This document is a Design-Build Statement of Work for the replacement of the Guam (ZUA) Airport Traffic Control Tower (ATCT) Cab. The project is located at the FAA Guam CERAP facility in Barrigada, Guam. The scope of work includes demolition, hazardous materials abatement, and construction of a new cab structure including architectural, structural, plumbing, mechanical, and electrical work. The design must meet current codes and address wind and seismic requirements for Guam. The Design-Builder will be required to submit design deliverables at 45%, 70%, and 100% completion for FAA review and approval. The total performance period is 300 calendar days, with a maximum 120-day cessation of ATCT cab operations allowed. This is a pre-solicitation market survey to identify capable design-build contractors, including small businesses, service-disabled veteran-owned small businesses, and 8(a) certified firms. Responses to the market survey are due by July 23, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW GUM ATCT CAB 06-27-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
Design-Build Statement of Work
Guam (ZUA) Airport Traffic Control Tower Cab Replacement
Barrigada, Guam
October 10, 2024
Guam (ZUA) Airport Traffic control Tower Cab Replacement
JCN: 20012097
1. PROJECT DESCRIPTION:
This is a “Design-Build” project to replace the existing Federal Aviation Administration (FAA) owned Guam (ZUA) Air Traffic Control Tower (ATCT) Cab complete with new structural components and architectural features, to include new roofing system, windows and window washer sprinklers, and slat-wall consoles. The replacement will be based on the existing approximate square footage of 166 square feet with eight column supports.
The FAA acquired the existing facility from the US Navy after the 1995 Base Realignment and Closure (BRAC). The Guam ATCT Tower/Cab and adjoining Center Radar Approach Control (CERAP) facility were constructed in the 1950s and has gone through various modifications including the addition of an exterior flight of stairs from the 5th Floor to the Cab, see Figures 1 and 2.
Figure 1 CAB and Enclosed Exterior Stairs Figure 2 CERAP and CAB
The Cab structure has suffered from severe corrosion from the extreme environmental effects of the salt air that has infiltrated into the Cab window framing and structural supports. Replacement will meet current codes and will address the increasing wind and seismic events.
2. PROJECT LOCATION:
This project is located at the FAA Guam CERAP (ZUA),1775 Admiral Sherman Blvd., Barrigada, GU
96913-1612 USA.
3. SCOPE OF WORK:
Provide all necessary labor, materials, transportation, equipment, and supervision, engineering design, certifications, permits and other incidental work required for this project.
Other incidental work required includes all items and considerations necessary to ensure a complete and usable final product, including, but not limited to, the necessary design and construction considerations not specifically stated elsewhere in this statement of work. Complete and usable final product means that the completed final product can be used to fully satisfy the requirements and the intended purpose of the project.
The existing line of sight (LOS) and eye elevation height will be designed to the current elevation. The Cab windows will be designed to the current dimensional shapes and angle. The mullions and roof support are internal structures to the Cab and will be assumed that they too will be designed similarly. These are attached to the 10” concrete wall, atop of the 5th Floor Roof, see Figure 3.
Figure 3, 10” Concrete Wall
The Design-Builder will be required to submit an Architect-Engineer Qualification Standard Form 330-
21. The proposal will conform to the requirements of the Request for Proposal (RFP) and this SOW.
At each review phase, the FAA Project Engineer will assemble the comments and send a copy to the Design-Builder firm via electronic mail. After receiving the comments, a design review meeting will be held. Meeting location will be determined upon selection of the Design-Builder. If the Design-Builder wishes to change the location, written approval by the FAA Contracting Officer is required, in advance.
Except for the FAA, the Kickoff meeting, site visits, and conference meeting expenses will be covered by the Design-Builder. The Design-Builder will ensure attendance by its project manager and lead engineering disciplines at all design reviews. Participation by teleconference is negotiable due to distance and time-zone differences.
All work under this contract will be performed in compliance with technical input from FAA personnel, FAA Standard Orders, and applicable Codes. The Design-Builder. will furnish sufficient skilled technical, supervisory, and administrative personnel to ensure the expeditious completion of the work specified herein within the allotted time frames.
The final deliverables under this contract will be build ready Drawings, Construction Specifications, and construction cost estimate that are thorough and provide sufficient detail to allow construction of all aspects of this project.
At the conclusion of this project, the entire design including all engineering drawings, specifications, reports, and studies will become the property of the FAA.
