J-1 ZBW Snow SOW.pdf

PDF 529 KB Posted

Download PDF, 529 KB

Attached to
Snow Removal and Landscaping Services at Multiple FAA Facilities in Nashua, NH
Solicitation number
697DCK-27-R-00016
Issued by

About this file

This document contains combined technical specifications for snow removal and sanding services at three Federal Aviation Administration (FAA) facilities in the Boston area: the Boston Air Route Traffic Control Center (ARTCC) at 35 Northeastern Boulevard in Nashua, NH; the Boston District Office Facility at 11 Murphy Drive in Nashua, NH; and the Boston Child Care Facility (CCF) at 53 Northeastern Boulevard in Nashua, NH. The specifications establish performance standards requiring the contractor to commence snow removal operations within two hours of notification when snow accumulation reaches two inches, as determined by the National Weather Service. For the ARTCC facility, parking lots (1, 2, 3, 4, and A), comprising approximately 37,000 square yards, must be accessible on a 24-hour basis. For the Child Care Facility, parking lots and walkways must be cleared by 5:30 AM daily (except three designated holidays: New Year's Day, Thanksgiving, and Christmas). For the Murphy Drive facility, areas must be cleared by 6:00 AM Monday through Friday (except eleven designated federal holidays). The contractor must maintain equipment availability including two front-end loaders (minimum 3 cubic yards), two snow plows (minimum 5 tons, 7-foot width), sufficient dump trucks (minimum 6 cubic yards), sanding equipment, a 4-wheel ATV with plow, and snow blowers. Sand must consist of washed sand treated with a minimum of 35 pounds of urea per ton. The contractor is fully responsible for all damages resulting from operations, including damage to property, landscaping, pavement, and fencing, with damaged shrubs and trees to be replaced with nursery-grown specimens of the same species. All contractor personnel must undergo FBI background and fingerprint checks prior to commencing work. The contractor must provide 24/7 contact information to designated government representatives and maintain adequate qualified supervision at all times. Holiday work is mandatory when circumstances require, and call-back services for re-plowing and re-sanding must be provided within two hours of notification. Payment is contingent upon COR verification of compliance with specifications, with deductions applied for areas not properly cleared or sanded.

View the file

Other files

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combined Snow Plowing Specifications for the Boston ARTCC, 11 Murphy Drive

District Office Facility and the Boston Child Care Facility (CCF)

TECHNICAL SPECIFICATIONS

SNOW REMOVAL AND SANDING SERVICES

FOR

FEDERAL AVIATION ADMINISTRATION

35 NORTHEASTERN BLVD, NASHUA, NH

July 29, 2020

Boston ARTCC

SECTION I

SPECIFICATIONS - PLOWING/SANDING

1.1 Snow removal and sanding operations shall commence within two hours after notification by the NAS Operation Manager (NOM) or the Contracting Officer’s Representative (COR). Notification will take place when the snow depth reaches two (2) inches. Determination of snow depth for payment will be as recorded by the National Weather Service Office on the following website.

http://forecast.weather.gov

1.2 If additional sanding is required it shall be accomplished only when directed by the NOM or the COR and on a per job basis. Sand will be applied to ensure uniform distribution over all areas.

1.3 All fire hydrants located at the facility will be kept clear of snow for a radius of at least six (6) feet in all directions. Piling of snow will not be permitted in front of the hydrant connections.

1.4 Parking Light Poles at the facility will be kept clear of snow for a radius of at least three (3) feet in all directions. Piling of snow will not be permitted in front of the parking light poles.

1.5 Catch basins at the facility will be kept clear of snow for a distance of at least five (5) feet beyond the edges of the catch basin cover. (See Catch Basin Drawing 1A.)

1.6 All drainage areas, storm drains shall be kept free and clear of snow and ice. The loading dock entrance shall be plowed and sanded and kept free of snow and ice.

1.7 The parking lots 1,2,3,4 & A, comprising approximately 37,000 square yards, are used on a 24 hour basis. Therefore, snow removal and/or sanding of areas cannot be done concurrently. Security will determine which parking lots are closed for snow removal and have that listed on the information sign at the entrance of the facility.

This is determined by the time of day and the amount of employee cars in the parking lots.

