23002614 COS ATCT Mini Split HVAC Drawings.pdf
PDF 3 MB Posted
- Attached to
- Colorado Springs, CO - ATCT Mini-Split HVAC Replacement Federal contract opportunity
- Solicitation number
- 697DCK-24-R-00416
About this file
This document contains drawings and specifications for the replacement of the mini-split HVAC system at the Colorado Springs, CO Air Traffic Control Tower (ATCT). The work includes the demolition of the existing 3-ton HVAC outdoor unit and associated components, and the installation of a new 4-ton outdoor heat pump unit, two 1-ton ceiling cassettes, and one 2-ton ducted indoor unit. The new HVAC system must be integrated with the facility's existing automated logic control system. The project is being procured through a competitive solicitation (Solicitation Number: 697DCK-24-R-00416) issued by the Federal Aviation Administration (FAA) Southwestern Region. This is a total small business set-aside with an estimated size range of $50,000 - $150,000. A site visit will be offered and questions must be submitted by 6/1/24.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Experience Form - 697DCK-24-R-00416.pdf | ||
| 697DCK-24-R-00416 - Amendment No. 0002.pdf | ||
| 697DCK-24-R-00416 - Amendment No. 0001.pdf | ||
| Solicitation - 697DCK-24-R-00416.pdf | ||
| 23002614 COS ATCT Mini Split HVAC Replacement Scope of Work (SOW).pdf | ||
| Wage Determination - CO20240022 - 2.23.24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLORADO SPRINGS ATCT
SITE: PETERSON SPACE FORCE BASE
ADDRESS: 460 KINCHLOE LOOP, COLORADO SPRINGS, CO 80914
OWNER: FEDERAL AVIATION ADMINISTRATION
LATITUDE: 38° 48' 27.1"N
LONGITUDE: 104° 42' 6.1"W
ELEVATION: 6180' MSL
ELECTRIC: PSFB CE
COS ATCT
HVAC REPLACEMENT PROJECT
COLORADO SPRINGS, CO
FEBRUARY 2024
NOT TO SCALE
VICINITY MAP
SHEET INDEX
SITE DATA:
COS-ATCT-23002614-G001 COVER SHEET AND VICINITY MAP
COS-ATCT-23002614-G002 PROJECT LOCATION PLAN AND NOTES
COS-ATCT-23002614-D001 HVAC DEMOLITION PLAN
COS-ATCT-23002614-M001 HVAC INSTALLATION PLAN (SUBJUNCTION LEVEL)
COS-ATCT-23002614-M002 HVAC INSTALLATION PLAN (JUNCTION LEVEL)
COS-ATCT-23002614-M003 NEW HVAC ELEVATION AND SCHEDULE
COS-ATCT-23002614-E001 HVAC GROUNDING AND ELECTRICAL PANEL SCHEDULES
COS-ATCT-23002614-E002 ONE-LINE DIAGRAM
REFERENCE DRAWINGS
COS-D-ATCT-A001-BL BASE BUILDING AND ATCT LOBBY FIRST FLOOR PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-G001
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT
COVER SHEET AND VICINITY MAP
C O
S-
AT
C T-
-G
1.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
FOR CONSTRUCTION
UP
MACHIN
E R
M.
ELEVATOR
CABLE CHASE
STAIR
ELEVATOR
CABLE CHASE
BREAK ROOM
MEN
WOMEN
CABLE CHASE
RPT2
DPT2
FLOOR HATCH
RPT-3
DPT-1
T-9
T-8
CONVENIENCE
UNIT W/SINK AND
MICROWAVE
ELEC.
CLOSET
STAIR
FPB
AED
CORRIDOR
CABLE CHASE
WET MANUAL STANDPIPE IN UTILITY
CHASE LEG OF ATCT WITH HOSE BIB
IN CORRIDOR OUT ACCESS DOOR TO CAB
STAIR
(TO CAB)
UTILITY
OBSTRUCTION
LIGHT TEST PANEL
METAL GRATING
(TYP)
ELEVATOR MOTOR
AND CABLE
CEILING HATCH
ELEVATOR
CONTROL
TVSS
PANEL
CP5
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
GENERAL NOTES:
LEGEND:
WORK AREA
JUNCTION LEVEL PROJECT LOCATION PLAN
SCALE: 1/4" = 1'-0"
SUBJUNCTION LEVEL PROJECT LOCATION PLAN
SCALE: 1/4" = 1'-0"
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-G002
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT
PROJECT LOCATION PLAN AND NOTES
C O
S-
AT
C T-
-G
2.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
1. THE COS ATCT IS LOCATED ON PETERSON AIR FORCE BASE, COLORADO SPRINGS, CO.
ACCESS TO THE SITE MUST BE COORDINATED WITH LOCAL SSC.
