Landscaping Statement of Work Summary

This is a Statement of Work (SOW) for grounds maintenance services at three Federal Aviation Administration (FAA) facilities located in Nashua, New Hampshire: the FAA Admin Facility (11 Murphy Dr), FAA Child Care Center (53 Northeastern Blvd), and FAA ARTCC (35 Northeastern Blvd). The contractor must furnish all labor, supervision, equipment, and materials to perform comprehensive grounds maintenance including grass cutting (uniform height between 2-4 inches), edging, fertilization, trash and debris removal, vegetation and shrub pruning, irrigation, ditch cleaning, and snow disposal area restoration. All work must comply with applicable quality standards, environmental requirements, safety requirements, and schedules. The contractor must manage work schedules, provide adequate supervision, and maintain status information. Work shall be performed during regular hours unless otherwise authorized by the Contracting Officer Representative (COR); work outside regular hours requires COR approval.

Facility-specific requirements include: at the FAA Admin Facility, the contractor must furnish and maintain four seasonal flower containers (minimum 24 inches wide, 19-gallon capacity) at front and rear entrances from May 31 through September 30. At the FAA Child Care Center, all work must be completed before noon, two flower containers must be maintained at the front entrance, rubber mulch (minimum 6-inch depth) must be maintained in play areas with monthly redistribution, sandbox sand must be replaced annually by end of May, playground equipment must be power washed annually by end of May, irrigation systems must be activated after freezing threat and winterized before winter, and tick control treatment must be applied to the playground perimeter during May through August with 48-hour advance COR coordination. At the FAA ARTCC, annual perennial plant bed maintenance is required, including dividing and transplanting existing perennials, cutting back ornamental grasses, and furnishing/installing 50 replacement or supplemental perennial plants. Additional requirements include annual fall and spring landscape cleanups, fence line vegetation removal within 10 feet on both sides, ditch maintenance to 2-inch height, and tree monitoring with COR notification for pruning or removal needs. All contractor-furnished products must comply with EPA, USDA BioPreferred, WaterSense, Green Seal, and other applicable environmental standards. The government will provide water at exterior hose bibs and handle major irrigation system maintenance (time clocks, valve systems, underground piping), but the contractor is responsible for sprinkler riser connections, sprinkler heads, and any damage caused by contractor operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Landscaping Statement of Work

1.0 Purpose

The purpose of this SOW is to obtain grounds maintenance services at three (3) locations:

#1 FAA Admin Facility, 11 Murphy Dr, Nashua, NH, 03062

#2 FAA Child Care Center, 53 Northeastern Blvd, Nashua, NH 03062

#3 FAA ARTCC 35 Northeastern Blvd, Nashua, NH, 03062

2.0 General Requirements

The requirements contained in Sections 2.0 through 2.11 apply to all three facilities, unless specifically stated otherwise.

The Contractor must furnish all labor, supervision, equipment, and materials necessary to provide grounds maintenance services in accordance with the requirements specified herein. The operations to be performed must include cutting grass, edging, fertilization, collection and disposal of litter and trash, vegetation cutting and removal, shrub pruning, irrigation, ditch cleaning, and other miscellaneous services, to include restoration of the “snow disposal” area.

All work shall be performed in accordance with the applicable quality standards, environmental requirements, safety requirements, and schedules established in this SOW.

2.1 Management and Work Control

The Contractor shall manage, schedule, and coordinate all work necessary to ensure timely completion of services. The Contractor shall provide adequate supervision, personnel, equipment, and materials and shall maintain work schedules and status information.

2.2 Work Hours

Work shall be performed during regular hours unless otherwise authorized by the COR.

Work outside regular hours, including weekends and holidays, requires COR approval.

2.3 Vegetation, Herbicide, and Pesticide Control

The Contractor shall use the least toxic effective means of controlling weeds, pests, and invasive vegetation. Herbicides and pesticides shall only be used when authorized by the COR and shall comply with all applicable Federal, State, and local requirements. Required licensing, supervision, training, product documentation, and application records shall be maintained and provided as specified herein.

2.4 Trash, Litter, and Vegetative Debris

The Contractor shall collect and remove trash, litter, leaves, pine straw, pine cones, limbs, and other vegetative debris from all maintenance areas. Debris shall be properly disposed of, recycled, or composted and removed from the area the same day it is collected.

2.5 Grounds Maintenance

The Contractor shall maintain all grassed areas, landscaped areas, planting beds, shrubs, hedges, trees, paved areas, drainage areas, fence lines, and other designated maintenance areas in accordance with the requirements of this SOW.