The Scope of Work includes, but is not limited to, the following:
1. Administrative Work:
a. Mobilization and Demobilization.
b. Preparation of Miscellaneous Contract Submittals.
c. Application of Permits and Required Clearances.
d. Other administrative work not mentioned above but required by Basic Contract.
e. Complete Architectural and Engineering Design services professionally licensed to practice in Guam, signed and stamped. All design drawings, specifications, and calculations shall be prepared by/or under direct supervision of a professional engineer/architect with current National Council of Examiners for Engineering and Surveying (NCEES) of National Council of Architectural Registration Boards (NCARB) registration issued from a stated within the United States of America or one of its territories.
f. The Design-Builder must provide all professional architectural, engineering, and related technical services, labor, materials, and equipment required for the design and construction phases of the project.
g. The Design-Builder will be responsible for the professional and technical accuracy, usability, completeness and coordination of all designs, calculations, drawings, specifications, and cost estimates, including those prepared by sub-consultants.
h. The Design-Builder must utilize a Certified Industrial Hygienist (CIH) or appropriate professional official based on the Guam requirements for all hazardous material design (HAZMAT) and abatement work.
i. Professional licensing for Guam is required for the Architect/Engineer of Record.
j. Design reviews: The FAA has final review authority in relation to the design.
k. Modifications: Contract modifications will follow the General procedures of the project.
All modifications come directly from FAA Contracting Officer.
2. Survey and Site Inspection:
a. Provide hazardous materials survey report, to include asbestos/lead base paint, and conduct abatement as defined and identified in the survey report.
3. Demolition and/or Removal Work:
a. Secure area prior to work.
b. All identified Air Traffic Control equipment, within and on the exterior of the Cab, will be removed for re-installation by others.
c. Forensic inspection is anticipated to determine if the corrosive environment has penetrated fasteners and embedded re-bar in the 10-inch-thick circumferential concrete pedestal wall supporting the Cab.
d. Demolition of the false ceiling above ATCT Radar Microwave Equipment Room on 5th Floor is required and removal of the electrical conductors, conduit, and junction box from the distribution panel on 5th floor to the Cab.
e. Cutting and plugging and removal of all existing utilities in the ATCT Cab to include communication conduits, electrical lighting and conduits, HVAC ducting, plumbing, window washer system, and fire protection systems will be necessary.
f. Provide and install watertight barrier to the exposed Cab structure during removal and construction of the ATCT Cab, i.e., exterior Cab stairwell and former ships ladder / HVAC return air pathway into the ATCT Tower.
g. National Airspace System (NAS) equipment including those present on the 5th floor will always remain functional. Spaces containing NAS equipment or FAA personnel will be protected from weather and the space will be cooled to ensure functionality.
h. Remove any miscellaneous items not specifically mentioned above but require removal or demolition to accommodate the construction of this project.
i. Conduct any necessary clearing and cleaning of materials from the work area.
j. All construction debris shall be disposed of off FAA properly at an approved disposal site.
4. New Architectural/Structural Works:
a. The following are considered minimum performance requirements:
i. Match existing profile, dimensions, and installation to the extent possible.
ii. Stainless steel roof hatch and ladder.
iii. Roof top guardrails.
iv. Slat-Wall console.
v. Overhead window sprinklers.
vi. Match existing elevated flooring and eye level height.
vii. Grounded elevated floor, anti-static carpeting, floor panel access to the plenum where all wiring and flexible conduit are plenum rated.
b. Provide loading requirements as specified in ASCE 7-22 for structures in Guam. The prescriptive design approach will be applied to all structural loading including wind and seismic conditions occurring in Guam.
c. Provide secure construction of the ATCT Cab structure offsite or indoors to prevent weathering to the structure before final protective coating.
d. Provide an interior factory protective coating and curing system applied to the steel Cab frame is desired.
e. Provide concrete reinforcement in members resisting earthquake‐induced forces and meet the tensile and yield strength criteria in accordance with the ACI 318 Seismic Provisions.
f. Provide low-E (low emissivity) ATCT Cab Glazing in accordance with wind loading pressures as specified in ASCE 7-22 for the island of Guam and the FAA Terminal Facilities Design Standard (TFDS) V2.2, Chapter 7.
i. All new glazing units shall be insulated.
ii. Provide a low-E coating to reduce solar heat gain in the summer.
iii. Provided tempered glass where required by code.
iv. Match existing color/tint.
v. Provide manufacturer’s standard warranty for insulated glazing units, but not less than 10 years after final acceptance by FAA.