2. THE COS ATCT IS ACTIVE 24 HOURS A DAY, 7 DAYS A WEEK. ALL SHUTDOWNS
MUST BE COORDINATED A MINIMUM OF 3 WEEKS IN ADVANCE.
3. BUILDING IS TO REMAIN WEATHERTIGHT THROUGHOUT CONSTRUCTION WHEN WORK IS
DONE FOR THE DAY ANY AREAS WHERE WEATHERPROOFING IS COMPROMISED OR
REMOVED NEED TO BE SEALED AND COVERED.
4. ALL ELECTRICAL WORK SHALL COMPLY WITH THE LATEST REVISION OF FAA-C-1217H.
"ELECTRICAL WORK, PREMISES WIRING".
5. ALL EQUIPMENT GROUNDING SHALL COMPLY WITH THE LATEST REVISION OF FAA
SPECIFICATIONS FAA-STD-019F CHANGE 3, "LIGHTNING PROTECTION, GROUNDING,
BONDING AND SHIELDING REQUIREMENTS FOR FACILITIES".
6. WHERE HOT WORK IS REQUIRED, OBTAIN NECESSARY HOT WORK PERMITS.
FIRE EXTINGUISHERS SHALL BE PRESENT AT ALL TIMES.
7. DRAWING PACKAGE IS INFORMATIONAL ONLY, FIELD VERIFY ALL MEASUREMENTS.
8. IF INFORMATION INCLUDED IN DRAWING PACKAGE DIFFERS FROM SITE CONDITIONS
VERIFY IN THE FIELD AND COORDINATE WITH PROJECT ENGINEER PRIOR TO PROCEEDING
WITH DEMOLITION.
9. IF CONDITIONS ARE UNSAFE FOR FAA INSPECTION, CONTRACTOR SHALL PROVIDE
PICTURES FOR AREA OF CONCERN FOR FAA REVIEW AND DISCUSSION.
10. CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLETING ALL LOCATES (ELECTRICAL,
PLUMBING, COMMUNICATIONS, AND OTHER) BEFORE ANY AND ALL DIGGING OR
TRENCHING.
11. AN FAA REPRESENTATIVE MUST HANDLE ALL SHUTDOWNS.
12. ALL SHUTDOWNS MAY BE CANCELED AT ANY MOMENT TO MAINTAIN NATIONAL AIRSPACE
SYSTEM OPERATIONS.
13. CONTRACTOR WILL PROVIDE OPERATION AND MAINTENANCE MANUALS, PARTS LIST,
AND WARRANTY INFORMATION, SEE PROJECT SCOPE OF WORK FOR ADDITIONAL DETAILS.
T
MECHANICAL PLATFORM
TRANSFER FAN
RPT-3 T-9
DPT-1
METAL GRATING (TYPICAL)
STAIR
ELEC. CLOSET
CABLE CHASE
BREAK ROOM
ELEVATORCABLE CHASE
CONDENSATE
LINE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
HVAC DEMO PLAN
SCALE : 3/8" = 1'-0"D001
A
LEGEND:
REMOVE AND DISPOSE
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-D001
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT (SUBJUNCTION LEVEL)
HVAC DEMOLITION PLAN
C O
S-
AT
C T-
-D
1.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
GENERAL NOTES:
REMOVE THE EXISTING 3-TON HVAC OUTDOOR UNIT INCLUDING ALL ASSOCIATED HARDWARE.
REMOVE EXISTING COPPER REFRIGERANT LIQUID LINE AND REFRIGERANT SUCTION LINE.
RECAPTURE REFRIGERANT AS PER EPA REQUIREMENTS. ONLY TECHNICIANS WITH EPA 608
CERTIFICATION CAN DO THIS WORK.
REMOVE EXISTING DISCONNECT SWITCH.
REMOVE EXISTING CONDULET, CONDUIT AND ASSOCIATED FLEX CONDUIT.
REMOVE A DIFFUSER IN THE BREAK ROOM, ENSURING MINIMAL DISRUPTION TO THE
SURROUNDING WALL STRUCTURE. ASSOCIATED ELECTRICAL COMPONENTS SHALL BE
DEMOLISHED.
FOLLOWING THE REMOVAL OF A DIFFUSER, PATCHING REQUIRED ON THE WALL IN THE BREAK
ROOM.
REMOVE EXISTING THERMOSTAT.
REMOVE EXISTING CONDENSATE PUMP, WIRING AND CONDENSATE LINE ASSOCIATED WITH THE
DIFFUSER.
