000.00 Engineer's Estimate 5 EACH $1,800.00 $9,000.00
A0440 20301-1400 REMOVAL OF INLET
Herback General Engineering, LLC $785.00 $8,635.00 Hooker Creek, Inc. $2,500.00 $27,500.00 Steve Manning Construction Inc $1,500.00 $16,500.00 Engineer's Estimate 11 EACH $750.00 $8,250.00
A0460 20301-2300 REMOVAL OF SIGN/MARKER
Herback General Engineering, LLC $225.00 $14,175.00 Hooker Creek, Inc. $170.00 $10,710.00 Steve Manning Construction Inc $300.00 $18,900.00 Engineer's Estimate 63 EACH $55.00 $3,465.00
A0470 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Herback General Engineering, LLC $160.00 $32,000.00 Hooker Creek, Inc. $290.00 $58,000.00 Steve Manning Construction Inc $100.00 $20,000.00 Engineer's Estimate 200 EACH $100.00 $20,000.00
6 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0480 20302-1200 REMOVAL OF GUARDRAIL
Herback General Engineering, LLC $12.00 $59,184.00 Hooker Creek, Inc. $21.00 $103,572.00 Steve Manning Construction Inc $20.00 $98,640.00 Engineer's Estimate 4,932 LNFT $8.00 $39,456.00
A0500 20302-2100 REMOVAL OF PIPE CULVERT
Herback General Engineering, LLC $36.00 $10,260.00 Hooker Creek, Inc. $57.00 $16,245.00 Steve Manning Construction Inc $150.00 $42,750.00 Engineer's Estimate 285 LNFT $50.00 $14,250.00
A0520 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
Herback General Engineering, LLC $4.65 $242,730.00 Hooker Creek, Inc. $11.30 $589,860.00 Steve Manning Construction Inc $9.00 $469,800.00 Engineer's Estimate 52,200 SQYD $5.00 $261,000.00
A0540 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
Herback General Engineering, LLC $60.00 $1,500.00 Hooker Creek, Inc. $240.00 $6,000.00 Steve Manning Construction Inc $200.00 $5,000.00 Engineer's Estimate 25 SQYD $40.00 $1,000.00
A0580 20401-0000 ROADWAY EXCAVATION
Herback General Engineering, LLC $78.00 $585,000.00 Hooker Creek, Inc. $84.00 $630,000.00 Steve Manning Construction Inc $99.20 $744,000.00 Engineer's Estimate 7,500 CUYD $30.00 $225,000.00
A0600 20402-0000 SUBEXCAVATION
Herback General Engineering, LLC $176.00 $44,000.00 Hooker Creek, Inc. $150.00 $37,500.00 Steve Manning Construction Inc $278.00 $69,500.00 Engineer's Estimate 250 CUYD $75.00 $18,750.00
7 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 20421-0000 ROCK EXCAVATION
Herback General Engineering, LLC $745.00 $145,275.00 Hooker Creek, Inc. $750.00 $146,250.00 Steve Manning Construction Inc $1,020.00 $198,900.00 Engineer's Estimate 195 CUYD $150.00 $29,250.00
A0640 20425-1000 DITCH, EXCAVATION
Herback General Engineering, LLC $24.00 $21,600.00 Hooker Creek, Inc. $29.00 $26,100.00 Steve Manning Construction Inc $20.00 $18,000.00 Engineer's Estimate 900 LNFT $20.00 $18,000.00
A0660 20441-0000 WASTE
Herback General Engineering, LLC $38.00 $190,000.00 Hooker Creek, Inc. $53.00 $265,000.00 Steve Manning Construction Inc $28.00 $140,000.00 Engineer's Estimate 5,000 CUYD $20.00 $100,000.00
A0680 20442-0000 SLOPE SCALING
Herback General Engineering, LLC $1,080.00 $21,600.00 Hooker Creek, Inc. $1,300.00 $26,000.00 Steve Manning Construction Inc $985.00 $19,700.00 Engineer's Estimate 20 CUYD $500.00 $10,000.00
A0700 20501-0000 CONTROLLED BLAST HOLE
Herback General Engineering, LLC $29.00 $84,100.00 Hooker Creek, Inc. $27.00 $78,300.00 Steve Manning Construction Inc $32.00 $92,800.00 Engineer's Estimate 2,900 LNFT $60.00 $174,000.00
A0720 20702-1000 GEOTEXTILE FILTER, CLASS 2, TYPE E
Herback General Engineering, LLC $10.00 $2,000.00 Hooker Creek, Inc. $6.50 $1,300.00 Steve Manning Construction Inc $10.00 $2,000.00 Engineer's Estimate 200 SQYD $1.00 $200.00
8 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0740 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
