Bid_Tabs_NM_FTFS_333(1).pdf
PDF 96 KB Posted
- Attached to
- NM FTFS 333(1), Juan Tabo & La Luz Federal contract opportunity
- Solicitation number
- 6982AF18B000015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_NM_FTFS_333(1).pdf | ||
| 8-24-18_Q&A_on_NM_FTFS_333(1),_Juan_Tabo_&_La_Luz.pdf | ||
| NM_FTFS_333(1)_Plan_Sheets_&_X-sections_signed.pdf | ||
| 6982AF18B000015.pdf | ||
| NM.FTFS.0333(1).Juan_Tabo_La_Luz.Geotech.2018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 09/04/18
1 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF18B000015
Division: Central Federal Lands
State: NM County: Bernalillo, Sandoval
Federal Land: Cibola National Forest Opened at: Lakewood, CO
Opened by: Eric Grosskreuz
Date: 08/28/18
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
PERIKIN Enterprises, LLC $769,529.78 1314 Madeira Drive SE Albuquerque, NM 87108
GC Works, Inc. $784,205.34 4801 Lang Avenue N.E., Suite 110 Albuquerque, NM 87109
Gandy Dancer, LLC $826,795.00 5801 Bobby Foster Road SE Albuquerque, NM 87105
La Forge and Budd Construction Company, Inc. $884,000.00 2020 North 21st Street Parsons, KS 67357
Engineer's Estimate $651,000.00
2 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15101-0000 MOBILIZATION
PERIKIN Enterprises, LLC Lump Sum $12,720.97 GC Works, Inc. Lump Sum $59,000.00 Gandy Dancer, LLC Lump Sum $70,000.00 La Forge and Budd Construction Company, Inc. Lump Sum $145,000.00 Engineer's Estimate ALL LPSM Lump Sum $69,750.00
A0120 15205-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
PERIKIN Enterprises, LLC Lump Sum $9,397.57 GC Works, Inc. Lump Sum $22,651.20 Gandy Dancer, LLC Lump Sum $4,900.00 La Forge and Budd Construction Company, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $4,500.00
A0140 15214-2000 SURVEY AND STAKING, RETAINING WALL
PERIKIN Enterprises, LLC Lump Sum $2,931.71 GC Works, Inc. Lump Sum $10,090.08 Gandy Dancer, LLC Lump Sum $5,700.00 La Forge and Budd Construction Company, Inc. Lump Sum $7,500.00 Engineer's Estimate ALL LPSM Lump Sum $2,500.00
A0160 15214-3000 SURVEY AND STAKING, PARKING AREA
PERIKIN Enterprises, LLC Lump Sum $16,124.41 GC Works, Inc. Lump Sum $56,284.80 Gandy Dancer, LLC Lump Sum $17,500.00 La Forge and Budd Construction Company, Inc. Lump Sum $6,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,500.00
A0180 15301-0000 CONTRACTOR QUALITY CONTROL
PERIKIN Enterprises, LLC Lump Sum $73,229.73 GC Works, Inc. Lump Sum $35,692.80 Gandy Dancer, LLC Lump Sum $46,500.00 La Forge and Budd Construction Company, Inc. Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $12,500.00
A0200 15401-0000 CONTRACTOR TESTING
PERIKIN Enterprises, LLC Lump Sum $12,459.77 GC Works, Inc. Lump Sum $25,039.87 Gandy Dancer, LLC Lump Sum $21,000.00 La Forge and Budd Construction Company, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $17,500.00
3 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 15501-0000 CONSTRUCTION SCHEDULE
PERIKIN Enterprises, LLC Lump Sum $34,591.25 GC Works, Inc. Lump Sum $7,550.40 Gandy Dancer, LLC Lump Sum $9,000.00 La Forge and Budd Construction Company, Inc. Lump Sum $3,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,500.00
A0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
PERIKIN Enterprises, LLC $3.30 $3,300.00 GC Works, Inc. $2.92 $2,920.00 Gandy Dancer, LLC $3.00 $3,000.00 La Forge and Budd Construction Company, Inc. $3.00 $3,000.00 Engineer's Estimate 1,000 LNFT $6.00 $6,000.00