1.8 Snow Disposal Areas are designated in Drawing 1A.

SECTION II

SPECIAL PROVISIONS - DEFINITIONS AND INSTRUCTIONS

2.1 Definitions

a. The word “snow” as appears in these specifications shall mean any form of precipitation that can occur during winter months.

b. The word “sand” as appears in these specifications shall mean “washed sand for sanding”, treated at a minimum of thirty-five (35) pounds of urea (a fertilizer chemical to melt snow non-cursive and non-damaging to shrub and lawn growth) per ton. This combination is to be mixed thoroughly prior to its application.

c. The word “job” as used in these specifications shall cover that period of time necessary to remove snow or apply sand caused by a storm and as directed by the government representative under the terms of the contract. To complete a job, more than one visit to the facility may be necessary.

d. The word “storm” as used in paragraph 2.1 (c) shall mean that duration of precipitation as determined as a storm by the National Weather Service.

2.2 The contractor shall be required to furnish proper types of equipment necessary to expeditiously accomplish the services throughout the areas covered by this contract.

DESCRIPTION OF SERVICES

2.3 The contractor shall furnish and supply all labor, vehicles, equipment, tools and supplies necessary to remove snow to the disposal areas as designated in (Drawing 1A.)

2.4 Snow removal and sanding for each job order pursuant to the technical specifications, Section I, Paragraph 1.1 through 1.7, shall be accomplished so as to afford access to all buildings and availability for use of all parking lots/drop-off areas located at these facilities. Piling snow in the parking lots closes off parking space for FAA employees and will not be allowed. The contractor will push the snow piles over the curbing and into the grass areas. If snow piles develop in other than designated areas, the COR will contact the contractor to move and or remove the snow piles at the contractor’s expense. The COR will show the contractor where snow piles are allowed during the site survey.

2.5 The contractor will be required to furnish adequate qualified supervision at all times during the progress of any work covered by these specifications. The supervisor shall represent the contractor during his absence and all directives given him consistent with the specifications shall be binding as if given to the contractor.

2.6 Due to the unique and important services performed by the Air Route Traffic Control Center, it is imperative that snow removal services commence as required in Section I, therefore the contractor shall provide contact telephone numbers to the Environmental Unit Manager, Boston ARTCC, telephone number (603)-879-6682, at which he can be notified to commence services on a 24 hour, 7 day per week basis.

2.7 The contractor will be required to start work covered by the specifications within two hours of receiving verbal notification from the authorized government representative.

2.8 Work and/or services performed under the contract will be subject to approval by the Contracting Officer’s Representative to insure full compliance with the specifications. All areas not cleared and/or sanded in accordance with the specifications as determined by the COR will result in appropriate deduction being made from the job price.

2.9 The contractor will not permit nor cause, as the result of his operations, the piling or mounding of snow upon any planted or landscaped area. This includes bushes, trees, shrubs, and grass areas, except as shown in the disposal areas.

2.10 Should circumstances require, holiday work is mandatory. For the purpose of this specification, the legal holidays are defined as follows:

a. New Year’s Day (January 1) b Martin Luther King Jr.’s Birthday (third Monday in January)

c. Washington’ Birthday (third Monday in

February)

d. Memorial Day (fourth Monday in May)

e. Juneteenth (June 19)

f. Independence Day (July 4)

g. Labor Day (first Monday in September)

h. Columbus Day (second Monday in October)

i. Veteran’s Day (November 11)

j. Thanksgiving Day (fourth Thursday in

November)

k. Christmas Day (December 25)

2.11 The contractor shall be required to provide “call back” service for the purposes of re-plowing and/or re-sanding/ice melt of areas which have been covered with snow and/or ice as the result of drifting, alternate thawing, and freezing, etc. Call back services shall be rendered within two (2) hours notification by COR/NOM.

2.12 Contractor shall assume full responsibility for any and all damage for injury to persons, property, and equipment which results from any of his operations. The contractor will be held liable for any damages caused by himself, his employees, or his equipment to any other equipment, apparatus, or installed fixed or real property in any of the areas covered by these specifications in which his work is performed. The contractor shall also be responsible for damage to lawn, pavement, shrubbery, trees and curbing areas – other than grass damage in snow disposal areas. Replacement of damaged shrubs and trees shall be of the same species and growth and shall be nursery grown.