FIELD VERIFY PANEL P-1, CB # 20,22, 40A CIRCUIT BREAKER IS FEEDING POWER TO EXISTING
HVAC PRIOR TO REMOVING. LEAVES BREAKER AT THE SITE FOR FUTURE USE.
SEE COS-ATCT-23002614-E001 FOR PANEL SCHEDULE.
DEMOLITION NOTES:
1. SSC SHALL BE NOTIFIED PRIOR TO SHUTDOWNS AND DEMOLITION OF ITEMS.
2. POWER OFF ALL HVAC UNITS BY DE-ENERGIZING HVAC CIRCUIT BREAKERS IN POWER
DISTRIBUTION PANEL PRIOR TO DEMOLITION.
3. ALL NEW AND/OR REMOVED MECHANICAL EQUIPMENT SHALL COMPLY WITH
LOCKOUT/TAGOUT PROCEDURES, FAA ORDER JO 3900.67.
4. REFRIGERANT SHALL BE RECYCLED, PROVIDE A RECYCLING RECEIPT TO THE FAA.
5. HVAC UNITS MUST BE PROPERLY DISPOSED OF, PROVIDE A DISPOSAL RECEIPT TO THE FAA.
6. IF INFORMATION INCLUDED IN DRAWING PACKAGE DIFFERS FROM SITE CONDITIONS,
VERIFY IN THE FIELD AND COORDINATE WITH PROJECT ENGINEER PRIOR TO PROCEEDING
WITH DEMOLITION.
7. EXISTING CONDUIT MAY BE REUSED IF PROPERLY SIZED, IN GOOD CONDITION, IN
APPROPRIATE LOCATION, AND MEETS ALL RELEVANT CODES IN THEIR MOST CURRENT
EDITIONS.
8. BEFORE EXISTING HVAC DEMOLITION NEW HVAC UNIT MUST BE FULLY OPERATIONAL OR
CONTRACTOR MUST PROVIDE TEMPORARY COOLING EQUAL TO EXISTING HVAC SYSTEM.
METAL GRATING FLOOR
CABLE CHASE
T
MECHANICAL PLATFORM
TRANSFER FAN
RPT-3 T-9
DPT-1
METAL GRATING (TYPICAL)
CC-1
CU-1
BREAK ROOM
ELECT. CLOSETSTAIR
ELEVATOR
CABLE CHASE
CC-2
CEILING
ACCESS
PANEL
LIGHT FIXTURE
LIGHT FIXTURE
LIGHT FIXTURE
LIGHT FIXTURE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
HVAC INSTALLATION PLAN (SUBJUNCTION LEVEL)
SCALE : 3/8" = 1'-0"M001
B
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-M001
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT
HVAC INSTALLATION PLAN (SUBJUNCTION LEVEL)
C O
S-
AT
C T-
-M
1.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
LEGEND:
REFRIGERANT LINES
ELECTRICAL LINES
2 7
CONSTRUCTION NOTES:
1. SSC SHALL BE NOTIFIED PRIOR TO SHUTDOWNS.
2. CHECK WALL FOR ANY OBSTRUCTIONS (STUDS, CONDUIT, ETC.) PRIOR TO CUTTING OUT
OR ADJUSTING OPENINGS FOR NEW HVAC UNITS.
3. REMOVE THE MINIMUM AMOUNT OF SECTIONS OF WALL NECESSARY TO INSTALL NEW
UNIT.
4. FOR HVAC UNIT SCHEDULE, SEE DRAWING: COS-ATCT-23002614-M003.
5. SEAL THE WALL AND ANY OPENINGS ASSOCIATED WITH THE REMOVAL OF THE OLD UNIT
AND THE INSTALLATION OF THE NEW UNIT TO BE WEATHERTIGHT.
6. DRAWING PACKAGE IS INFORMATIONAL ONLY, FIELD VERIFY ALL DIMENSIONS.
7. FOR HVAC UNIT ELECTRICAL INSTALLATION DETAILS, SEE DRAWINGS:
COS-ATCT-23002614-E001, E002.
GENERAL NOTES:
INSTALL ONE (1) NEW 4 TON CARRIER MULTIZONE CONDENSING UNIT OR FAA APPROVED EQUAL.
FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR MOUNTING METHOD.
NOTE: UNIT MUST SUPPORT THE FOLLOWING OPERATING RANGE:
COOLING OPERATING RANGE -22°~122° F (-30°~50° C)
HEATING OPERATING RANGE -22°~75° F (-30°~24° C)
INSTALL TWO (2) NEW ONE (1) TON CEILING CASSETTES, CARRIER SERIES OR APPROVED EQUAL.
