Market Survey 697DCK-26-X-XXXXX - EFS II Matrix 20260630 v3.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
MARKET SURVEY FOR ENTERPRISE FINANCIAL SERVICES (EFS) II: AMENDMENT 0003
Solicitation number
697DCK-26-X-XXXXX
Issued by

About this file

This is a Market Survey Question and Answer Document that consolidates vendor inquiries and FAA responses regarding the Enterprise Financial Services (EFS) II procurement. The document contains 85 comments and questions submitted by vendors including CEXEC, Changeis Inc., Delaware Nation Industries, Elevare LLC, Guidehouse Inc., Human Touch, JMA Solution, Millennium Enterprise Corporation, and Tantus Technologies between June 1-11, 2025, with responses issued by June 26, 2026. The anticipated NAICS code is 541219 (Other Accounting Services), though vendors questioned whether 541611 (Administrative Management Consulting) would be more appropriate given the broad scope of nine work areas spanning budget operations, financial operations, program and project management, training, strategic planning, risk management, and administrative services.

Key procurement structure decisions remain to be determined at the solicitation phase, including whether EFS II will be structured as a single or multiple-award contract, whether separate award tracks will exist for small business versus large business competitors, whether offerors must demonstrate capability across all nine work areas or can compete for subsets, and whether cross-teaming between small and large businesses will be permitted. The incumbent contractors are Ernst & Young LLP (large business) and CEXEC Inc. (small business) under contracts totaling $483,661,447. The FAA confirmed that primary financial systems in scope are PRISM and Delphi, that hybrid work arrangements are anticipated, support will be distributed across multiple FAA facilities, data visualization and financial analytics tools (such as Tableau or Power BI) are in scope, a 90-day transition period is planned, and existing training content will be leveraged. Numerous questions marked as "TBD" (To Be Determined) indicate that the solicitation phase will clarify contract type options (firm fixed price, time-and-materials, labor-hour), staffing requirements, labor category qualifications, Section 508 compliance scope, key personnel requirements, and organizational conflict of interest restrictions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Comment IDCompany NameContact NameContact EmailDate ReceivedSOW Section ReferencePage NumberComment TypeVendor Comment / QuestionInternal OwnerDiscipline / FunctionAFM/ACQ Response Required ByFinal Response (AFM/ACQ)Resolution StatusResponse Issued DateSOW Revision Required?Document UpdatedAddendum NumberPriority / Risk LevelNotes / Action Items
1CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Would the FAA consider adding NAICS code 541611 Administrative Management and General Management Consulting Services to the solicitation? This NAICS code is from the first EFS FAA CO Announcement. This NAICS code has a broader scope than 541219 Other Accounting Services and covers all of the current and prospective taskings on EFS II.Stephen Young/Karina Espinosa/Sharief Williams6/26/26For the time being the FAA is only consider using 541219.
2CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25When does the FAA plan to release the EFS II SIR and award the EFS II contracts?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA does not have a definite date. However, please continue to monitor SAM.gov.
3CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Does the FAA intend to maintain two (2) separate contract awards—one for small business and one for large business—under EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
4CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Does the FAA intend to make a single award or multiple awards for the small business and large business contract pools under EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
5CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25If multiple awards are made, will task orders be competed among all awardees or will the FAA use another process to select task order awardees?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
6CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Will the FAA permit cross-teaming between small business and large business offerors?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
7CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Does the FAA anticipate any organizational conflict of interest (OCI) restrictions?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
8CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25The draft SOW includes DOT-wide ordering authority under the Economy Act. Does the FAA anticipate DOT operating administrations utilizing the EFS II contract?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
9CEXECAlisa Randolfialisa.randolfi@cexec.com6/9/25Will the task order types available under EFS II include labor hour, T&M, and fixed price, or will they all be fixed price?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
10Changeis, IncEmily Lawrencecontracts@changeis.com6/11/25The predecessor EFS contract used NAICS 541611 (Administrative Management and General Management Consulting Services). EFS II uses NAICS 541219 (Other Accounting Services). Given that the nine work areas span budget operations, financial operations, program and project management, training, strategic planning and investment analysis, risk management, and administrative services, would FAA clarify why there is a NAICS change?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
11Changeis, IncEmily Lawrencecontracts@changeis.com6/11/25The Market Survey notes that one purpose is to assess whether adequate competition exists to set the procurement aside among small businesses. What factors will the Government weigh in deciding between a full set-aside, partial set-aside, or full and open competition?Stephen Young/Karina Espinosa/Sharief Williams6/26/26This is determined by who repsonds to the market survey whether it be large or small businesses who are capable of doing the work.