g. Provide fully-adhered membrane Roofing system with a minimum 25-year warranty, minimum meeting at a minimum FM approval:
i. FM 4450 and 4470 – Class 1.
h. Provide roof walk pads for roof top servicing/maintenance of equipment, antennas, and roof drains.
i. Structural analysis loading requirements for the replacement design of the three-dimensional Cab structure will be referenced to the current editions of: ASCE 7-22 Minimum design loads for buildings.
j. Provide a positive drainage and scuppers for ATCT Cab roof.
k. Provide and install black metal drop ceiling grid and black acoustic ceiling tiles.
l. Provide and install new ATCT Slat Wall consoles to include mounting, grounding, cable racks/troughs, ducts/conduits, and powering; Slat Wall will be fully grounded in accordance with FAA standards. The FAA will provide comments for the design.
m. Match interior and exterior paint scheme.
5. New Plumbing/Mechanical Works:
a. Provide new sewer/waste lines and appurtenances as designed to be connected to the existing sewer cleanout for the kitchen sink.
b. Provide a new water lines and appurtenances as designed to be connected to the nearest existing waterline for the kitchen sink and window sprinklers.
c. Provide and install associated power, controls, devices, and appurtenances for a complete and usable system.
d. Provide and install new vertical and horizontal HVAC ducting and insulation as designed to be connected to the existing vertical HVAC, to include electrical disconnect switches, volume dampers, air registers/grills, ductwork sheet metal materials, ductwork insulation, ductwork hangers and seismic bracing. HVAC ducting will be provided a separate support independent of the raised floor and other associated materials for mounting.
e. Test, adjust, and balance the new air distribution system in accordance with National Environmental Balancing Bureau or Associated Air Balance Council standard.
f. Maintain and protect existing stairwell pressurization system. The new system will be interconnected and operate in conjunction with the existing building fire protection system, and HVAC control system.
g. Provide and install new programmable thermostats for the existing air handling units, and HVAC control system, and fan coils units in the building.
h. Perform balancing of the existing HVAC system and stairwell pressurization to ensure that intended results are achieved.
i. Provide an exterior window sprinkler system located centrally and above each window panel in accordance with ASTM E1886 and ASTM E1996, to include a downward window spray system, selector switch, sprinkler control Cabinet, relays, control board wiring conduits and other devices and accessories associated for the proper operation of the system inside the ATCT Cab that can activate and terminate the sprinklers.
j. Provide a water softener for window sprinkler water supply, to include but not limited to electrical wirings, pipes, valves, fittings, hangers and supports.
k. Provide an efficient path for return air movement back to AHU-4. Currently the return air path is via a small grill located at the top of the retired ship ladder access adjacent to the stairwell entrance to the Cab.
l. Provide the ATCT Cab with a mini split mounted on the Cab roof with indoor black Ceiling Cassette, sized appropriately based off heat load calculations.
6. New Electrical Works:
a. Provide and install all light fixtures, essential duplex receptacles, critical twist lock receptacles, light switches, communications outlets (telephone & data outlets), branch circuit conduit and wiring, fire alarm visual/audio devices and other related materials, devices, and accessories associated with the electrical, communication and fire alarm system inside the ATCT Cab, including the void spaces beneath the Cab floor, exterior catwalk, and Cab roof.
b. Provide energy efficient 1’x 4’ parabolic type T-8 Light LED light fixture with a troffer and anti-glare diffuser, equipped with emergency battery. Provide LED Exit sign lights with battery backup including branch circuit conduit and wiring between fixtures and homerun to electrical panel board. Provide calculations to ensure that new lighting system meets the required minimum illuminations level. Final location of the switches will be provided by the FAA.
c. Provide a gradient dimming and separate control for each set of lights. Luminaries will comply with National energy Policy Act of 2005 and Energy Star requirements as well as FCC Part 15.
d. Lighting in the ATCT Cab and 5th floor including spacing of each fixture and illumination level will be designed in accordance with NFPA 101, IBC/IBF and OSHA as well as FAA requirements listed below in the Design References. Provide an electrical load & voltage drop calculation and lighting calculation using the latest Illuminating Engineering Society of North America’s (IESNA) HB, IESNA Lighting Handbook. Light fixtures will be provided a separate support independent with false drop ceiling and other associated materials for mounting and will be in accordance with the latest Architectural Compatibility & Base Design Standards.
e. Provide a minimum of twelve (12) critical receptacles and six (6) essential receptacles (distributed such that there are two critical and one essential receptacle per position), each on a dedicated circuit. Location of receptacles will be provided by the FAA.
