About this file

This document is an amendment to a solicitation for an air terminal units replacement project at an FAA facility in Auburn, Washington. The amendment provides answers to questions received from potential offerors. The project involves replacing VAV boxes in the Operations Support Wing, including connections to existing HVAC ducts and hydronic piping, replacing hot water flow control valves, and reinstalling existing air terminal unit controllers to the building automation system. Offerors must acknowledge receipt of the amendment. The estimated value of the project is between $250,000 and $500,000. The site visit is scheduled for March 28, 2022, with an RSVP deadline of March 24. Questions are due by April 4 and offers must be submitted by April 18. The FAA understands long equipment lead times and will issue notice to proceed accordingly.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

(SF-30) FAA Template No. 11 (8/97)

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

OMB Control No. 2120-0595

p. 1

Amendment 0001 is to post the questions received and their applicable answers.

FEDERAL AVIATION ADMINISTRATION

2200 S. 216TH STREET

DES MOINES, WA 98198-6547

WS-22-00393

697DCK-22-R-00238

1 2

04/06/2022

03/10/2022

RFO 697DCK-22-R-00238 ZSE VAV Replacement Project Questions & Answers

1) Question: Are there previous test and balance reports for air flows? If so, please provide a copy.

Answer: The previous test and balance reports were not found. The airflows are on the drawings that were included in the RFO attachment, however, they are greyed-out as an existing condition and are hard to read. The original as-built drawings in normal line weight are included with Amendment 0001 so the airflow values are more readable.

See attachments:

NMD-501-41836-OS-M007

NMD-501-41836-OS-M008

NMD-501-41836-OS-M009

NMD-501-41836-OS-M010

NMD-501-41836-OS-M011

2) Question: The project reflects a 90-day completion from Notice-to-Proceed (NTP). This will be extremely tight. Will the NTP come when the equipment arrives? All HVAC equipment is currently running between 16-30 weeks.

Answer: The 90-day timeframe from NTP to completion is just an estimate and is negotiable based upon the contractor’s means and methods and final approved project schedule. The NTP is not issued until the submittal process is complete and lead times are taken into consideration. The FAA understands there may be long lead times on certain equipment, so the NTP date will be scheduled accordingly.

Amendment
RFO Questions and Answers