Attachment 01 PWS Elevator Refurbishment SLC UT.pdf

PDF 519 KB Posted

Attached to
Elevator Refurbish and Maintenance, SLC ATCT, Salt Lake City, UT
Solicitation number
697DCK-27-R-00021
Issued by

About this file

This is a Performance Work Statement (PWS) for elevator refurbishment and maintenance services at the Federal Aviation Administration's Air Traffic Control Tower (ATCT) in Salt Lake City, Utah.

The contractor must modernize two elevators—one gear traction elevator serving the 328-foot tower with 23 levels and one hydraulic elevator serving the base building's first and second floors—to comply with the latest ASME A17.1 safety code. Modernization work includes replacing controllers, hoist way and switches, drive machines and sheaves, governors and safety systems, car structures, cabs, hoist way door panels, signal and operating fixtures, signage, painting, and fire life safety system integration. The contractor must also provide full-service maintenance for one year following modernization, with operational availability of 99% or greater per quarter, no more than one unscheduled outage per quarter, and response time not exceeding one hour to service calls. Normal working hours are 6:00 a.m. to 2:30 p.m., Monday through Friday, though the contractor may work multiple shifts to minimize elevator downtime. The contractor must obtain FAA badging, comply with all OSHA requirements, provide qualified elevator mechanics and supervisory personnel, and submit detailed submittals including drawings, specifications, project schedules, and quality control plans prior to work commencement. All parts replaced must be from original equipment manufacturers. The contractor is responsible for fire alarm panel integration, heating and ventilation modifications as needed, telecommunication devices, and providing 24-hour emergency telephone monitoring during the warranty period. Performance evaluation will be based on the attached Performance Requirements Summary, and a Quality Assurance Surveillance Plan must be submitted after contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Facility Elevator Refurbishment

Air Traffic Control Tower Salt Lake City, Utah

October 2026

PWS, Elevator Refurbishment and Maintenance, SLC ATCT, UT

Contents

BACKGROUND:

SCOPE OF WORK

GENERAL REQUIREMENTS:

Personnel

Lock Out/Tag Out

Security

Housekeeping

Safety And Health

Quality Control Program

Qualifications Of Contract Employees

Submittals

Supplies, Materials, And Equipment

Quality Control Program

Facility Maintenance Moratoriums

Air Traffic Operations/Restrictions To Access

DEFINITIONS

ELEVATOR MODERNIZATION:

Fire Alarm Control Panel

Temperature and Humidity

Communication Devices

Elevator Monitoring:

Elevator Modernization Working Hours

Inspections And Tests

MAINTENANCE SERVICE

Repairs

Preventive Maintenance

Scheduling Preventative Maintenance

After Hours

Acceptable Performance Requirements

ATTACHMENTS

BACKGROUND:

The elevators that serve the (were commissioned in 1999. There is one elevator serving the tower (gear traction elevator) and another serving the base building (hydraulic elevator). The tower elevator is the primary means of vertical transportation up and down the tower and is the only elevator that serves the ATCT. The ATCT is 328-ft above ground level (AGL) and the tower elevator services 23 levels.

The base building elevator, used by facility staff who cannot use the stairs, is also in need of repair. The base building elevator only serves the first and second floor of the base building. Both elevators are accessible by the link connecting the tower and base building facilities. These elevators are in operational condition but see frequent outages.

SCOPE OF WORK

The Contractor must provide all labor, material, transportation, engineering, and supervision to Perform Modernization of one elevator serving the tower (gear traction elevator) and another serving the base building (hydraulic elevator) in order to bring them up to the most recent elevator code and provide one (1) year of Maintenance Service as stated in this Performance Work Statement (PWS).

GENERAL REQUIREMENTS:

Personnel

a) The Contractor must provide qualified elevator mechanics, work crews, and supervisory personnel in such numbers, places, and times to fully meet the contract requirements.

b) All persons furnished by the Contractor, including subcontractors, are the sole responsibility of the

Contractor. The Contractor must be responsible for their compliance with all applicable laws, rules, regulations and security clearances.

c) The Contractor must assign an individual to work directly with the Contracting Officer (CO). This individual will be responsible for all matters pertaining to the contract requirements.