Herback General Engineering, LLC $125.00 $6,000.00 Hooker Creek, Inc. $320.00 $15,360.00 Steve Manning Construction Inc $195.00 $9,360.00 Engineer's Estimate 48 CUYD $225.00 $10,800.00
A0760 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
Herback General Engineering, LLC $146.00 $584.00 Hooker Creek, Inc. $200.00 $800.00 Steve Manning Construction Inc $500.00 $2,000.00 Engineer's Estimate 4 CUYD $165.00 $660.00
A0780 25210-0000 ROCKERY
Herback General Engineering, LLC $65.00 $43,225.00 Hooker Creek, Inc. $120.00 $79,800.00 Steve Manning Construction Inc $102.00 $67,830.00 Engineer's Estimate 665 SQFT $50.00 $33,250.00
A0800 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE
Herback General Engineering, LLC $122.00 $951,600.00 Hooker Creek, Inc. $189.00 $1,474,200.00 Steve Manning Construction Inc $153.00 $1,193,400.00 Engineer's Estimate 7,800 SQFT $72.00 $561,600.00
A0820 26002-0000 ROCK DOWEL
Herback General Engineering, LLC $246.00 $14,760.00 Hooker Creek, Inc. $290.00 $17,400.00 Steve Manning Construction Inc $265.00 $15,900.00 Engineer's Estimate 60 LNFT $250.00 $15,000.00
A0840 26005-0000 SHEAR PIN
Herback General Engineering, LLC $350.00 $7,000.00 Hooker Creek, Inc. $360.00 $7,200.00 Steve Manning Construction Inc $400.00 $8,000.00 Engineer's Estimate 20 EACH $325.00 $6,500.00
9 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 30202-2000 ROADWAY AGGREGATE, METHOD 2
Herback General Engineering, LLC $56.00 $683,200.00 Hooker Creek, Inc. $77.00 $939,400.00 Steve Manning Construction Inc $42.60 $519,720.00 Engineer's Estimate 12,200 TON $65.00 $793,000.00
A0880 30301-2000 SHOULDER RECONDITIONING
Herback General Engineering, LLC $15,300.00 $160,512.30 Hooker Creek, Inc. $16,000.00 $167,856.00 Steve Manning Construction Inc $28,000.00 $293,748.00 Engineer's Estimate 10.491 MILE $1,000.00 $10,491.00
A0900 30302-1000 DITCH RECONDITIONING
Herback General Engineering, LLC $5.00 $3,500.00 Hooker Creek, Inc. $23.00 $16,100.00 Steve Manning Construction Inc $9.00 $6,300.00 Engineer's Estimate 700 LNFT $10.00 $7,000.00
A0920 30401-5000 FULL DEPTH RECLAMATION, METHOD 2
Herback General Engineering, LLC $143,000.00 $443,300.00 Hooker Creek, Inc. $175,000.00 $542,500.00 Steve Manning Construction Inc $98,000.00 $303,800.00 Engineer's Estimate 3.100 MILE $50,000.00 $155,000.00
A0960 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
Herback General Engineering, LLC $213.00 $4,260,000.00 Hooker Creek, Inc. $150.00 $3,000,000.00 Steve Manning Construction Inc $185.00 $3,700,000.00 Engineer's Estimate 20,000 TON $160.00 $3,200,000.00
A0980 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Herback General Engineering, LLC $533.00 $106,600.00 Hooker Creek, Inc. $400.00 $80,000.00 Steve Manning Construction Inc $435.00 $87,000.00 Engineer's Estimate 200 TON $300.00 $60,000.00
10 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1020 40303-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1, WEDGE AND LEVELING COURSE
Herback General Engineering, LLC $211.00 $875,650.00 Hooker Creek, Inc. $150.00 $622,500.00 Steve Manning Construction Inc $175.00 $726,250.00 Engineer's Estimate 4,150 TON $110.00 $456,500.00
A1040 40601-0000 FOG SEAL
Herback General Engineering, LLC $905.00 $49,775.00 Hooker Creek, Inc. $910.00 $50,050.00 Steve Manning Construction Inc $1,400.00 $77,000.00 Engineer's Estimate 55 TON $575.00 $31,625.00
A1060 41102-0000 PRIME COAT
Herback General Engineering, LLC $1.65 $108,075.00 Hooker Creek, Inc. $2.50 $163,750.00 Steve Manning Construction Inc $1.40 $91,700.00 Engineer's Estimate 65,500 SQYD $0.90 $58,950.00
A1080 41105-0000 BLOTTER