2.5.1 Grass Cutting

All grassed areas located within the maintenance areas must be cut to a uniform height between two (2) inches and four (4) inches. Grass clippings must be uniformly distributed over the mowed area. Trimming around trees, shrubs, flower/shrub beds, cultivated areas, poles, walls, valves, and other similar objects must be accomplished to match the height and appearance of the surrounding mowed grass. Grass clippings and trimmings must be removed from sidewalks and other paved areas the same day the grass is cut.

2.5.2 Edging

All sidewalks, driveways, street edges, curbs, other paved areas, and shrubbery areas located within the maintenance area must be edged. Edging must create a l/2 inch wide and l inch deep clear zone immediately adjacent to the paved surface. The edging operation must produce neat, clean lines along the sidewalks and other areas edged. All vegetation growing in the following areas must be removed during the edging operation:

• Sidewalk and driveway expansion joints and cracks.

• Street/driveway curbing expansion joints.

• Cracks between curbing and street/driveway pavement.

For continued maintenance of vegetation growing in cracks and expansion joints, herbicide treatment may be utilized to reduce the amount of mechanical work. Debris generated by edging operations, which falls on or is thrown on sidewalks, on curbs, and streets, must be removed from the site the day of the edging operation and disposed of from the area.

2.5.3 Plant and Shrub Pruning

Shrubs, bushes, hedges and cultivated plants must be pruned to accomplish:

• Remove new growth attaining a length of three (3) inches.

• Evenly form and balance the shrub, bush, or plant according to its natural growth habits.

• Remove dead, damaged or diseased wood.

• Remove vines, tree sprouts or any other extraneous vegetative growth from under or on the shrubbery.

• Prune or remove growth in front of windows.

All clippings and debris must be removed from the site the same day and disposed of.

2.5.4 Cultivation and Mulching of Shrubs, Hedges, and Flower Beds

Shrubs, hedges, and flower beds must be cultivated and mulched. Cultivation includes weeding of shrubs, hedges, and flower beds. Mulch in bed areas such as wood bark chips, pine straw, etc., must be well groomed after removal of weeds, rocks, etc. Additional mulch, of the same type as existing, must be provided and placed around all shrubs and flower beds as required to maintain a minimum depth of three (3) inches.

2.5.5 Fertilization

The Contractor shall provide fertilizer applications to maintain healthy and attractive grass and flower bed areas. The Contractor shall apply a pre-emergent fertilizer to flower beds and all grass areas in the spring, timed appropriately for local growing conditions. Straight fertilizer or fertilizer with broad leaf weed killers (as needed) will then be applied three (3) other times spread throughout the growing season. The Contractor shall notify the COR of the proposed application date at least forty-eight (48) hours prior to application.

Applications shall not be performed during conditions that could result in excessive runoff, drift, or ineffective treatment.

The Contractor shall maintain records of all applications, including the date, product used, application rate, areas treated, and shall provide such records to the COR upon request.

2.6 Snow Disposal Area Restoration

Following the snow season, the Contractor shall restore areas affected by snow removal and storage operations. Within twenty-one (21) calendar days after all snow and ice have melted, the Contractor shall remove accumulated sand, gravel, debris, and other material from snow disposal areas, landscaped areas, parking lots, roadways, sidewalks, curbs, and other affected areas. All affected areas shall be left clean, safe, orderly, and suitable for normal spring growth.

2.7 Fall Landscape Cleanup

The Contractor shall perform one (1) comprehensive fall cleanup annually following the growing season and before winter weather. Cleanup shall include removal of leaves, pine needles, twigs, and other seasonal debris from all lawns, landscape beds, sidewalks, parking areas, and drainage areas as well as the appropriate cutting back of perennials and ornamental grasses.

2.8 Spring Landscape Cleanup

The Contractor shall perform one (1) comprehensive spring cleanup annually, completed no later than April 30 unless otherwise directed by the COR. Cleanup shall include removal of all leaves, pine needles, pine cones, twigs, branches, litter, and other accumulated debris from all lawns, landscape beds, sidewalks, parking areas, and drainage areas as well as redefining and edging landscape beds to establish clean, well-defined bed lines.

2.9 Fence Line Security

Fence line vegetation removal must consist of the removal of grass, weeds, trees (less than three inches at ground level), and all other vegetative growth to ground or pavement level within 10 feet on both sides of fence lines per security rules. Mechanical methods of vegetation removal must be used. If mechanical methods are not feasible, chemical methods may be used with approval by the COR. Debris generated by vegetation removal operations must be removed and disposed of from the area the same working day.