Lock Out/Tag Out

a) Only the FAA will turn off, lock out, and tag out systems, not the Contractor, including facility equipment, valves, and breakers. The FAA will lock out and tag out systems, and the Contractor may add their lock out and tag out on top of the FAA’s. The Contractor must positively verify de-energization before working on any systems.

Security

a) Contractors will need to obtain FAA badging prior to the start of work.

Housekeeping.

a) Take all necessary precautions to safeguard and protect all FAA property with which the

Contractor comes in contact while performing the contract work.

b) Maintain all building space and any FAA-owned equipment the Contractor is authorized to use, in a neat, clean, orderly, and working condition at all times.

c) All machine rooms, hoist ways, pits, elevator equipment, and landing sill grooves must be kept clean, free of dust, dirt, grease, oil, and foreign debris.

d) In keeping with environmental protection as well as American Society of Mechanical Engineers

(ASME) A17.1 requirements, the contractor must immediately notify the CO and Contracting Officer Representative (COR) in writing and email of any indication of underground oil seepage which may be attributed to a leaking underground hydraulic cylinder.

e) Keep Safety Data Sheets (SDS) on-site for all materials used.

f) Use reasonable care to minimize the generation of waste and properly dispose of all waste off site. Any waste generated must be removed from the site daily.

g) Use reasonable care to minimize the risks this work poses to the environment, the customers, the general public, and the contract employees.

Safety And Health

a) Applicable Requirements. All work must comply with the applicable requirements of OSHA 29

CFR 1910/1926 and 40 CFR 761. All work must comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent will apply.

b) Responsibility. The Contractor must assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work.

c) Safety Equipment. The Contractor must provide all necessary safety equipment and ensure that equipment and all relevant safety procedures are applicable for the job being performed and are utilized properly.

Quality Control Program

a) The Contractor must perform to the standards as contained in the contract documents and utilize a comprehensive quality control program to assure that the contract requirements are provided as specified. Include a maintenance control program as specified in the latest edition of ASME 17.1.

Qualifications Of Contract Employees

a) Qualifications. The personnel employed by the Contractor must be capable employees, trained and qualified in elevator maintenance and repair work.

b) Licenses. Where applicable, all persons employed in a trade, craft, or profession that is licensed by state or local authorities must have the appropriate license prior to performing any contract work. The license must be of a grade or level consistent with the requirements of the work being performed in reference to Submittals Section of this PWS.

Submittals

a) After the award of the contract, prior to the physical start of the modernization, the contractor must submit drawings, specifications, layouts, shop drawings, project schedules, manufacturer’s data, routine work schedules, information related to the modernization and personnel qualifications to the FAA for informational purposes.

b) For all materials to be incorporated into the construction, submit Catalog Cuts, Specification or Technical Data Sheets and Safety Data Sheets (SDSs) of the proposed materials. The Contractor must provide each submittal in either Microsoft Word (.docx) or Adobe PDF format, transmitted by email to the COR, unless another format is specified. Each electronic submission must include a Cover Memo numbered in consecutive order and be a single consolidated file (with photographs/data embedded or attached as labeled appendices) unless file size requires separate attachments, in which case each attachment must be clearly named and referenced in the cover memo. The COR will review each deliverable for completeness and may approve or reject any submission that is not in compliance. The Contractor must correct and resubmit all rejected submittals.

Supplies, Materials, And Equipment

a) The Contractor must provide all labor, supplies, materials, repair or replacement parts, tools, and equipment as necessary to perform the work specified in this contract efficiently and effectively.

b) All parts replaced under the provisions of this contract must be from the original equipment manufacturer, manufactured to original equipment manufacturer (OEM).

Quality Control Program

a) The Contractor must be required to submit a quality control plan in accordance with ASME

A17.1 with their proposal.