Herback General Engineering, LLC $77.00 $14,630.00 Hooker Creek, Inc. $150.00 $28,500.00 Steve Manning Construction Inc $80.00 $15,200.00 Engineer's Estimate 190 TON $105.00 $19,950.00
A1100 41201-0000 TACK COAT
Herback General Engineering, LLC $1,600.00 $176,000.00 Hooker Creek, Inc. $910.00 $100,100.00 Steve Manning Construction Inc $1,400.00 $154,000.00 Engineer's Estimate 110 TON $950.00 $104,500.00
A1120 50207-0000 CONCRETE PAVEMENT RESTORATION, CRACKING AND SEATING PAVEMENT
Herback General Engineering, LLC $6.65 $339,150.00 Hooker Creek, Inc. $4.40 $224,400.00 Steve Manning Construction Inc $4.80 $244,800.00 Engineer's Estimate 51,000 SQYD $0.85 $43,350.00
11 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1140 55401-1000 REINFORCING STEEL
Herback General Engineering, LLC $12.50 $2,225.00 Hooker Creek, Inc. $18.00 $3,204.00 Steve Manning Construction Inc $10.00 $1,780.00 Engineer's Estimate 178 LB $2.50 $445.00
A1160 56603-0000 REINFORCED SHOTCRETE
Herback General Engineering, LLC $398.00 $358,200.00 Hooker Creek, Inc. $490.00 $441,000.00 Steve Manning Construction Inc $525.00 $472,500.00 Engineer's Estimate 900 SQYD $250.00 $225,000.00
A1180 60101-0000 CONCRETE
Herback General Engineering, LLC $4,036.00 $12,108.00 Hooker Creek, Inc. $3,300.00 $9,900.00 Steve Manning Construction Inc $3,400.00 $10,200.00 Engineer's Estimate 3.0 CUYD $1,325.00 $3,975.00
A1200 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT
Herback General Engineering, LLC $6,870.00 $6,870.00 Hooker Creek, Inc. $8,600.00 $8,600.00 Steve Manning Construction Inc $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $3,200.00 $3,200.00
A1220 60201-0400 12-INCH PIPE CULVERT
Herback General Engineering, LLC $385.00 $13,475.00 Hooker Creek, Inc. $110.00 $3,850.00 Steve Manning Construction Inc $300.00 $10,500.00 Engineer's Estimate 35 LNFT $145.00 $5,075.00
A1240 60201-0500 15-INCH PIPE CULVERT
Herback General Engineering, LLC $608.00 $12,160.00 Hooker Creek, Inc. $250.00 $5,000.00 Steve Manning Construction Inc $320.00 $6,400.00 Engineer's Estimate 20 LNFT $190.00 $3,800.00
12 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1260 60201-0600 18-INCH PIPE CULVERT
Herback General Engineering, LLC $367.00 $104,595.00 Hooker Creek, Inc. $190.00 $54,150.00 Steve Manning Construction Inc $330.00 $94,050.00 Engineer's Estimate 285 LNFT $135.00 $38,475.00
A1280 60201-0800 24-INCH PIPE CULVERT
Herback General Engineering, LLC $680.00 $166,600.00 Hooker Creek, Inc. $370.00 $90,650.00 Steve Manning Construction Inc $390.00 $95,550.00 Engineer's Estimate 245 LNFT $180.00 $44,100.00
A1300 60201-0900 30-INCH PIPE CULVERT
Herback General Engineering, LLC $768.00 $38,400.00 Hooker Creek, Inc. $470.00 $23,500.00 Steve Manning Construction Inc $400.00 $20,000.00 Engineer's Estimate 50 LNFT $165.00 $8,250.00
A1320 60201-1100 42-INCH PIPE CULVERT
Herback General Engineering, LLC $800.00 $48,000.00 Hooker Creek, Inc. $710.00 $42,600.00 Steve Manning Construction Inc $600.00 $36,000.00 Engineer's Estimate 60 LNFT $230.00 $13,800.00
A1340 60201-1200 48-INCH PIPE CULVERT
Herback General Engineering, LLC $2,520.00 $113,400.00 Hooker Creek, Inc. $3,900.00 $175,500.00 Steve Manning Construction Inc $700.00 $31,500.00 Engineer's Estimate 45 LNFT $270.00 $12,150.00
A1360 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT
Herback General Engineering, LLC $788.00 $1,576.00 Hooker Creek, Inc. $270.00 $540.00 Steve Manning Construction Inc $500.00 $1,000.00 Engineer's Estimate 2 EACH $1,200.00 $2,400.00
13 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1380 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