f. Provide 20 Amp, 120-volt receptacles on two (2) on the Cab Roof, two (2) on the Cab Catwalk, one (1) suspended below the Cab Ceiling and adjacent to the Cab Ladder.
g. Match the existing number of replacement ground plates, locations will be provided by the
FAA.
h. Essential Power: Provide 20 Amp, 120-volt, single-phase duplex receptacles including branch circuit conduit and wiring between devices and homerun to electrical panel board.
i. Provide appropriately sized breaker, conduit and wiring sourced from the panel board on the
ATCT 5th floor Equipment Room for the Mini Split System located on the Cab roof.
j. Critical Power: Provide new 20 Amp, 120-volt, single-phase twistlock receptacles including branch circuit conduit and wiring between devices and homerun to electrical panel board.
k. Provide a Surge Protection Device (SPD) for the essential and the critical panelboards feeding the ATCT Cab. SPD will be installed according to FAA-Standard-019G, Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Facilities and Electronic Equipment. Relocation of some existing wall mounted devices may be required to ensure the SPD is at mounted as close to its feeder breaker as possible.
l. Provide new communication (Telephone and Data) outlets including branch circuit and conduit wiring between devices and homerun.
m. Provide and install eight (8) recessed LED downlights and controlled by four (4) dimmer type switches. Dimmer type switch will control two (2) fixtures and to be mounted on the front side of the Slat Wall counters.
n. The Lighting layout will match the existing.
o. Provide two exterior convenience circuits for the ATCT Cab Roof and two exterior convenience circuits on the Catwalk. One convenience circuit in the stairway and one on the interior of the ATCT Cab ceiling.
p. Provide cable ladder, cable tray, conduit runs for conductors from the ATCT 5th floor to each ATCT Cab positions, to the mullions in the Cab, and to communication junction boxes on the catwalk.
7. Fire Life Safety Design:
a. Provide Decommission plan for temporary removal of fire alarm devices in the Cab.
Anticipated devices include pull station, fire alarm annunciator, control relays for HVAC control and smoke detectors.
b. Provide procedures for the temporary decommission and recommissioning of the ATCT Cab Exterior stairwell and HVAC return air passage while maintaining pressurization to the enclosed portion of the ATCT Tower stairwell.
c. Provide active fire alarm system for remainder of the ATCT Tower facility during construction.
d. Provide areas of the ATCT Tower that may remain safely occupied during demolition and construction activities.
e. Provide firestops and schedules for penetrations into the new Cab.
f. Provide coordination with FAA Electronics Engineering to establish penetration points and opening dimensions in the new Cab floor (assume 2-hour rating for floor).
g. Provide suitable firestop products or solutions for maintaining the barrier rating at walls and floors where required. Consider future expansion needs and maintainability of firestop system products.
h. Provide full fire alarm devices and services to the ATCT Cab including detection, notification, control, and annunciation.
i. Conceal fire alarm conduit pathways from line of sight in ATCT Cab.
j. The existing fire alarm and mass notification system will be extended to the new ATCT Cab.
The new alarm system in the ATCT Cab will be capable of delivering a general building alarm and notification to occupants in the event of fire. The system will have the features compatible with the FAA Standards.
4. DESIGN AND CONSTRUCTION REQUIREMENTS:
The project shall conform to the latest International Building Code, ASCE, FAA Terminal Facilities Standard Design, and other referenced Standards and Codes for building construction and safety and will be used where applicable and referenced below. Modern construction techniques maybe incorporated in the project design to obtain both quality and economy and to provide a functional, complete, and usable facility.
The Design-Builder will obtain all applicable permits required for work being accomplished.
Due to age and undocumented existing conditions, Government documents and “as-built” drawings shall not be solely relied upon for project information. The Contractor performs field reconnaissance, surveys, and field measurements to verify dimensions shown on government furnished reference documents. The FAA furnished As-Built drawings which will be provided electronically upon request.
The Design-Builder’s operation shall be limited to providing minimum disruption to facility operations and mission requirements. Applicable work contingency plans shall be available in the event of a natural disaster and other related emergencies.
The Design-Builder ’s operation shall be confined to the immediate vicinity of the new work and shall not in any way interfere or obstruct the ingress or egress to and from adjacent property. All existing improvements shall be protected from damage.
The Design-Builder will repair or replace items damaged during the construction to the satisfaction of the FAA Contracting Officer.