Facility Maintenance Moratoriums

a) The FAA has established moratorium dates for construction activity at critical Air Traffic Control facilities. The intent is to minimize impact on the ability of FAA to perform its operational activities during peak air travel dates. Moratorium dates are typically scheduled near holidays for example Thanksgiving Holiday and the Christmas/New Year Holiday. The Contractor must be aware of these dates and request specific information yearly for scheduling work on or around the moratorium periods. All activity during moratorium periods must be approved in advance by the FAA. Submit items of work to be performed during moratorium dates no later than forty-five

(45) days prior to the moratorium dates. Activities that have, in the sole opinion of the FAA, potential to negatively impact FAA operations will not be approved. A written waiver will be provided by the FAA to the Contractor outlining the allowable work items.

Air Traffic Operations/Restrictions To Access

b) Access to work areas may be restricted from time to time by necessity of air traffic operations.

DEFINITIONS

Normal Working Hours: 6:00 a.m. to 2:30 p.m. five (5) days per week.

Operational Availability: The amount of time the elevator is in full working service and is accessible by FAA personnel. Unscheduled outages and service call response times are durations when the elevator is not operationally available; therefore, these actions would count against the operational availability percentage.

Quarter: A quarter year cycle starts the 1st of the month and ends on the last day of the third month.

Outage: is an event that places an elevator in an out of service (OTS) state for any length of time, with no minimal time frame.

Unscheduled Outage: an event that places an elevator out of service (OTS) for any length of time, with no minimal time frame that is not scheduled.

Response Time: The amount of time it takes the contractor to arrive at an elevator starting at the time the contractor is contacted. The time starts when the contractor, not the contractor’s responding technician, receives the service call.

ELEVATOR MODERNIZATION:

Requirement

a) The Contractor must provide all labor, material, transportation, engineering, and supervision to perform a professional initial assessment to identify all deficiencies of each elevator. Based on this assessment, provide modernization (alteration) of each elevator and elevator components in accordance with the latest edition of the ASME A17.1 “Safety Code for Elevators and Escalators” to maximize the life expectancy of each elevator plant. In addition to the ASME A17.1 mandatory requirements for the alteration, the contractor must comply and meet all requirements of Section 2.27 “Emergency Operation and Signaling Devices” Section of this Performance Work Statement (PWS).

1) The components of both elevators to be replaced in support of this modernization must include the following (all below sections apply to both elevators unless explicitly stated):

a) Elevator Controllers

i) Tower Existing: TAC50

ii) Tower Code data plate

iii) BB Existing: Northern Elevator Limited Serial 808

iv) BB Code data plate

b) Hoist way and Switches

i) Wiring and traveling cables

ii) Tape selector system

iii) Final and terminal limit switches

iv) Pit stop switch

v) All other switches needed for modernization

vi) Guide rail

vii) Emergency floor identification (ID)

c) Drive machine and Sheaves

i) Tower Elevator

(1) Geared drive alternating current (AC) motor including conductors and conduit to electrical panels

(2) Redundant break

(3) Overhead sheaves

(4) Hoist rope

(5) Motion Control

(a) AC-VVVF (Variable Voltage, Variable Frequency) Solid state drive

ii) Base Building Elevator

(1) Hydraulic Lift System

(a) Tank

(b) Hydraulic Cylinder

(c) Piston

(d) Control Valves

(e) Solid State Microprocessor

(f) Controller

(g) Motor Starter

(h) Motor/Pump including conduit and conductors up to power source

(2) Redundant break

(3) Overhead sheaves

(4) Hoist rope

(5) Hydraulic Pump

(6) Hydraulic Power Unit

(7) Control Panel

(8) Actuators

(9) Pressure Relief Valve

(10) Fluid Reservoir and Fluid

(11) Sump Pump

d) Governors and Safety Systems

i) Overspeed Governor (including tension sheave and governor rope)

ii) Tension sheave

iii) Governor Rope

iv) Safeties (clean, test and replace as needed)

v) Emergency Brakes

vi) Replace pit stop switch

vii) Guide Rails

e) Car Structures

i) Roller guide assemblies

ii) Platform Guide

iii) Safety switch

(1) Removes power from elevator when elevator is opened more than 2-inches

f) Elevator Cabs

i) Lighting

ii) Carpet

iii) Handrail

iv) Door Operator

v) Infrared door protection system

vi) Stainless steel drop ceiling

vii) Light Emitting Diode (LED) light

(1) LED lights must meet Federal Communications Commission (FCC)/FAA requirements

