This document is a solicitation for recurring solid waste and recycling removal services at the Southern California Terminal Radar Approach Control facility. The services required include collection and disposal of all solid waste and recyclable materials as detailed in the attached statement of work. The contract will be a firm-fixed price award with a period of performance from April 1, 2024 through March 31, 2029. Questions regarding the solicitation are due by February 19, 2024 with answers provided by February 26, 2024. Proposals must be submitted by March 5, 2024 to the Department of Transportation Federal Aviation Administration Southwestern Region. The principal NAICS code for this requirement is 562111.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Revised 2/26/2024

Solid Waste Removal Southern California TRACON, (SCT)

9175 Kearny Mesa, CA 92126

1.0 Purpose

The purpose of this Statement of Work (SOW) is to obtain Recurring Waste and Recycling Removal Services at Southern California Terminal Radar Approach Control (SCT) 9175 Kearny Villa Road, San Diego, CA 92126 by means of a firm fixed price.

1.1 General Requirements

The Contractor must furnish all labor, supervision, equipment, and materials necessary to provide Non- Hazardous Solid Waste and Recyclable Material Removal Services in accordance with the requirements specified herein.

2.0 Service Location

Southern California Terminal Radar Approach Control (SCT) 9175 Kearny Villa Road, San Diego, CA 92126

3.0 Requirements

3.1 Scope

The location of the dumpster is to be coordinated with the Point of Contact, ESU.

(2) 8 CY YD Waste Container 2 lifts per week

(1) 8 CU Yd Card Board Recycle waste Container 2 lifts per week

(1) 6 CU Yd Green Waste Container/Organic lift 1 per week

Properly dispose of all materials in accordance with all applicable Federal, State, and local waste regulations.

**. “Contamination of trash” The contractor is required to put a sign that is waterproof on the container that states what will be allowed in that container.

Vendor needs to state the pricing for drop off and pickup for the new containers.

3.2 Work Outside Regular Hours

Except as may otherwise be specified, all work must be performed during regular hours, as described in Section 5.0, Definitions. If the Contractor desires to perform work on Saturday, Sunday, holidays, or outside regular hours, they may submit a request to the Contracting Officer (CO) for approval.

3.3 Management

The Contractor must manage the total work effort associated with the waste removal services required herein to assure fully adequate and timely completion of these services. The Contractor must provide an adequate staff of personnel with the necessary expertise to assure the performance of the work in accordance with sound and efficient practices.

3.3.1 Work Control

The Contractor must implement all necessary work control procedures to ensure timely accomplishment of work requirements. The Contractor must plan and schedule work to assure labor, equipment, and material are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

3.4 Continuity of Services.

To ensure continuity of essential services, the Contractor must be prepared to commence work on the start date of this contract, and should not assume that Government or previous Contractor employees will be available to guide, direct, or specifically orientate each Contractor employee.

4.0 Government Furnished Property and Service

4.1 Government Furnished Facilities

The Government will not provide office space operational facilities, or lay down areas to the Contractor.

The Contractor must secure and maintain the necessary office space, facilities, and equipment storage areas required for the performance of this contract at his/her own expense.

4.2 Government Furnished Equipment

The Contractor must furnish all tools and equipment required for the performance of this contract. The Government will not provide tools or equipment to the Contractor.

4.3 Government Furnished Material

The Government will not provide any materials to the Contractor.

4.5 Contractor Furnished Items

Except for the items listed in the "GOVERNMENT FURNISHED PROPERTY AND SERVICES" clause, the Contractor must provide all equipment, materials, and services to perform the requirements of this contract.

4.6 Access to Site

Work performed at the site shall be done under FAA Escort at all times. The point of contact for access into the site is the Environmental Manager.

5.0 Definitions

1. Contracting Officer (CO). The individual designated by the Contracting Officer to administer the contract. Throughout this contract, the term CO will be used to refer to the individual designated to administer the contract or his/her designated representative.

2. Contracting Officer's Representative (COR). The person whom the CO will designate by name and/or position title to conduct liaison between the Contractor and the CO on matters pertinent to this contract and be his/her authorized representative. Designation will be accomplished in writing and provided to the Contractor.

3. Contractor. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor must ensure that his/her subcontractors comply with the provisions of this contract.

4. Recycling" means the series of activities including collection, separation, and processing from which products or other materials are recovered from a solid waste stream for use in the form of raw materials in the manufacture of products other than fuel for producing heat or power by combustion.

5. Regular Hours. The Government's regular (normal) hours are from 7:00 a.m. to 5 p.m., Mondays through Fridays.

END OF STATEMENT OF WORK

1.0 Purpose
1.1 General Requirements
3.0 Requirements
3.2 Work Outside Regular Hours
3.3 Management
3.3.1 Work Control
3.4 Continuity of Services.
4.0 Government Furnished Property and Service
4.2 Government Furnished Equipment
4.3 Government Furnished Material
4.5 Contractor Furnished Items
4.6 Access to Site
5.0 Definitions

File details come from the government source that posted it. Updated .