5. CODES AND STANDARDS AND DESIGN REFERENCES:
The following FAA Reference Documents and Codes will be considered a part of this SOW. Refer to the latest editions (and any supplements) in effect on the date of the contract. Current copies of the FAA Orders and Standards referenced within this SOW and will be provided electronically in PDF format upon request:
FAA Reference Documents Standards:
a. FAA-TFDS V2.2 Terminal Facilities Standard Design
b. 08 88 58 ATCT Cab Glass Specification
c. FAA-STD-019G Lightning and Surge Protection, Grounding, Bonding, and Shielding
Requirements for Facilities and Electronic Equipment
d. FAA-C-1217H Chg. 1 Electrical Work Premises Wiring
e. FAA-STD-002h FAA Standard Engineering Drawing Preparation and Support
USACE Publications:
EM385-1-1 Site Safety and Health Officer Section 01.A17.b.
National Fire Protection Association (NFPA)
NFPA 1 Fire Code, 2024 NFPA 10 Standard for Portable Fire Extinguishers, 2022 NFPA 70 National Electrical Code, 2023 NFPA 72 National Fire Alarm and Signaling Code, 2022
NFPA 75 Standard for The Fire Protection of Information Technology Equipment, 2024 NFPA 101 Life Safety Code, 2024
International Code Council (ICC)
IBC International Building Code, 2024 IEBC International Existing Building Code, 2024 IFC International Fire Code, 2024 IMC International Mechanical Code, 2024
IPC International Plumbing Code, 2021 SMACNA Sheet Metal and Air Conditioning Contractors' National Association
6. ENVIRONMENTAL REQUIREMENTS:
Design-Builder will ensure that all required permits are obtained before construction begins. Design- Builder will submit for approval an Environmental Protection Plan. Resource Conservation and Recovery Act (i.e., hazard waste, Pb, ACM, etc.) or Safe Drinking Water Act (i.e., PW distribution of FS lines, etc.) or Occupational Safety and Health Act (i.e., ACM abatement, noise, confined space, etc.) or others as applicable.
7. SUBMITTALS:
In addition to the submittals required under the Basic Contract, submit the following:
Proposal Requirements:
a. Narrative of the proposal, indicating, in detail, and materials considered significant for this project for technical evaluation purposes.
b. The overview of the proposed demolition and construction methodology for each Contract Line-Item Number (CLINs) with minimal or no disruption of active of active facilities and/or equipment within the ATCT Tower and CERAB facilities.
c. Catalog Cuts for materials and equipment considered significant for technical evaluation purposes for the following:
i. Architectural – Provide window type, window washer, and Slat Wall console.
ii. Mechanical – Provide electrical disconnect switches, volume dampers, air registers/grills, ductwork sheet metal materials, ductwork insulation, ductwork hangers and seismic bracing, mini-split.
iii. Electrical – Provide fire alarm/visual devices, pull station, strobes, speakers, sprinkler heads, sprinkler pipe, pipe elbow, flexible coupling, pipe cap, 1’x4’ T-8 LED lamps parabolic type fixtures, exit signed light fixtures, 20 Amps 120 Volts duplex receptacles, communication (telephone & Data) outlets, conduits & wirings, and light switches.
d. Preliminary construction schedule and utility outages.
e. Detailed Cost Estimate.
Submittal Requirements (After Award and Before Start of Construction):
a. Construction Schedule.
b. Activity Hazard Analysis.
c. Accident Prevention Plan.
d. Construction Quality Control Plan.
e. Environmental Protection Plan.
f. Confirmation of all environmental clearances, permits, and/or concurrence of work.
g. Design Drawings. Provide drawings in Autodesk® AutoCAD format version R2010 (or later) in ANSI D (22”x34”) size format. Drawings will use the standard FAA title block on each sheet per and will comply with FAA-STD-002H. After completion of 100% Submittal Review or before Final Design Submittal, obtain FAA drawing numbers from the FAA Engineering Drafter – Terminal Engineering Group.
h. 45% Design Submittal: Thirty (30) calendar days after award, submit five (5) hard copies of the design drawings and specifications and a PDF copy in CD-ROM to FAA Project Engineer for Government review and approval. Allow twenty-one (21) working days for Government review.
i. 70% Design Submittal: Thirty (30) calendar days after award, submit five (5) hard copies of the design drawings and specifications and a PDF copy in CD-ROM to FAA Project Engineer for Government review and approval. Allow twenty-one (21) working days for Government review.
j. 100% Design Submittal: Thirty (30) calendar days following receipt of Government review comments on the 60% design. Submit five (5) hard copies of the design drawings and specifications and a PDF copy in CD-ROM to FAA Project Engineer for Government review and approval. Allow twenty-one (21) working days for Government review.
k. Final Design Submittal: Allow fourteen (14) working days following receipt of 100% Government review comments. Submit the originals and three (3) hard copies of the design drawings and specifications to the FAA Project Engineer for Government review and signature.