(2) FAA-E-37018

viii) Hatch

g) Hoist way Door Panels

i) Door panels

ii) Sills

iii) Tracks/headers

iv) Entrance frames

v) Hangers

vi) Interlocks

vii) Unlocking devices

viii) Pick-up Rollers

ix) Sill-type closers

x) Damaged gibs and bumpers

h) Signal and Operating fixtures

i) Car operating panel

ii) Car Position Indicator

(1) Cab

(2) Hallways (floors 3 to 22 do not function)

iii) Hall Buttons

iv) Emergency Services Fixture

(1) Must include fireman’s emergency service key switch

v) Hoist way Access Key Switches

(1) Adjacent to each elevator lobby entrance at the top and bottom terminal landings as required by code

vi) Master Phone

vii) Voice/tone key switch (identify function)

i) Elevator signage

i) i.e. Fire evacuation signs

j) Painting

i) Machine room floor

ii) Pit Floor

iii) Top of elevator car

iv) Hoist way door fascia

v) Inside of hoist way between floors

k) Fire Life Safety system

i) Contractor is responsible for integrating the modernized elevator into existing fire life safety system. This includes programming, materials, testing, and any other work needed for the modernized elevator to be properly integrated into the fire life safety system, including shunt trip. The fire life safety system includes fire panels, control systems, and communication systems.

l) Asbestos

i) Contractor is not to disturb any Asbestos containing materials (ACMs). Asbestos abatement is not included in the scope of this performance work statement.

ii) Elevator Brake Shoes – Contractor must assume the existing elevator brake shoes contain asbestos and must handle them in accordance with all applicable regulations.

2) The contractor must provide full-service maintenance warranty, inspection and testing of the elevators as required by ASME A17.1 Section 8.11 and at the minimum interval specified in Appendix N of ASME A17.1 or the authority having jurisdiction (AHJ). See Warranty Section of this PWS.

3) Electrical, grounding and bonding work must comply with the latest edition of FAA Specification

1217 “Electrical Work Interior” and FAA STD 019 “Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Facilities and Electronic Equipment”. FAA Orders/Regulations/Standards can be found at the following website:

https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/power_services/sys_eng _team/stand_specs

Fire Alarm Control Panel

a) The Contractor must be responsible for connecting and interfacing the new elevator equipment

(i.e. controller) with the fire alarm panel and must assure compatibility between them.

Contractor must be responsible for any required upgrades to the fire alarm panel required for compatibility.

Temperature and Humidity

a) The Contractor must ensure proposed modernization complies with ASME A17.1 Section

2.7.9.2 Temperature and Humidity. It must be the contractor’s responsibility to assure that all equipment is installed in an environment suited for its optimal operation in accordance with its Manufacturer’s specifications. The Contractor must be responsible for any modifications or additions to the heating, ventilation, and air conditioning (HVAC) system as required for compliance.

https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/power_services/sys_eng_team/stand_specs https://my.faa.gov/org/linebusiness/ato/operations/facilities_engineering/power_services/sys_eng_team/stand_specs

Communication Devices

a) The Contractor must be responsible for the telephones, telephone lines, intercom devices and programming of telephone instruments within the hoist way to meet ASME A17.1.

b) Modernization of each elevator must include elevator cab finishes including ceiling, LED lighting, wall panels, handrails and flooring with similar or equal composition. All material proposed to be used in the course of the modernization must be submitted for approval by the COR prior to installation. Reference paragraph 13.B.3 Submittals. All elevator cab finishes must meet the requirements of ASME A17.1 and all other codes included in the solicitation and this PWS. Elevator finishes must comply with National Fire Protection Association (NFPA) 101 class A or B flame spread rating.