12Changeis, IncEmily Lawrencecontracts@changeis.com6/11/25Section C.3.7 of the RFI lists activities including developing risk taxonomies and lexicons, recommending governance structures, and monitoring risk indicators. Would FAA clarify whether Work Area 7 is intended as enterprise risk management (agency-level ERM framework development and monitoring) or program-level risk management embedded in project management support?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
13Delaware Nation Industries (DNI)Leanne RicknerLeanne.Rickner@DNIgov.com6/9/25Does the government intend to award a single-award or multiple-award? We understand the current EFS is a multi-award, but did not want to assume this new procurement would be the same.Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
14Elevare, LLCMichelle Berkshiremberkshire@elevaretourguide.com6/1/25Can you please share incumbent?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Large: Ernst & Young, Small Business: Cexec
15Guidehouse IncKristin Uckertkuckert@guidehouse.com6/11/25Will the government consider providing an extension to the RFI submission date, allowing vendors to fully consider and incorporate the government’s responses to questions once released.Stephen Young/Karina Espinosa/Sharief Williams6/26/26Yes
16Guidehouse IncKristin Uckertkuckert@guidehouse.com6/11/25Question #2 includes the sentence "If applicable, describe how the approaches outlined in your response to the first question proved successful in performing these services." Is the government's intent for vendors to describe the specific performance and customer satisfaction measures/indicators that their federal clients used to monitor the quality of services provided under the contracts cited as past performance examples in the response to Question #2? If not, would the government clarify the intent for Question #2?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Please describe your past performance.
17Human TouchLulya HabteLulya.Habte@humantouchllc.com6/11/26For planning purposes, can the FAA confirm the primary financial system(s) of record and the main budget/financial tools in scope for EFS II (e.g., Delphi or other DOT/FAA systems), so that respondents can accurately describe their capabilities and avoid assumptions in their responses?Stephen Young/Karina Espinosa/Sharief Williams6/26/26This has not been determined at this time; two systems that are currently used are PRISM & Delphi.
18Human TouchLulya HabteLulya.Habte@humantouchllc.com6/11/26Section C.1.4 notes that DOT components beyond FAA may place orders under EFS II. Does FAA anticipate significant use by other DOT organizations, and if so, are there particular types of services (e.g., internal controls, budget operations, strategic analysis) they are most likely to request?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
19Human TouchLulya HabteLulya.Habte@humantouchllc.com6/11/26Can FAA confirm whether contractors under EFS II will be expected to develop training that is delivered through one or more existing LMS platforms, and whether there are any preferred formats or standards for training content that respondents should assume?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
20JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will EFS II be structured as a single IDIQ contract or a suite of separate contracts? If a single vehicle, will task orders be competed among all awardees or directed to specific contractors?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
21JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Does the FAA anticipate setting aside EFS II exclusively for small businesses, or will large businesses be permitted to compete as primes or in joint ventures/teaming agreements with small businesses?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
22JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26What is the anticipated total ceiling value and estimated ordering period (base years plus options) for EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
23JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will all nine work areas described in the SOW be available under every task order, or will task orders be issued against specific work areas only?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
24JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the FAA require offerors to demonstrate capability in all nine work areas to be eligible for award, or may offerors compete for a subset of work areas?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
25JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will EFS II be competed through the existing eFAST vehicle or through a new procurement vehicle? If a new vehicle, what is the anticipated SIR/RFP release timeline?Stephen Young/Karina Espinosa/Sharief Williams6/26/26It is not anticipated that EFS will be competed through eFAST but this has not been determined at this time.
26JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the FAA create a small business award for EFS II? If so, will it be a set aside or open competition?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
27JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26If the FAA creates a small business (SB) award under EFS II, will a large Prime pursuing EFS II as a large be allowed to team with a SB to compete for the SB award?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
28JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26The SOW states this is an agency-wide contract and any FAA office may order. Will there be a designated ordering approval process, or may any FAA program office place task orders directly against the contract without further authorization?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
29JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Section C.1.4 excludes software development and custom configuration of COTS products. Does this exclusion apply to Tableau or Power BI dashboard development, or are data visualization and financial analytics tools within scope?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Data visualization and financial analytics tools are within scope
30JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will individual task orders be issued as firm fixed price, time-and-materials, or labor hour contracts, or will the ordering contracting officer determine contract type at the task order level?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
31JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Does the Section 508 compliance requirement apply to all contractor deliverables—including internal reports, briefings, dashboards, and training materials—or only to products that will be publicly distributed or posted on FAA-accessible websites?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
32JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the FAA provide a Section 508 test environment or accessibility testing tools for contractor use, or is the contractor expected to procure and operate its own testing infrastructure?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
33JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the contractor perform OMB Circular A-123 internal control testing independently, or will it support FAA personnel who lead the testing? Please clarify the expected contractor-versus-Government role split for testing and analysis activities described in C.3.2.1.1 and C.3.2.1.2.Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
34JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26How many open internal control findings or corrective action plans are currently active across the FAA offices expected to use EFS II? This information will help offerors estimate level of effort for deficiency remediation work under C.3.2.2Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
35JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the contractor have access to FAA's internal audit management system (e.g., TeamMate or equivalent) to track corrective action plans, or is the contractor expected to maintain tracking in its own tools with periodic reporting to the COR?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
36JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Does the FAA require project managers assigned to EFS II task orders to hold a PMP or FAC-P/PM certification? If so, at what certification level—Entry, Mid, or Senior—and must certification be in place at assignment or within a defined period thereafter?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
37JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will program governance activities under C.3.3.1.1 involve oversight of recipients of FAA program funds (e.g., grant recipients, interagency partners)? If so, how many recipient entities are anticipated, and what audit or compliance review activities will the contractor be expected to support?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
38JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26How many FAA offices or program organizations are expected to receive budget formulation and execution support under EFS II? Is the scope limited to ABA and AFN, or does it extend to all FAA Lines of Business and regional offices?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
39JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Does contractor support for reimbursable agreements include formation activities—drafting MOUs, preparing Economy Act determinations, coordinating interagency agreement documentation—or only execution and administration monitoring after agreements are in place?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
40JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Approximately how many active reimbursable agreements does the FAA anticipate requiring contractor support to administer at any given time under EFS II? This information will help offerors develop accurate staffing estimates.Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
41JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will workforce analysis and PC&B support be limited to the ABA/AFN workforce, or is it intended to extend to other FAA Lines of Business and program offices that order under EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
42JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the contractor be responsible for coordinating posting of online training content to FAA's Learning Management System (LMS), or will FAA staff handle LMS administration while the contractor develops and hands off the content?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
43JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Approximately how many training events (courses, workshops, briefings) per year does the FAA anticipate requiring under EFS II, and what is the expected range of audience size per event? This will help offerors estimate staffing and level of effort for Work Area 5.Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
44JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will the FAA provide existing training content as Government-furnished information (GFI), or will the contractor be expected to develop all training materials from the ground up? Will GFI include prior course materials, subject matter expert access, and learning objectives?Stephen Young/Karina Espinosa/Sharief Williams6/26/26This has not been determined at this time - it is anticipated that the FAA will want to leverage exisiting training.
45JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will contractor staff be required to work on-site at FAA facilities, or will remote and hybrid telework arrangements be permitted? If on-site work is required, at which FAA locations (e.g., FAA Headquarters, 800 Independence Ave. SW; Mike Monroney Aeronautical Center; regional offices)?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Hybrid
46JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Will staff assigned to budget execution tasks be required to hold active Federal Appropriations Law certification at the time of assignment, or may they obtain certification within a specified grace period after assignment begins?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
47JMA SolutionScott Porterscott.porter@jma-solutions.com6/10/26Where a contractor incorporates pre-existing proprietary tools, templates, or methodologies into Government work products, will the contractor retain limited rights in that pre-existing intellectual property, or does incorporation into a deliverable result in unlimited Government rights over all embedded content?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
48Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Is the FAA considering a single-award or multiple-award contract structure for EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
49Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Can FAA provide estimated staffing levels, labor category mix, and anticipated annual funding levels associated with EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA labor category staffing levels will be introduced during the solicitation phase.
50Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Can the FAA provide information regarding the current contract(s), including contractor name(s), approximate contract value, and staffing levels supporting these services today?Stephen Young/Karina Espinosa/Sharief Williams6/26/26693KA9-19-D-00004 (ERNST & YOUNG LLP) / 693KA9-19-D-00005 (CEXEC Inc): Total award value: $483,661,447.00
51Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Approximately what percentage of anticipated effort is expected across each of the nine work areas?Stephen Young/Karina Espinosa/Sharief Williams6/26/26This has yet to be determined.
52Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Does FAA anticipate primarily on-site, hybrid, or remote support for EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Hybrid.
53Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Will support be centralized within FAA Headquarters organizations or distributed across multiple FAA facilities nationwide?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Distributed across multiple FAA Facilities.
54Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Will the final solicitation include a transition-in period, and if so, what duration is anticipated?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
55Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26How does FAA envision knowledge transfer and continuity requirements between incumbent and successor contractors?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA envisions a fluid transfer of knowledge between vendors.
56Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26How does FAA anticipate weighting direct FAA financial management experience versus broader federal financial management experience?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA will value both alike.
57Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26The RFI references innovation and measurable cost savings. Are there specific modernization initiatives, automation efforts, or financial transformation objectives FAA seeks to emphasize under EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA is seeking overall general cost savings.
58Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26What are the FAA's primary objectives for EFS II that differ from the current approach or existing contracts supporting financial management services?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
59Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Given the highly specialized nature of FAA financial and budget operations, how does FAA intend to evaluate and ensure continuity of institutional knowledge during contract transition?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA will determine the continuity of knowledge during the 90 day transition period.
60Millennium Enterprise Corporation (MEC)Riley Winchesterriley.winchester@me-sys.com6/9/26Can FAA identify the primary financial, budget, reporting, and business intelligence systems anticipated to be used under EFS II?Stephen Young/Karina Espinosa/Sharief Williams6/26/26PRISM & Delphi.
61Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Does FAA anticipate EFS II will be awarded as a multiple-award vehicle? If so, are there current projections for the number of awardees?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
62Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Does FAA anticipate separate award pools or tracks, such as Full and Open and Small Business?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
63Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26If separate tracks are established, may a large business prime the Full and Open track and also subcontract to a Small Business prime on the Small Business track?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
64Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Is FAA seeking to expand the number of vendors available under EFS II compared to the current EFS vehicle?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
65Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Will FAA evaluate proposed team capabilities using both prime contractor and subcontractor experience?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
66Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26May offerors demonstrate coverage of EFS II work areas through a combination of prime and subcontractor experience?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
67Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Will FAA consider federal internal controls, audit readiness, A-123, and remediation experience from non-FAA agencies as relevant?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
68Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Will FAA consider financial systems support, reporting, data analysis, and process automation experience relevant to financial and accounting operations?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
69Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Does FAA expect EFS II contractors to support financial reporting automation, dashboards, and data-quality improvement?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
70Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Does FAA want offerors to describe how they would bring new ideas for future task orders, including automation, analytics, and process improvement opportunities?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
71Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26The RFQ appears to contemplate a single award for this OCDIO Digital Factory Capacity Task Order. Please confirm whether the Government intends to make one task order award under this RFQ, or whether the Government reserves the right to make multiple awards, partial awards, or separate capacity task order awards by work area, team size, OM&E scope, Operating Administration, or other groupingStephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
72Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Please confirm whether the Government imposes any teaming exclusivity restrictions for this RFQ. Specifically, may the same subcontractor, consultant, or teaming partner participate on more than one offeror’s quotation, provided all actual or potential Organizational Conflicts of Interest are disclosed and mitigated as required?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
73Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Because the PWS describes a scalable Digital Factory / Capacity-as-a-Service model supporting DOT Operating Administrations, please clarify whether the Government anticipates issuing future OCDIO Digital Factory capacity task orders under SWES using the same or similar structure, and whether future task orders may be segmented by Operating Administration, platform, work area, team size, or other capacity groupingStephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
74Tantus TechnologiesTim Pereztperez@tantustech.com6/10/26Does the FAA anticipate that responses to this Draft will be used as a 'down select' for identifying potential contractors for a targeted release?Stephen Young/Karina Espinosa/Sharief Williams6/26/26To Be Determined (TBD) at the solicitation phase.
