This document is a Statement of Work (SOW) for the replacement of two 20-ton air conditioning (AC) units at the Phoenix (PHX) Terminal Doppler Weather Radar (TDWR) facility in Phoenix, Arizona. The project requires the contractor to provide temporary cooling during the replacement, remove and dispose of the existing units, install two new 20-ton, 230V, 3-phase condensing units and air handlers, inspect and test the new equipment, provide training, and submit documentation.

The related federal contract opportunity is a solicitation (Solicitation Number: 697DCK-24-R-00411) for this AC unit replacement project at the PHX TDWR facility. It is a small business set-aside with a total firm fixed-price contract award anticipated. The period of performance is to begin within 5 days of the Notice to Proceed. A site visit is strongly encouraged on June 10, 2024, and proposals are due by June 26, 2024. The solicitation is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phoenix (PHXV) Direct Expansion Systems (DX) Replace 2 AC Units at the Phoenix (PHX) Terminal Doppler Weather Radar

(TDWR) Facility Statement of Work

March 15, 2024

Project Replace 2 20-Ton Air Conditioning (AC) Units.

Location Phoenix (PHX) Terminal Doppler Weather Radar (TDWR) facility, located at 4831 W Lower Buckeye Rd, Phoenix, Arizona 85326.

General This project is to replace two air conditioning (AC) units that cool the Radar equipment at the TDWR facility.

Execution of Work at Project Location The Contractor shall comply with the requirements and regulations of the Phoenix Terminal Doppler Radar (TDWR) facility and shall perform his/her work so as not to interrupt or interfere with the normal business and operation of the Radar at this location.

The Contractor shall assume full responsibility for the protection and safekeeping of products stored on the site. The Contractor and his Subcontractors shall maintain the job site in a neat and orderly condition; this includes the daily removal of rubbish, waste and tools, equipment, and materials not required for the work in progress.

Scope of Project Furnish all necessary labor, material, equipment, transportation, and services to perform the following items of work.

a) Provide, install, and connect temporary, portable, air-conditioning unit(s) capable of cooling the Radar facility during the duration of this project while the permanent units are off line.

b) Remove the two (2), existing, 20-Ton, air conditioning units and air handlers from the premises and dispose of at a State approved disposal facility for air conditioning (AC) materials and refrigerants.

c) Install two (2) new 20-Ton, 230V, 3PH, condensing units and air handlers in the existing location of the units removed, and connect to existing ductwork, piping, electrical, and control wiring.

(TDWR) Facility Statement of Work

March 15, 2024

d) Scope to include supplying any miscellaneous parts, materials, and labor required to complete the installations.

e) Provide installation inspection and start up of the newly installed equipment.

f) Thoroughly test the newly installed equipment to ensure proper functionality and performance according to manufacturer specifications.

g) Provide operator training for SSC maintenance personnel.

h) Provide documentation of equipment installation, including warranties, Operation and

Maintenance (O&M) Manuals, and Service Manuals, total refrigerant charge, and any required certifications, to the appropriate authorities and the client.

Submittals The contractor shall submit documentation, manufacturers “data sheets”, and Material Safety Data Sheets (MSDS), for all equipment and materials to be used on and incorporated into the project to the COR for approval prior to commencement of work. Additional submittals should include product cut sheets, dimensions, specifications, estimated project timeline, and a brief history of similar local projects completed.

Deliveries or Performance Commencement, Prosecution, and Completion of Work: The Contractor shall be required to

(a) Commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than thirty (30) calendar days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.

Work Schedule All work shall be scheduled and performed at the designated times coordinated with the SSC Manager, Jerry Florez, and/or the COR. All work shall be performed so that normal Radar operation may continue with a minimum of disruption or interference. If any Radar equipment outages are required while doing the installation, they shall be coordinated with the SSC Manager, Jerry Florez, and/or the local POC.

(TDWR) Facility Statement of Work

March 15, 2024

Security Requirements The Contractor shall comply with all security requirements of the Government and the Phoenix Terminal Doppler Radar (TDWR) facility.

Access to Site The project is located at the Phoenix Terminal Doppler Weather Radar (TDWR) facility. Work performed at the site shall be always done under proper escort. The point of contact for access into the site is the SSC Manager, Jerry Florez. Access arrangements shall be made with advance coordination with the appropriate authorities.

Applicable FAA Documents FAA-STD-019 (latest version) Lightning Protection, Grounding, Bonding and Shielding Requirements for Facilities.

FAA-STD-020 (latest version) Transient Protection Grounding Bonding & Shielding Requirements for Electronic Equipment.

FAA-C-1217 (latest version) Electrical Work Interior.

FAA Order 3900.64 (latest version) ATO Electrical Safety Program.

FAA Order 3900.67 (latest version), Lockout Tagout Program.

NFPA Standard 70 (latest version) Standard for Electrical Safety.

Material Specifications Item Description Remarks

2 Each Trane 20-Ton Split Heat Pump Units Contractor or Equivalent furnished

FAA Contacts Jerry Florez, Manager, Phoenix Sky Harbor Environmental and Central Arizona System Service Center, Federal Aviation Administration, (602) 206-1845

(TDWR) Facility Statement of Work

March 15, 2024

Frank Schulte, Arizona Group District Facilities Manager, Albuquerque District, Federal Aviation Administration, (805) 400-0462

Location
General
Execution of Work at Project Location
Security Requirements
Access to Site
FAA Contacts

File details come from the government source that posted it. Updated .