Elevator Monitoring:

a. After completion of the modernization efforts, but before final acceptance, and while the elevators are being used by FAA personnel, the contractor must be required to have at least one technician on site for 5 businesses days, 1 work week, Monday through Friday, during normal working hours, to perform “elevator monitoring” quality control duties. It is the FAA’s intent to have the technician consistently operate each elevator throughout the business days to ensure any and all deficiencies are resolved. Final acceptance will be a consideration only after all deficiencies are resolved.

b. The Contractor must be responsible for the coordination and compliance of the requirements and for the cost of any permits, fees, and independent third-party inspections.

c. Replace the sump pumps, associated piping, electrical service and sump pump controls in the elevator pits.

d. All machinery exterior and equipment parts must have a factory applied painted finish.

e. The machine room and pit floors must be painted with approved materials.

Elevator Modernization Working Hours

a) All scheduled contract work must be accomplished to minimize the time each elevator is out of service, which may include working multiple shifts. Elevator modernization working hours will be the project normal working hours 6:00am-2:30pm Monday through Friday (see DEFINITIONS Section of this PWS). Any work done beyond normal working hours must be mutually agreed upon by both parties and approved by the CO.

Inspections And Tests

b) Maintenance and Repair Inspections by the FAA. The FAA reserves the right to make any test or inspection it deems necessary to make sure that all performance requirements are being maintained. The Contractor must complete any repairs or deficiencies specified in the inspection report within 30 calendar days. When all listed deficiencies have been corrected, the

Contractor must sign and date the inspection report and return it to the CO. At its discretion, the FAA may then re-inspect the work.

c) Safety Deficiencies. If any condition is disclosed which constitutes a safety hazard to either elevator passengers or equipment, that unit must be removed from service immediately. After corrections have been made, verified safe and reported to the onsite personnel, the subject unit must be placed back in service. A copy of the report must be provided to the CO.

d) Scheduling. The Contractor must schedule at a time mutually agreed to and confirmed in writing in advance and conduct elevator inspections as required in the ASME A17.1. The Contractor must accompany the inspector during each inspection.

e) Testing. The Contractor must perform all elevator tests required by the latest edition of the ASME A17.1, including Firefighters Service. Any damage to elevator equipment caused by any such test must be repaired by the Contractor. At its discretion, the FAA may have representatives present to witness any or all such tests. In addition to the requirements stated in ASME A17.1 for the Category 5 test of safeties at rated load and rated speed, the Contractor must:

i) Check and adjust existing load weighing devices to ensure that they perform their intended function at the correct weight.

ii) Make all adjustments required to ensure that the safety devices perform their intended function as designed.

f) Contract Close-out Inspection.

i) Upon completion of the modernization, the Contractor must prepare an Existing Deficiency Report in conjunction with the COR that lists the deficiencies found for FAA review/approval. The Contractor must correct all deficiencies that fall within the scope of this contract. The COR has the right to bring in a 3rd party inspector. The Contractor must also be responsible for latent deficiencies that are discovered after the close-out inspection. All deficiencies must be corrected within 30 calendar days of notification to the Contractor.

MAINTENANCE SERVICE

a. The Contractor must assume responsibility for full-service maintenance service upon completion of each elevator modernization for a period of one (1) year.

1) Ensure that the original operating criteria of the modernized elevators is maintained at all times for each elevator including:

a) Maximum capacity in pounds

b) Rated speed in feet per minute

c) Performance time measured brake to brake

d) Door operation

e) Traffic handling capabilities

f) Service call response time not to exceed one (1) hours

g) Smooth and quiet ride quality

h) Software and controls

i) Lighting and safety controls

2) Include a down-time percentage for each elevator less than three percent (3%) per year based on 365 days/24 hours per day, or as otherwise proposed by the Contractor and accepted by the FAA at the time of award.