75Would the Government provide preferred labor categories, minimum qualifications, or key personnel requirements for each work area?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
76Would the Government confirm the final solicitation will identify key personnel requirements?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
77Would the Government confirm that the contractor’s internal corporate information systems, if required to be used to perform this work and handle controlled unclassified information (CUI), are only required to comply with National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 and Federal Acquisition Regulation (FAR) 52.204-21, and that the strict adherence to NIST SP 800-53, Revision (Rev.) 5 controls is solely applicable to the Federal Aviation Administration (FAA) application being assessed?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
78Would the Government confirm the final SOW will include a deliverables list, frequency, acceptance criteria, and expected review timelines?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
79Would the Government provide examples of the types of “Other financial, budget, and management-related activities” anticipated under Work Area 9? Should this area be viewed primarily as surge support, special projects, emerging requirements, studies and analyses, or all of the above?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
80Would the Government provide the anticipated volume for administrative services, including meeting support, correspondence, action tracking, and document management?SOW C.3.8Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
81Will the incumbent be required to support structured transition activities, including document transfer, process walkthroughs, current-state briefings, and status of open actions?Stephen Young/Karina Espinosa/Sharief Williams6/26/26The FAA will determine the continuity of knowledge during the 90 day transition period.
82Does the Government anticipate a single award or multiple award structure, and will tasking be managed through task orders, work authorizations, or a consolidated performance model?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
83Would the Government provide historical workload volumes for recurring reports, task requests, meetings, corrective actions, or administrative support activities?Stephen Young/Karina Espinosa/Sharief Williams6/26/26TBD
84Could you also please confirm that we’re permitted to use a smaller, legible font size for headers, footers, footnotes, tables, and any graphics, provided that all substantive narrative text is in 12-point Times New Roman?Stephen Young/Karina Espinosa/Sharief Williams6/26/26Yes, you're permitted to use a smaller font size for headers, footnotes, tables, and graphics.
85Please confirm that the title page, cover letter, and table of contents of the RFI response would be excluded from the 30 page response limit.Stephen Young/Karina Espinosa/Sharief Williams6/26/26The Federal Aviation Administration (FAA) confirms that the title page, cover letter, and table of contents are excluded from the 30 page limit.

Sheet2

Comment IDUnique identifier for each comment/question (e.g., Q001, C001).
Company NameName of the respondent/vendor submitting the comment.
Contact NameIndividual who submitted the comment.
Contact EmailFor follow-up if clarification is needed.
Date ReceivedDate the comment was submitted.
SOW Section ReferenceSection, paragraph, table, or attachment being referenced.
Page NumberPage number in the SOW package.
Comment TypeQuestion, Clarification, Exception, Recommendation, Commercial, Technical, Legal, etc.
Vendor Comment / QuestionFull text of the comment or question.
Internal OwnerTeam member responsible for preparing the response.
Discipline / FunctionEngineering, Contracts, Procurement, Legal, Operations, Finance, etc.
Response Required ByInternal due date for drafting a response.
Proposed ResponseDraft answer under review.
Final ResponseApproved response to be issued to all vendors.
Resolution StatusOpen, In Review, Pending Clarification, Approved, Closed.
Response Issued DateDate the final response was communicated.
SOW Revision Required?Yes/No.
Document UpdatedReference to revised section, addendum, or amendment.
Addendum NumberIf the response resulted in an official addendum.
Priority / Risk LevelHigh, Medium, Low.
Notes / Action ItemsAdditional tracking information.