2.13 The contractor and his employees will exercise at all times an operation which will not inhibit security, fire safety, hazard safety, vehicle and pedestrian traffic, and vehicle parking.

2.14 The contractor, upon request of the Contracting Officer or their representative, shall dismiss from the premises any employee of the contractor who, in the opinion of the Contracting Officer or their representative, interferes with the terms, conditions, or specifications of the contract.

2.15 All misplaced property found by the contractor’s employees in the course of their work will be turned over to security personnel at the guard house.

2.16 The contractor shall submit to the COR a list of all contract personnel employed on the premises of 35 Northeastern Blvd. All personnel performing under this contract shall be subject to a security background check to be conducted prior to commencing this contract. The contractor and each of his/her employees performing under this contract shall be subject to a least a FBI background and fingerprint check.

SECTION III

EQUIPMENT REQUIRED

3.1 In order to assure expeditious removal of snow, the contractor will be required to have available for use at the facility, at least the following types and quantities of equipment. The use of tractor treated equipment with metal treads is prohibited.

a. Two front end loaders – minimum capacity 3 cu. Yards (farm tractor type excluded).

b. Two snow plows – minimum capacity 5 tons, min. width 7’.

c. Sufficient dump trucks to remove snow from the cleared areas – minimum capacity 6 cu. Yards.

d. Sanding equipment – Type of equipment utilized shall provide for an expeditious, even distribution of sand to the widest extent possible, and at the same time operated in such a manner as to not cause possible damage to any personal/real property in the vicinity of operation.

A snow blower may be utilized in those areas where it is practical and where it will not violate any other terms of the contract.

SECTION 1V

SNOW REMOVAL

4.1 All walkways and entry doors will be clear of snow. Refer to the facility drawing with red lines that indicate the location of all walkways and doors.

(See Drawing 1A.)

4.2 In the event of a large storm, the contractor will provide additional employee’s to ensure that all walkways and doors are shoveled clear of snow at all times.

4.3 Due to the number of walkways and doors, it is Mandatory that the contractor has a 4 wheel ATV with a plow attached. This will ensure timely snow removal during all snow storms.

4.4 All walkways and entry doors will be treated with ice melt or equivalent to avoid ice buildup. Pure salt products will not be used for ice mitigation on the sidewalks. The ice melt will be stored in the landscaping shed during the winter months. The contractor may use the garage as a staging point during large snow storms when additional employees are required.

4.5 The contractor will provide all tools and supplies: This includes all snow shovels, ice picks, 4 wheel ATV with plow, snow blowers, ice melt and cold weather clothing.

4.6 All snow removal equipment and supplies will be removed from the Center grounds at the end of the snow season. The COR will determine that date.

Drawing 1A: Storm Drain Locations

Drawing 1A: Snow Disposal Areas

Drawing 1A: Sidewalks and Door Locations.

. TECHNICAL SPECIFICATIONS

SNOW REMOVAL AND SANDING SERVICES

FOR THE

FEDERAL AVIATION ADMINISTRATION (FAA)

BOSTON DISCTRICT OFFICE FACILITY

11 MURPHY DRIVE

NASHUA, NH

AND

THE LAUNCHING PAD

CHILD CARE FACILITY (CCF)

53 NORTHEASTERN BLVD.

NASHUA, NH

Updated August 22, 2019

SECTION 1

OVERVIEW

1.1 Scope of Work: Provide snow removal and sanding services for two (2) Federal

Aviation Administration (FAA) facilities. Snow removal and sanding/ice melt operations will be in the form of snow plowing of parking lots and snow blowing/shoveling of walkways, entrances, smoking area, and emergency exits.

1.2 Services shall be performed upon accumulation of two inches (2”) of snow and completed on a job basis per the National Weather Service Office website

1.3 Location of Work: FAA Child Care Facility, know as “The Launching Pad”, located at 53 Northeastern Blvd, Nashua, NH and the FAA administrative building located at 11 Murphy Drive, Nashua. Please see Drawing 1B (11 Murphy Drive and Drawing 1C (Child Care Facility) for details regarding these two facilities.

