21 Amendment 0001.pdf
PDF 229 KB Posted
- Attached to
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Peña Blvd, Denver, CO
- Solicitation number
- 697DCK-26-R-00391
About this file
This is an Amendment of Solicitation/Modification of Contract issued by the Federal Aviation Administration (FAA), AAQ-500 Regional Acquisitions office located in College Park, Georgia. The amendment number is 0001 with an effective date of August 27, 2026, referencing solicitation number 697DCK-26-R-00391 dated August 26, 2026. The amendment is not extended.
The solicitation pertains to reattachment of electrical conduit at the Denver Air Traffic Control Tower (DEN ATCT), located at 9800 Peña Boulevard, Denver, Colorado 80249. The contracting officer is Linda M. Hennequant (Linda.Hennequant@faa.gov). This amendment adds informational attachments to the solicitation: a Trip Report on DEN ATCT Power dated May 6, 2026 (27 pages); ATCT Panel Schedules drawing dated January 16, 2020 (1 page); and ATCT Power Plans and Details drawing dated January 16, 2020 (1 page). Section J of the solicitation was revised to update the attachment list, which now includes the Statement of Work for Conduit Reattachment (August 25, 2026, 26 pages), Wage Determination CO20260020 (May 18, 2026, 5 pages), and Form Past Performance Experience Info (August 25, 2026, 1 page), in addition to the three attachments noted above. Offerors must acknowledge receipt of this amendment prior to the offer submission deadline specified in the original solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6)CODE
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. CONTRACT AUTHORITY
(Signature of Contracting Officer)
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Linda M. Hennequant
See continuation page
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
697DCK-26-R-00391
08/27/2026
08/26/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-26-R-00391/0001
Reattach Electrical Conduit, DEN ATCT, 9800
Peña Blvd, Denver, CO 80249
Contracting Officer: Linda.Hennequant@faa.gov
The purpose of this amendment is to include the
Trip Plan and the Drawings for information only.
ADDITIONS/ATTACHMENTS: The following are hereby attached and included in the Solicitation and the subsequent Award:
ATTACHMENTS:
1. Trip Report- DEN ATCT Power, Dated
5/6/2026, 27 pages
2. Drawing – ATCT Panel Schedules, Dated
1/16/2020, 1 page
3. Drawing – ATCT Power Plans and Details, Dated 1/16/2020, 1 page
END OF AMENDMENT
LIST OF CHANGES:
Section J - List of Documents, Exhibits and Other Attachments was revised as follows.
Attachment List was revised as follows.
Table has been revised and now reads as follows:
ATTACHMENT TITLE DATE NO. OF
PAGES
1 Statement of Work Conduit Reattachment 08/25/2026 26 2 Wage Determination CO20260020 05.18.2026 05/18/2026 5 3 Form Past Performance_Experience Info 08/25/2026 1 1a Trip Report 05/06/2026 27 1b Drawing ATCT Power plans 01/16/2020 1 1c Drawing ATCT Panel Schedules 01/16/2020 1
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
File details come from the government source that posted it. Updated .