ENSURE INSTALLATION ALLOWS FOR FULL ACCESS TO DROP DOWN CEILING AREA WITHOUT
INTERFERENCE WITH OTHER INSTALLED DEVICES. CUT CEILING TILES AS NECESSARY FOR NEW
DIFFUSERS INSTALLATION. PROVIDE AND INSTALL NEW CEILING TILES TO REPLACE ANY
REMOVED OR DAMAGED ONES, ENSURING A MATCH WITH EXISTING TILES.
INSTALL NEW COPPER REFRIGERANT LIQUID LINE AND REFRIGERANT SUCTION LINE. DETERMINE
THE MOST CONVENIENT ROUTE FOR REFRIGERANT LINES, AIMING TO MINIMIZE WALL
PENETRATION OR DISTURBANCE. FIELD VERIFY.INSTALL ALONG PATH AS POSSIBLE AND
REROUTE/RED LINE DRAWINGS AS NEEDED TO AVOID OBSTACLES. KEEPING BENDS TO A
MINIMUM. ALL REFRIGERANT LINES MUST BE PROPERLY INSULATED.
NOTE: ALL PENETRATIONS TO THE WALL MUST BE PROPERLY SEALED AROUND
THE OPENINGS.
INSTALL ONE (1) 60A SQUARE-D, NON-FUSED, 2 POLE, MOTOR RATED, HEAVY DUTY NEMA 3R
DISCONNECT SWITCH. INSTALL ALL NEW CONDULET, CONDUIT AND ASSOCIATED FLEX CONDUIT.
SEE COS-ATCT-23002614-E001 AND E002 FOR PANEL SCHEDULE AND ELECTRICAL DETAILS.
INSTALL NEW CONDUIT ALONG PATH AS POSSIBLE AND REROUTE/RED LINE DRAWINGS AS
NEEDED TO AVOID OBSTACLES. KEEPING BENDS TO A MINIMUM.
INSTALL MANUFACTURER AND AUTOMATED LOGIC SYSTEM RECOMMENDED THERMOSTAT.
CONNECT THERMOSTAT TO FACILITY'S CURRENT AUTOMATED LOGIC SYSTEM HUB. INSTALL
MANUFACTURER AND ALS RECOMMENDED 24V INTERFACE. CONNECT THERMOSTAT TO 24V
INTERFACE, TERMINAL TO TERMINAL. CONNECT DIFFUSER TO 24V INTERFACE.
NOTE: CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH AUTOMATED LOGIC
SYSTEM TO INTEGRATE NEW MULTIZONE MINI SPLIT SYSTEM INTO FACILITY'S
EXISTING AUTOMATED LOGIC SYSTEM.
CREATE A NEW PENETRATION TO INSTALL ALL NEW CONDUCTORS, CONDUITS AND ALL OTHER
ELECTRICAL COMPONENTS FROM PANEL RPT-3 TO THE OUTDOOR UNIT (CU-1).
FIELD VERIFY CONDUIT RUN. SEE COS-ATCT-23002614-E001 AND E002 FOR PANEL SCHEDULE AND
ELECTRICAL DETAILS.
PROVIDE NEW CONDENSATE LINE FOR EACH INDOOR DIFFUSER (CC-1 AND CC-2).
LOCATE AND TIE INTO EXISTING CONDENSATE DRAIN LINE IN CEILING.
EXTERNAL CONDENSATE PUMP MAY REQUIRED IF THE INTERNAL CONDENSATE PUMP IN A
DIFFUSER IS NOT ABLE TO EFFECTIVELY LIFT AND PUMP THE CONDENSATE TO THE DESIRED
DRAINAGE POINT.
INSTALL THE MANUFACTURER RECOMMENDED WIND BAFFLE KIT ON THE OUTDOOR CONDENSER
UNIT (CU-1).
UP
MACHIN
E R
M.
ELEVATOR
CABLE CHASE
MEN
WOMEN
RPT2
FLOOR HATCH
STAIR
FPB
AED
CORRIDOR
CABLE CHASE
WET MANUAL STANDPIPE IN UTILITY
CHASE LEG OF ATCT WITH HOSE BIB
IN CORRIDOR OUT ACCESS DOOR TO CAB
STAIR
(TO CAB)
UTILITY
OBSTRUCTION
LIGHT TEST PANEL
METAL GRATING
(TYP)
ELEVATOR MOTOR
AND CABLE
CEILING HATCH
CC-3
DPT2
DU-4
T
PANEL
CP5
TVSS
ELEVATOR
CONTROL
T
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-M002
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT
HVAC INSTALLATION PLAN (JUNCTION LEVEL)
C O
S-
AT
C T-
-M
2.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
LEGEND:
REFRIGERANT LINES
HVAC INSTALLATION PLAN (JUNCTION LEVEL)
SCALE : 3/8" = 1'-0"M002
C
CONSTRUCTION NOTES:
1. SSC SHALL BE NOTIFIED PRIOR TO SHUTDOWNS.
2. CHECK WALL FOR ANY OBSTRUCTIONS (STUDS, CONDUIT, ETC.) PRIOR TO CUTTING OUT
OR ADJUSTING OPENINGS FOR NEW HVAC UNITS.