3) Include less than or equal to one (1) unscheduled outage calls per quarter, per elevator.

4) Include timely response to outages not exceeding one (1) hour.

5) Include responding to unscheduled and/or emergency service calls 7 days per week, 24 hours per day as part of the warranty period including service calls required due to external circumstances such as power spikes or interruptions.

6) Provide 24-hour emergency elevator telephone monitoring services during the warranty period.

The monitoring service must be capable of providing the recorded transcripts.

7) 90 calendar days prior to the expiration of the contract, the Contractor must survey to assess each elevator unit and verify that they conform to the specifications and the other provisions of the contract. At the conclusion of the survey, the Contractor must provide the FAA representative a copy of the equipment final assessment report and performance evaluation for each individual unit covered by this contract. The report must indicate all repairs during the warranty period and upgrades as well as the current condition and cleanliness of each unit.

Repairs

a) "Repairs" are defined as scheduled or unscheduled work required to prevent the breakdown or failure of an elevator, or to return an elevator back to service after a breakdown or failure.

b) The Contractor must complete all repairs within 24 hours after discovering the problem or of receiving notification that corrective action is required. The Contractor must notify the CO/COR immediately if repairs cannot be made within 24 hours. If the Contractor cannot complete the repairs within 24 hours, they must present, within two working days, a plan to the COR for completing the work.

c) Upon request, the Contractor must furnish a record of all repairs made to the elevators, their accessories, or appurtenances.

d) Any repair work and associated cost outside the scope of this contract must have prior written approval by the CO.

Preventive Maintenance

e) Definition. "Preventive Maintenance" (PM) is regularly scheduled work on the elevator(s) that the

Contractor must do to accomplish the following:

i) Ensure safe, reliable and continued operation.

ii) Prevent breakdowns due to worn parts.

iii) Maintain elevators in accordance with ASME A17.1 standards.

f) Routine Work Schedule. Not later than five working days before the full-service maintenance warranty start date, the Contractor must submit to the CO/COR an annual work schedule for each elevator. A simple schedule indicating, for example, the elevator mechanic will be in a particular facility the first Tuesday of every month. The purpose is to let the facility personnel know when to expect the elevator mechanic.

g) Definition. “Service Call” is a report of an elevator malfunction made by authorized FAA personnel or designated building occupants and the Contractor's subsequent response to and correction of the problem.

h) Whenever called by authorized personnel (7 days per week, 24 hours per day), the Contractor must respond promptly.

i) For each service call, the Contractor must provide to the CO documentation that contains the following minimum information.

i) A description of the problem.

ii) The location of the problem.

iii) A description of the action taken to resolve the problem.

iv) The time and date corrective action was completed.

v) The name of the person who corrected the problem.

Scheduling Preventative Maintenance.

a) Prior to removing an elevator from service, the elevator mechanic must schedule a time mutually agreed to and confirmed in writing in advance with the COR or designated facility representative.

After Hours.

a) The contractor will be required to perform preventive maintenance work outside normal working hours to minimize the impact to facility personnel. The FAA reserves the right to allow the contractor to perform work, inspections, and tests during normal working hours if facility operations allow it. Any scheduled work that removes an elevator from service (fireman’s service test, dispatching work, etc.) must be coordinated with the COR prior to removing the elevator from service. The Contractor must notify the COR or designated facility representative to coordinate after-hours access to the building

Acceptable Performance Requirements.

a. The contractor’s performance will be evaluated in accordance with the attached Performance

Requirements Summary (PRS).

b. After Award, the Contractor will be required to submit QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)in accordance with the SUBMITTALS Section of the PWS. Once the QASP is approved it will be incorporated into the contract via Contract Modification.