Herback General Engineering, LLC $815.00 $815.00 Hooker Creek, Inc. $380.00 $380.00 Steve Manning Construction Inc $600.00 $600.00 Engineer's Estimate 1 EACH $955.00 $955.00
A1400 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Herback General Engineering, LLC $910.00 $6,370.00 Hooker Creek, Inc. $420.00 $2,940.00 Steve Manning Construction Inc $800.00 $5,600.00 Engineer's Estimate 7 EACH $1,200.00 $8,400.00
A1420 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
Herback General Engineering, LLC $1,140.00 $2,280.00 Hooker Creek, Inc. $540.00 $1,080.00 Steve Manning Construction Inc $900.00 $1,800.00 Engineer's Estimate 2 EACH $1,000.00 $2,000.00
A1440 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
Herback General Engineering, LLC $2,624.00 $5,248.00 Hooker Creek, Inc. $2,900.00 $5,800.00 Steve Manning Construction Inc $1,800.00 $3,600.00 Engineer's Estimate 2 EACH $1,700.00 $3,400.00
A1460 60401-0000 MANHOLE
Herback General Engineering, LLC $32,170.00 $64,340.00 Hooker Creek, Inc. $17,000.00 $34,000.00 Steve Manning Construction Inc $7,500.00 $15,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00
A1480 60403-1200 INLET, FLH TYPE 5A
Herback General Engineering, LLC $14,605.00 $335,915.00 Hooker Creek, Inc. $8,100.00 $186,300.00 Steve Manning Construction Inc $7,000.00 $161,000.00 Engineer's Estimate 23 EACH $5,600.00 $128,800.00
14 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1500 60403-2300 INLET, FLH TYPE 7B
Herback General Engineering, LLC $12,660.00 $37,980.00 Hooker Creek, Inc. $11,000.00 $33,000.00 Steve Manning Construction Inc $9,000.00 $27,000.00 Engineer's Estimate 3 EACH $4,000.00 $12,000.00
A1520 60405-0000 MANHOLE ADJUSTMENT
Herback General Engineering, LLC $930.00 $55,800.00 Hooker Creek, Inc. $3,800.00 $228,000.00 Steve Manning Construction Inc $1,200.00 $72,000.00 Engineer's Estimate 60 EACH $1,000.00 $60,000.00
A1540 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
Herback General Engineering, LLC $17.60 $130,240.00 Hooker Creek, Inc. $5.50 $40,700.00 Steve Manning Construction Inc $4.00 $29,600.00 Engineer's Estimate 7,400 LNFT $7.00 $51,800.00
A1560 60905-1000 GUTTER, CONCRETE
Herback General Engineering, LLC $180.00 $26,100.00 Hooker Creek, Inc. $230.00 $33,350.00 Steve Manning Construction Inc $90.00 $13,050.00 Engineer's Estimate 145 LNFT $70.00 $10,150.00
A1580 61108-4000 ADJUST VALVE BOX
Herback General Engineering, LLC $975.00 $43,875.00 Hooker Creek, Inc. $1,800.00 $81,000.00 Steve Manning Construction Inc $600.00 $27,000.00 Engineer's Estimate 45 EACH $650.00 $29,250.00
A1600 61505-1000 ACCESSIBILITY RAMP, CONCRETE
Herback General Engineering, LLC $3,385.00 $3,385.00 Hooker Creek, Inc. $16,000.00 $16,000.00 Steve Manning Construction Inc $4,500.00 $4,500.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00
15 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1620 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Herback General Engineering, LLC $124.00 $539,400.00 Hooker Creek, Inc. $82.00 $356,700.00 Steve Manning Construction Inc $80.00 $348,000.00 Engineer's Estimate 4,350 LNFT $45.00 $195,750.00
A1640 61702-0600 TERMINAL SECTION, TYPE FLARED
Herback General Engineering, LLC $5,854.00 $158,058.00 Hooker Creek, Inc. $7,100.00 $191,700.00 Steve Manning Construction Inc $6,900.00 $186,300.00 Engineer's Estimate 27 EACH $2,625.00 $70,875.00
A1660 61702-0800 TERMINAL SECTION TYPE TANGENT
Herback General Engineering, LLC $6,485.00 $25,940.00 Hooker Creek, Inc. $9,700.00 $38,800.00 Steve Manning Construction Inc $9,500.00 $38,000.00 Engineer's Estimate 4 EACH $3,500.00 $14,000.00
A1680 61702-1200 TERMINAL SECTION, TYPE LST