3. REMOVE THE MINIMUM AMOUNT OF SECTIONS OF WALL NECESSARY TO INSTALL NEW
UNIT.
4. SEAL THE WALL AND ANY OPENINGS ASSOCIATED WITH THE REMOVAL OF THE OLD UNIT
AND THE INSTALLATION OF THE NEW UNIT TO BE WEATHERTIGHT.
5. FOR HVAC UNIT SCHEDULE, SEE DRAWING: COS-ATCT-23002614-M003.
6. FOR HVAC UNIT ELECTRICAL INSTALLATION DETAILS, SEE DRAWINGS:
COS-ATCT-23002614-E001, E002.
7. DRAWING PACKAGE IS INFORMATIONAL ONLY, FIELD VERIFY ALL DIMENSIONS.
GENERAL NOTES:
INSTALL A NEW (1) TON CEILING CASSETTE, CARRIER SERIES OR APPROVED EQUAL. ENSURE
INSTALLATION ALLOWS FOR FULL ACCESS TO DROP DOWN CEILING AREA WITHOUT
INTERFERENCE WITH OTHER INSTALLED DEVICES. CUT CEILING TILES AS NECESSARY FOR NEW
DIFFUSERS INSTALLATION. PROVIDE AND INSTALL NEW CEILING TILES TO REPLACE ANY
REMOVED OR DAMAGED ONES, ENSURING A MATCH WITH EXISTING TILES.
INSTALL ONE (1) NEW TWO (2) TON CEILING MOUNTED DUCTED DIFFUSER, CARRIER SERIES OR
APPROVED EQUAL. ENSURE DIFFUSER IS MOUNTED TO THE CEILING IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. SELECT INSTALLATION LOCATION TO MINIMIZE
INTERFERENCE WITH EXISTING CEILING COMPONENTS AND CONDUITS, PROMOTING EASE OF
ACCESS TO ADJACENT COMPONENTS. VERIFY INSTALLATION SITE AVOIDS DISRUPTION TO
NEARBY EQUIPMENT OR SYSTEMS.
INSTALL NEW COPPER REFRIGERANT LIQUID LINE AND REFRIGERANT SUCTION LINE. DETERMINE
THE MOST CONVENIENT ROUTE FOR REFRIGERANT LINES, AIMING TO MINIMIZE WALL
PENETRATION OR DISTURBANCE. FIELD VERIFY.INSTALL ALONG PATH AS POSSIBLE AND
REROUTE/RED LINE DRAWINGS AS NEEDED TO AVOID OBSTACLES. KEEPING BENDS TO A
MINIMUM. ALL REFRIGERANT LINES MUST BE PROPERLY INSULATED.
NOTE: ALL PENETRATIONS TO THE WALL INSIDE THE MECHANICAL ROOM MUST BE SEALED
WITH FIRE RATED CAULKING AROUND THE OPENINGS.
INSTALL MANUFACTURER AND AUTOMATED LOGIC SYSTEM RECOMMENDED THERMOSTAT.
CONNECT THERMOSTAT TO FACILITY'S CURRENT AUTOMATED LOGIC SYSTEM HUB. INSTALL
MANUFACTURER AND ALS RECOMMENDED 24V INTERFACE. CONNECT THERMOSTAT TO 24V
INTERFACE, TERMINAL TO TERMINAL. CONNECT DIFFUSER TO 24V INTERFACE.
NOTE: CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH AUTOMATED LOGIC
SYSTEM TO INTEGRATE NEW MULTIZONE MINI SPLIT SYSTEM INTO FACILITY'S
EXISTING AUTOMATED LOGIC SYSTEM.
PROVIDE NEW CONDENSATE LINE FOR EACH INDOOR DIFFUSER (CC-3 AND DU-4).
LOCATE AND TIE INTO EXISTING CONDENSATE DRAIN LINE IN CEILING.
EXTERNAL CONDENSATE PUMP MAY REQUIRED IF THE INTERNAL CONDENSATE PUMP IN A
DIFFUSER IS NOT ABLE TO EFFECTIVELY LIFT AND PUMP THE CONDENSATE TO THE DESIRED
DRAINAGE POINT.