A0260 20101-0000 CLEARING AND GRUBBING
PERIKIN Enterprises, LLC $3,811.26 $3,811.26 GC Works, Inc. $9,335.04 $9,335.04 Gandy Dancer, LLC $10,700.00 $10,700.00 La Forge and Budd Construction Company, Inc. $5,000.00 $5,000.00 Engineer's Estimate 1.0 ACRE $9,800.00 $9,800.00
A0280 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
PERIKIN Enterprises, LLC Lump Sum $53,213.41 GC Works, Inc. Lump Sum $50,952.84 Gandy Dancer, LLC Lump Sum $27,850.00 La Forge and Budd Construction Company, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0300 20401-0000 ROADWAY EXCAVATION
PERIKIN Enterprises, LLC $11.36 $35,216.00 GC Works, Inc. $7.81 $24,211.00 Gandy Dancer, LLC $11.50 $35,650.00 La Forge and Budd Construction Company, Inc. $12.00 $37,200.00 Engineer's Estimate 3,100 CUYD $20.00 $62,000.00
A0320 20441-0000 WASTE
PERIKIN Enterprises, LLC $2.28 $7,752.00 GC Works, Inc. $16.01 $54,434.00 Gandy Dancer, LLC $25.00 $85,000.00 La Forge and Budd Construction Company, Inc. $25.00 $85,000.00 Engineer's Estimate 3,400 CUYD $16.00 $54,400.00
4 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
PERIKIN Enterprises, LLC $381.35 $24,787.75 GC Works, Inc. $250.71 $16,296.15 Gandy Dancer, LLC $300.00 $19,500.00 La Forge and Budd Construction Company, Inc. $100.00 $6,500.00 Engineer's Estimate 65 CUYD $150.00 $9,750.00
A0360 25210-0000 ROCKERY
PERIKIN Enterprises, LLC $78.42 $125,472.00 GC Works, Inc. $50.42 $80,672.00 Gandy Dancer, LLC $62.50 $100,000.00 La Forge and Budd Construction Company, Inc. $123.00 $196,800.00 Engineer's Estimate 1,600 SQFT $65.00 $104,000.00
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2
PERIKIN Enterprises, LLC $48.89 $48,890.00 GC Works, Inc. $31.51 $31,510.00 Gandy Dancer, LLC $125.00 $125,000.00 La Forge and Budd Construction Company, Inc. $65.00 $65,000.00 Engineer's Estimate 1,000 TON $45.00 $45,000.00
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
PERIKIN Enterprises, LLC $155.38 $65,259.60 GC Works, Inc. $238.77 $100,283.40 Gandy Dancer, LLC $135.00 $56,700.00 La Forge and Budd Construction Company, Inc. $120.00 $50,400.00 Engineer's Estimate 420 TON $150.00 $63,000.00
A0420 41101-1000 PRIME COAT, METHOD 1
PERIKIN Enterprises, LLC $1,304.63 $3,913.89 GC Works, Inc. $3,136.85 $9,410.55 Gandy Dancer, LLC $500.00 $1,500.00 La Forge and Budd Construction Company, Inc. $700.00 $2,100.00 Engineer's Estimate 3 TON $1,000.00 $3,000.00
A0440 60201-0400 12-INCH PIPE CULVERT
PERIKIN Enterprises, LLC $73.29 $1,465.80 GC Works, Inc. $15.77 $315.40 Gandy Dancer, LLC $60.00 $1,200.00 La Forge and Budd Construction Company, Inc. $150.00 $3,000.00 Engineer's Estimate 20 LNFT $120.00 $2,400.00
5 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0460 60201-0800 24-INCH PIPE CULVERT
PERIKIN Enterprises, LLC $102.61 $4,514.84 GC Works, Inc. $18.70 $822.80 Gandy Dancer, LLC $120.00 $5,280.00 La Forge and Budd Construction Company, Inc. $125.00 $5,500.00 Engineer's Estimate 44 LNFT $150.00 $6,600.00
A0480 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
PERIKIN Enterprises, LLC $652.32 $1,304.64 GC Works, Inc. $32.95 $65.90 Gandy Dancer, LLC $860.00 $1,720.00 La Forge and Budd Construction Company, Inc. $600.00 $1,200.00 Engineer's Estimate 2 EACH $700.00 $1,400.00
A0500 60915-1000 WHEELSTOP, CONCRETE
PERIKIN Enterprises, LLC $168.58 $7,248.94 GC Works, Inc. $109.82 $4,722.26 Gandy Dancer, LLC $240.00 $10,320.00 La Forge and Budd Construction Company, Inc. $200.00 $8,600.00 Engineer's Estimate 43 EACH $130.00 $5,590.00
A0520 61501-0200 SIDEWALK, COLORED CONCRETE
PERIKIN Enterprises, LLC $202.29 $10,114.50 GC Works, Inc. $244.36 $12,218.00 Gandy Dancer, LLC $120.00 $6,000.00 La Forge and Budd Construction Company, Inc. $125.00 $6,250.00 Engineer's Estimate 50 SQYD $230.00 $11,500.00
A0540 61501-0700 SIDEWALK, DECOMPOSED GRANITE
PERIKIN Enterprises, LLC $43.98 $8,796.00 GC Works, Inc. $308.88 $61,776.00 Gandy Dancer, LLC $50.00 $10,000.00 La Forge and Budd Construction Company, Inc. $60.00 $12,000.00 Engineer's Estimate 200 SQYD $70.00 $14,000.00
A0560 61502-1000 DRIVE PAD, CONCRETE
PERIKIN Enterprises, LLC $234.54 $18,059.58 GC Works, Inc. $218.28 $16,807.56 Gandy Dancer, LLC $140.00 $10,780.00 La Forge and Budd Construction Company, Inc. $100.00 $7,700.00 Engineer's Estimate 77 SQYD $230.00 $17,710.00
6 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 61902-0900 GATE, METAL
PERIKIN Enterprises, LLC $5,775.62 $11,551.24 GC Works, Inc. $6,177.60 $12,355.20 Gandy Dancer, LLC $3,600.00 $7,200.00 La Forge and Budd Construction Company, Inc. $4,500.00 $9,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00
A0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
PERIKIN Enterprises, LLC $285.85 $5,717.00 GC Works, Inc. $140.89 $2,817.80 Gandy Dancer, LLC $160.00 $3,200.00 La Forge and Budd Construction Company, Inc. $100.00 $2,000.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
A0620 62201-3450 LOADER, TRACK TYPE, 2 CUBIC YARD MINIMUM CAPACITY
PERIKIN Enterprises, LLC $190.57 $3,811.40 GC Works, Inc. $131.45 $2,629.00 Gandy Dancer, LLC $170.00 $3,400.00 La Forge and Budd Construction Company, Inc. $100.00 $2,000.00 Engineer's Estimate 20 HOUR $130.00 $2,600.00
A0640 62301-0000 GENERAL LABOR
PERIKIN Enterprises, LLC $60.83 $1,216.60 GC Works, Inc. $54.91 $1,098.20 Gandy Dancer, LLC $42.00 $840.00 La Forge and Budd Construction Company, Inc. $50.00 $1,000.00 Engineer's Estimate 20 HOUR $45.00 $900.00
A0660 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
PERIKIN Enterprises, LLC $95.28 $952.80 GC Works, Inc. $96.10 $961.00 Gandy Dancer, LLC $50.00 $500.00 La Forge and Budd Construction Company, Inc. $150.00 $1,500.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00
A0680 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
PERIKIN Enterprises, LLC $197.90 $1,979.00 GC Works, Inc. $68.64 $686.40 Gandy Dancer, LLC $50.00 $500.00 La Forge and Budd Construction Company, Inc. $150.00 $1,500.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00
7 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0700 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
PERIKIN Enterprises, LLC $0.88 $2,024.00 GC Works, Inc. $4.01 $9,223.00 Gandy Dancer, LLC $4.50 $10,350.00 La Forge and Budd Construction Company, Inc. $7.00 $16,100.00 Engineer's Estimate 2,300 SQYD $4.00 $9,200.00
A0720 62511-2000 SEEDING, HYDRAULIC METHOD
PERIKIN Enterprises, LLC $0.98 $2,254.00 GC Works, Inc. $0.70 $1,610.00 Gandy Dancer, LLC $1.50 $3,450.00 La Forge and Budd Construction Company, Inc. $2.00 $4,600.00 Engineer's Estimate 2,300 SQYD $2.00 $4,600.00
A0740 62516-2000 MULCHING, HYDRAULIC METHOD
PERIKIN Enterprises, LLC $1.42 $3,266.00 GC Works, Inc. $0.70 $1,610.00 Gandy Dancer, LLC $1.50 $3,450.00 La Forge and Budd Construction Company, Inc. $2.00 $4,600.00 Engineer's Estimate 2,300 SQYD $2.00 $4,600.00