ATTACHMENTS

A. PERFORMANCE REQUIREMENT SUMMARY (PRS)

END OF PERFORMANCE WORK STATEMENT

ATTACHMENT A - Performance Requirement Summary (PRS) Elevator Refurbishment and Maintenance, SLC ATCT, UT

The Contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The PRS and the Contractor’s Quality

Control Plan provide information on Contract requirements, the expected level of Contractor performance and the expected method of remedy. These thresholds are critical to mission success. Procedures as set forth in 3.10.4-4 INSPECTION OF SERVICES - BOTH FIXED-

PRICE & COST REIMBURSEMENT, will be used to remedy all deficiencies.

1. SITE LOCATIONS

1.1. Federal Aviation Administration’s (FAA) Air Traffic Control Tower (ATCT), 1201 N 4000

W, Salt Lake City, Utah, 84116.

2. MAINTENANCE PERFORMANCE

2.1. Maintenance performance is measured under three criteria: Operational Availability per quarter, the number of Unscheduled Outages per quarter, and prompt Response time to unscheduled outages. The stated requirements for Operational Availability and maximum number of unscheduled outages are as follows:

2.1.1. Operational Availability of 99% or greater per quarter pertaining to the maintenance contract

2.1.2. Less than or equal to one (1) unscheduled Elevator Outages per quarter pertaining to the maintenance contract.

Performance Objective Performance Threshold

Annual Inspection and Certification 100% as required by ASME 17.1

Perform preventive maintenance as scheduled and unscheduled/emergency calls

Operational Availability of 99% or greater per quarter

Unscheduled Outages Less than or equal to one (1) per quarter

Maintenance records updated upon completion of service

100% after each service call or scheduled service event

Reports submitted within 5 business days 100% submittal after each service call

Provide as–built drawings Within 30 days of completion of modernization or repair work.

Unscheduled/Emergency calls 100% response time as specified in each location’s

Elevator Information Sheet

ATTACHMENT A – PRS, Elevator Refurbishment and Maintenance, SLC ATCT, UT

3. QUALITY CONTROL

3.1. The Contractor must develop and maintain a quality control program to ensure custodial services are performed in accordance with commonly accepted commercial practices and services identified in this PWS. The Contractor must develop and implement procedures to identify, prevent, and to identify and prevent non-performance, while ensuring that non-performance and continual repeat of defective service does not occur. As a minimum, the Contractor must develop quality control procedures addressing the areas identified in this Attachment.

4. QUALITY ASSURANCE

4.1. The Government must inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this Contract. The

COR will use the Contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official record of the

Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a

Contract Discrepancy Report (CDR) for issuance to the Contractor. The Contractor must respond to the CDR in accordance with instructions provided and return it to the CO within 10 calendar days of receipt.

5. PERIODIC QUARTERLY PROGRESS MEETINGS

5.1. The CO, COR, other Government personnel as appropriate, and the Contractor may periodically meet to discuss the Contractor’s performance. The following issues may be discussed; opportunities to improve the Contract, any modifications required of the

Contract, unsatisfactory inspections and valid customer complaints against each performance objective observed and steps taken by the Contractor to prevent occurrences in the future. The Contractor must provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the

Contractor not concur with the minutes, the Contractor will provide a written notification to the Contracting Office identifying areas of non-concurrence for resolution.

End of Attachment A

BACKGROUND:
SCOPE OF WORK
GENERAL REQUIREMENTS:
Personnel
Lock Out/Tag Out
Security
Housekeeping.
Safety And Health
Quality Control Program
Qualifications Of Contract Employees
Submittals
Supplies, Materials, And Equipment
Quality Control Program
Facility Maintenance Moratoriums
Air Traffic Operations/Restrictions To Access
DEFINITIONS
ELEVATOR MODERNIZATION:
Fire Alarm Control Panel
Temperature and Humidity
Communication Devices
Elevator Monitoring:
Elevator Modernization Working Hours
Inspections And Tests
MAINTENANCE SERVICE
Repairs
Preventive Maintenance
Scheduling Preventative Maintenance.
After Hours.
Acceptable Performance Requirements.

ATTACHMENTS

File details come from the government source that posted it. Updated .