Herback General Engineering, LLC $2,645.00 $2,645.00 Hooker Creek, Inc. $13,000.00 $13,000.00 Steve Manning Construction Inc $12,500.00 $12,500.00 Engineer's Estimate 1 EACH $1,600.00 $1,600.00
A1700 61707-1000 STRUCTURE TRANSITION RAILING, G4 SYSTEM
Herback General Engineering, LLC $168.00 $4,536.00 Hooker Creek, Inc. $1,300.00 $35,100.00 Steve Manning Construction Inc $1,260.00 $34,020.00 Engineer's Estimate 27 LNFT $180.00 $4,860.00
A1720 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM
Herback General Engineering, LLC $168.00 $13,608.00 Hooker Creek, Inc. $670.00 $54,270.00 Steve Manning Construction Inc $670.00 $54,270.00 Engineer's Estimate 81 LNFT $210.00 $17,010.00
16 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1740 61801-0000 CONCRETE BARRIER
Herback General Engineering, LLC $650.00 $48,750.00 Hooker Creek, Inc. $500.00 $37,500.00 Steve Manning Construction Inc $1,270.00 $95,250.00 Engineer's Estimate 75 LNFT $275.00 $20,625.00
A1760 61902-0000 GATE
Herback General Engineering, LLC $38,364.00 $38,364.00 Hooker Creek, Inc. $28,000.00 $28,000.00 Steve Manning Construction Inc $4,000.00 $4,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00
A1780 61902-1600 GATE, METAL, 20 FEET WIDTH
Herback General Engineering, LLC $9,612.00 $19,224.00 Hooker Creek, Inc. $8,900.00 $17,800.00 Steve Manning Construction Inc $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $7,500.00 $15,000.00
A1800 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Herback General Engineering, LLC $165.00 $13,200.00 Hooker Creek, Inc. $174.00 $13,920.00 Steve Manning Construction Inc $160.00 $12,800.00 Engineer's Estimate 80 HOUR $250.00 $20,000.00
A1820 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Herback General Engineering, LLC $165.00 $13,200.00 Hooker Creek, Inc. $192.00 $15,360.00 Steve Manning Construction Inc $180.00 $14,400.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00
A1840 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $230.00 $18,400.00 Steve Manning Construction Inc $180.00 $14,400.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00
17 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1860 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $263.00 $21,040.00 Steve Manning Construction Inc $180.00 $14,400.00 Engineer's Estimate 80 HOUR $200.00 $16,000.00
A1880 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $238.00 $19,040.00 Steve Manning Construction Inc $250.00 $20,000.00 Engineer's Estimate 80 HOUR $215.00 $17,200.00
A1900 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $238.00 $19,040.00 Steve Manning Construction Inc $250.00 $20,000.00 Engineer's Estimate 80 HOUR $225.00 $18,000.00
A1920 62301-0000 GENERAL LABOR
Herback General Engineering, LLC $80.75 $6,460.00 Hooker Creek, Inc. $88.00 $7,040.00 Steve Manning Construction Inc $80.00 $6,400.00 Engineer's Estimate 80 HOUR $100.00 $8,000.00
A1940 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $205.00 $16,400.00 Steve Manning Construction Inc $120.00 $9,600.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00
A1960 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Herback General Engineering, LLC $250.00 $20,000.00 Hooker Creek, Inc. $200.00 $16,000.00 Steve Manning Construction Inc $230.00 $18,400.00 Engineer's Estimate 80 HOUR $215.00 $17,200.00
18 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1980 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
Herback General Engineering, LLC $11.85 $165,900.00 Hooker Creek, Inc. $9.00 $126,000.00 Steve Manning Construction Inc $8.00 $112,000.00 Engineer's Estimate 14,000 SQYD $10.00 $140,000.00
A2000 62510-2000 SEEDING, HYDRAULIC METHOD