"CASSETTE" TYPE AIR HANDLING UNIT.
CC-1 (BREAK ROOM SUB-JUNCTION LEVEL)
CC-2 (BREAK ROOM SUB-JUNCTION LEVEL)
CC-3 (CORRIDOR ROOM JUNCTION LEVEL)
LIQUID LINE
SUCTION
LINE
DUCTED AIR HANDLING UNIT
DU-4 (MECHANICAL ROOM JUNCTION LEVEL)
MULTIZONE DUCTLESS HVAC UNIT SCHEDULE
ID
CU-1 4-TON OUTDOOR HEAT PUMP UNIT
TYPE
SUPPLY FAN
CFM
HP
0.11
COOLING CAPACITY
TOTAL CAPACITY (BTU / H)
48,000
EER
11.6
HEATING CAPACITY
TOTAL CAPACITY (BTU / H) V / PH
230 / 1
MCA
MOCP
DISCONNECT
NEMA-3R
ELECTRICAL
REFRIGERANT
R-410A
WEIGHT (LBS)
GENERAL
NOTES
1, 3, 4, 6, 7, 8, 9
NOTES:
1. OUTDOOR HEAT PUMP SHALL BE CARRIER 38MGRQ48E--3, OR APPROVED EQUAL
2. INDOOR UNITS CEILING CASSETTES SHALL BE 40MBCQ12---3, OR APPROVED EQUAL
3. HEAT PUMP SHALL BE MOUNTED AT THE MECHANICAL PLATFORM OUTSIDE AT THE SUBJECTION LEVEL
4. INDOOR UNITS SHALL BE CEILING MOUNTED BY AND SUPPLIED WITH MANUFACTURER AND AUTOMATED
LOGIC SYSTEM RECOMMENDED THERMOSTAT AND 24V INTERFACE MODULE.
5. PROVIDE WITH MANUFACTURER RECOMMENDED THERMOSTAT, OR APPROVED EQUAL
6. HEAT PUMP SHALL BE SUPPLIED WITH MANUFACTURER RECOMMENDED LOW AMBIENT KIT.
7. HEAT PUMP SHALL BE SUPPLIED WITH MANUFACTURER RECOMMENDED BASEPAN HEATER.
8. ALL UNITS SHALL BE INTEGRATED WITH FACILITY'S AUTOMATED LOGIC SYSTEM FOR CONTROL PURPOSE.
9. HEAT PUMP SHALL BE INSTALLED WITH MANUFACTURER RECOMMENDED WIND BAFFLE KIT.
48,000
CC-1,2,3 1-TON CEILING CASSETTE INDOOR UNIT 280-400 .061 12,000 13 230 / 1 15 15 R-410A 35 2, 4, 5, 88250-14000
DU-4 2- TON DUCTED INDOOR UNIT 440-780 0.27 24,000 11.6 230 / 1 25 35 R-410A 87 2, 4, 5, 824,000
TYP. CONDENSER UNIT FOR AIR HANDLING
UNITS CC-1, 2, 3 AND DU-4.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
02/08/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-M003
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT (JUNCTION LEVEL)
NEW HVAC ELEVATION AND SCHEDULE
C O
S-
AT
C T-
-M
3.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
GENERAL NOTES:
1. THIS DIAGRAM IS SCHEMATIC ONLY. EXACT ROUTING OF PIPING AND MOUNTING OF UNITS
TO BE DETERMINED ON-SITE.
2. DRAWING PACKAGE IS INFORMATIONAL ONLY, FIELD VERIFY ALL DIMENSIONS.
TYP MULTIZONE HVAC PLAN
SCALE: NONE
ELECTRICAL COMPONENTS SCHEDULE
NAME DESCRIPTION
CONDUCTORS (POWER) TWO #6 AWG STRANDED COPPER, THWN, ONE #8 GND
CIRCUIT BREAKER 60A, 2 POLE BREAKERS MADE BY SQUARE D, BOLT ON, UL LISTED AS HACR
DISCONNECT SERVICE DISCONNECT SWITCH WITH LOCKING PROVISION.
HEAVY DUTY NEMA 3R, NON-FUSED, 60A, 2 POLE, MADE BY SQUARE D.