1.4 Point to Contact. It is imperative that snow removal services commence as required in Section 2, therefore, the Contractor shall provide contact telephone numbers to the Contractor Officer Representative (COR) so that notification can commence for services on a 24-hour, 7-day a week basis.

1.5 Certificate of Insurance. The Contractor to whom award is made will be required to furnish a Certificate of Insurance.

SECTION 2

TECHNICAL SPECIFICATIONS

2.1 The Contractor shall commence work upon two inches (2”) of snow accumulation, or within two (2) hours after notification by the Government Representative.

2.2 The parking lot, walkways, entrance and emergency exits at 53 Northeastern Blvd

(Child Care Facility) shall be shoveled clear of snow and ice and acceptable for children drop-off by 5:30 AM, Monday through Sunday, except holidays as listed in Section 4, paragraph 4.6. Snow from the parking lot shall be disposed of in the areas shown on the attached drawing, identified as “Snow Disposal Area”.

2.3 One of the emergency exits at the Child Care Facility runs through the playground. A material used in two sections of the walkway, known as pour-in-place rubber, cannot withstand the use a snow blower or metal shovels.

Therefore, the snow must be removed from the areas circled on the attached drawing is done so by a plastic shovel or broom only.

2.4 The parking lot, walkways, entrances, smoking area, and emergency exits at 11

Murphy Drive shall be shoveled clear of snow and ice and acceptable for employees by 6:00 AM, Monday through Friday, except holidays as listed in Section 4, paragraph 4.7. Snow from the parking lot shall be disposed of in the areas shown on the attached drawing identified as “Snow Disposal Area.”

2.5 All fire hydrants located at the 11 Murphy Drive facility shall be kept clear of snow for a radius of at least six (6) feet in all directions. Piling of snow will not be permitted in front of the hydrant connections.

2.6 Sanding will be done when ice forms on the parking lots and walkways from snow or freezing rain, or upon notification by the Contracting Officer’s Representative (COR). Sanding will also be done following the final snow plowing after each storm to prevent frozen build-up on the parking lots. Sand will be applied to ensure uniform distribution over all areas.

2.7 Call-back sanding. If additional sanding is required it shall be accomplished only when directed by the COR and on a per job basis.

2.8 The rolling fence gates and tilt-away gates around the guard house at 11 Murphy

Drive shall be cleared of snow and pilings. Removal of snow around the gate openings and mechanisms will be accomplished by hand shoveling or snow blower to prevent damage.

2.9 Parking lot and sign floodlights at both facilities will be kept clear of snow for a radius of at least three feet (3’) in all directions. Piling of snow will not be permitted in front of the floodlight assemblies.

2.10 Each parking lot has areas identified as “Snow Disposal Areas”, as shown on the attached two (2) drawings. These areas shall be used to pile snow. Snow shall not be piled within five feet (5’) of any fence. Any other area that may need to be used to pile snow must be coordinated and approved by the COR, prior to use.

2.11 When snow piles begin to impact parking spaces, the COR will contact the contractor to move and/or remove the snow piles at the contractor’s expense.

2.12 Catch basins at both facilities will be kept clear of snow for a distance of at least five (5) foot beyond the edges of the catch basin cover at both facilities.

2.13 All drainage areas, at both facilities, shall be kept free and clear of snow and ice.

The loading dock at 11 Murphy Drive shall be plowed and sanded, and kept free of snow and ice.

2.14 Work and/or services performed under the contract will be subject to review by the COR to insure full compliance with the specifications. All areas not cleared and/or sanded in accordance with the specifications, as determined by the COR, will result in appropriate deduction being made from the job price.

2.15 The Contractor will not permit nor cause, as the result of operations, the piling or mounding of snow upon any planted or landscaped area. This includes bushes, trees, shrubs, and grass areas, except as shown in the attached two (2) drawings noted as “Snow Disposal Area.”