Herback General Engineering, LLC $5,200.00 $43,160.00 Hooker Creek, Inc. $5,400.00 $44,820.00 Steve Manning Construction Inc $3,000.00 $24,900.00 Engineer's Estimate 8.3 ACRE $4,750.00 $39,425.00
A2020 62515-2000 MULCHING, HYDRAULIC METHOD
Herback General Engineering, LLC $3,340.00 $27,722.00 Hooker Creek, Inc. $3,500.00 $29,050.00 Steve Manning Construction Inc $3,000.00 $24,900.00 Engineer's Estimate 8.3 ACRE $4,750.00 $39,425.00
A2040 63301-0000 SIGN SYSTEM
Herback General Engineering, LLC $502.00 $48,694.00 Hooker Creek, Inc. $630.00 $61,110.00 Steve Manning Construction Inc $700.00 $67,900.00 Engineer's Estimate 97 EACH $380.00 $36,860.00
A2060 63309-1000 DELINEATOR, TYPE SNOW POLE
Herback General Engineering, LLC $251.00 $89,105.00 Hooker Creek, Inc. $140.00 $49,700.00 Steve Manning Construction Inc $140.00 $49,700.00 Engineer's Estimate 355 EACH $85.00 $30,175.00
A2080 63316-1000 REMOVE AND RESET SIGN
Herback General Engineering, LLC $335.00 $670.00 Hooker Creek, Inc. $1,400.00 $2,800.00 Steve Manning Construction Inc $1,320.00 $2,640.00 Engineer's Estimate 2 EACH $300.00 $600.00
19 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A2100 63318-1000 SNOW POLE HOLDER
Herback General Engineering, LLC $251.00 $28,865.00 Hooker Creek, Inc. $140.00 $16,100.00 Steve Manning Construction Inc $130.00 $14,950.00 Engineer's Estimate 115 EACH $60.00 $6,900.00
A2120 63402-2300 PAVEMENT MARKINGS, TYPE L, SOLID
Herback General Engineering, LLC $10,985.00 $285,610.00 Hooker Creek, Inc. $11,200.00 $291,200.00 Steve Manning Construction Inc $10,800.00 $280,800.00 Engineer's Estimate 26.0 MILE $2,625.00 $68,250.00
A2140 63403-0400 PAVEMENT MARKINGS, TYPE D
Herback General Engineering, LLC $34.00 $17,000.00 Hooker Creek, Inc. $8.50 $4,250.00 Steve Manning Construction Inc $32.00 $16,000.00 Engineer's Estimate 500 SQFT $10.00 $5,000.00
A2160 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
Herback General Engineering, LLC $670.00 $23,450.00 Hooker Creek, Inc. $490.00 $17,150.00 Steve Manning Construction Inc $640.00 $22,400.00 Engineer's Estimate 35 EACH $380.00 $13,300.00
A2180 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
Herback General Engineering, LLC $2,175.00 $4,350.00 Hooker Creek, Inc. $325.00 $650.00 Steve Manning Construction Inc $2,000.00 $4,000.00 Engineer's Estimate 2 EACH $375.00 $750.00
A2200 63407-0200 RECESSED PAVEMENT MARKER, BI-DIRECTIONAL REFLECTIVE
Herback General Engineering, LLC $18.40 $26,680.00 Hooker Creek, Inc. $11.00 $15,950.00 Steve Manning Construction Inc $18.00 $26,100.00 Engineer's Estimate 1,450 EACH $12.00 $17,400.00
20 out of 20
Project No: CA FLAP NEV 40(1)
Project Name: Donner Pass Road Improvements
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A2220 63501-0000 TEMPORARY TRAFFIC CONTROL
Herback General Engineering, LLC Lump Sum $842,000.00 Hooker Creek, Inc. Lump Sum $1,361,000.00 Steve Manning Construction Inc Lump Sum $1,450,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,000,000.00
A2225 63713-0000 FIELD OFFICE SERVICES
Herback General Engineering, LLC $2,665.00 $47,970.00 Hooker Creek, Inc. $3,000.00 $54,000.00 Steve Manning Construction Inc $3,000.00 $54,000.00 Engineer's Estimate 18 MO $2,000.00 $36,000.00
A2230 64502-0000 LOCATE UTILITIES
Herback General Engineering, LLC $969.00 $38,760.00 Hooker Creek, Inc. $1,100.00 $44,000.00 Steve Manning Construction Inc $1,800.00 $72,000.00 Engineer's Estimate 40 EACH $425.00 $17,000.00
Total Schedule - All Items
Herback General Engineering, LLC $16,515,011.30 Hooker Creek, Inc. $17,417,417.00 Steve Manning Construction Inc $17,555,967.00 Engineer's Estimate $12,077,390.00
| 2020-01-30T10:03:00-0700 | |