2.10 Ditch Maintenance

Vegetative growth in drainage ditches must be cut to a height of two (2) inches on bottom and sides. Mouths of ditches, inlets, and outlets must be cleared of sediment, vegetation, and debris to allow unrestricted flow of water. All brush cuttings, trash, and debris must be removed and disposed of from the area the same day of cleaning.

2.11 Trees

Trees will be monitored for health and growth. If any tree needs to be pruned or removed due to disease, dead branches, or damage, the COR will be notified. The contractor will provide a quote separate from this contract to the COR for all work discussed.

3.0 SPECIAL REQUIREMENTS BY FACILITY

The following requirements are facility-specific and are in addition to the General Requirements in Section 2.0.

3.1 FAA Administrative Facility

3.1.1 Summer Flowers

The Contractor shall furnish, install, and maintain seasonal summer flower displays consisting of:

• Two (2) flower containers (minimum 24” wide at top with minimum 19 gallon capacity) with assorted seasonal flowering plants at the front entrance beneath the canopy.

• Two (2) flower containers (minimum 24” wide at top with minimum 19 gallon capacity) with assorted seasonal flowering plants at the rear entrance.

Containers shall be installed no later than May 31 and maintained through September 30.

The Contractor shall provide watering, fertilization, deadheading, pruning, weeding, mulching, and replacement of plants as necessary to maintain a healthy and attractive appearance.

3.2 FAA Child Care Center

3.2.1 Work Hours

All work shall be completed during morning hours, prior to 12:00 PM (noon).

3.2.2 Summer Flowers

The Contractor shall furnish, install, and maintain two (2) flower containers (minimum 24” wide at top with minimum 19 gallon capacity) with seasonal flowering plants at the front entrance. Containers shall be installed no later than May 31 and maintained through September 30, including watering, fertilization, deadheading, pruning, weeding, mulching, and replacement as necessary.

3.2.3 Child Play Areas

The Contractor shall:

• Maintain a minimum six (6) inch depth of rubber mulch in designated play areas and rake monthly to redistribute mulch.

• Replace the top four (4) inches of sand in both sandboxes annually following winter and prior to the end of May, maintaining the required final depth of two (2) inches from the top rail.

• Power wash the outdoor playground equipment annually following winter and prior to the end of May.

3.2.4 Irrigation

Pfeiff, Stephanie (FAA) “Large” containers is non-specific. If you’re not too worried about how the vendor interprets it, that’s okay, but we would have a hard time holding them to any specific size.

Irrigation system to be activated and watering schedule set up after threat of freezing weather and must be winterized after summer use before freezing weather.

Sprinkler riser connections and sprinkler heads must be maintained, repaired, or replaced by the Contractor as necessary to eliminate obstructions, leaks, and other defects which would prevent proper operation. Sprinkler heads must be maintained clear of dirt and other debris for approximately one inch around their outside circumference.

The Government will provide all other required maintenance to installed sprinkler systems due to normal wear and tear, to include time clocks, valve systems, and underground piping up to, but not including the sprinkler riser connection and sprinkler heads. Any damage to such systems caused by the Contractor must be repaired or replaced by the Contractor at no expense to the Government. The Contractor must promptly report damage to or malfunction of any sprinkler system to the COR.

The Contractor must abide by any local, state, or other water agency regulations or controls in force at the time of this contract.

3.2.5 Tick Control

The Contractor shall treat the playground perimeter for ticks during May, June, July, and August. Treatment shall be coordinated with the COR at least forty-eight (48) hours prior to application.

3.3 FAA ARTCC

3.3.1 Perennial Plant Bed Maintenance

The Contractor shall perform annual maintenance of all perennial planting beds, including:

• Dividing, thinning, and transplanting existing perennials as necessary.

• Cutting back and thinning ornamental grasses.

• Furnishing and installing fifty (50) replacement or supplemental perennial plants as necessary.

All plant material shall be healthy, nursery-grown, and suitable for local growing conditions. Proposed changes to the landscape design or new plant species require COR approval prior to installation.

4.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

Pfeiff, Stephanie (FAA) Do you have any requirements about the size of the new plants?

The Government will not provide office space, storage, tools, equipment, or materials. The Contractor shall furnish all equipment, materials, and services necessary to perform the work.

Water will be available at existing exterior hose bibs. The Contractor shall provide any required service lines, hoses, portable sprinklers, and other equipment. Electricity is not available at the facilities.

All Contractor-furnished products shall comply with applicable environmental requirements, including, where applicable, EPA, USDA BioPreferred, WaterSense, Green Seal, and other specified sustainability standards.

File details come from the government source that posted it. Updated .