CONDUCTORS (CONTROL) TWO AWG #16 SOLID COPPER
CONDUIT (CONTROLS) 1/2" MINIMUM EMT INSIDE, RGS OUTSIDE
CONDUIT (POWER) 3/4" MINIMUM EMT INSIDE, RGS OUTSIDE
DISCONNECT LABELS
SCALE: NONE
PANEL P-1
SQUARE D
3-PHASE
MANUFACTURER
PHASE
FLOORS OUTLETS (RM# 39)
RESTROOM HAND DRYERS
CIRCUIT BREAKER TYPE
MAIN BREAKER AMPS
NUMBER OF WIRES
SERVICE
SPARE
NQOB
20 15
AMPS
VOLTS
SURFACE MOUNT ENCLOSURE
MODEL NUMBER
SERIES
AMPS SERVICE
AMPS
SUBJUNCTION LEVEL (A/C) UNIT
CONV OUTLETS RM# 20, 35 & West Hallways
EXH. FANS & EM LIGTHS (RM# 33,34)
CONV OUTLETS (RM# 26,27)
CONV OUTLETS RM# 29
ELECTRICAL HEATER (RM# 30)
CONV OUTLETS (RM# 37,38)
SPARE 60
Men's RR Hand Dryer (Room 33) 60
GFCI Outlet North Side Light Post 20
GFCI Outlet East Side Light Post 20 GFCI Outlet South Side Light Post 20
Women's RR Hand Dryer (Room 34) 20
CONVENIENCE OUTLET
60 SPARE
60 Temp Power (LMB right side of P1)
TCW training outlets Room 3920 TCW training outlets Room 3920 TCW training outlets Room 3920 TCW training outlets Room 3920
LANDSCAPE LIGHTNING SYSTEM30
FED FROM PANEL "MDPE" THRU T-1
4 RECESSED LIGTHS (RM# 39)
CONV OUTLETS (RM# 39)
VACUUM CLEANER (RM# 26)
CONV OUTLETS (RM# 32,33,34,35)
CONV OUTLETS (RM# 29,30)
RESTROOM LIGTHS (RM#33,34)
SPARE
CONV OUTLETS (RM# 37,38)
CONV OUTLETS (RM# 36,37)
CONV OUTLETS (RM# 39)
SPACE HEATER SIDE OF P-1
PANEL RPT-3
SQUARE D
3-PHASE
MANUFACTURER
PHASE
CONV OUTLETS (UTILITY LEG)
SPARE
CIRCUIT BREAKER TYPE
MAIN BREAKER AMPS
NUMBER OF WIRES
SERVICE
NQOB
20 17
60 15
AMPS
VOLTS
SURFACE MOUNT ENCLOSURE
MODEL NUMBER
SERIES
AMPS SERVICE
AMPS
STAIRWELL HEATERS (UPPER)
SPARE
SPARE(208V)
CONDENSATE PUMP/TRANSFER PUMP
SPARE 20
SUBJUNCTION LEVEL (A/C) CU-1 UNIT
BLANK
BLANK
SPARE20
SPARE20
SPARE (208V)30
BLANK
FED FROM PANEL DP-1 THRU T-9
MAIN BREAKER
EMERGENCY LIGHTS TOWER & STAIRS
CONV OUTLETS (CABLE LEG)
EMERGENCY LIGHTS
BLANK
SPARE
SPARE
CONV. OUTLETS (REFRIGERATOR) 20
KITCHEN UNIT 20
CONV. OUTLETS (WATER COOLER) 20
SPARE 30
BLANK
BLANK
20 CONV OUTLETS
20 SPARE
20 SPARE
20 SPARE
20 SPARE
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
PANEL SCHEDULE PANEL "P-1"
SCALE: NONE
ELECTRICAL COMPONENTS SCHEDULE
SCALE: NONE
NEW CONDULET
IS
SU
ED
F
O R
ED
M
02/07/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-E001
ATCT
COS AIR TRAFFIC CONTROL TOWER
HVAC REPLACEMENT PROJECT (SUBJUNCTION LEVEL)
HVAC GROUNDING AND ELECTRICAL PANEL SCHEDULES
C O
S-
AT
C T-
-E
1.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
PANEL SCHEDULE PANEL "RPT-3"
SCALE: NONE
HVAC ELECTRICAL ELEVATION VIEW
SCALE: NONE
LEGEND:
REMOVE
CONSTRUCTION NOTES:
1. ALL ELECTRICAL WORK SHALL COMPLY WITH THE LATEST REVISION OF FAA-C-1217H.
"ELECTRICAL WORK, PREMISES WIRING"
2. ALL EQUIPMENT GROUNDING SHALL COMPLY WITH THE LATEST REVISION OF FAA
SPECIFICATIONS FAA-STD-019F CHANGE 3, "LIGHTNING PROTECTION, GROUNDING,
BONDING AND SHIELDING REQUIREMENTS FOR FACILITIES"
3. WORK INSIDE PANEL CANNOT OCCUR WHILE THE PANEL IS ENERGIZED
4. AN FAA REPRESENTATIVE MUST HANDLE ALL SHUTDOWNS
5. COORDINATE ALL SHUTDOWNS A MINIMUM OF TWO WEEKS IN ADVANCE WITH AN FAA
REPRESENTATIVE
6. ALL SHUTDOWNS MAY BE CANCELED AT ANY MOMENT TO MAINTAIN NAS OPERATIONS
GENERAL NOTES:
FIELD VERIFY THIS CIRCUIT BREAKER IS FEEDING POWER TO EXISTING HVAC PRIOR TO
REMOVING. LEAVES BREAKER AT THE SITE FOR FUTURE USE. REMOVE EXISTING CONDUCTOR.
SEE DRAWING COS-D-ATCT-A001-BL FOR PANEL P-1 LOCATION.
PROVIDE AND INSTALL 60A, 2 POLE, CIRCUIT BREAKER, MADE BY SQUARE D, MOTOR RATED, BOLT
ON, UL LISTED AS HACR TYPE OR APPROVED EQUAL.
PROVIDE AND INSTALL, ONE (1) 60A SQUARE-D, NON-FUSED, 2 POLE, MOTOR RATED, HEAVY DUTY
NEMA 3R DISCONNECT SWITCH.
PROVIDE AND INSTALL 1 - 14" LIQUIDTIGHT FLEXIBLE NON-METALLIC CONDUIT IN LENGTHS NO
LONGER THAN 6' AND ITS ACCESSORIES.
FOR NEW GROUNDS: RUN A 2/0 TINNED COPPER CONDUCTOR FROM HVAC UNIT DIRECTLY TO
THE EES (EARTH ELECTRODE SYSTEM) FOR PROPER GROUNDING. FOR CONNECTION DETAILS
SEE FAA-STD-19, CHAPTER 3.
INSTALL TWO NEW CONDULET (LB, LL, LR), ONE FOR THE CONTROL WIRE AND ONE FOR POWER
WIRE.
MATERIAL: MUST BE FERROUS. ALUMINUM IS UNACCEPTABLE.
PROVIDE AND INSTALL NAME PLATE ON THE ELECTRICAL DISCONNECTS. IT SHOULD BE RIGID
PLASTIC, WITH ENGRAVED, BLACK WITH WHITE LETTERS, WITH A MINIMUM
HEIGHT OF 3/8-INCH. IT SHALL BE SECURED TO THE DISCONNECT USING A WEATHER-PROOF
BONDING MATERIAL (GLUE).
ELECTRICAL LABEL INFORMATION MAY CHANGE DURING CONSTRUCTION
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
02/08/2024
CALEB SMITH
MGR: ENGINEERING - SEATTLE
COLORADO SPRING
COS-ATCT-23002614-E002
ATCT
ONE-LINE DIAGRAM
C O
S-
AT
C T-
-E
2.
dw g
FAC. SUPPORT GROUP
ENGINEERING SERVICES
ATO- TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
COLORADO SPRINGS MUNICIPAL AIRPORT
THIS DRAWING PRODUCED ON THE XXXXXXXXXX REGION AUTOCAD SYSTEM
MAULIK SHIYANI
PROJECT ENGINEER
23002614
CO
1. REFERENCE DRAWING COS-D-ATCT-E020-BL.
GENERAL NOTES:
LEGEND:
REMOVE
REFERENCE ONLY
Maulik M Shiyani Rectangle
Maulik M Shiyani Rectangle
| g2.pdf |
| Sheets and Views |
| G002 |
| D.pdf |
| Sheets and Views |
| COS-ATCT-23002614-D001 |
| M1.pdf |
| Sheets and Views |
| COS-ATCT-23002614-M001 |
| M2.pdf |
| Sheets and Views |
| COS-ATCT-23002614-M002 |
| M3.pdf |
| Sheets and Views |
| COS-ATCT-23002614-M003 |
| E1.pdf |
| Sheets and Views |
| COS-ATCT-23002614-E001 |
| E2.pdf |
| Sheets and Views |
| COS-ATCT-23002614-E001 |
| 2024-02-09T11:50:06-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:51:31-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:51:56-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:52:15-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:52:32-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:52:49-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T11:53:06-0800 | |
| MAULIK MANSUKHLAL SHIYANI |
| 2024-02-09T12:05:09-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:05:42-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:06:04-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:06:29-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:06:52-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:07:14-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:07:42-0900 | |
| CALEB P SMITH |
| 2024-02-09T12:08:21-0900 | |
| CALEB P SMITH |
File details come from the government source that posted it. Updated .