2.16 The Contractor shall assume full responsibility for any and all damage for injury to persons, property, and equipment that result from any snowplowing or sanding operations. The Contractor will be held liable for any damages caused by himself, his employees, or his equipment to any other equipment, apparatus, or installed fixed or real property in any of the areas covered by these specifications in which work is performed.

a. The Contractor shall be responsible for fixing damage to lawn, pavement, shrubbery, trees, curbing areas, and fencing - other than grass damage in “Snow Disposal Areas.” Replacement of damaged shrubs and trees shall be of the same species and growth and shall be nursery grown.

b. The Contractor shall also be responsible for insuring that the plowed snow does not damage the fence and fence fabric located around the perimeter of the facility. The Contractor is responsible for fixing any fence fabric which becomes untied as a result of the plowed snow.

2.17 The Contractor and his employees will exercise at all times an operation which will not inhibit security, fire safety, hazard safety, vehicle and pedestrian traffic, and vehicle parking.

2.18 All misplaced property found by the Contractor's employees in the course of their work shall be turned over to the COR at 11 Murphy Drive.

2.19 The Contractor, upon request of the COR, shall dismiss from the premises any employee of the Contractor who, in the opinion of the COR, interferes with the terms, conditions, or specifications of the contract.

2.20 All invoices must be submitted to the Contracting Officer (CO) with a copy to the COR for approval. Upon verification by the COR that the services being billed have been satisfactorily received and are in compliance with the specifications, the CO will certify the invoice correct and proper for payment. The invoice will then be forwarded to Accounting in Oklahoma for payment.

SECTION 3

EQUIPMENT REQUIRED

3.1 The contractor shall furnish and supply all labor, vehicles, equipment, tools and supplies necessary to plow, sand and remove snow to the disposal areas as designated in Section 2.

3.2 In order to assure expeditious plowing/sanding of snow/freezing rain, the Contractor shall be required to have available for use, at least the following types and quantities of equipment:

a. One truck – four-wheel drive, with a steel plow having a minimum width of seven feet (7’).

b. Sanding equipment. The type of equipment utilized shall provide for an expeditious, even distribution of sand to the widest extent possible, and at the same time operated in such a manner as not to cause possible damage to any personal/real property in the vicinity of operation.

c. Snow blower for clearing walkways, entrances, and emergency exits at the Murphy Drive and Child Care Facilities.

d. Plastic shovel or broom for clearing Child Care Facility emergency walkway through the playground.

3.3 The use of vehicles having tires equipped with chains may be used only when severe snow and ice conditions warrant them. The use of tracked equipment is prohibited.

SECTION 4

DEFINITIONS

4.1 The word "snow" as it appears in these specifications shall mean any form of precipitation that can occur during winter months.

4.2 The word "sand" as it appears in these specifications shall mean "washed sand for sanding,” treated at a minimum of thirty-five (35) pounds of urea (a non-corrosive alternative to rock salt to melt snow and non-damaging to shrub and lawn growth) per ton. This combination is to be mixed thoroughly prior to its application.

4.3 The word "job" as used in these specifications shall cover that period of time necessary to remove snow and/or apply sand caused by a storm, and as directed by the Government Representative under the terms of the contract. To complete a job, more than one visit to the facility may be necessary.

4.4 The word "storm" as used in paragraph 4.3 shall mean that duration of precipitation as determined as a storm by the National Weather Service, Taunton, MA.

4.5 “Government Representative” is limited to the Contracting Officer Representative (COR), the Contracting Officer (CO), and the Facility Manager as identified by the COR.

4.6 For the purpose of this specification, the legal holidays defined for 53 Northeastern Blvd (Child Care Facility) are as follows:

a. New Year's Day

b. Thanksgiving Day

c. Christmas Day

4.7 For the purpose of this specification, the legal holidays defined for 11 Murphy Drive are as follows:

a. New Year's Day (January 1)

b. Martin Luther King Jr.'s Birthday (third Monday in

January)

c. Washington's Birthday (third Monday in February)

d. Memorial Day (last Monday in May)

e. Juneteenth (June 19)

f. Independence Day (July 4)

g. Labor Day (first Monday in September)

h. Columbus Day (second Monday in October)

i. Veteran's Day (November 11)

j. Thanksgiving Day (fourth Thursday in November)

k. Christmas Day (December 25)

TECHNICAL SPECIFICATIONS
FOR
July 29, 2020
SECTION II
SECTION III

FEDERAL AVIATION ADMINISTRATION (FAA)