A0760 63301-0000 SIGN SYSTEM
PERIKIN Enterprises, LLC $367.33 $5,509.95 GC Works, Inc. $363.79 $5,456.85 Gandy Dancer, LLC $360.00 $5,400.00 La Forge and Budd Construction Company, Inc. $750.00 $11,250.00 Engineer's Estimate 15 EACH $420.00 $6,300.00
A0780 63308-3000 OBJECT MARKER, TYPE 3
PERIKIN Enterprises, LLC $117.27 $1,759.05 GC Works, Inc. $251.80 $3,777.00 Gandy Dancer, LLC $115.00 $1,725.00 La Forge and Budd Construction Company, Inc. $300.00 $4,500.00 Engineer's Estimate 15 EACH $200.00 $3,000.00
A0800 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
PERIKIN Enterprises, LLC $0.53 $29,150.00 GC Works, Inc. $0.23 $12,650.00 Gandy Dancer, LLC $0.50 $27,500.00 La Forge and Budd Construction Company, Inc. $0.36 $19,800.00 Engineer's Estimate 55,000 LNFT $0.40 $22,000.00
8 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0820 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
PERIKIN Enterprises, LLC $87.95 $527.70 GC Works, Inc. $82.37 $494.22 Gandy Dancer, LLC $110.00 $660.00 La Forge and Budd Construction Company, Inc. $300.00 $1,800.00 Engineer's Estimate 6 EACH $150.00 $900.00
A0840 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
PERIKIN Enterprises, LLC $109.94 $219.88 GC Works, Inc. $85.80 $171.60 Gandy Dancer, LLC $110.00 $220.00 La Forge and Budd Construction Company, Inc. $300.00 $600.00 Engineer's Estimate 2 EACH $400.00 $800.00
A0860 63501-0000 TEMPORARY TRAFFIC CONTROL
PERIKIN Enterprises, LLC Lump Sum $81,148.38 GC Works, Inc. Lump Sum $17,940.00 Gandy Dancer, LLC Lump Sum $48,000.00 La Forge and Budd Construction Company, Inc. Lump Sum $8,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0880 64603-0000 FIXTURE (FEE TUBE & ENVELOPE BOX)
PERIKIN Enterprises, LLC $2,585.88 $5,171.76 GC Works, Inc. $3,272.26 $6,544.52 Gandy Dancer, LLC $2,600.00 $5,200.00 La Forge and Budd Construction Company, Inc. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $2,600.00 $5,200.00
A0900 64603-0100 FIXTURE, TRASH RECEPTACLE
PERIKIN Enterprises, LLC $3,664.79 $3,664.79 GC Works, Inc. $2,303.50 $2,303.50 Gandy Dancer, LLC $2,600.00 $2,600.00 La Forge and Budd Construction Company, Inc. $4,000.00 $4,000.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00
A0920 64603-0700 FIXTURE, PICNIC TABLE
PERIKIN Enterprises, LLC $2,345.47 $2,345.47 GC Works, Inc. $1,617.47 $1,617.47 Gandy Dancer, LLC $7,500.00 $7,500.00 La Forge and Budd Construction Company, Inc. $3,500.00 $3,500.00 Engineer's Estimate 1 EACH $2,200.00 $2,200.00
9 out of 9 Project No: NM FTFS 333(1)
Project Name: Juan Tabo & La Luz Access Roads
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0940 64603-0800 FIXTURE, KIOSK (2-PANEL)
PERIKIN Enterprises, LLC $9,103.37 $9,103.37 GC Works, Inc. $3,315.31 $3,315.31 Gandy Dancer, LLC $4,300.00 $4,300.00 La Forge and Budd Construction Company, Inc. $13,500.00 $13,500.00 Engineer's Estimate 1 EACH $4,500.00 $4,500.00
A0960 64603-0800 FIXTURE, KIOSK (3-PANEL)
PERIKIN Enterprises, LLC $13,581.77 $13,581.77 GC Works, Inc. $3,882.22 $3,882.22 Gandy Dancer, LLC $6,000.00 $6,000.00 La Forge and Budd Construction Company, Inc. $16,000.00 $16,000.00 Engineer's Estimate 1 EACH $5,500.00 $5,500.00
Total Schedule - All Items
PERIKIN Enterprises, LLC $769,529.78 GC Works, Inc. $784,205.34 Gandy Dancer, LLC $826,795.00 La Forge and Budd Construction Company, Inc. $884,000.00 Engineer's Estimate $651,000.00
File details come from the government source that posted it.