Provide the original “wet-signed” drawings (on Mylar sheets) and specifications.
Electronically seal and sign all Adobe® Acrobat® PDF drawings and other documents. The Electronic signature software utilized should meet the requirements of the National Council of Examiners for Engineering and Surveying (NCEES). The electronic signatures shall be printable and viewable in Adobe Acrobat® and Adobe Reader® with no additional software.
l. As-Built Drawings: Submittal requirements (Fourteen (14) calendar days after completion/acceptance of the project and prior to final payment):
m. Submit as-built drawings: to FAA Project Engineer in ANSI D (22”x 34”) size Mylar sheets and two (2) sets of CD-ROMs containing native CADD files, PDF of drawings and specifications, calculations, basis of design; submittal register, and other (photos, support files, etc.) as applicable.
8. SITE SAFETY AND HEALTH OFFICER (SSHO) QUALIFICATIONS:
The Site Safety and Health Officer for this Scope of Work shall meet the requirements in accordance with the EM385-1-1 Section 01.A17.b.
9. QUALITY CONTROL (QC) MANAGER QUALIFICATIONS:
The QC Manager for this Scope of Work shall meet the requirements in accordance with the basic contract.
10. PRE-AWARD PHASE / SITE SURVEY:
Pre-proposal Site Survey – It is highly recommended that all interested Design-Builder Contractors attend a pre-bid site survey at the Guam ATCT to see firsthand the condition of the facilities, and the conditions under which the construction work will need to be completed. The pre-bid site survey date(s) is scheduled for October 30 and 31, 2024. Both days are available. Questions arising from the pre-bid survey must be submitted to the FAA CO within ten (10) business days. FAA will consolidate and address all questions, then disseminate the final responses to all the bidders. Bidders that choose not attend the post-site survey conference do so at their own risk and may miss valuable information.
Facility Drawings – A number of existing facility drawings (PDF format) are included with this SOW and photographs are subdivided into three separate categories Site Drawings, as-builts and redrawn (Attachment J-2), Photographs from previous survey conducted on ATCT Cab windows noting the corrosion Building (Attachment J-3), and Guam ATCT Presentation (Attachment J-4); however, some drawings may contain information for more than one category. The drawings contain information pertaining to the building envelope work included in this call order. While the drawings generally depict the existing conditions, some of the drawings are old and likely outdated; therefore, the Design- Builder Contractors are hereby cautioned that some of the information/details may not be completely accurate. The pre-bid site survey may be used to validate the information contained in the provided drawings. If some information cannot be validated via visual inspection during the pre-bid site survey, each Design-Builder contractor shall make and document their assumptions. If it turns out that the successful bidders’ assumptions were incorrect, a contract modification will be issued by FAA to address the differing conditions.
11. PERFORMANCE PERIOD:
Normal work hours are between 7:30 a.m. and 4:30 p.m., Monday through Friday, excluding Federal Holidays. No work will be performed outside normal duty hours unless authorized in writing by the
Contracting Officer. Any work outside normal work hours must be requested at least 3 days in advance.
Total performance period is 300 calendar days commencing on the date of contract award. Full cessation of ATCT Cab operations shall only be authorized for a maximum of 120 calendar days to allow the removal of existing tower Cab and installation of the new tower Cab where lowest operational impact occur. The Performance Period includes all required design, reviews, approval of final design, procurement of long lead materials or items, construction, testing, corrections, if required, final testing, acceptance, and other requirements necessary to deliver a complete and usable ATCT Cab.
| DB - SOW GUM ATCT CAB 10-9-2024.pdf |
| 1. PROJECT DESCRIPTION: |
| 2. PROJECT LOCATION: |
| 3. SCOPE OF WORK: |
| 4. DESIGN AND CONSTRUCTION REQUIREMENTS: |
| 5. CODES AND STANDARDS AND DESIGN REFERENCES: |
| Proposal Requirements: |
| Submittal Requirements (After Award and Before Start of Construction): |
11. PERFORMANCE PERIOD: